HomeMy WebLinkAboutEMERSON ACRES SUBDIVISION - MINOR SUB - 22-88 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (2)CITY OF FORT COLLINS
OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT
April 4, 1988
Mr. Harold Einarsen
Einarsen Real Estate, Inc.
Lincoln Office Center
419 Canyon, Suite 300
Fort Collins, CO. 80521
Dear Harold,
This letter is to follow up our conversation of April 5, 1988 and to help resolve
the issues which remain on Emerson Acres.
The City is willing to add language to the plat and the development agreement
that would allow the easements for the 100-year floodplain for both the Pro-
vincetowne channel and Stanton Creek to be reduced should channclization
occur. Such channclization would have to be of sufficient specifications to
convey the 100-year storm. The following plat note is submitted for your
review:
"The City of Fort Collins Stormwater Utility will allow the easements that are
shown on this plat describing the 100-year floodplain for both the Province-
towne channel and Stanton Creek to be adjusted accordingly should channcliza-
tion of these casements result in a reduced 100-year floodplain."
Regarding your concern about the conveyance of storm flows in Stanton Creek
across your northerly property line, Glen Schlueter, Storm Drainage Engineer,
has reported that the neighboring property would not be allowed to develop in
any manner that would affect either upstream or downstream adjacent property
owners. Any impacts on adjacent property would have to be preceded by per-
mission from that property owner. In fact, the neighboring property owner has
retained the services of an engineering consulting firm who's representatives
have contacted Glen Schlueter about development. It is Glen's understanding
that this firm will design a storm drainage system that will accept all historic
upstream flows without causing any back flow onto Emerson Acres.
• P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221.6750
OFFICE OF DEVELOPMENT
SERVICES, PLANNING
Page 2 • 0
Regarding your concern about the fire hydrant, I contacted Mr. Dean Hill,
Operations Supervisor of the Fort Collins -Loveland Water District.
There is a 20 inch diameter water pipe in Lemay Avenue that would serve as
the water supply. The first step would be to contact the District by letter
requesting permission to tap the line. It would then be the landowner's
responsibility to hire a contractor to design the installation. These installation
plans must be reviewed by the District. The contractor, not the District, then
performs the work. The installation is then inspected by the District.
Mr. Hill further explained that the 20 inch water line is located in the western
portion of Lemay Avenue. Access to the line would likely have to be done by
boring as opposed to a pavement cut due to the new asphalt. The cost of a
typical hydrant is approximately $1,500. Design, materials, and labor is roughly
estimated at approximately $3,000 for a total cost of approximately $4,500.
Regarding the separate ownership of Lot 6, please inform Intermill Land Sur-
veying that a signature block must be added to the document to include this
owner.
Regarding Mr. Dickinson's
request for the S.I.D.
to riprap the
Provincetowne
channel to a point where
the old 12 inch tile pipe terminated,
Mr. Matt
Baker
responded by asking that
the request be put in
writing. The
request
should
state specifically that the
owner grants permission
to do the work. Mr.
Baker
stated that the request will
be evaluated based on
the financial
ability
of the
S.I.D. to perform additional
work.
Regarding Mr. Dickinson's concern about the
to do improvements to County Road #32, N
require the creation papers to be amended 1
which must be approved by City Council. P
Staff would support such an amendment at
sion that Dueck Company may be discussing
with Larimer County, not the City.
Dueck Company using S.I.D. funds
Baker responded that this would
authorize a reallocation of funds
r. Baker expressed doubt that City
ais time. It is Mr. Baker's impres-
improvements to County Road #32
This concludes the summation of our meeting on April 5, 1988. Please contact
me if further clarification is needed or if this summation does not meet with
your understanding.
Sincerely,
T_,ZTQ,�
Ted Shepard
City Planner
cc: Glen Schlueter, Storm Drainage Engineer
Matt Baker, Special Improvement District Coordinator
Mike Herzig, Development Engineer
Robert Dickinson, 8029 South County Road #9, Fort Collins, CO. 80525
Mark Paige, Intermill Surveying, 1301 N. Cleveland, Loveland, CO. 80537