Loading...
HomeMy WebLinkAboutSTITCH-TECH WAREHOUSE - EXPANSION OF A NON-CONFORMING USE - 16-88B - CORRESPONDENCE - STORMWATER-RELATED DOCUMENTSMEMORANDUM DATE: June G. 1988 TO: Sherri Albertson -Clarke. Planner FROM: Susan Duba Hayes, Civil Engineer II RE: Storm Drainage Review of Stich -Tech Warehouse Expansion I received the revisions for Stich -Tech last week and have the following comments: 1. They have proposed a modification of an existing irrigation structure and ditch located on their property. Apparently they are still in negotiation with the water user regarding the final modification (either pipe it or eliminate it). To protect the City against any future claims, I think that we should hold the building permit until the negotiations have been completed. Proof of the water user's permission must be qiven to us either in the form of a letter, or a signature on the proposed plan. 2. They have also proposed regrading their outlet ditch some 200 feet gffof the property. Again they need permission to do this. As I understand it (from Phil Robinson), the entire site is owned by the railroad, including the area where the regrading will take place. The railroad company must be contacted and approval received from them to do the work. Approval can be in the form of a letter. S. I have already spoken to Phil Robinson about the above comments as well as some additional technical comments about the detention pond. l will hand deliver the marked -up revisions to Phil R. today. If you have any comments or questions please call me. Susan