HomeMy WebLinkAboutC & L PARTNERSHIP SPECIAL REVIEW - COUNTY REFERRAL - 16-88 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSi
CITY OF FORT COLLINS
OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT
March 16, 1988
Janette Dickinson
c/o Larimer County
Planning Division
P.O. Box 1190
Fort Collins, CO. 80522
Re: C & L Partnership Special Review - Expansion of a previously approved
sand and gravel pit and concrete batch plant.
Dear Ms. Dickinson:
Staff has reviewed the C & L Partnership Special Review and has the follow-
ing comments:
1. A portion the City's bike trail system borders this property along the north
side. Staff requests that the developer provide some naturalistic plantings of
native trees and shrubs to buffer the trail from this operation.
2. Staff would like to review a more detailed reclamation plan with location
and quantities of proposed plantings indicated.
3. The City standard for maximum side slopes for detention ponds and drain-
age swales is 4:1.. The side, slopes for the lake should not exceed this
standard.
4. Staff would like to review a storm drainage plan for the site.
5. Taft Hill Road is designated as an arterial street requiring a 100 foot Right
of Way. Staff requests that the applicant dedicate a 50 foot half Right of
Wa y.
OFFICE OF DEVELOPMENT
SERVICES, PLANNING
300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221.6750
•
•
6. Staff recommends that the County consider requiring special dust control
measures.
Thank you for the opportunity to review this proposal. If you have any
questions, please call my office at 221-6750.
Sincerely,
j
Ripley, City Planne
xc: Joe Frank, Assistant Director
Mike Herzig, Development Coordinator