Plans - Stormwater Management Plan - 05/19/2022
Gazloway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MIDTOWN GARDENS MARKETPLACE KING SOOPERS #146 FORT COLLINS, COLORADO PREPARED FOR: Dillon Companies/King Soopers, Inc. 55 Tejon Street Denver, Colorado 80223 Phone: (303) 778-3053 PREPARED BY: Galloway & Company, Inc. 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 PREPARATION DATE: May 19, 2022 TABLE OF CONTENTS I. Certification .....................................................................................................................................4 Engineer's Statement..................................................................................................................4 Developer's Certification .............................................................................................................4 11. Project Contacts..............................................................................................................................5 111. General Requirements.....................................................................................................................5 IV. Site Description ...............................................................................................................................6 ProjectLocation..........................................................................................................................6 V. Site Map..........................................................................................................................................7 VicinityMap................................................................................................................................7 Nature of Construction Activity....................................................................................................7 VI. Existing Conditions..........................................................................................................................7 Soils............................................................................................................................................7 ExistingVegetation .....................................................................................................................8 ReceivingWaters........................................................................................................................8 Extentof Disturbance..................................................................................................................8 Sequence of Major Activities.......................................................................................................9 Potential Pollution Sources........................................................................................................10 Non-Stormwater Discharges .....................................................................................................10 VII. Stormwater Management Controls.................................................................................................10 Erosion Control Administrator....................................................................................................10 Potential Pollutant Sources.......................................................................................................11 Control Measures for Stormwater Pollution Prevention..............................................................16 ErosionControl.........................................................................................................................17 MaterialsManagement..............................................................................................................18 SedimentControl......................................................................................................................18 Site Management and Other Practices......................................................................................19 Revising Control Measures and the SWMP...............................................................................21 Vill. Final Stabilization & Long-Term Stormwater Management.............................................................22 Inactivation of Permit Coverage.................................................................................................24 IX. Inspection & Maintenance Procedures...........................................................................................24 InspectionSchedules................................................................................................................25 Inspection Procedures ..............................................................................................................25 Control Measure Maintenance/Replacement and Failed Control Measures................................26 Record Keeping and Documentation.........................................................................................27 X. Standard City of Fort Collins Erosion Control Notes.......................................................................28 XI. Conclusion.....................................................................................................................................36 Conformancewith Standards....................................................................................................36 Galloway&Company, Inc. Page 2 of 41 XII. References....................................................................................................................................36 Appendix A—Reference Information......................................................................................................37 NRCS Web Soil Survey Information..........................................................................................37 FEMAFIRMette........................................................................................................................37 Appendix B—SWMP Site Maps and Calculations..................................................................................38 SWMP Site Maps and Details....................................................................................................38 AppendixC— Inspection Report.............................................................................................................39 State Inspection Report Template.............................................................................................39 Appendix D—Spill and Prevention Control.............................................................................................40 Spill Prevention and Control Plan..............................................................................................40 SiteSpill Log.............................................................................................................................40 Appendix E— Erosion Control Ecsrow....................................................................................................41 Galloway&Company, Inc. Page 3 of 41 I. Certification Engineer's Statement This report and plan for the SWMP design of Midtown Gardens Marketplace (King Soopers #146) was prepared by me (or under my direct supervision) in accordance with the provisions of City of Fort Collins Stormwater Criteria Manual adopted December 2018. Philip Dalrymple, PE Date Registered Professional Engineer State of Colorado No 41171 Developer's Certification Dillon Companies/King Soopers, Inc. hereby certifies that the Midtown Gardens Marketplace (King Soopers#146)shall be installed and maintained according to the design presented in this report. This Erosion and Sediment Control Plan has been placed in the City of Fort Collins file for this project. The Plan fulfills the Urban Drainage and Flood Control District's technical criteria and the criteria for erosion control and requirements of City of Fort Collins to the best of my knowledge. I understand that additional erosion control measures may be needed if unforeseen erosion problems occur or if the submitted Plan does not function as intended. The requirements of this Plan shall run with the land and be the obligation of the landowner until such time as the plan is properly completed, modified, or voided. Authorized Signature Date Dillon Companies/King Soopers, Inc. Galloway&Company, Inc. Page 4 of 41 II. Project Contacts Owner/Developer: Dillon Companies/King Soopers, Inc. 55 Tejon Street Denver, Colorado 80223 Phone: (303) 778-3053 Contact: Kevin McKenzie Engineer: Galloway & Company, Inc. 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 Phone: 303-770-8884 Contact: Phil Dalrymple, PE Landscape Architect: Galloway & Company, Inc. 6162 S. Willow Drive, Suite 320 Greenwood Village, CO 80111 Phone: 303-770-8884 Contact: Sarah Adamson Contractor: TBD Erosion Control Administrator(SWMP Administrator): TBD III. General Requirements This Stormwater Management Plan (SWMP) has been prepared for Dillon Companies/King Soopers, Inc., the developer of the site, to fulfill the SWMP requirements of the State of Colorado. The SWMP identifies all potential pollution sources which may be expected to affect stormwater quality and the initial (construction phase) and final (after construction) erosion and sedimentation control requirements. It also specifies the use and maintenance of control measures, designed in accordance with sound engineering and hydrologic practices, to reduce pollutants and sediment in stormwater discharges associated with construction activity. The control measures are presented in detail in the text of this report and are shown on the Erosion and Sediment Control plans (Site Maps) included in the back of this report. This site must Galloway&Company, Inc. Page 5 of 41 implement the provisions of this SWMP as written and updated from commencement of construction activity until final stabilization is complete. Both the owner and operator must apply as permittees, except for instances where the duties of the owner and operator are managed by the owner. The permittee is responsible for updating the SWMP as construction activity on the site dictates and documenting any changes within this document. Additionally, this SWMP details control measures and processes for spill prevention control and countermeasures which shall be adhered to on site. IV. Site Description Project Location Midtown Gardens Marketplace (hereafter referred to as "the site" or "project site") will be located at the northwest corner of South College Avenue and West Drake Road. It is bounded on north by an existing commercial development; on the south by West Drake Road (including a Jiffy Lube to remain); on the east by College Avenue; and on the west by the MAX-BRT Bus Line. Spring Creek is located north of the site. More specifically, the site is located in the Southeast Quarter of Section 23, Township 7 North, Range 69 West in the City of Fort Collins, County of Larimer and State of Colorado. Legal Description A replat of Lots 1, 2, and 4 of K-Mart Plaza, and all of Lot 2 of the extension of K-Mart Plaza, situated in the Southeast 1/4 of Section 23, Township 7 North, Range 69 West, of the 6'h Principle Meridian, City of Fort Collins, County of Larimar, State of Colorado. Project Coordinate Location • Longitude 105°04'40"W • Latitude 40°33'14"N The Midtown Gardens Marketplace will be developed in one phase and is approximately 11.34 acres. The existing vacant Kmart building along with the vacant retail building at the northeast corner of the site will be removed. A new King Soopers Marketplace will replace the Kmart, while a new King Soopers fueling station will replace the vacant retail building. The existing parking lot will be reconstructed to accommodate the new structures. The lot containing the Loaf N' Jug will remain vacant for future development but is included in this report in its developed condition. Galloway&Company, Inc. Page 6 of 41 V. Site Map Vicinity Map W a't4pctr ks 'N 1ti�gA E PTOV". n A F Pmr(n.r1:,1 SHEELY PROSPECT ADDITION AT -SPRING OLD PROSPECT MEADOWS 1 L H.uiY Gardrn�on Sprh;Cr�_,k ®R iu,uCe_•:. INDIAN HILLS C'!P�kEr n-,yrs VAiNr I mdr.Ma^<rt® ! STOVER AREA MISSION HILLS SITE Rocq Mtxlntaln nox company fort CA:* 4Ioodwwd Industr'al Cnnimb, SOUTH COLLEGE Q Colorado State HEIGHTS University J. YNn R- n7f7it 9c a f�,dur1L rnaka Rd Online q � g 3 THUNDERBIRD SCOTCH PINES T v EAST 3 r. 4 MEADOWLARK THUNDER-MOOR WOODWEST i �,.�•� 50UTHM00R VILLAGE Nature of Construction Activity The project consists of the construction of utility and roadway infrastructure for the residential subdivision. Improvements will include cut/fill grading, underground utility mains and service extensions, internal roadway installation, building foundation and vertical construction, installation of detention/water quality facilities, and installation of associated landscaping, parking, drives, and site amenities. VI. Existing Conditions Soils The NRCS Web Soil Survey of Fort Collins, Colorado indicates site soils to be a mix of soil types and Hydrologic Soil Groups (HSGs)including: • Nunn Clay Loam, HSG 'C', 100% of total project area Galloway&Company, Inc. Page 7 of 41 According to the USDA NRCS Web Soil Survey, 'Nunn Clay loam, 0 to 1 percent slopes' covers the entire project site. This soil is associated with Hydrologic Soil Group (HSG) 'C'. HSG 'C' soils have a slow infiltration rate when thoroughly wet and consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Refer to Appendix A for the soil survey information. Existing Vegetation The site is currently fully developed and consists of a currently vacant Kmart store, a small retail building at the northeast corner of the site, a small retail on the southeast corner of the site (to remain), and an existing Loaf N' Jug fueling station. Receiving Waters The site has been broken into three basins, each with their own set of sub-basins. A description of each basin and their characteristics can be found below. The intent of the drainage design is to have the runoff from the majority of the site collected and drain through a water quality and detention facility prior to entering the existing storm sewer system offsite. Pond A has been sized based on the City of Fort Collins LID requirements for the necessary portions of the site, which will be located at the downstream connection point to the existing storm drain system at the southeast corner of the site in College Ave. The released stormwater from the site will travel in the existing storm sewer system, and ultimately reach Spring Creek. Extent of Disturbance The total area of the site is 11.34 acres. Construction of this project will account for disturbed and impervious areas as shown in the table below and will be completed in one phase. The earthwork for this project will result in fill which will be imported to the site. Total Disturbed Area (ac) 12.12 ac Pre-Construction Impervious Area (ac) 7.29 ac Post-Construction Impervious Area(ac) 7.11 ac Total new Impervious Area (ac) 0 ac The adjusted cut and fill quantities are listed below. Cut Volume = 1,710 CY Fill Volume = 10,250 CY Net Volume = 8,540 CY Fill Galloway&Company, Inc. Page 8 of 41 Sequence of Maior Activities The projected sequence of work is expected to occur in the following order, with some overlap and adjustments as site conditions dictate: • Install control measures • Demolish existing buildings and parking lot • Rough overlot grading • Grade building pad • Trench and install underground utilities • Commerce vertical construction • Fine grade the remainder of the site • Pavement installation • Seed native areas and install permanent landscaping • Remove final control measures upon establishment of vegetation Construction is anticipated to begin in June 2021 and substantial completion of the project is anticipated in July 2022. The major milestones of construction and their associated control measures are listed in the following table. Rough utility Building Curb and Paving Fine Grading Permanent Grading Installation Construction Gutter Landscaping Construction Dust Control / / / / / / Concrete Washout / / ,// ,/ Area v v v v Good Housekeeping ,// / ,/ / / Silt Fence / / / / Inlet Protection v/ v/ v/ v/ Vehicle Tracking Control v v v v Stabilized Staging Area / / / / / / Street Sweeping Temporary Batch Plant Galloway&Company, Inc. Page 9 of 41 Potential Pollution Sources During construction there is potential for pollution from grading, utility, roadway, and building construction activities. These activities include ground disturbance, refueling and maintenance of equipment, washing of equipment, concrete waste, and the on-site use of paints, solvents, and other chemicals required for construction. Additionally, there is potential for pollution from the concrete washout area, temporary batch plant, worker's trash and portable toilets. Locations of potential pollution sources will be shown and updated on the Site Maps by the ECA. The ECA is also responsible for adhering to the Spill Prevention and Control Plan included in Appendix E of this plan. Non-Stormwater Discharges Based on current information, the only non-stormwater discharge(s) anticipated are landscape irrigation return flow, emergency firefighting activities, discharge to the ground of concrete washout water, and construction dewatering activities. If landscape irrigation is to be installed, then potential return flow from the irrigation system must be documented. Emergency firefighting activities that may occur on the site are permissible under the Colorado General Permit for Stormwater Discharges Associated with Construction Activity. A designated contained concrete washout area is located on the Site Map; infiltration discharge of concrete washout water from washing of tools and concrete mixer chutes may be discharged on this construction site provided that control measures in accordance with Part 1.B.1.a.ii.(b) of the Colorado General Permit for Stormwater Discharges Associated with Construction Activity are installed to prevent pollution of groundwater and discharges do not leave the site as surface runoff or to surface waters. If low risk discharges including potable water monitoring devices, potable water snowmelt, or uncontaminated groundwater to land occur, they must be discharged in accordance with the CDPHE Low Risk Discharge policies. VII. Stormwater Management Controls Erosion Control Administrator The Erosion Control Administrator (ECA) is an individual knowledgeable in the principles and practices of erosion and sediment control and pollution prevention and has the skills to assess conditions at construction sites that could impact stormwater quality and to assess the effectiveness of stormwater controls implemented to meet the requirements of the CDPS General Permit. The Permittee(s) is responsible for ensuring that the inspector is a qualified stormwater manager. The Permittee(s) shall Galloway&Company, Inc. Page 10 of 41 designate a ECA who will be the contact for all SWMP related issues and the person responsible for its accuracy, completeness, and implementation. The ECA should be a person with authority to adequately manage and direct day-to-day stormwater quality management activities at the site. The ECA is responsible for holding a weekly stormwater meeting attended by the Permittee(s) with all contractors and subcontractors involved in ground-disturbing activities to review the requirements of the Permit(s), the SWMP, and address any problems that have arisen in implementing the SWMP or maintaining the BMPs. The ECA shall maintain a log of all weekly meetings and document the issues addressed in the meetings. The name and contact information for the Erosion Control Administrator is: Name: TBD Phone: TBD Potential Pollutant Sources Potential pollutant sources for this site include: Disturbed and Stored Soils — Areas on the project site that are to be disturbed will be grubbed and overlot graded prior to major utility and roadway construction. This will be a one-time activity, per construction phase, and should be completed relatively early in the project timeline. The areas of grading that will not require additional disturbance shall receive final landscaping within 7 days. Otherwise temporary seeding and mulching will be required within 7 days of last disturbance if no further disturbance is anticipated for at least 14 days. Any soil stockpiles utilized during construction will be covered with a tarpaulin when not in active use and will have silt fence installed along the base of the slope. Construction Vehicle Entrance and Vehicle Tracking of Sediments —There is potential for tracking of soils between the beginning of the grading process and the final stabilization of the site. Construction vehicle entrances shall be minimized to reduce the potential for tracking of soils off-site and vehicle tracking control shall be installed at each construction entrance. Vehicle tracking control is to be installed prior to land disturbance activities and sweeping is to take place as needed. Vehicle access to the exposed and disturbed subgrade will be limited primarily to roll on/off earthmoving equipment and heavy materials delivery trucks. The ECA is responsible for ensuring that access to exposed subgrade is limited, both in quantity and in timing relative to the tracking susceptibility of the soil as it relates to moisture content. The ECA must keep the adjacent parking areas and public rights-of-way free from mud and other tracked debris from the site. Galloway&Company, Inc. Page 11 of 41 Management of Contaminated Soils — Contaminated soils are not anticipated based on due diligence conducted for the project site. If suspect soils are encountered construction activity shall immediately halt and environmental professionals shall review the materials and provide recommendations on handling of materials. All handling of materials shall be in accordance with State and Federal regulations. Loading and Unloading Operations—Loading and unloading operations are expected during demolition and during the delivery and staging of materials and equipment. Additionally, imported materials may be necessary to achieve final grades. All loading and unloading operations of equipment shall be accomplished in areas protected by erosion and sediment controls. It is recommended that all equipment be cleaned on-site and within protected areas prior to exiting the site. Outdoor Storage Activities — Outdoor storage is anticipated during construction activities including delivery and staging of materials. Potential chemicals include paint, fuel, oil, form oil, hydraulic fluid, plumbing glue, and fertilizer. Outdoor storage activities shall be limited to the designated stabilized staging area. All stored chemicals require protection from the elements and must be stored off the ground in some manner. An emergency spill kit is required to be in proximity of any stored chemicals and hazardous materials. The kit at a minimum would have a broom, chemical absorbent, shovel, and turn pallets. Good housekeeping practices shall be employed to prevent pollution associated with solid, liquid, and hazardous construction-related materials and wastes. Secondary containment for fuel tanks, petroleum products, and chemicals shall be utilized to reduce the likelihood of contamination of State Waters and Waters of the United States. The ECA shall show storage locations on the site maps and update them as needed. Fueling of Vehicles and Equipment — Vehicle and equipment fueling shall occur within the stabilized staging area. Fueling is expected to occur during all phases of construction activity. Under no circumstances shall fueling take place within 200 feet of any State Waters or Waters of the United States or within 50 feet of an inlet or ditch. Spill response kits shall be readily available an accessible at locations where fueling takes place. Please refer to the Hazardous Material Management and Spill Reporting Plan section for information on clean-up and disposal of spills. Temporary on-site fuel tanks for construction vehicles shall meet all state and federal regulations. Tanks shall have approved spill containment with the capacity required by the applicable regulations. From NFPA 30: All tanks shall be provided with secondary containment (i.e. containment external to and separate from primary containment). Secondary containment shall be constructed of materials of sufficient thickness, density, and composition so as not to be structurally weakened as a result of contact with the fuel stored and capable of containing discharged fuel for a period of time equal to or longer than the maximum anticipated time sufficient to allow recovery of discharged fuel. It shall be capable of Galloway&Company, Inc. Page 12 of 41 containing 110% of the volume of the primary tank if a single tank is used, or in the case of multiple tanks, 150% of the largest tank or 10% of the aggregate, whichever is larger. The tanks shall be in sound condition free of rust or other damage which might compromise containment. Fuel storage areas will meet all EPA, OSHA and other regulatory requirements for signage, fire extinguisher, etc. Hoses, valves, fittings, caps, filler nozzles, and associated hardware shall be maintained in proper working condition at all times. The location of fuel tanks shall be shown on the Site Maps and shall be located to minimize exposure to weather and surface water drainage features. A Spill Prevention and Control (SPCP) Plan has been included in Appendix E. Maintenance of Vehicles and Equipment— If equipment is to be maintained and stored in an open area this area should not be within the drip line of trees and not be within 100 feet of a watercourse or wetland. Runoff should be diverted away from watercourses and wetlands. Maintenance should be done on impervious areas surrounded with impervious berms. Where this is not possible, use pads designed to contain the pollutants which may leak or spill during maintenance operations. Impervious pads are particularly important on sandy and other course soils where spilled materials can easily leach into the groundwater. Equipment shall be checked before and after each use and, minimally, during the weekly stormwater inspection if otherwise idle. Periodic checks of the equipment wash areas shall be performed to ensure proper operation. Hazardous Material Management and Spill Reporting Plan —Any hazardous or potentially hazardous material that is brought onto the construction site will be handled properly in order to reduce the potential for storm water pollution. All materials used on this construction site will be properly stored including the use of secondary containment measures, handled, dispensed and disposed of following all applicable label directions. Flammable and combustible liquids will be stored and handled according to 29 CFR 1926.152. Only approved containers and portable tanks shall be used for storage and handling of flammable and combustible liquids. Material Safety Data Sheets (MSDS) information will be kept on site for any and all applicable materials. In the event of an accidental spill, immediate action will be undertaken by the General Contractor to contain and remove the spilled material. All hazardous materials will be disposed of by the Contractor in the manner specified by federal, state and local regulations and by the manufacturer of such products. As soon as possible, the spill will be reported to the appropriate agencies. As required under the provisions of the Clean Water Act, any spill or discharge entering waters of the United States will be properly reported. The General Contractor will prepare a written record of all spills and associated clean- Galloway&Company, Inc. Page 13 of 41 up and also notify the City of Fort Collins at 970-221-6700. Spills should be reported online at Access Fort Collins (https://clients.comcate.com/newrequest.php?id=150). The General Contractor will provide notice to Owner immediately upon identification of a reportable spill. Any spills of petroleum products or hazardous materials in excess of Reportable Quantities as defined by EPA or the state or local agency regulations, shall be immediately reported to the EPA National Response Center (1-800-424-8802), the Colorado Department of Public Health and Environment (CDPHE) (1-877-518-5608), the City of Fort Collins at(970-221-6700). The State reportable quantity for petroleum products is 25 gallons or more (or that cause a sheen on nearby surface waters). Spills from regulated aboveground and underground fuel storage tanks must be reported to the State Oil Inspector within 24 hours (after-hours contact CDPHE Emergency Spill Reporting Line). This includes spills from fuel pumps. Spills or releases of hazardous substances from regulated storage tanks in excess of the reportable quantity (40 CFR Part 302.6) must be reported to the National Response Center, the local fire authority immediately, the State Oil Inspector, and the City of Fort Collins within 24 hours. The reportable quantity for hazardous materials can be found in 40 CFR 302 at: http://www.ecfr.gov/cqi-bin/text-idx?tpl=/ecfrbrowse/Title40/40cfr302 main 02.tpl In order to minimize the potential for a spill of petroleum product or hazardous materials to come in contact with storm water, the following steps will be implemented: a) All materials with hazardous properties (such as pesticides, petroleum products, fertilizers, detergents, construction chemicals, acids, paints, paint solvents, additives for soil stabilization, concrete, curing compounds and additives, etc.) will be stored including secondary containment measures in a secure location, under cover, when not in use. b) The minimum practical quantity of all such materials will be kept on the job site and scheduled for delivery as close to time of use as practical. c) A spill control and containment kit (containing for example, absorbent material such as kitty litter or sawdust, acid neutralizing agent, brooms, dust pans, mops, rags, gloves, goggles, plastic and metal trash containers, etc.) will be provided on the construction site and location(s) shown on Site Maps. The kit should be inspected for completeness as a part of weekly stormwater inspections. d) All of the product in a container will be used before the container is disposed of. All such containers will be triple rinsed with water prior to disposal. The rinse water used in these containers will be disposed of in a manner in compliance with state and federal regulations and will not be allowed to mix with storm water discharges. Galloway&Company, Inc. Page 14 of 41 e) All products will be stored in and used from the original container with the original product label. f) All products will be used in strict compliance with instructions on the product label. g) The disposal of excess or used products will be in strict compliance with instructions on the products label and local regulations. The contractor is responsible for the Spill Prevention and Control Plan (SPCP) included in Appendix D of the SWMP. If the contractor elects to provide his own SPCP it must be included in Appendix D as a replacement. A contractor provided SPCP shall clearly state measures to stop the source of a spill, contain the spill, clean up the spill, dispose of contaminated materials, and train personnel to prevent and control future spills. In addition, the SPCP must include contact and documentation requirements for each of the Minor, Significant, and Hazardous spill magnitudes. Further requirements are listed below in the equipment fueling section. Significant Dust or Particulate Generating Processes — Dust and airborne particulates can be expected during clearing and grubbing, site grading, saw cutting, and final stabilization activities. Dust mitigation shall be implemented as necessary. Routine Maintenance Activities Involving Chemicals, Detergents, Fuels, Solvents, Oils, etc. — On- site routine maintenance activities involving fertilizers, pesticides, detergents, fuels, solvents, oils, etc. shall occur within the stabilized staging area when possible and shall be kept to a minimum. Routine maintenance activities are expected to occur during all phases of construction activity. The ECA shall show storage locations on the appropriate plan sheets and update them as needed. All chemicals are to be protected from the elements. Spill response kits shall be readily available an accessible at locations where maintenance takes place. Please refer to the Hazardous Material Management and Spill Reporting Plan section for information on clean-up and disposal of spills. On-Site Waste Management — Waste generation is expected as a result of construction activities. All waste shall be properly stored and disposed of to minimize the potential for pollution of stormwater or snowmelt runoff. Additionally, on-site waste should be stored such that wind will not transport refuse away from the storage area. This may include the use of storage containers, dumpsters, fencing or covers. Concrete Truck/Equipment Washing (including truck chute and associated fixtures and equipment) — Concrete washout area shall be installed prior to any concrete placement on site. Signs shall be placed at the construction entrance(s), at the washout area, and elsewhere as necessary to clearly indicate the location of the concrete washout area. The washout area shall be repaired and Galloway&Company, Inc. Page 15 of 41 enlarged or cleaned out as necessary to maintain capacity for wasted concrete. Concrete and concrete wash water shall be removed from the site and disposed of at an accepted waste facility. Dedicated Asphalt and Concrete Batch Plants — A small temporary batch plant may be installed to allow on-site storage and mixing of concrete and masonry. This should be protected by sediment traps, silt fence, diversion ditches or other perimeter protection as appropriate to keep stockpiled material within the plant area and located on the Site Maps by the ECA. Non-Industrial Waste Management Worker's Trash — The site shall be policed at the end of each work day to be kept free of trash and debris resulting from workers day to day activities. If necessary, utilize clearly marked and protected containers for trash and debris at convenient locations throughout the site. Burying of waste on site is prohibited. Trash must be properly contained at the end of each day. Portable Toilets — All personnel involved with construction activities must comply with state and local sanitary or septic system regulations. Temporary sanitary facilities will be provided at the site throughout the construction phase. They must be utilized by all construction personnel and must be serviced weekly by a commercial operator. The location of sanitary facilities shall be shown on the Site Maps. Portable toilets must be securely anchored a minimum of 10' behind curbs and are not allowed within 50' of inlets or within 50' of a water of the State or the municipal storm drain system. Concrete and Saw Cutting Waste — Concrete and asphalt cutting are expected during demolition activities. The waste material from these operations will be fully contained and cleaned up immediately by vacuum. Any remaining residue shall be cleaned by vacuum or street sweeping. Dewatering — Dewatering of excavations shall occur as permitted by a Water Quality Control Division Low Risk Guidance Document. Any water from dewatering operations shall be uncontaminated and discharge to a control measure and captured on-site for infiltration and/or evaporation. Under no circumstances shall construction dewatering water be allowed to leave the site as surface runoff. If contamination of groundwater is suspected, a separate construction dewatering permit will be required. Control Measures for Stormwater Pollution Prevention The following erosion control, sediment control, materials management, and site management measures shall be utilized and/or installed as indicated on the site maps to reduce the potential of the sources identified above to contribute pollutants to stormwater discharges. Galloway&Company, Inc. Page 16 of 41 The following structural control measures are anticipated to be implemented on this site: BMP Quantity Unit Permanent Seeding 0.93 AC Wind Erosion and Dust Control 12.12 AC Concrete Washout Area 1 EA Silt Fence 3123 LF Rock Sock 12 LF Storm Sewer Inlet Protection 16 EA Construction Fence 2614 LF Vehicle Tracking Control 1 SY Stabilized Staging Area 1636 SY Site maps and control details can be found in Appendix B of this document. Erosion Control Temporary and Permanent Seeding —All denuded areas that will be inactive for 14 days or more must be stabilized temporarily with the use of fast-germinating annual grass/grain varieties appropriate for site soil and climate conditions, straw/hay mulch, wood cellulose fibers, tackifiers, netting and/or blankets. Stockpiles and diversion ditches/berms must be stabilized to prevent erosion and dust issues. A City of Fort Collins approved seed mix shall be used. All areas at final grade must be seeded or sodded within 14 days after completion of work in that area. Prepare soil and seed immediately after final grade is achieved. At the completion of ground-disturbing activities the entire site must have permanent vegetative cover, meeting vegetative density requirements, or mulch per landscape plan, in all areas not covered by hardscape (pavement, buildings, etc.). Except for small (<100 SF) level spots, seeded areas should be protected with mulch, tackifier, or a rolled erosion control product. Mulch must be crimped by disc or other machinery. Wind Erosion and Dust Control — Wind erosion and dust control measures help to keep soil particles from entering the air because of land disturbing construction activities. These control measures include a variety of practices generally focused on either graded disturbed areas or construction roadways. For graded areas, practices such as seeding and mulching, use of soil binders, site watering, or other practices that provide prompt surface cover should be used. For construction roadways, road watering and stabilized surfaces should be considered. Dust control measures should be used on any site where dust poses a problem to air quality. Dust control is important to control for the health of construction workers and surrounding waterbodies. Dust control shall be implemented throughout construction once the site has any exposed, bare soil. It shall be implemented until all bare soil has been covered by final stabilization. Galloway&Company, Inc. Page 17 of 41 Materials Management Concrete Washout Area —The concrete washout area shall be installed prior to any concrete placement on site. Signs shall be placed at the construction entrance(s), at the washout area, and elsewhere as necessary to clearly indicate the location of the concrete washout area. The washout area shall be repaired and enlarged or cleaned out as necessary to maintain capacity for wasted concrete. Concrete shall be removed from the site and disposed of at an accepted waste facility. The concrete washout area shall be installed as shown on site maps prior to any concrete work. It shall remain in place until all concrete work is complete. Stockpile Management — Stockpile management includes measures to minimize erosion and sediment transport from soil stockpiles. Soil stockpiles shall be located away from all drainage system components including inlets. When practical, choose stockpile locations that will remain undisturbed for the longest period of time as the phases of construction progress. Place sediment control measures such as silt fence, straw wattles, or rock socks around the perimeter of all stockpiles. For stockpiles in active use, provide a stabilized designated access point on the upgradient side of the stockpile. Soils stockpiled for more than 60 days should be seeded and mulched with a temporary grass cover. Soil stockpile management shall be installed when soil stockpiling begins. It shall remain in place until all soil has been replaced or hauled off-site to a permanent location. Good Housekeeping Practices — A clean and orderly work site reduces the possibility of accidental spills and reduces safety hazards to employees and subcontractors. It will also help minimize potential contamination of stormwater runoff. Housekeeping practices are to include providing waste management, establishing proper building material staging areas, designating paint and concrete washout areas, establishing proper equipment and vehicle fueling and maintenance practices, controlling equipment and vehicle washing and allowable non-stormwater discharges, and developing a spill prevention and response plan. Good housekeeping practices shall be employed throughout the duration of construction. Sediment Control Silt Fence — Silt fence is a synthetic permeable woven or non-woven geotextile fabric incorporating support stakes at intervals sufficient to support the fence (5-feet maximum distance between posts), water, and sediment retained by the fence. The fence is designed to retain sediment-laden storm water and allow settlement of suspended soils before the storm water flows through the fabric and discharges off-site. Silt fence shall be located on the contour to capture overland, low-velocity sheet flows. Silt fence shall be installed at the start of construction prior to any earth moving activities. Silt fence shall remain in Galloway&Company, Inc. Page 18 of 41 place until site construction has been completed to a point where other control measures can control the remaining sediment concerns. Rock Sock — Rock socks consist of gravel wrapped by wire mesh or a geotextile to form an elongated cylindrical filter to prevent sediment transfer. They are used to trap sediment from stormwater runoff that flows onto roadways as a result of construction activities. They can be used as curb flow control, perimeter control, or as part of inlet protection. Rock socks shall be installed at the start of construction prior to any earth moving activities. Rock socks shall remain in place until final stabilization. Storm Sewer Inlet Protection — Inlet protection devices intercept and/or filter sediment before it can be transported from a site into the storm drain system and discharged into a lake, river, stream, wetland, or other body of water. These devices also keep sediment from filling or clogging storm drain pipes, ditches, and downgradient sediment traps or ponds. Inlet protection may also include placement of a barrier to create a bypass of an inlet transferring flow downstream to a sediment trap, basin, or other inlet discharging to a non-critical area. The primary mechanism is to place controls in the path of flow sufficient to slow the sediment-laden water to allow settlement of suspended soils before discharging into the storm sewer. It is possible that as construction progresses from storm sewer installation through to paving that the inlet protection devices should change. All inlet protection devices create ponding of storm water. This should be taken into consideration when deciding on which device or devices should be used. Inlet protection shall be installed around all existing inlets at the start of construction prior to any earth moving activities and around all proposed inlets as they are constructed. Inlet protection shall remain in place until final stabilization (pavement and/or landscaping). Site Management and Other Practices Construction Phasing and Scheduling — Effective construction site management to minimize erosion and sediment transport includes attention to construction phasing, scheduling, and sequencing of land disturbing activities. On most construction projects, erosion and sediment controls will need to be adjusted as the project progresses and should be documented in the SWMP. All construction projects can benefit from upfront planning to phase and sequence construction activities to minimize the extent and duration of disturbance. Larger projects and linear construction projects may benefit most from construction sequencing or phasing, but even small projects can benefit from construction sequencing that minimizes the duration of disturbance. Typically, erosion and sediment controls needed at a site will change as a site progresses through the major phases of construction. Erosion and sediment control practices corresponding to each phase of construction must be documented in the SWMP. Protection of Existing Vegetation — Existing vegetation should be preserved for the maximum practical duration on a construction site through the use of effective construction phasing. Preserving vegetation Galloway&Company, Inc. Page 19 of 41 helps to minimize erosion and can reduce revegetation costs following construction. Potential sources of injury to existing trees include soil compaction during grading or due to construction traffic, direct equipment-related injury such as bark removal, branch breakage, surface grading and trenching, and soil cut and fill. In order to minimize injuries that may lead to immediate or later death of the tree, tree protection zones shall be established at the beginning of a construction project and remain in place until final stabilization. Construction Fence— Construction fence shall restrict site access to designated entrances and exits for safety and preservation of adjacent areas. Construction fence shall be installed around the perimeter of the site except at construction access points at the start of construction prior to any earth moving activities. It shall remain in place until construction is complete and no further threat to public safety exists (e.g. open trenches, heavy operating equipment on-site). Vehicle Tracking Control — Vehicles leaving construction sites can track sediment onto adjoining roadways. This sediment can create safety hazards and contribute significantly to sediment pollution in waterways. The purpose of a vehicle tracking control measure is to prevent soil and mud on work vehicles from being carried offsite and deposited on public roads, parking lots, and other areas. All points closed to the general public and providing access into the construction site shall include a marked construction exit that will be monitored for any signs of tracking from the construction site. It is expected that only trailer delivered equipment will access the exposed subgrades and that vehicle tracking to the adjacent publicly accessible parking and the public rights-of-way should not be evident. However, if that proves not to be the case a roughened exit composed of ribbed steel plate and down-gradient silt dikes is to be installed to the dimensions shown on the site maps. The rough texture of the plates helps to remove clumps of soil adhering to the construction vehicle tires through the action of vibration and jarring over the rough surface and the friction of the ribbed matrix against soils attached to vehicle tires. It may also be necessary to install a wheel wash system. If this is done, a sediment trap control must be installed to treat the wash water before it discharges from the site. Discharge must be directed to the sediment basin within the limits of construction as indicated. The vehicle tracking control shall be installed at all construction access points at the start of construction prior to any earth moving activities. It shall remain in place until permanent pavement is installed. Stabilized Construction Roadway—A stabilized construction roadway is a temporary method to control sediment runoff, vehicle tracking, and dust from roads during construction activities. When a construction roadway is expected to have frequent construction traffic it is advisable to install a stabilized construction roadway instead of rough-cut street controls. The road surface shall be stabilized with an aggregate base course of 3-inch diameter granular material. Roadside ditches shall also be stabilized if applicable. Early application of road base is typically suitable in place of the coarse aggregate specified above. Galloway&Company, Inc. Page 20 of 41 Stabilized Staging Area—This is a clearly designated area where construction equipment and vehicles, stockpiles, waste bins, and other construction-related materials are stored. The stabilized storage area consists of a stabilized surface, covered with 3-inch diameter aggregate or larger. The stabilized staging area shall be installed as shown on the site maps at the start of construction prior to any earth moving activities. It shall remain in place until permanent pavement is installed. Street Sweeping and Vacuuming — Street sweeping and vacuuming remove sediment that has been tracked onto roadways to reduce sediment transport into storm drain systems or a surface waterway. Street sweeping or vacuuming should be conducted when there is noticeable sediment accumulation on roadways on or adjacent to the construction site. Typically, this will be concentrated at the entrance/exit to the construction site. Well-maintained stabilized construction entrances, vehicle tracking controls and tire wash facilities can help reduce the necessary frequency of street sweeping and vacuuming. Street sweeping shall occur as needed and at a minimum once a day throughout the duration of construction. Dewatering Operations — Dewatering typically involves pumping water from an inundated area to a control measure, and then downstream to a receiving waterway, sediment basin, or well-vegetated area. Dewatering typically involves several control measures in sequence. Dewatering operations are used when an area of the construction site needs to be dewatered as the result of a large storm event, groundwater, or existing ponding conditions. This can occur during deep excavation, utility trenching, and wetland or pond excavation. All dewatering discharges must be treated to remove sediment before discharging from the construction site. Discharging water into a sediment trap or basin is an acceptable treatment option. Water may also be treated using a dewatering filter bag and a series of straw bales or sediment logs. If these options are not feasible, a settling tank or an active treatment system may need to be utilized. Settling tanks are manufactured tanks with a series of baffles to promote settling. Flocculants can also be added to the tank to induce more rapid settling. Contact the state agency for special requirements prior to using flocculants and land application techniques. Some commonly used methods to handle the pumped water without surface discharge include land application to vegetated areas through a perforated discharge hose (i.e., the "sprinkler method") or dispersal from a water truck for dust control. Paving and Grinding Operations — Runoff from paving and grinding operations shall be managed to minimize pollutants entering storm drainage systems and natural waterways. Use runoff management practices during all paving and grinding operations such as surfacing, resurfacing, and saw cutting. Revising Control Measures and the SWMP Should there be changes to the implemented control measures the ECA shall be notified and the SWMP modified to accurately reflect the field conditions. Examples include, but are not limited to, removal of Galloway&Company, Inc. Page 21 of 41 control measures, identification of new potential pollutant sources, addition of control measures, modification of control measure installation and implementation criteria or maintenance procedures, and changes in items included in the Site Map and/or description. SWMP revisions must be made prior to changes in site conditions, except for Responsive SWMP Changes, as follows: • SWMP revisions must be made immediately after changes are made in the field to address control measure installation and/or implementation issues; or • SWMP revisions that require the development of supporting documentation (e.g. design of sediment basin capacity) must be made as soon as practicable, but in no case more than 72 hours, after change(s) in control measure installation and/or implementation occur at the site. Notation must be included in the plan that identifies: • The date of the site change • The control measure removed or modified • The location(s) of those control measure(s) • Any changes to the control measure(s) Demolition & Permitting Prior to construction and building permit, the demolition permit must be obtained. Once the demo permit is acquired, construction on the site may begin. Demolition of the site will include the destruction of an existing commercial building, removal of an existing parking lot, and removal of existing topsoil. During this phase, erosion control measures must also be in place to mitigate affects due to dust and other forms of off-site impacts. Erosion control measures used in this phase must be in place prior to demolition and may include the following: dust control and watering, construction fences, silt fences, inlet protection, rock socks, concrete washouts, and vehicle tracking control. This SWMP should be viewed as a "living document'that is to be continuously reviewed and modified as part of the overall process of assessing and managing stormwater quality issues on-site. Vill. Final Stabilization & Long-Term Stormwater Management Permanent stabilization of the site will include establishment of native seeded areas in specified ROW and overlot graded areas with a City of Fort Collins approved seed mix, permanent landscaping areas, and pavement placement. In accordance with the CDPS General Permit for Stormwater Discharges Associated with Construction Activity (COR-400000) (the stormwater permit): "Final site stabilization is achieved when perennial vegetative cover provides permanent stabilization with a density greater than 70 percent of pre-disturbance levels over the entire area to be stabilized by vegetative cover or equivalent Galloway&Company, Inc. Page 22 of 41 cover has been employed." Additionally, all permanent stormwater control measures must be completed and operational as designed and any stormwater conveyances cleaned of sediment and stabilized. Further, all temporary stormwater control measures must be removed unless designed to decompose on- site. The following criteria must be met when planning for final stabilization: • Stabilization must be permanent • ALL disturbed areas must be stabilized • Alternatives must follow good practice The stormwater permit allows the use of alternatives to vegetation to achieve final stabilization. These alternatives must meet specific criteria to be considered equivalent to vegetation. Examples of alternative stabilization practices include: • Permanent Paving and Buildings • Hardscape • Geogrid • Xeriscape • Compacted and Stabilized Unpaved Driving Surfaces This site will be constructed in one phase. The only area that will receive permanent seeding is the future pad lot at the southeast corner of the site. Refer to the Seed Mix below and notes on the Final Landscape Plans. Seed Mix Information SEED NOTES 1. ALL SEED MIXES AVAILABLE THROUGH: SEED ESTABLISHMENT NOTES ARKANSAS VALLEY SEED 1. THE LANDSCAPE CONTRACTOR SHALL SEED ALL NATIVE SEED 4300 MONACO STREET AREAS AS SOON AS POSSIBLE AFTER COMPLETION OF GRADING DENVER,CO 80216 OPERATIONS. SOIL PREPARATION MEASURES IN AREAS TO BE PHONE:(303)-320-7500 SEEDED SHALL BE COMPLETED PRIOR TO SEEDING. 2. SEED MIX:LOW GROW MIX 2 FOR PROPER ESTABLISHMENT,SEED SHALL BE INSTALLED WHEN AT LEAST THREE MONTHS REMAIN IN THE GROWING SEASON. IF 3. ALL SEED APPLICATIONS SHALL BE DRILL LESS THAN THREE MONTHS REMAIN IN THE GROWING SEASON SEEDED AT 15.20 LBS/ACRE,WITH AT THE TIME OF SEEDING,THE LANDSCAPE CONTRACTOR SHALL HYDROSLURRY APPLIED OVER THE SEED BED IMMEDIATELY NOTIFY THE LANDSCAPE ARCHITECT AND OWNER. AFTER SEEDING. THE SLURRY MIX SHALL THE IRRIGATION SYSTEM FOR SEEDED AREAS SHALL BE FULLY CONTAIN THE FOLLOWING: OPERATIONAL AT THE TIME OF SEEDING. LBS./1.000 SF WOOD FIBER MULCH 46 3. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ADDITIONAL CORRECTIVE MEASURES,AT HIS OWN COST,TO 15.15.15 ORGANIC FERTILIZER 9 SATISFY ESTABLISHMENT REQUIREMENTS AND ENSURE TIMELY ORGANIC BINDER 4 CLOSEOUT. THESE MEASURES MAY INCLUDE,AT THE OWNER'S OPTION,RESEEDING OF SPARSELY GERMINATED AREAS AND/OR INSTALLATION OF SOD IN ALL SEEDED AREAS. LOW GROW MIX % LATIN COMMON 30 AGROPYRON CRISTATUM EPHRAIM CRESTED WHEATGRASS 25 FESTUCA OVINA SHEEP FESCUE 20 LOLIUM PERENNE PERENNIAL RYE 15 FESTUCA RUBRA SUBSP.COMMUTATA CHEWINGS FESCUE Galloway&Company, Inc. Page 23 of 41 Inactivation of Permit Coverage Once the criteria for final stabilization have been met, the Permittee shall make a request to terminate the permit through the Colorado Environmental Online Services (CEOS) system. The ECA shall provide a completed SWMP binder to the owner at the conclusion of the project which will include the original SWMP, all markups or other changes to the SWMP, and inspection and maintenance records. The owner shall keep this document on file for a minimum of 3 years after construction completion. IX. Inspection & Maintenance Procedures The contractor must keep the approved SWMP on site at all times. The person(s) inspecting the site may be on the Permittee's staff or a third party hired to conduct stormwater inspections under the direction of the Permittee. The Permittee is responsible for ensuring that the inspector is a qualified stormwater manager. All regulatory authorities may inspect the land or site covered by the SWMP at any time, without prior notice, for compliance with the SWMP. If site conditions indicate that the objectives of this section are not being met, the operator shall make appropriate modifications to the SWMP. Any modification must be recorded on the owner's copy of the SWMP and the ECA notified. The Permittee must maintain inspection records on site with the SWMP and such records must be provided to the regulatory agencies for review upon request. At a minimum, the inspection report must include: • The inspection date • Name(s) and title(s)of personnel conducting the inspection • Weather conditions at the time of inspection • Phase of construction at the time of inspection • Estimated acreage of disturbance at the time of inspection • Location(s)of discharges of sediment or other pollutants from the site • Location(s)of control measures needing maintenance • Location(s)and identification of inadequate control measures • Location(s) and identification of additional control measures needed that were not in place at the time of inspection. • Description of the minimum inspection frequency (either in accordance with Part I.D.2., I.D.3. or I.D.4.) utilized when conducting each inspection. • Deviations from the minimum inspection schedule as required in Part I.D.2. • After adequate corrective action(s)and maintenance have been taken, or where a report does not identify incidents requiring corrective action or maintenance, the report shall contain a statement as required in Part I.A.3.f. Galloway&Company, Inc. Page 24 of 41 The State Construction Stormwater Site Inspection Report template has been included in Appendix D. The Permittee may provide their own inspection report if desired but must ensure it meets the requirements above. Inspection Schedules Between the time this SWMP is implemented and final Inactivation Notice or Termination Application has been submitted, all disturbed areas and pollutant controls must be inspected with one of the following minimum frequencies: • At least one inspection every 7 calendar days • At least one inspection every 14 calendar days, plus post-storm event inspections conducted within 24 hours after the end of any precipitation or snowmelt event that causes surface erosion. If more frequent inspections are required to ensure that control measures are properly maintained and operated, the inspection schedule must be modified to meet this need. The first site inspection must occur within 7 calendar days of the commencement of construction activities on site. The contractor and ECA shall adhere to the maintenance schedules listed in the details for each control measure. Permittees must conduct site inspections at least once every 7 calendar days for sites that discharge to a water body designated as an Outstanding Water by the Water Quality Control Commission. Preventative maintenance shall be coupled with periodic inspections. Inspection Procedures The purpose of site inspections is to assess performance of pollutant controls. Based on these inspections the contractor, in consultation with the ECA (if different) will decide whether it is necessary to modify this SWMP, add or relocate controls, or revise or implement additional control measures in order to prevent pollutants from leaving the site via stormwater runoff. The contractor has the duty to cause pollutant control measures to be repaired, modified, supplemented, or take additional steps as necessary in order to achieve effective pollutant control. Note: If a control measure is covered by snow, mark the control measure as not applicable and document the reason the control measure cannot be inspected on the daily report. The inspection must include observation of: • The construction site perimeter and discharge points, including discharges into a storm sewer system • All disturbed areas • Areas used for material/waste storage that are exposed to precipitation • Areas determined to have a significant potential for stormwater pollution, such as demolition areas, concrete washout areas, or construction vehicle entrances • All erosion and sediment control measures identified in the SWMP Galloway&Company, Inc. Page 25 of 41 • Structural control measures that may require maintenance, such as secondary containment around fuel tanks or the condition of spill response kits Examples of specific items to evaluate during site inspections are listed below. This list is not intended to be comprehensive. During each inspection, the inspector must evaluate overall pollutant control system performance as well as particular details of individual system components. Additional factors should be considered as appropriate to the circumstances. Additional information on maintenance requirements can be found in the BMP Fact Sheets in Volume 3 of the Urban Storm Drainage Criteria Manual by the Urban Drainage and Flood Control District. Construction Exit and Track Out— Locations where vehicles enter and exit the site must be inspected for evidence of off-site sediment tracking. A stabilized construction exit shall be constructed where vehicles enter and exit. Exits shall be maintained or supplemented as necessary to prevent the release of sediment from vehicles leaving the site. Any sediment deposited on the roadway shall be swept as necessary throughout the day or at the end of every day and disposed of in an appropriate manner. Sediment shall NOT be washed into storm sewer systems. Erosion Control Devices— Rolled erosion control products (nets, blankets, turf reinforcement mats) and marginally vegetated areas (areas not meeting required vegetative densities for final stabilization) must be inspected weekly. Rilling, rutting and other signs of erosion indicate the erosion control device is not functioning properly and additional erosion control devices are warranted. Material Storage Areas — Material storage areas should be located to minimize exposure to weather. Inspections shall evaluate disturbed areas and areas used for storing materials that are exposed to rainfall for evidence of, or the potential for, pollutants entering the drainage system or discharging from the site. If necessary, the materials must be covered or original covers must be repaired or supplemented. Also, protective berms must be constructed, if needed, in order to contain runoff from material storage areas. All state and local regulations pertaining to material storage areas will be adhered to. Discharge Points — All discharge points must be inspected to determine whether erosion and sediment control measures are effective in preventing discharge of sediment from the site or impacts to receiving waters. Control Measure Maintenance/Replacement and Failed Control Measures The Colorado General Permit for Stormwater Discharges Associated with Construction Activity requires that all erosion and sediment control practices and other protective measures identified in the SWMP be maintained in effective operating condition and in accordance with good engineering, hydrologic and Galloway&Company, Inc. Page 26 of 41 pollution control practices. Sediment that has been collected by sediment controls, such as silt fence and inlet protection, shall be removed when observed to prevent failure of control measures, and remove the potential of that sediment from being discharged from the site if the control measure did fail. Removed sediment shall be properly disposed of on-site. Maintenance activities to correct problems noted during inspections must be documented as discussed in the documentation section below. The inspection process must also include procedures to ensure that, when needed, control measures are replaced or new control measures added to adequately manage the pollutant sources at the site. This procedure is part of the ongoing process of revising the control measures and the SWMP as discussed above, and any changes to control measures must be recorded in the SWMP. The SWMP must be modified as soon as practicable to reflect current conditions. Control measures that have failed or have the potential to fail without maintenance or modifications must be addressed as soon as possible, immediately in most cases, to prevent the discharge of pollutants. If it is infeasible to install or repair a control measure immediately after discovering the deficiency, the following information must be documented and kept on record: 1) Describe why it is infeasible to initiate the installation or repair immediately; and 2) Provide a schedule for installing or repairing the control measure and returning it to an effective operating condition as soon as possible. If applicable, the Permittee must remove and properly dispose of any unauthorized release or discharge (e.g. discharge of non-stormwater, spill or leak not authorized by the Construction Stormwater Permit). The Permittee must also clean up any contaminated surfaces to minimize discharges of the material in subsequent storm events. Record Keeping and Documentation All erosion control measures and stabilizations shall be inspected weekly and after each precipitation or snow melt event. The Permittee must document inspection results and maintain a record of the results for a period of 3 years following closing of permit coverage. These records must be made available to the Owner, the City & County, the State, or the EPA upon request. The following items must be documented as part of the site inspections: • The inspection date • Name(s) and title(s)of personnel making the inspection • Location(s)of discharges of sediment or other pollutants from the site • Location(s)of control measures that need to be maintained • Location(s) of control measures that failed to operate as designed or proved inadequate for a particular location • Location(s) where additional control measures are needed that were not in place at the time of inspection • Deviations from the minimum inspection schedule as indicated above Galloway&Company, Inc. Page 27 of 41 • Description and dates of corrective actions taken including requisite changes to the SWMP After adequate corrective action(s) has been taken, or where a report does not identify any incidents requiring corrective action, the report shall contain a signed statement indicating the site is in compliance with the permit to the best of the signer's knowledge and belief. Record of spills, leaks, or overflows that result in the discharge of pollutants must be documented and maintained. Information that should be recorded for all occurrences includes the time and date, weather conditions, reasons for the spill, who the spill was reported to, etc. A complete copy of the SWMP shall be kept with the inspection and maintenance records for the aforementioned 3-year period. X. Standard City of Fort Collins Erosion Control Notes 1) The Property Owner, Owner's Representative, Developer, Design Engineer, General Contractor, Sub-contractors, or similar title for the developing entity (here after referred to as the Developer) has provided these Erosion Control Materials in accordance with Erosion Control Criteria set forth in the Manual as an attempt to identify erosion, sediment, and other potential pollutant sources associated with these Construction Activities and preventing those pollutants from leaving the project site as an illicit discharge. Full City requirements and are outlined and clarified in the Manual under Chapter 4: Construction Control Measures and should be used to identify and define what is needed on a project. 2) The Developer shall make themselves thoroughly familiar with the provisions and the content of the specifications laid out in the Manual, the Development Agreement, the Erosion Control Materials compiled for this project, and the following notes as all these materials are applicable to this project. 3) The Developer shall implement and maintain Control Measures for all potential pollutants from the start of land disturbing activities until final stabilization of the construction site. 4) The City Erosion Control Inspector shall be notified at least twenty-four(24) hours prior to the desired start of any construction activities on this site to allow adequate time for on-site confirmation (initial inspection which can take up to two business days after receiving the request)that the site is in fact protected from sediment and pollutants discharges off site. Please contact erosion@fcgov.com early to schedule those Initial Erosion Control Inspections well in advance so that demolition, clearing, grubbing, tree removal, and scraping may begin without delay. Failure to receive an on-site confirmation before construction activities commence is an automatic "Notice of Violation" and can result in further enforcement actions. 5) The Developer shall proactively provide all appropriate Control Measures to prevent damage to adjacent downstream and leeward properties. This includes but is not limited to: trees, shrubs, lawns, Galloway&Company, Inc. Page 28 of 41 walks, pavements, roadways, structures, creeks, wetlands, streams, rivers, and utilities that are not designed for removal, relocation, or replacement in the course of construction. 6) At all times the Developer shall be responsible to ensure adequate Control Measures are designed, selected, installed, maintain, repaired, replaced, and ultimately removed in order to prevent and control erosion suspension, sediment transportation, and pollutant discharge as a result of construction activities associated with this project. 7) All applicable Control Measures based upon the sequencing and/or phasing of the project shall be installed prior to those construction activities commencing. 8) As dynamic conditions (due to the nature, timing, sequence, and phasing of construction) in the field may warrant Control Measures in addition, or different, to what is shown on these plans, the Developer shall at all times be responsible to implement the Control Measures that are most effective with the current state and progress of construction. The Developer shall implement whatever measures are determined necessary, and/or as directed by the City Erosion Control Inspector. The Developer shall insure that all Erosion Control Plans (Maps) or SWMP documents are updated to reflect the current site conditions, with updates being initialed and dated. These site inspections and site condition updates shall be made available upon request by the City. 9) All listings, provisions, materials, procedures, activities, site work and the like articulated in this or other written site-specific documents (Including but not limited to the erosion control reports, development agreements, landscape, and drainage materials) shall meet or exceed the most restrictive language for City, County, State, and Federal regulations with regards to erosion, sediment, pollutant, and other pollution source Control Measures. The Developer shall be responsible to comply with all of these aforementioned laws and regulations. 10) The Developer shall ensure that all appropriate permits (CDPS General Permit Stormwater Discharges Associated with Construction Activity, Dewatering, Clean Water Act, Army Corps of Engineers' 404 Wetlands Mitigation Permit, etc.) have been attained prior to the relevant activity has begun. These permits or copies shall be made available upon request by the City. 11) The Developer shall furnish all conveniences and assistances to aid the Erosion Control Inspectors of materials, workmanship, records, and self-inspections, etc. of the Control Measures involved in the construction activities. 12) The Developer shall request clarification of all apparent site construction issues that may arise due to inconsistencies in construction plans for the site or site conditions around the selected Control Measures by contacting the Erosion Control Inspector. The Erosion Control Inspector will not be responsible for any explanations, interpretations, or supplementary data provided by others. 13) All Control Measures shall be installed in accordance with the Manual. 14) The City reserves the right to require additional Control Measures as site conditions warrant, to the extent authorized by relevant legal authority. Galloway&Company, Inc. Page 29 of 41 15) As with any construction standards, occasions may arise where the minimum erosion control standards are either inappropriate or cannot be justified. In these cases, a variance to these standards may be applied for pursuant to the terms, conditions, and procedures of the Manual. 16) Inspection. The contractor shall inspect site pollutant sources and implement Control Measures at a minimum of once every two weeks during construction and within 24 hours following a precipitation event. Documentation of each inspection shall be recorded and retained by the contractor. 17) All temporary Control Measures shall be cleaned, repaired, or reconstructed as necessary in order to assure continual performance of their intended function. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any drainage way. 18) Any Control Measure may be substituted for another standard Control Measure so long as that Control Measure is equal to, or of greater protection than the original Control Measure that was to be used in that location. (ex. silt fence, for wattles, or for compact berms) Wattle alone on commercial construction sites have shown to be an ineffective substitute for silt fence or compact berms unless it is accompanied by a construction fence to prevent vehicle traffic. 19) Any implementation or replacement of existing Control Measures for a non-standard control, or alternative Control Measure, shall require the review and acceptance by the City erosion control staff before the measure will be allowed to be used on this project. These Control Measures' details shall be submitted, reviewed and accepted to be in accordance with the Erosion Control Criteria based upon the functionality and effectiveness in accordance with sound engineering and hydrological practices. Land disturbance, Stockpiles, and Storage of Soils 20) There shall be no earth-disturbing activity outside the limits designated on the accepted plans. Off road staging areas or stockpiles must be preapproved by the City. Disturbances beyond these limits will be restored to original condition. 21) Pre-disturbance vegetation shall be identified, protected, and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area required for immediate construction operations, and for the shortest practical period of time. This should include sequencing and phasing construction activities in a way so that the soil is not exposed for long periods of time by schedule or limit grading to small areas. This should also include when practical advancing the schedule on stabilization activities such that landscaping takes place shortly if not immediately after grading has occurred. Vegetation efforts shall start as soon as possible to return the site to a stabilized condition. Sensitive areas should avoid clearing and grading activities as much possible. 22) All exposed soils or disturbed areas are considered a potential pollutant and shall have Control Measures implemented on the site to prevent materials from leaving the site. Galloway&Company, Inc. Page 30 of 41 23) All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition at all times by equipment tracking, scarifying or disking the surface on a contour with a 2 to 4 inch minimum variation in soil surface until mulch, vegetation, and/or other permanent erosion control is installed. 24) No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport through the use of surface roughening, watering, and down gradient perimeter controls. All soil stockpiles shall be protected from sediment transport by wind in accordance with Municipal Code §12-150. All stockpiles shall be flattened to meet grade or removed from site as soon as practical, and no later than the completion of construction activities or abandonment of the project. All off-site stockpile storage locations in City limits shall have a stockpile permit from the City Engineering Department prior to using the area to store material. If frequent access from hardscape to the stockpile is needed a structural tracking Control Measure shall be implemented. 25) All required Control Measures shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc.). All of the required erosion Control Measures must be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 26) All inlets, curb-cuts, culverts, and other storm sewer infrastructure which could be potentially impacted by construction activities shall be protected with Control Measures. Material accumulated from this Control Measure shall be promptly removed and in cases where the protection has failed, the pipes shall be thoroughly cleaned out. 27) All streams, stream corridors, buffers, woodlands, wetlands, or other sensitive areas shall be protected from impact by any construction activity through the use of Control Measures. 28) All exposed dirt shall have perimeter control. Any perimeter controls that drain off or has the ability to be tracked onto the nearby hardscape shall have some form of effective sediment control as the, or as part of the, perimeter control. 29) All exposed slopes should be protected. All exposed steep slopes (Steeper than 3:1 H:V) shall be protected from erosion and sediment transport through use of Control Measures. 30) No soils shall remain exposed by land disturbing activity for more than thirty (30) days after activity has ceased before required temporary seeding or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed. This is not just limited to projects that are abandoned; this includes any project that is temporarily halted and no immediate activity is to resume within the next thirty (30) days, unless otherwise approved by the City Erosion Control Inspector. During a season when seeding does not produce vegetative cover, another temporary erosion control shall be implemented with or until temporary seeding or permanent erosion control can be performed. 31) All individual lots shall have effective sediment controls located on the street side and any down gradient side. Typically most lots drain to the front yet on those cases where houses are along a pond or drainage swale have the lot drain in a different direction than the street, those individual lots will Galloway&Company, Inc. Page 31 of 41 need protection on that down gradient side to prevent sediment from leaving the lot. See the Individual Lot Details for further clarification. Vehicle Tracking 32) At all points where vehicles exit or leave the exposed dirt area on to a hardscape or semi hardscape (concrete, asphalt, road base, etc.) shall have installed at least one structural tracking Control Measure to prevent vehicle tracking. All areas not protected by an adequate perimeter control shall be considered a point where vehicles exit the site. Access points should be limited to as few entrances as possible (All perimeter areas shall be protected from tracking activities). 33) In all areas that the structural tracking Control Measures fail to prevent vehicle tracking, collection and proper disposal of that material is required. All inlets located near access points and affected by tracking activities shall be prevented from the introduction of sediment into the drainage system. 34) City Municipal Code §20-62, among other things, prohibits the tracking, dropping, or depositing of soils or any other material onto city streets by or from any source. City Municipal Code, §26-498, among other things, prohibits the discharge of pollutants on public or private property if there is a significant potential for migration of such pollutant. Therefore, all tracked or deposited materials (intentional or inadvertent) are not permitted to remain on the street or gutter and shall be removed and legally disposed of by the Developer in a timely and immediate manner. Dirt ramps installed in the curb-lines are not exempt to these sections of code and shall not be permitted in the street right of way (public or private). 35) If repeated deposit of material occurs on a site, additional structural tracking controls may be required of the Developer by the City Erosion Control Inspector. Loading and Unloading Operations 36) The Developer shall apply Control Measure to limit traffic (site worker or public) impacts and proactively locate material delivered to the site in close proximity to the work area or immediately incorporated in the construction to limit operational impacts to disturbed areas, vehicle tracking, and sediment deposition that could impact water quality. Outdoor Storage or Construction Site Materials, Building Materials, Fertilizers, and Chemicals 37) Any materials of a non-polluting nature (steel, rock, brick, lumber, etc.) shall be inspected for any residue coming off the material during routine inspection and will generally be located where practical at least fifty(50)feet from any permanent or interim drainage ways. 38) Any high environmental impact pollutant materials that have a high likelihood to result in discharge when in contact with stormwater (lubricants, fuels, paints, solvents, detergents, fertilizers, chemical sprays, bags of cement mix, etc.) should not be kept on site where practical. When not practical, they Galloway&Company, Inc. Page 32 of 41 should be stored inside (vehicle, trailer, connex, building, etc.) and out of contact with stormwater or stormwater runoff. Where not available, they shall be stored outside in a raised (high spots or on pallets), covered (plastic or tarped), and sealed (leak proof container) in secondary containment location. The secondary containment or other Control Measure shall be adequately sized, located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine inspections. Vehicle and equipment maintenance and fueling 39) Parking, refueling, and maintenance of vehicles and equipment should be limited in one area of the site to minimize possible spills and fuel storage areas. This area shall be located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine inspections. All areas shall keep spill kits and supplies close. Significant Dust or Particulate generating Process 40) The property must be actively preventing the emission of fugitive dust at all times during construction and vegetation activities. All land disturbing activities that result in fugitive dust shall be in accordance with Municipal Code §12-150 to reduce the impacts to adjacent properties and community health. All required practices shall be implemented, and additional ones shall be followed. These practices include watering the sites and discontinuing construction activities until the wind subsides as determined by any City Inspectors. Concrete truck / equipment washing, including the concrete truck chute and associated fixtures and equipment 41) All concrete and equipment washing shall use structural Control Measures appropriate to the volume of wash and frequency of use. These Control Measures shall be located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine inspections. These areas shall be clearly identified and protected from any wash from leaving the Control Measure. If frequent access from hardscape to the Control Measure is to occur, a structural tracking Control Measure shall be implemented. These Control Measures shall be frequently cleaned out. 42) The Developer is responsible for ensuring washing activity is taking place at the appropriate Control Measure and site workers are not washing or dumping wash water on to the dirt or other uncontrolled locations. Dedicated Asphalt and concrete batch plants 43) Dedicated asphalt and concrete batch plants are not acceptable on construction sites within the City of Fort Collins without an expressed written request and plan to reduce pollutants associated with that Galloway&Company, Inc. Page 33 of 41 type of activity and approval by the City of Fort Collins specifically the Erosion Control Inspector. The Developer shall inform the erosion control inspection staff of any dedicated asphalt, or concrete batch plants that is to be used on site. Concrete Saw Cutting Materials 44) Saw cutting material shall be in accordance with Municipal Code §12-150 for air emissions and all water applications to the saw cutting shall prevent material from leaving the immediate site and collected. These cutting locations, once dried, shall be swept and scraped of all material and shall have proper and legal disposal. Waste Materials Storage and Sanitary Facilities 45) Trash, debris, material salvage, and/or recycling areas shall be, where practical, at least fifty (50)feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine inspections. These facilities should be located out of the wind and covered as able. Where not able to cover, locating said areas on the side of other structures to reduce exposure to winds, and follow maximum loading guidelines as marked on the container. The Developer is required to practice good housekeeping to keep the construction site free of litter, construction debris, and leaking containers. 46) Sanitary facilities shall be prevented from tipping through the use of anchoring to the ground or lashing to a stabilized structure. These facilities shall also be located as far as practical from an inlet, curb cut, drainage swale or other drainage conveyances to prevent material transport from leaving the local area. This consists of the facility being located, where practical, at least fifty (50) feet from any permanent or interim drainage ways. Other Site Operations and Potential Spill Areas 47) Spills: For those minor spills that; are less than the State's reportable quantity for spills, stay within the permitted area, and in no way threaten any stormwater conveyance, notify the City of Fort Collins Utilities by email at erosion@fcgov.com or phone (970) 817-4770. For any significant, major, or hazardous spills, notify the City of Fort Collins Utilities by phone only after Emergency Response (911) has been notified and is on route, County Health Department (LCDHE) has been notified through Larimer County Sheriff Dispatch (970) 416-1985, and the State Spill Hotline Incident Reporting have been contacted 1-877-518-5608. Written documentation shall be provided to the City within 5 days of the event. All spills shall be cleaned up immediately. 48) Selection of"plastic welded" erosion control blankets shall not be used in areas that wildlife, such as snakes, are likely to be located as these have proven to cause entrapment issues. Final stabilization and project completion Galloway&Company, Inc. Page 34 of 41 49) Any stormwater facilities used as a temporary Control Measure will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the Owner, Homeowners Association (HOA), or other party responsible for long term maintenance of those facility. 50) All final stabilization specifications shall be done in accordance with the Manual, Chapter 4: Construction Control Measures. 51) All disturbed areas designed to be vegetated shall be amended, seeded & mulched, or landscaped as specified in the landscape plans within 14 working days of final grading. 52) Soil in all vegetated (landscaped or seeded) areas, including parkways and medians shall comply with all requirements set forth in Sections 12-130 through 12-132 of the City Municipal Code, as well as Section 3.8.21 for the City Land Use Code. 53) All seeding shall refer to landscaping plans for species mixture and application rates and depths requirements. 54) All seed shall be drilled where practical to a depth based upon the seed type. Broadcast seeding shall be applied at double the rate as prescribed for drill seeding and shall be lightly hand raked after application. Hydroseeding may be substituted for drill seeding on slopes steeper than 3(H):1(V) or on other areas not practical to drill seed and crimp and mulch. All hydroseeding must be conducted as two separate processes of seeding and tackification. 55) All seeded areas must be mulched within twenty-four (24) after planting. All mulch shall be mechanically crimped and or adequately applied tackifier. The use of crimped mulch or tackifier may require multiple re-applications if not properly installed or have weathered or degraded before vegetation has been established. Areas of embankments having slopes greater than or equal to 3H:1 V shall be stabilized with an erosion mat or approved equal to ensure seed will be able to germinate on the steep slopes. During a season when seeding does not produce vegetative cover, another temporary erosion control shall be implemented along with, or until, temporary seeding or permanent erosion control can be performed. 55) The Developer shall warranty and maintain all vegetative measures for two growing seasons after installation or until seventy percent (70%) vegetative cover has been established, whichever is longer and meets all the Criteria outlined in the Fort Collins Stormwater Criteria Manual Chapter 4: Construction Control Measures. 56) The Developer shall maintain, monitor, repair, and replace any and all applicable Control Measures until final stabilization has been obtained. All Control Measures must remain until such time as all upstream contributing pollutant sources have been vegetated or removed from the site. When any Control Measure is removed, the Developer shall be responsible for the cleanup and removal of all sediment and debris from that Control Measure. At the point at which the site has been deemed stabilized and verified by City Erosion Control Inspector, all temporary Control Measures can then be fully removed. All measures shall be removed within 30 days after final stabilization is achieved. Galloway&Company, Inc. Page 35 of 41 57) The responsible party shall maintain and keep current all payments or related forms of security for the Erosion Control Escrow until 1) stabilization has been reached and 2) all Control Measures and/or BMPs have sediment materials collected and the Control Measure removed from the site. At that time the site will be considered completed and any remaining Erosion Control Escrow shall be returned to the appropriate parties. XI. Conclusion Conformance with Standards The Stormwater Management report for Midtown Gardens Marketplace — King Soopers #146, was prepared in compliance with the City of Fort Collins Stormwater Criteria Manual adopted December 2018 and the Colorado General Permit for Stormwater Discharges Associated with Construction Activity. XII. References 1. City of Fort Collins Stormwater Criteria Manual adopted December 2018 2. Urban Storm Drainage Criteria Manual, Volume 3, Urban Drainage and Flood Control District, revised October 2019. 3. General Permit Application and Stormwater Management Plan Preparation Guidance, Colorado Department of Public Health and Environment, November 2018 Galloway&Company, Inc. Page 36 of 41 Appendix A — Reference Information NRCS Web Soil Survey Information FEMA FIRMette Galloway&Company, Inc. Page 37 of 41 USDA United States A product of the National Custom Soil Resource Department of Cooperative Soil Survey, Agriculture a joint effort of the United Report for NRCSStates Department of Agriculture and other La ri m e r County Federal agencies, State Natural agencies including the Resources Agricultural Experiment Area, Colorado Conservation Stations, and local Service participants r . 4 WSW :,;`itsii --TT dr 0 �400 ft Rft�tr 5w;)r4 i4 July 22, 2020 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nres.usda.gov/wps/ portal/nres/main/soils/health/)and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nres) or your NRCS State Soil Scientist (http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nres142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at(202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800)795-3272 (voice)or(202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 SoilMap.................................................................................................................. 8 SoilMap................................................................................................................9 Legend................................................................................................................10 MapUnit Legend................................................................................................ 11 MapUnit Descriptions.........................................................................................11 Larimer County Area, Colorado...................................................................... 13 73—Nunn clay loam, 0 to 1 percent slopes.................................................13 74—Nunn clay loam, 1 to 3 percent slopes.................................................14 References............................................................................................................16 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and 6 Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. 7 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 Custom Soil Resource Report Soil Map 'a e qq 493220 493260 493.300 493340 493380 493420 493460 4935W 40"33'19"N - 40°33'19"N I � 1. • r J 287 14 40 a "A. � 7 Soil Map may not be valid at this scale. N/yI9 a r 40°33'7"N �,•, — '� ~ - y 40°37 T'N 493220 493260 493300 493340 493380 493420 493460 493500 Map Scale:1:1,820 if pdnted on A portrait(8.5'x 11")sheet N Meters 0 50 100 200 300 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:Lr M Zone 13N WGS84 9 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest(A01) 8 Spoil Area The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) Q 1:24,000. Stony Spot Soils Very Stony Spot 0 Soil Map unit Polygons Warning:Soil Map may not be valid at this scale. Wet Spot .w Soil Map Unit Lines Enlargement of maps beyond the scale of mapping can cause p Other misunderstanding of the detail of mapping and accuracy of soil � Soil Map Unit Points 9 PP� 9 Y .- Special Line Features line placement.The maps do not show the small areas of Special Point Features contrasting soils that could have been shown at a more detailed V Blowout Water Features scale. Streams and Canals ® Borrow Pit Transportation Please rely on the bar scale on each map sheet for map Clay Spot 1-14 Rails measurements. Closed Depression 0%/ Interstate Highways Gravel Pit Source of Map: Natural Resources Conservation Service N US Routes Web Soil Survey URL: Gravelly Spot - _ Major Roads Coordinate System: Web Mercator(EPSG:3857) O Landfill Local Roads Maps from the Web Soil Survey are based on the Web Mercator Lava Flow Background projection,which preserves direction and shape but distorts g distance and area.A projection that preserves area,such as the Marsh or swamp . Aerial Photography Albers equal-area conic projection,should be used if more Mine or Quarry accurate calculations of distance or area are required. O Miscellaneous Water This product is generated from the USDA-NRCS certified data as Q Perennial Water of the version date(s)listed below. y Rock Outcrop Soil Survey Area: Larimer County Area,Colorado + Saline Spot Survey Area Data: Version 15,Jun 9,2020 Sandy Spot Soil map units are labeled(as space allows)for map scales 40 Severely Eroded Spot 1:50,000 or larger. 0 Sinkhole Date(s)aerial images were photographed: Aug 11,2018—Aug Slide or Slip 12,2018 Sodic Spot The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. 10 Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 73 Nunn clay loam,0 to 1 percent 16.4 99.1% slopes 74 Nunn clay loam, 1 to 3 percent 0.2 0.9% slopes Totals for Area of Interest 16.5 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, 11 Custom Soil Resource Report onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform.An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 Custom Soil Resource Report Larimer County Area, Colorado 73—Nunn clay loam, 0 to 1 percent slopes Map Unit Setting National map unit symbol: 2ting Elevation: 4,100 to 5,700 feet Mean annual precipitation: 14 to 15 inches Mean annual air temperature: 48 to 52 degrees F Frost-free period: 135 to 152 days Farmland classification: Prime farmland if irrigated Map Unit Composition Nunn and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Nunn Setting Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Pleistocene aged alluvium and/or eolian deposits Typical profile Ap -0 to 6 inches: clay loam Bt1 -6 to 10 inches: clay loam Bt2- 10 to 26 inches: clay loam Btk-26 to 31 inches: clay loam Bk1 -31 to 47 inches: loam Bk2-47 to 80 inches: loam Properties and qualities Slope: 0 to 1 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 7 percent Salinity, maximum in profile: Nonsaline (0.1 to 1.0 mmhos/cm) Sodium adsorption ratio, maximum in profile: 0.5 Available water storage in profile: High (about 9.1 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 4e Hydrologic Soil Group: C Ecological site: Clayey Plains (R067BY042CO) Hydric soil rating: No 13 Custom Soil Resource Report Minor Components Heldt Percent of map unit: 10 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Ecological site: Clayey Plains (R067BY042CO) Hydric soil rating: No Wages Percent of map unit: 5 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Ecological site: Loamy Plains (R067BY002CO) Hydric soil rating: No 74—Nunn clay loam, 1 to 3 percent slopes Map Unit Setting National map unit symbol: 2tlpl Elevation: 3,900 to 5,840 feet Mean annual precipitation: 13 to 17 inches Mean annual air temperature: 50 to 54 degrees F Frost-free period: 135 to 160 days Farmland classification: Prime farmland if irrigated Map Unit Composition Nunn and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Nunn Setting Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Pleistocene aged alluvium and/or eolian deposits Typical profile Ap-0 to 9 inches: clay loam Bt-9 to 13 inches: clay loam Btk- 13 to 25 inches: clay loam Bk1 -25 to 38 inches: clay loam Bk2-38 to 80 inches: clay loam 14 Custom Soil Resource Report Properties and qualities Slope: 1 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 7 percent Salinity, maximum in profile: Nonsaline to very slightly saline (0.1 to 2.0 mmhos/cm) Sodium adsorption ratio, maximum in profile: 0.5 Available water storage in profile: High (about 9.9 inches) Interpretive groups Land capability classification (irrigated): 2e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: Clayey Plains (R067BY042CO) Hydric soil rating: No Minor Components Heldt Percent of map unit: 10 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Ecological site: Clayey Plains (R067BY042CO) Hydric soil rating: No Satanta Percent of map unit: 5 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Ecological site: Loamy Plains (R067BY002CO) Hydric soil rating: No 15 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/ n res/detai I/national/soi Is/?cid=n res 142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nresl42p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nres.usda.gov/wps/portal/nres/detail/soils/ home/?cid=nres142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 16 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ nres/detail/soils/scientists/?cid=nres142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid=nres 142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/lnternet/FSE—DOCUMENTS/nrcsl42p2_052290.pdf 17 —Bridge co MAP SCALE 1 500' 250 0 500 10 ==�09EET 4 METE o PANEL IJ9IJ/U RUTGERS1 FIRM Q U.1 0) FLOOD INSURANCE RATE MAP :D z < W LARIMER COUNTY, 0 COLORADO AND INCORPORATED AREAS < U) U) 23 jaHiner County Canal No. 2 5 pril PANEL 987 OF 1420 (SEE MAP INDEX FOR FIRM PANEL LAYOUT) IGD CONTAINS, CC COMMUNITY NUMBER PANEL SUFFIX F0RTNSGlTY0F of.l. M.7 a 0 CL fm Lu Notice for L111: The Wis 11",b,,111,1 W- 111"11 11 raredsrh-phoing—poorro;the Corn—hy Number shaven 0 above should be used on Insurenue applications for the subject fty. MAP NUMBER 08069CO987G MAP REVISED MAY2,20112 Federal Emergency Management Agency PRINCETO L1 032 This is an official copy of portion of the above referenced flood map. It DRAKE ROAD was extracted using F-MrrOn-Line. This map does not reflect changes or amendments which may have been made subsequent to the date on the 1itegl'Aa-k� For the latest product information about National Flood Insurance Program flood maps check the FEMA Flood Map Store at wwuvmsc.fema.gd Appendix B — SWMP Site Maps and Calculations SWMP Site Maps and Details Galloway&Company, Inc. Page 38 of 41 STORMWATER MANAGEMENT PLAN NOTES EROSION CONTROL LEGEND I_ THE CONTRACTOR ANO/CR AUTHORIZED AGENTS SHALL REMOVE ALL SEDIMENT,MUD,CONSTREGU �� /1 /I LOD DISCHAARGEDgTO,OR ACCUMULATE IN,MEROWOUNESµAND PUBLICARIGHTS OF WAYS OF -5115 ---EXISTING MAJOR CONTOUR Galloway THE TOWN AS A RESULT CONST U CONSTRUCTION SADILES ASSIXIATEO WITH THIS SITE -----2A ------ EASING MINOR CONTOUR O 71MELYDEVELOPMENT OR CONSTRUCTION PROJECT.SAID REMOVAL SHALL BE CONDUCTED IN A B1629.WMlbw DNVe,$INe320 IP TIMELY MANNER \ -SD , I..�I ® PROPOSED MAJOR CONTOMt SW"`J`Nv-aAe,C080111 CIF ,, 2 AWITIONPL ERO§ON AND SEDIMENT CONTROL MEASURES MAY BE REQUIRED OF ME OWNER 303.Tr0.RR84 I 4.piIIUIcUN LOD ' ' ® ANT H15 OR HER AGENTS DUE TO UNFORESEEN EROSION PROBLEMS OR IF ME SUBMITTED ® PgOPpSED MINOR CONTOUR GellowsyUS.wm I \ I III RIM DOES NOT FUNCTION AS INTEMTN.THE REQUIRE ENE BE THIS RAN SHNL BE THE - -- �-_-- - CF - -- -- -`- O� ORICAPQN OF ME PERMIT HOLDER UNTIL RICH PINE AS ME PLPN IS PROPERLY P W K P LOD CF L' COMPLETED AND ME PERMIT IS KLEMM, sD EXISTNG STORM SEWER(LESS THAN BY) CF 'I 1 THE CONTRACTOR SHILL PREENT SEDIMENT,DEBRIS AND ALL OVER POLWi4Ni5 FROM I,III O f0 ID 60 ENTERING THE STORM KKR SYSTEM DURING ALL DEMOLITION,EXCAVATION,TRENCHING, PROPOSED STORM SEVER(LESS THAN 12') �--- ^ - - 41� BORING,GRADING OR OTHER CONSMWnON OPERATIONS THAT ARE PART OF THIS PROJECT SCALE:V-p THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR AEMEDIAFOR OF ANY ADVERSf IMPACTS i0 ADJACENT WATERWAYS,WI:MANDS,ETC.,RESULTING FRONI MURK GONE As ®EXISTING STORM SEWER SILT DIKE i0 REMAIN IN PART HE THIS PRWECE PROPOSED S1OPMSEND?SE PUCE UNTIL DRST RFi It OF \ LOD j^I PAVEMENT CONSTRUCTED t O A THE CONTRACTOR SHALL LOCATE,INSTALL,AND MAINTAIN ALL WATER QUALITY EROSION L CONTROL MEASURES AND AS INDICATED IN THE APPROED STg2MWATER MANAGEMENT POUT _ I (SEE DETAIL SHEET C35) w (F] ' PVMT PERMANENT PAVEMENT IN 13 P i'I I 5, RO -WT STREETS SHALL BE MULCHED WITHIN 14 DAYS OF THE COMPLETION OF CARBIDEww/ SF GU RADING UNLESS A LAYER OF AGARREGATE ROAD BAY OR ASPHALT PANNG IS TO R y ROW ARROW Y� -- _. M r J I APPLIED TO SAID ROUGH-CUT STREETS NIMIN 14 DAYS. DF III 6. THE DEVELOPER,GENERAL CONTRACTOR,STAGING CONTRACTOR AND/OR MEN AUTHORIZED CLOD LOD LIMITS GE DISTURBANCE AGENTS SHALL ENSURE THAT All LOADS OF CUT AND FEE MATERIAL IMPORTED TO OR •,y K SF LOD II D'� EXPORTED FROM THIS SEE SHUT BE PROPERLY COVERED TO PREVENT LOSS OF ME VTC VEHICLE MASKING CONMW MATERIAL DURING TRANSPORT ON PUBLIC RIGHTS OF WAY. ________ _ V l GOALS THAT WILL BE STOCKPILED FOR MORE THAN 30 DAYS SHALL BE PROTECTED FROM ® COPYRIGHT 5011__-_-__ _=- - Y= ---_�• Cw CONCRETE WASHOUT AREA -_____ ,- WIND AND WATER MYRON WMIu a DAYS OF STOCKPILE CONSTRUCTION,IF 57OMPLEs Y� _ _i ARE LOCATED WITHIN TOR FEET OF A DRANAGEWAY,RE AOETIONAL SEDIMENT WN1R0.S SUCH ® $$ STABILIZED 5igC1NG AREA THE6E PLPNS ME AM INSTRUMENT OF SERVICE J AS TEMPORARY OWES OR SILT FENCE SNAIL BE REQUIRED. ANDARETALICAT ERTYOFGEMORREPRODMAY c " I NOTBE DUPLICATED,DISCLOBED,OR REPRODUCED '�- a 8. APPROVED EROSION AND SEGMENT CONTROL MEASURES STALL BE MAINTAINED AND KEPT IN IP SOME INLLi PROTECTION WITHOUT THEWRNIEN CONBENT OF GPLLOWAY. \ �I I� I SH REPAIR OF THE DURATION OF LIME PROJECT.ACCUMULATED SEDIMENT AND DEBRIS COPYRIGHTS D PRICLEATTEINFRINGEMENTS WILL BE ENFORCED ANU PROSECUTED, F _ _-_ ADVERSELY IMPACTS THE FUNCTIONING OF ME CONTROL MEASURE. OR DEBRIS NENi COu1ROL LOG ;N -- -----� -I- ___ . Y' I SHALL R REMOVED FROM A CONTROL MEASURE WHEN THE SEDIMENT SCL CUD 1A M o I J I 9. CONSTRUCTION SEQUENCING MAY NECESSITATE RELOCATION OR TEMPORARY REMOVAL OF 1` n'` RS CURB SOCKS THE CCNTRR MEASURES MOM HEREON,THE CONTRACTOR MAY RELOCATE CONTROL y d I MEASURES INCLUDING VTQ SSA AND CONSTRUCTION TRAILERS AT THEIR DISCiETCN ME --_------ SO PROPOSED SAWCUi LINE I ' IMPOSE ME RN, SENT BE RESTORED AT SUCH A TIME As MA WILL NO LONGER IMPOSE THE RECORD BE ME SIZE COPY Of ME DRAWINGS SHALL BE MARKED UP MOCKINGLY, LOGY, CF � I ' i I y ---_ ANT A RECORD OF CONTROL MEASURE MODIFlCAlI0N5 KEPI IN ME SITE IrvSFECTION LOG SF— SF SILT FENCE N `; ~ I / I� 1D. ALL EROSION AND SEDIMENT TCONTROLBAI PRACTICES AND OTHER PROTECTIVE MEASURES CF CF CONSTRUCTION FENCE ` I bF-1}--f x IMETSELECFlED IN WE SWOP VOILA BE CONTROL MD IN MEASURES AND OPERATION CgI OFM.PROPER LOD it ` I I LDD YLEcnox AND IxsrALLATIox OF cOuiROL MEASURES AUD IMPIEMENTAnOx OF I COMPREHENSIVE INSPECTION AND MAINTENANCE PROCEDURES IN ACCORDANCE WIN ME SO SILT DIKE I / ± LOD SWAP SHOULD BE ADEQUATE IN CC MEET THIS CONDITION.ENGINEER, MEASURES THAT ARE NOT TP ARDUA1ELr MAINTAINED IN ACCORDANCE RE GOOD F COLLq, O HYDROLOGIC,AND BB 66 'I 1 --„� / SF POLLUPON CONTRW PRACTICES.INCLUDING REMOVAL GE COLLECTED SEDIMENT OUTSIDE ME O PS PERMANENT SEEDING l> V ® a II'I 1 0 ACCEPTABLE TOLERANCES OF THE CONTROL MEASURES ARE CONSIDERED r0 BE NO LONGER •1 LOT OPERATING EFFECTIVELY AND MUST BE ADDRESSED. LS IMMANENT LANDSCAPING 1C.2DT Y 'I, INITIAL EROSION CONTROL NOTES c ) 4738 AC iP '1 X !P of I �` �'• SP sllE POSTING CONTACTS AND PERMITS ZONING:GENERAL COMMERGAL ;I i)I R'+� I ry X 1, INSTALL THE-PP INFORMATION SIGN AND POST REWIRED DOCUMENTS NEAR THE PLANNED CONSTRUCTION EXIT,AND WHIN EASY ACCESS TO AXE GENERAL PUBLIC WITHOUT e-w WP WASHOUT POSTING L ENTERING THE ATE. SF ¢HE 2. STANE/FLAG/PAINT ME LED(WHERE STAKING G NOT POSABRE/PRACIICAL,THE LOD MUST ES BE CON PlCupuslY AND PROMINENTLY,MARKET TO DEMOTE ME BOUNDARY).LOD MUST EASEMENT SCHEDULE REMAIN CONSPICUOUSLY MARKED THROUGHOUT ME ENTIRE CWSIAUCPON PROTECT EXISTING R FIFTY EASEMENT',REF-ALTA SURAY iI 1 ti L II _I l I I 3, INSTALL INRi PROMCnW ON EXISTING INRiS WITHIN L➢D. Fry I .y{{I o S OB EXISTING IS'DPUTY EASEMENT i0 E. LTA SUR Y PLAT I� (� 'I ,'';I i '• I e�b"�Ilpl" 4. INSTALL TEMPORARY ROW SOCK DON GRAOIPNT FRgA TEMPORARY SPRING ACTINPES. © EXISTING 20'UPLIIY EASEMFNi:REF.ALTA SURVEY I 1 5 BLACK OUT STRIPING THAT CONRIGUS WIM TEMPORARY SPRING,PAINT TEMPORARY QD EMSTING w'UPLITY EASEMENT;REF.ALTA SURVEY �J I STRIPING AND INSTALL CONSTRUCTION FENCE AND JERSEY BARRIERS Q ' / O EXISTING 10'DRAINAGE EASEMENT ITSV BE VACATED;ARE.ALTA SURVY J INSTALL PERIMETER SEDIMENT CONTROL MEASURES IN ME MCNITY OF,AND DOWN GRADIENT OF EXISTING TRAFFIC EASEMENT TO R VACATED:REF.PRAT 0- LLI ITT' ANDM,ME LOCATION Of THE PLANNED CONSTRUCTION ROT,CONSTRUCTION OFFICE TRAILER, © EXISTING SHARED PARKING GSEMENT,AEG.ALTA AIRAY U AND ABSOLUTELY NEC PARKING AND STORAGE AREAS GEAR ONLY THE MINIMUM ATiFA I- CF I� M K « \"Lr\mAY• SF ABSOWIELY NECESSARY TO INSTALL MERE PERIMETER CONTROL MEASURES OH EXISTING w'UNDERGROUND UnUIY EASEMENT,REF.ALTA$NtVEY LIJ Q L \Y J INSTALL STABUZED CONSTRUCTION EXIT WIH SEDIMENT MAP AND GET PE PROJECT EXISTING 6'GAS AND POWER EASEMENT;REf ALTA 91RlEY n LOD I -, OFFICE TRAILER. OJ PROPOSED EMERGENCY ACCESS EASEMENT;PER,PLAT INSTALL REMAINING PERIMEnF SEDIMENT CONTROL MEASURES AS SIHOWIN W THE SIZE O PROPOSED UTILITY EASEMENT;REF.FLAT O Q L.I.. O D' X }� MATS.CLEAR ONLY THE MINIMUM AREA NECESSARY TO INSTALL PERIMETER CONTROL © PROPOSED DRAINAGE EASEMENT;REF-PLAT LLI x N MEASURES. Y Q (u) PROP O D PUBLIC ACCESS EASEMENT;REF.PLAT n Y SF L OF I 4 PREPARE TEMPORARY PARKING AND STORAGE AREA. O PROPOSED EMERGENCY ACCESS EASEMENT AND PUBLIC ACCESS 4// L SF \ y OD I 10 STABLIZE SITE POPES,BOTTOM AND ALL SIDES OF EMBANKMENTS OR POPES CF O PROPOSED 20'U11NTY EASEMENT;AS.PLAT Z Z Q Q O SEDIMENT(RAPS IMMEDIATELY UPON COMPLETION OF EACH,AS SPECIFIED IN THE SWPPP © PROPOSED UTILITY EASEMENT BY SEPARATE DOCUMENT Q C J L AND SEDIMENT TRAP DETAIL � ui G °6 O I� �+ y�j d1Y DF FDRT(bl11NS ER050N CONTROL PLAN NOTES U) LLI U I -I� _ SEE SHEET C0.1-NOTES FOR FULL LIST OF CITY ECP NOTES > C_ II V CIF _ Q z Q -- ----� -- - -SD— L $LLRE>�TA�NOTE CONTRACTOR SHALL MARK THE LIMITS OF DISTURBANCE WITH PAINT, J W LOD K FLAGGING,CONSiRUCT10N FENCE,OR OTHER ALLOWABLE MEASURES PRIOR J c i- EXPOSED SUBGRADE DUE TO PAVEMENT REMOVAL OR BUILDING J --- -- ",•�- --_-- ---- "- TO INSTALLATION OF CONTROL MEASURES OR START OF CONSTRUCTION. PZ Z - OF CF SF I FOUNDATION EXCAVATION,MUST BE KEPT BELOW TOP OF EXISTING O Lu O EXI'TOM nxc BUImINc PAVEMENT OR SEDIMENT CONTROL LOGS(WEIGHTED WADDLES)MUST BE 0 CO J () D I M (Erie iD RNAIn USED TO CONTROL SEDIMENT FROM RUNNING ACROSS THE EXISTING ¢ O J PAWFMENT. DISTURBED AREA TABLE F (0 O 1— �I UMITS AREA($.F.) AREA(AC) Z Z U s LOTo2F SF / STABILIZED STAGING AREA( NOTICE IMIM a cpxsmucnm RnazG 1zm LL Y (/) 4 I I I` SF 0,354 AS 1 ` THE STAGING AND STORAGE AREA AT THIS SITE MAY MAKE USE OF A SF _ I' MEMO:GExD1AL WMAEK. 1 PAVED DRIVE,DEPENDING ON CONTRACTOR'S WORK PHASING.SINCE THIS L 1 AREA WOULD CONSIST OF AN IMPERVIOUS SURFACE,A STONE STAGING CUT/FILL SUMMARY AREA WOULD NOT BE NEEDED.IT SHALL BE THE CONTRACTOR'S AREA(S.F.) CUT(C.Y.) FILL(C.Y.) NET BULL(C.Y.) o \ # Date I.. DAMOX \ K T G536 Y / 1 RESPONSIBILITY TO INSTALL CONTROL MEASURES AROUND THE STAGING PfiON ITT 0533 AC tJI 0 T o AREA TO PREVENT POLLUTANTS CFROMCUM FLOWING TO OTHER SITE AREAS.ANY 536,320 7,090 I3,np 6,350 _Ivoanozl I6Tcm SUBMITTAL PJD X - SF ZONING G xE AL ME pq r`_ ME srpRr BUILDING / 'III SEDIMENT OR DUST THAT HAS ACCUMULATED IXJ ANY EXISTING STABILIZED _Ialz4nozl zxo clttweMlTru P.II y X SURFACE YATHIN THE LIMITS OF DISTURBANCE,SHALL BE CLEANED Iwnrmzl BID PACKAGE IVI 1 so2s \ }- - -_b 0 LOT T,BLOCK 1 IMMEDIATELY.ANY WATER USED IN THE STABILIZED STAGING AREA SHALL BENCHMARK U \ ` VTC SSA LOD JFFr WGE P.U.D. BE COLLECTED PRIOR TO LEAVING THE LIMITS OF DISTURBANCE OR BEFORE PROJECT DATUM. NAwBO Iw1Mrsm1 AND ClttweMlTrAL IVI f zpwxc:GExERP1 WMMEPOIPL ENTERING THE EXISTNG STORM DRAINAGE SYSTEM. IwlWzozz 4TH ANYRUBMITTAL RED L L 1 Y\ Y Y CW O L K SIF BENCHMARK T STRUCTURE AR CAL CONTROL MONUMENTS ARE A 2'FORT CO CAP SET E A SOLID CONCRETE SM DISTINCT .THE MONUMENTS ARE STRINGED ER A OF FORT GOWNS GENWMARK' F I TJFHCLE TRACKING CONTROL( NOTICE ALWc WIM A DMsnucT Dfxnrnxc NUMBER(RFERExGED Aeowl. i _ _ - ELEvanw.a9e9.w - D O T V o - SF o -�_ L DEPENDING ON AN CIMPERVIOUSCTOSURFACE,WOKPHASING. EXIT THIS AREA WO PLEASE NOTES MIS FLAN GET IS USING uAAM FOR A VERTICAL DATUM,SURROUNDINGDA ) D _ _ _ N X DRDIVE, WOU DEVELOPMENT HAVE USED NGw29 UNADJUSTED DATUM(PRIOR GUY OF MT COLLINS DATUM) AD ����`Peaf� -�-oaf- -�; ---- �Dpn�� I NEEDED.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CLEAN FOP MDR ABROAD DATUMS. © O RS LOD $ CF - R$ RS CF -----LOD VEHICLES PRIOR TO THEM EMIRS THE SITE.ANY SEDIMENT OR DUST THAT IF NGVD29 UNRADJUSTED DATUM 3 RED FOR ANY LOD PRIM TY a FORT COLUNIS IS - - - ytee SHALLcnr a FORT COLLINS DATUM)-NAwefi DATUM-31e 29 UNADJUSTED DATUM(PRIOR _- . HAS ACCUMULATED AT THE CONSTRUCTION E%IT,OR ON ANY OTHER pURPOff,i E FOLLOWING EWAnON EXISTING STABILIZED SURFACE WITHIN THE LIMITS OF DISTURBANCE, BE CLEANED IMMEDIATELY.CONSIDERATION SHALL BE ER U TO A e ®- GOTIII� III. Ilw� �wl� =f�el5>:�A1lGfRWZ4R�'�- �f I LOO wTIEEL-WASH SYSTEM WHERE APPROPRIATE.ANY WATER USED FOR UKML ICVAU o CLEANING VEHICLES SHALL BE COLLECTED PRIOR TO LEAVNG THE LIMITS BASIS OF BEARING Aow ON vaMEs OF DISTURBANCE OR BEFORE ENTERING THE EXISTING STORM DRAINAGE ME EAST LINE OF THE GWTHEAST QUARTER BY K BE ON 23,FEWHILIP r NUNN,HAN 69 MEET CLADS ARTERIAL SYSTEM. WEST OF ME 6TH PM.RING MUNUMENTED AT ME NORTH END BY A i-I/2'ALUMINUM CAP, S NB500014fi AND AT ME ATOM END BY A 3"ALUMINUM CAP W RAN IS ASSURED i0 BEAR N W1R' "W. M A Rq..UP: DISTPNCE GE 264D.61 FEET BETWEEN SAID MONUMENTS pawn By: RISKS CONCRETE WASTE FROM CONCRETE READY-MIX TRUCKS W..By: PLO TREE PROTECTION NOTES DscHARGE aF Excess oR wns E coxCRETE AND/OR WASH WATER FROM CAUTION — NOTICE TO CONTRACTOR Dew M�AY,8,_ CONCRETE TRUCKS WILL BE ALEGI ON THE CONSTRUCTION SITE,BUT I. all BUSING UESS WRIN THE MYIIS CE RE OF4E10WENi A.WITHIN ANY NATURAL AREA BUFFER ZONES 9fALL REMAIN ANO R W NU OAMAdNC AIiACNMFJJT,RAS,FROM Ltlt PERMITS MAY L ND CLEARO TO MY AREAS WAD RA TREE LARGE PROPERLY AREAS CCNTAWINC 1. ALL E APPROPRIATE P LOCATIONS YONN ARE BASED ON MAPS FRONDED B PRBTECTEE UNLESS NOTED Wi REff PUNS FOR RfMOV/L PROTECTED BEES AMA METE THAN FROM G PATTERNS GP LAND LSEARILG AREAS READ RIGHTS-Bf-WAY AND N EASSNESITS MAY MAY TREE DIAMETER CH BREAST HEIGHT AUGER DISTANCE FROM FACE OF TREE ONLY INTO PORTABLE,IMPERMEABLE BASINS SUCH AS AN ELMS PAN. BY EN AFPRO E TM UTILITY SUCOMPANY AND FIELD SURFACE EROSION CONTROL W 2 CUMIN THE OR VMS GE ANY PROTECTED EA15RNG BEE,TLRE MALL BE NO PAN CT FAIL OAR AFOUR-WCIl DEPM UNLESS A BE RIBBONED BFF,'RARER MAN ERECTINGTAKES ARA FENCING AROUND EACH TREE AS TEND EMIT SUBSECTION(GXF)OM MAY BE (INCHES) (FEET) ALTERNATIVELY,WASTE CONCRETE CAN BE PLACED INTO FORMS TO MAKE AM )A THE TIME OF WRAP AND IS i0 BE TRACTORSCONSIDERMPLAN-INITIAL '# q1E PK ARBCM'Si aN FORESTER ALL EVALUATED Alm APPRTAO THE T CQXLWS FO ACCCMLKE ALL BY WEPLACBGGUE METAL i-0BSi STAKES A bAAwUM OF FIFTY(5D)FEET APART AND MNC RreBDN ER RBPE FROM STARE- RIP RAP OR OTHER USEFUL CONCRETE PRODUCTS. THE CURED RESIDUE AN APPROXINAIE LaCAPON ONLY. IT IS ME Ca;1RACiBA'S e 3 ALL PROlEC1FD EO51WC TREES SHALL R PRUAD i0 THE CITY GE FART CIXLINS fCRESRY SiNmAROs REF PRUNING AND REMOVAL TO-STAKE ALONG RE OU1510E PfRarus Of SUCH AREAS BEING CLEARED o-1 1 FROM THE CONCRETE WASHOUT DIKED AREAS SHALL BE DISPOSED IN RESPON98LItt TO FIELD ARIFT THE FIELD LEADER OF ALL MALL Bf PERFORMED BY A BUSMSS THAT HOLDS A CURRENT CITY OF FORT COLLINS ARBBRIST LICENSE THERE`MZD BY CBDE J THE WSTALLAROV OP URIIAS IMARPRBR LINES OR ANY UNDERCRpUND FlXNRE R MWMNG EXCAVAROW DEEPER MAN AX 6 INCHES LET TES NRTC OR PRIVATE,WAEMER SHOWN ON ME PLANS 4.RAW AN AND-1-17SUC ICA BaRRIFRs SHATT RE ERECTER ARgARO All PROTECTED EXISSWC FREES WR SUCH BARPoERS ro BE () 3-4 2 ACCORDANCE WITH APPLICABLE STATE AND FEDERAL REGULA¶DNS. THIS CR EST,PRIOR TO CONSTRUCTION REPORT ANY DISGEPANafs sxau R AccpuPusIIEO Rr RCRINc uNlxx RE ROUT sTsiFW DE PRmEciEO EnsTWc FREES AT a wNWUM IKPR R rnxNTr-faun JOBSIIE SUPERINTENDENT IS RESPONSIBLE FOR ASSURING THAT THESE 0 $ OF GRANGE FENCING A MINIMUM GE FOUR E,FEET IN HfILVfT,SECURED WR METAL i-POSTS,NO CLOSER RhKA RAN SIX(6)FEET Rt0.Y Rf TO ME ENGINEER PRIOR i0 CONSTRUCTION, 3 (2a)KEST THE AS R STAWNED I5 ATE COAST AGRIM ME Facf of ME TRff(BITER BARGE)aMB I5 ScaLm FRBM TREE paL�ETfR s-s s PROCEDURES ARE FOLLOWED. THE LOCATION OF CONCRETE WASHOUT O TRUNK OR BNE-HAIR(N)GE THE DRIP LINE,NHICHEAR T5 GREATER.MERE MALL BE AG STORAGE OR MpAMENi GE EWWKNi, AT BREAST HEIGHT AS EFSCRIREO W ME CWWi i0 ME Rlg1i uarcRlu,DEBRIS aR Flu WRW RE FEM1YYD TREE IRBTECBCW IBNE. m-u tD AREAS SHALL BE SHOWN ON THE SITE MAPS.FOLLOW ALL APPLICABLE 2. WHERE A FACTORED UTILITYESPON CROSSES AN EXISTNG TELLS,IT Is 8 ALL REf REMOVAL SHORN SHALL R COMPLETED WISIDE GE THE SONGBIRD AS1WC sEASL1V(fEB I-JULY 31)CR CONDUCT A C3.0 5 DURING RE CON5IRUCL O STAGY OF DEAL@ OUGHT RE MVRL OWS SHALLMA PREVENT THE CONCREC OF TOR OIL OR Y OTHER AN Rf SURREY OF IRFfS FNSURRIG NO ACnANE5i5 AV THE AREA ENNRONMENTAL REGULATORS FOR THE CONTRACTOR'S RESPONSIBILITY i0 FIELD ARIFT ME i HARRAGE AND E LET OF WASTE YAIU M SUCH A5 PAWL$BLS PROTECTED S,ASPHALT,CONCRETE,MOipR OIL CR ANY OTHER YAIERIAL 15-19 12 CONCRETE WASH OUT AREAS. HORIZONTAL AND VERTICAL LOCATION OF SUCH EXISTING DEPUTY, �-ABIOS. $ HARAWVL TO THE UfE of A 1REf WRIT RE DRIP LMf GE ANY PROIECIfO TREE aR STOUP BE TREES EITHER THROUGH FRMOLING OR ALTERNAnA MEOW. REPORT e OVER 19 15 INFORMATION TO ME ENGINEER PRIOR TO MTRUCPON, CWII WNMwyaaW STORMWATER MANAGEMENT PLAN NOTES EROSION CONTROL LEGEND /w- \ I_ THE CONTRACTOR ANO/W AUTHORIZED AGENTS SHALL REMOVE ALL SEDIMENT,MUD, G�III�O��� N / I DY HAVE KEN IWH AGEDGiO,OR ACCUMULATE DENTS,M IN,IxTVE ROW EMS ANDPUBLIC TS NAT RIGHTSCO WAYS OF -5115----EXISTING MAJOR CONTOUR ® ( THE TOWN AS A RESULT OF CONSTRUCTION ACIINIIES ASSOf1ATE0 AM THIS SIZE _____1q__------ EXISTNG MINOR CONTOUR ( DEVELOPMENT OR CONSTRUCTION PROJECT.SITU REMOVAL SHALL BE CONDUCTED IN A TIMELYELY MANNER 6162 S.WIIbW DHV,,SUN,320 M . LOD ® PROPOSED MAJOR CONSOUt 303"T'natl VillaAe,C080111 2 ADDITIONAL O N090N AND SEDIMENT CON1RW MEASURES MAY BE S OR IF E UB OMEITTED G,110 Yus %( ® AFN HIS S HER UNCAGENTS DUE TO INTENDED. MEN EROSION PROBLEMS OR P ME SUBMITTED ® PROPOSED MINOR tONTWR ORIlowsyUs.wm / I PLAN GOES OF NNCTW AS IDER UNTIL ME REQUIRE TIMEAS OL THIS RAN SUALIPROPERLY BE ME COMPLETED OF ME PERMIT HOLDER MM SUCH TIME AS ME PLAN IS PROPERLY COI.PLEIED AND ME PERMIT IS PELEAGER. sD EXISTING GiORM SEMER(LESS MIN 1Y) TAMMETS ROM 0 10 m Me 3 NTERI TH NC�MErSTORM SEWER BESTIAL DURING ALL OR GRALL PREVENT SEDIMENT, MDEMOURON,EXCAVATIONS AND ALL OVER ,PENNING, —SD PROPOSED STORM SEWER(LESS PLAN 12-) \ IP TyT-�`TL_ BORING,GRADING OR OVER CONSTRUCTION OPERATIONS THAT AAE PART OF MIS PROJECT CF CF C V'f ----- CF ` GOALS: THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR AEMEDIAFOR OF ANY ADVERSE - - EXISTING STORM SEWER IMPACTS TO ADJACENT WATERWAYS,WETLANDS,ETC.,RESULTING FROMWORK DONE AS LOD CF I� PART OF 1HI5 PROJECT PROPOSER STORM SEVER - F 4 THE CONTRACTOR SHALL LOCATE,INSTALL,AID MAINTAIN ALL WATER QUALITY EROSION •D y 11 GO MEASURES ANI AS INOCATED IN ME PP1-1 STURMWATER MANAGEMENT PIPER. PVMT PERMANENT PAVEMENT L �✓ - SF Q- EDLOD ' S ROD -WIT STREETS SHALL BE MULCHED WITHIN 14 DAYS OF THE WMPLEnON OF OKALOT - GRADING UNLESS A LAYER OF AGA REGATE ROAD BAY OR ASPHALT PARINGROW IS TO BE y ARROW IPO -_ - 0 21 r APPLIED TO SAID ROUGH-CUT STREETS AVIN 14 DAYS. AM i CLOD LOD wlrs of GGtugBAxGE 6, THE DEVELOPER,GENERAL CONTRACTOR,IMAGING CUT ANDCONTRACTOR MA ANAL ARMED)ME AUTHORIZED V ' AYNTG SHALL ENSURE VAi P1L LOADS OF CUT AND ED MAIEAIENLSOTO OR C SILT ONE i0 REMIN IN IP III EXPORTED FROM THIS SIDE SHALL BE PROPERLY COVERED i0 PREVENT LOSS OF ME VTC VEHICLES TRACKING CONTROL PUCE UNTIL RRSi LIP OF MATERIAL DURING TRANSPORT ON PUBLIC RIGHTS OF WAY. ti PAVEMENT CONSMUCIED � SF �� � ) GOES THAT WILL BE STOCKPILED FOR MORE MAN 30 DAYS SHALL BE PROTECTED FROM CW CONCRETE WYNCUT AREA (SEE DETML GREET Cis) �3 „ I ® COPYRIGHT o _'P' CF WHO AND WRIER IN 1NO FEET O 14 DAMN G STOCKPILE CONSTRUCTION.IF CONTROLS SUCH I, I THESE PLPNS AREAN INSTRUMENT OF SERVICE SL I ME TEMPORARY OWE 1 W FEET OF A O LAMED E RE AOETIONAL SEDIMENT CONTROLS SUCH $$ STABILIZED STAGING AREA / I O _ ' ® � AND ARE THE PROPERTY OF GPLLOWAY,AND MAY LOp _ AS TEMPORARY DKES OR SILT FORCE GHAL BE PEQU RE0. NOR BE TTIFEGUIPLICATRMI N LOSED,OR REPRODUCED P it y SF II I 8. APPROVED EROSION AND SEGMENT CONTROL MEASURES SHALL BE MAINTAINED AND KEPT IN IP SOME INLET PROTECTION WIIHWrTHEWROFTEN CONSENT OF GALLOWAY, II COPYRIGHTS PNDINFRINGEMENTS WILL BE O MN I CWD REPIR CO ME DURATION OL MIS PROJECT.ACCUMULAIEO GEDI E T AND DEBRIS SHALL EL REMOVED F E A CWMW MEASURE WHEN L E ASURE. OR DEBRIS ENFORCED ALTO PROSECUTED, I SCL SEGMENT CONTROL LOG I i I SF 'I ADVERSELY IMPACTS ME FUNCTIONING OF ME CONTROL MEASURE. IP IP II 9. LION TRUCnON SEQUENCING MAY NECESSITATE RELOCATION OR TEMPORARY REMOVAL CO CURB SOCKS I THE CONTROL MEASURES SHOWN HEREON.THE CONTRACTOR MAY RELOCATE CW1AW SF NCONSTRUCTION MEASURES NLLUO G VEC,SSA AND TRAILERS AT THEIR DISCRETION ME -- -- O ----- SC PROPOSED SAWCUi LINE MOL ME AN, R i EO AT H A ON THEY WI N N 1O CON SHALL BE ES W SUCH E A5 E HILL 0 LONGER IMPEDE THE RDAOF ME SITE WAY OF ME DRAWINGS SHALL PE MARKER UP ACCORDINGLY LED. VTC AM A RECORD GE CONTROL MEASURE MWIRCATIONS KEPI IN ME 91E WSPECTION LOG SF $F SILT FENCE P III 111 ALL EROSION AND SEDIMENT CONTROL PRACTICES AND OVER PROTECTIVE MEASURES CF CF CONSTRUCTION FENCE NI �J IDENTIFIED IN ME SWAP MUST BE MAINTAINED IN EFFECTIVE OPERATION CONDITION.FEWER 9 d I \ SELECTION AND INSTALLATION W CONTROL MEASURES AND IMPLEMENTATION W P p ~ JI P I ' COMPREHENSIVE INSPECTION AND MET THIS PROCEDURES IN ACCORDANCE HAT ME $D SILT DIKE L-� SWAP SHOULD BE ADEQUATE CC MEET CE CONDITION.CONTROL MEASURES,Ai ARE NOT b� ApEQUA1ELY MAINTAINER IN ACCORDANCE AM GOON ENGINEER,HYDROLOGIC,AND CF 4 'BEMPONARY RELOCATED LOCATION _ I OR MEi 4 POLLUTION CONTROL PRACTICES.INCLUDING REMOVAL Of COLLECTN SEDIMENT OUTSIDE ME O PS PERMANENT SEEDING ® e AtCONS"U"IONFOF Vf m ACOEPiABIE TOLERANCES OF THE CONTROL MEASURES ARE CONSIDERED r0 BE NO LONGER LS PERI1ANNi LANDSCAPING LOD T BE MAIN ~ I LOD OPERATING EFFECTIVELY AND MUST BE ADDRESSED. ' LOD INTERIM EROSION CONTROL NOTES a~o SP SITE POSTING(CONTACTS AND PERMITS) 1, BEGIN EXCAVATION AND INSTALLATION OF SANITARY SEVER USE AND STUB AMIN 0 ( CONSIAUCTON FENCE. WASHOUT POSTING MARKETPLACE & I N 2 PAY£DISTURBER AREA TO PRE-CHANTAUCnON CONDITION,REMOVE JERSEY BARRIERS,AND PINT EXISTING SPRING TO PRE-CONSTRUCTION CONDITION. H sF 2 ti 123,780$F �' I `�I 3. BEGIN DEMOLITION BE ASPHALT.(PHASE DEMOLITION TO ME EXTENT PRACTICAL TO MINIMIZE LOT �`+ " R VI ME AMOUNT OF AREA DISTURBED AT ANY POINT IN TIRE) 11171g A SF L ti ZONING:GE DEAL COMMERCIAL SF > p a EXCAVATE AND SET TANKS AND USE SPOILS TO BUILD KIOSK PAD. LI_I (o IP ~ I JI BE < 5 BEGIN GRATING THE SITE.START CONSTRUCTION OF ME BUILDING PAD AND STRUCTURES. U n 2I a E TEMPORARILY STABILIZE,T RECENT LA D CISRUCTON IMMEDIATELY EATY,FOULOWNGMY ME Q COMPLETION OF ME MOST L STOCKPILES LAND DISTURBING/GRADING ACTIVITY,MY DISTURBED J AREAS,INCLUDING MATERIAL STOCKPILES THAT ARE SCHEDULED OR LIKELY TO REMAIN W INACTIVE FOR 14 DAYS OR MORE, U Vl ,._ J INSTALL UTILIIIEG,STORM SEWERS,WAGS AND BUTTERS. w Q I� R INSTALL CONTROL MEASURES AMIN OFF-SITE WORK AREAS PRIOR TO BEGINNING WORK IN J Q 1•. 1L.1 I - THESE AREAS 0, O_ of 9, IMMEDIATELY PERMANFNTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE BROUGHT TO O Q I- w O o CF I U A, /n 'F 3.S GRADE. L.L 2i Y Y 0 10. PRIM I 111GAA1E AS NECESSARY. r^ �l _ " - ». PR P RE sI E FOR PAWnc. Z Z Q O 12. PAYE 91E. Q U J C _X� J 13. MANTIN APPROPRIATE INLET PROTECTION DEVICES FOR PAYED AREAS 6 WORK J G w O PROGRESSES,PER BMP DETAILS,IP 1 �vv -_ IP CF I U) W U W - = SF I 14. COMPLETE GRADING ME INSTALLATON OF PERMANENT STABILIZATION OVER ALL AREAS. } LL > LOD' Q uJ C,5 I5. REMOVE TEMPORARY STRGON1 AND PINT PERMANENT SNIPING O 0 Q z LL I 53'x34'ELLIPTICAL SD o w'GD O ° 16. OBTAIN L FULLYCONCURRENCE FROM CONSTRUCTION AS BEEN (CM)AND MAT ME ONE HAS BEN J �IL VnL J _L ^ LLY STABILIZED AND ALLCONSTRUCTIONN HAS BEEN COMPLETED. O J ` 1 _ 17, THE AREA CONTAINED'MMN VIS BOUNDARY ALL NOT BE FENCED AND WIDE BE O�n ILL O OLL K f I STABILIZED THROUGH GLEDNC AS DESCRIBED BY THE LANDSCAPE RAN IT SHALL PE �pp�� O v/ J U PROHIBITED i0 USE THIS SPACE xFORMPILY AS A OUwOBR SALES,MARKER OR MY UUSESTABILIZED STAGING AREA(SSA)NOTICE J J OVER MAN A VACANT 91E.MAINTENANCE ALL BE ME PESPONSIDUTY OF ME OMER (KING GWPERS). THE STAGING AND STORAGE AREA AT THIS SITE MAY MAKE USE OF A Q � O O PAVED DRIVE,DEPENDING ON CONTRACTOR'S WORK PHASING.SINCE THIS Z Z U Of j� SF ME PERMANENT WATER QUALITY CWMW MEASURES ARE TO BE INSTALLED UPON COMPLETION AREA WOULD CONSIST OF AN IMPERVIOUS SURFACE,A STONE STAGING c—c O I OF CowsTRucnoN sfpuNCE N ORDER TO MINIM7E nxv POTENTIAL YDWNTAnaN AREA WOULD NOT BE NEEDED.IT SHALL BE THE CONTRACTOR'S LL G Y Cn LL RESPONSIBILITY TO INSTALL CONTROL MEASURES AROUND THE STAGING } IP I E7TY OF FORT COWERS EROSION CONTR(1L PLAN NOTES AREA TO PREVENT POLLUTANTS FROM FLOWING TO OTHER SITE AREAS.ANY I 1a 3s'm 3B'sD 7e. -� 11-- �y _ i. Y I SEE SHEET CO.I-NOTES LI FULL LIST OF CITY ECP NOTES SEDIMENT OR DUST THAT HAS ACCUMULATED ON ANY EXISTING STABILIZED J O �'I / SURFACE WTHIN THE LIMIT$OF DISTURBANCE,SHALL BE CLEANED IP SF __ L50pPo?F SF ) Y IMMEDIATELY.ANY WATER USED IN THE STABILIZED STAGING AREA SHALL SF # Date Issuel Desaipti0n INIL / EXPOSED SUBGRAOE NOTE BE COLLECTED PRIOR i0 LEAVING THE LIMITS OF DISTURBANCE OR BEFORE Bvganoz, 1sTcm suawTrAL NQ ENTERING THE EXISTNG STORM DRAINAGE SYSTEM. - — ° AS SF w ZONING:BERAA1 WMKERCIAL ` EXPOSED SUBGRADE DUE TO PAVEMENT REMOVAL OR BUILDING -BWz4noz,zxD ClttsuWalTru BUD 25 ----" , ( FOUNDATION EXCAVATION,MUST BE KEPT BELOW TOP OF EXISTING SF i BENCHMARK BW„ ,BIDPAGKAGE PJD O LOT 1,BLOCK 1 I PAVEMENT OR SEDIMENT CONTROL LOGS LNG ACROSS WADDLES)MUST BE -BSI19YL021 3RD CItt5U2MITTAL PJO JIFFY SUBS P.UD. I USED TO CONTROL SEDIMENT FROM RUNNING ACROSS THE EXISTING PROJECT DATUM: NAwee SEE NOTE 17 GECARDINC ME �� ZONING:GENERAL CWMERCIPL \ / PAVEMENT. BSI19Y[0]]dM CIIYSUBMITTAL PJD '8 DURING CONBTRUITON OF `MAINIENANCE CO MIS LOT ONE STORY BUILDING o / ", BENCHMARK T C322 THEE GAR CONTROL MONUMENTS ARE A 2'ALLOW A CAP SET IN A SOLD ' SEER MAN,V1C WILL NEED M AREA IN INTERIM COMMON SF ADDING E STRUCTURE,ME MONUMENTS ARE STAMPER'CITY O FORT GOWNS PENONMARK' M I HAVE AN MUSS OFF LWATION - — Mr_ �^ \ (ACCESS OFF COLLEGE) ` - - SF �/ ALONG AM A DISTINCT IDENTIFYING NUMBER(REFERENCED ABOVE). O 4EHICLE TRACIONG CONTROL(�NODCE fLEvenax.age9.w - — \ � '6® VTC SSA L T S LOD THE CONSIRUCTON EXIT AT 1HI5 SITE MAY MAKE USE OF A PAVED DRIVE, N 1 s CIA `MP 23,238 SE DEPENDING ON CONTRACTOR'S WORK PHASING.SINCE THIS AREA WOULD PLEASE NOTE:MIS PLAN GET IS USING NAVD68 FOR A VERTICAL DATUM.SURROUNDING - — g E, CONSIST OF AN IMPERIAOUS SURFACE,A STONE EXIT WOULD NOT BE DEVELOPHFNSS HAYS USED NGVO29 UNADJUSTED DATUM(PRIOR GUY OF EMT COLORS DATUM) 0.G33 AC N G. L aA EA NEEDED.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CLEAN FOR MDR VERTICAL DATUMB. VEHICLES PRIOR TO THEM EXITING THE SITE.ANY SEDIMENT OR DUST THAT - — a - - - If NGVD29 UNADJUSTED DATUM(PRIOR CITY ON FORT WILLING DATUM)IS REQUIRED FOR ANY - - HAS ACCUMULATED AT THE CONSTRUCTION EXIT,OR DI ANY OTTER - _ PURPOSE,THE FOLLOWING EWATON SHOULD BE USED: NGVD29 UNADJUSTED DATUM(PRIOR _ _ SF -- EXISTING STABILIZED SURFACE WITHIN THE LIMITS B DISTURBANCE,SHALL - — _ -LI--- - -' BE CLEANED IMMEDIATELY.CONSIDERATION SHALL BE GIVEN TO A cnr a FORT WwxG DATUM)=NAwee DATUM-3.1e', T G G`U_ I — �-O. a- ___� --------'- WHEEL-WASH SYSTEM WHERE APPROPRIATE.ANY WATER USED FOR w 0 RS RS LOD \ CF --- - RS RS CF LOD CLEANING VEHICLES SHALL BE COLLECTED PRIOR i0 LEAVING THE LIMITS BASIS OF BEARING - OF DISTURBANCE OR BEFORE ENTERING THE EXISTING STORM DRAINAGE ME EAST LINE OF ME SQUTHEAST QUARTER OF SECTION 23,M NSMP 7 NWM,RANGE s9 �� LOD WWI � �"'. LOD WWI i�- _ - - - - - - WEST OF E BM PM.BEING 7MENIEU AT THE NORM END TO A 2-1/7 ALUMINUM CAP, Rq..UP: KSGOOO146 $Y$TEM AM AT ME 9JUV ND BY A 3"AUMINUM CAP,IS ASSUMED TO BEAR N W18'W"W. AV A -- - - MIS MU a 264D.61 FEET BETWEEN SAID MONUMENTS ,• 1 LSD Uawn By: RISKS .- PAY OO WxAetl BY: BUD SO w 0.VARIES DISCHARGE OF EXCESS OR WASTE CONCRETE AND/OR WASH WATER FROM CAUTION - NOTICE TO CONTRACTOR Dale. MAY1A,1p22 STREET CLASS ARTERIAL CONCRETE TRUCKS WLL BE ALLOWED ON THE CONSTRUCTION SITE,BUT 'y ONLY INTO PORTABLE,IMPERMEABLE BASINS SUCH AS AN ECO-PAN. 1. BY MELIAPPTY RWRITESUTLIITTY�DCOUPAnYYMm RED SUN MAPS RFACE EROSION CONTROL ALTERNATIVELY,WASTE CONCRETE CAN BE PLACED INTO FORMS TO MAKE EMDNGE AT ME TIME OF SURVEY AND IS TO BE CONSIDEPED PLAN-INTERIM RIP RAP OR OTHER USEFUL CONCRETE PRODUCTS. THE CURED RESIDUE AN APPROXIMATE LOCATION ONLY. IT Is ME CONTRACTORS FROM THE CONCRETE WASHOUT DIKED AREAS SHALL BE DISPOSED IN RESPOB98LItt TO FIELD VERIFY ME FIELD LOCATION OF ALL ACCORDANCE WEN APPLICABLE STATE AND FEDERAL REGULATIONS. THIS UTI NOT, BRIT OR PRIVATE,WIENER SHOWN ON ME PLANS CR NOT,PRIOR i0 CONSTRUCTION. REPORT ANY DISCIMPANCIES JOBSIIE SUPERINTENDENT IS RESPONSIBLE FOR ASSURING THAT THESE TO THE ENGINEER PRIOR TO CONSTRUCTION, PROCEDURES ARE FOLLOWED. THE LOCATION OF CONCRETE WASHOUT O AREAS SHALL BE SHOWN ON THE SITE MAPS.FOLLOW ALL APPLICABLE 2. WHERE A PROBLEM UTILITY CROSSES AN EMSDNG UTIUTY IT Is � C3. 1 ENVIRONMENTAL REGULATORS FOR THE CONTRACTOR'S REGPONSIBIUTY TO FIELD VERIFY ME { HORIZONTAL AND VERTICAL LOCATION OF SUCH EMOTING UTILITY, CONCRETE WASH OUT AREAS. EITHER THROUGH POTHOLING OR ALTERNATIVE MEMO. REPORT ivaea . INFORMATION TO ME ENGINEER PRIOR ro CONSTRUCTION, CaIIU AMA. STORMWATER MANAGEMENT PLAN NOTES EROSION CONTROL LEGEND /w- \ L THE CONTRACTOR ANG/W AUTHORIZED AGENTS SHALL REMOVE ALL SEDIMENT,MUD, G�III�O��� N / I DY HAVE KEN IWHNGEDGiO,OR ACCUMUUIARE IN, ROW LNESNAND PUBLITS NAT C CO WAYS OF -5115----EXISTING MAJOR CONTOUR ® ( THE TOWN AS A RESULT OF CWSTRUCRON ACIINIIES ASSOCIATED AM THIS SIZE -----z+-------- EMsnuc MINOR CONTOURDEVELOPMENT OR CONSTRUCTION PROJECT.sap REMOVAL SHALL BE CONDUCTED IN A TIMELY MANNER. 6182 G.WLIbw DMve,BUWe 320 LOD ® PROPOSED MAJOR CONTOMt 303"T'netl VillaAe,C080111 2 AM HIS PO EHER AN AND SEDIMENT CONMW MEASURES MAY BE S OF IF OF ME OMEN 303.TT0.8884 AID HIS S HER AGENTS DUE TO INTENDED. MEN EROSION PROBLEMS ON E ME SUBMITTED SEE SHEETS / PLAN DOES OF NNCTW AS INMM]N.ME H TIME AS M OL THIS RAN SHa1 BE ME ® PROPOSED MINOR CONTWR GellowsyUS.wm FI.O-F4.0IGN NEL / I COMPLETED OF ME PERMIT HOLDER UNTIL SUCH TIME AS ME PLAN IS PROPERLY r I C£MER DESIGN(IM) / \/• !I COMPLETED AND ME PERMIT IS AELEA9m. sD EXISTING STORM SMER(LESS MN 1Y) T REMO p -- REMOVED I r to I S ME CONTRACTOR SHILL PREVENT SEDIMENT,DEBRIS AND ALL OVER POLWrAMMTS FROM —SO PROPOSED a16RM SEVER(LESS MN 12") REMOVED 0 10 ID 60 __ _ REMOVED IT, I ' ENTERING ME STORM SEWER BESTIAL DURING ALL DEMOLITION,EXCAVATION,TRENCHINW \ IF P=_ �_- . BORING,GRADING OR OVER CONSTRUCTION OPERATIONS THAT AAE PART OF MIS RO ECT. IP .v ME CONTRACTOR SHALL BE HELD RESPONSIBLE FOR AEMEDIE GN OF ANY ADVERSE J H - \ 6C4LE:1'=fi0' - EXISTING STORM SEWER - —-�- _FENO`E° /I I IMPACTS TO ADJACENT WATERWAYS,WERANDS,ETC.,RESULTING FROM WORK DONE AS SD _--_ PART HE MIS PROJECT ®PROPOSED STORM SEVER OD 'I a 11 GO METHE ASURES TOR M NO ALL AS ANGCIAMD X ME°NPR-1 ITURI ATER MAINTAIN ALL WATER UMANAGEMENTALITY P� PVMT PERMANENT PAVEMENT 21 PMIT LS PVMT W y W LOFT F ' 5 RWgI-Wi STREETS SxALL BE MULCHED WITHIN 14 DAYS OF THE COMPLETION OF OVEALOi IC o .: LS UW y W wF GRADING GNL£SB A LAVER OF AD]REGAM ROAD BAY GR ASPHALT PANNG IS i0 R y ROW ARROW 7" R ,� SF APPLIED TO SAID ROUGH CUT STREETS WVIN 14 DAYS. W w O� O � � � �LOD� LOD calls a DISTURBANCES REMOVED ____ f W LEI. 6. ME DEVELOPER,ENSURE CWLL LOAD,CONING AND GE CONTRACTOR ANAL IMPORTED THEE AUTHORIZED AGENTS SHALL ENSURE THAT ALL LOADS OF CUT AND RLL O PROVENLOSS i0 OR 0 LS ' MDROATERIAL MGMDURING MRU SITE SHALL BE PROPERLY COFEAEO i0 PREVENT LOSS OF ME VTC VEHICLE TRACKING CONTROL SILT DIKE TO REMAIN IN P$ W W MATERIAL DURING 1RN6PORi ON PUBLIC RIGHTS OF WAY. PEACE UNTIL FIRST UFi°F : % S KEEDENi"'TRUCTED W ) SOULS FDA WILL N STOCKPILED FOR MORE MN 30 DAYS SHALL W PROTECTED FROM CW CONCRETE WASHOUT AREA (YE peua aHEET cBs) '3 O W I ® O COPYRIGHT PV?AT r o L$ L W W C WARD AND WATER EROSION WITHIN 14 DAYS OF STOCKPILE CONSTRUCTION,IF 57OMPLES THESE PLANS MEAN INSTRUMENT OF SERVICE IP Ii --- �i 1 r ' ME LOCATED MMIN 1W FEET OF A DRAINAGEWAY,ADN7IONAL SEDIMENT CONTROLS SUCH ® $$ STABILIZED 9iggNG AREA ANDAREIHEPROPERTYOFGALLOWAY,AND MAY REMOVED - y W W W . . LOD 1- qs TEMPORARY OWES OR SILT FENCE SHALL BE flEDUIRED. NOTCE GIPLICATED,DISCLOSED,OR REPRODUCED II �'. ' - 8. APPROVED EROSION AND SEGMENT CONTROL MEASURES SHALL BE MAINTAINED AND KEPT IN IP SOME INLET PROTECTION WEACUTTHEWRBOTH CONSENT OF GALLOWAY. I W O �� COPYRIGHTS NDINFRINGEMENTS WILL BE CWO REPAIR CO ME DURATION OL MIB PROJECT.ACCUMULATED SEDIMENT AND DEBRIS I � q ENFORCED ANY PROSECUTED, l W I SHALL�REMOVED FROM A CWIRW MEASURE WHEN ME SEDIMENT OR DEBRIS ulfl LS n " SCL SEGMENTW aL Lac REMO OW MEMO D ADVERSELY IMPACTS ME FUNCTIONING OF ME CONTROL MEASURE. O w !W W W w - 1 I Pwr P w P'YMT LS L QUIP 9, CONSTRUCTION SEQUENCING G MAY NECESSITATE RELOCATION OR TEMPORARY REMOVAL CO RS CURB sOCICS ' THE CONMOL MEASURES SHOWN HEREON,THE CONTRACTOR MAY THEIRRELOCATE CONTROL O Y / I F ! ..... IB':50 O MEASURES E RESG VAC,SSA AND CONSTRUCTION MAILERS AT THEIR DISCRETION.ME --------- SC PROPOSED SAWCUi LINE CONTROL MEA51RE5 41NL BE RESTORED AT SUCH A TIME A5 THEY CULL NO LONGER �I: a.1IJ LS IMPOSE ME MURK,ME SIZE WRY OF THE DRAWINGS SHALL BE MARKED UP MOCKINCEY, AID A RE IRS BE CONTROL MEASURE MODIFICATIONS WRIT IN THE SITE INSPECTION LOG SF SF SILT FENCE Y ice' `r - LS OF ALL EROSION AND SEDIMENT CONTROL PRACTICES AND OVER PROTECTIVE MEASURES CF CF O CONSTRUCTION FENCE L - NI IDENFIED IN TILE SWAP MUST BE MAINTAINED IN EFFECTVE OPERATION CONDITION.FEWER $ 'x Iy _ PVNT) @ SELECTION NINSTALLATION BF D CONTROL MEASURES AND IMPLEMENTATION OF I'P REMOVED L LS COMPREHENSIVE INSPECTION AND MAINTENANCE PROCEWRES IN MCORGANCE WM ME SD SILT DIKE V 1 AH.I.OVE6 I' I 1 SWUP SHOULD BE ADEQUATE IN CC MEET THIS IN COMMON CONTROL MEASURES CHAT NE NOT O _ • A°EQUAIELY MAINTAINED IN ACCORDANCE WIH GOON ENGINEER,HYDROLOGIC,AND NENOV4D CF PMTT i LS - ' PCLLUTIW CONTROL PRACTICES.INCLUDING REMOVAL OF COLLECTED SEDIMENT OUTSIDE ME O PS PERJNFNi SEEDING ® a 0 O 'kS:d: gCCEPTABIE TOLERANCES OF THE CONTROL MEASURES ARE CONEDEAED TO BE NO LONGER LOD E 1. PINTJ y ' LED OPERATING EFFECTWILY AND MUST BE ADDRESSED. LS IMMANENT LANDSCAPING 11. NO DEBPoS OR TRACKWT Is ALLOWED ONTO NEIGHBORING STREETS OR DEVELOPMENT.IT 1 - LOD NY TRACKOUi DOES OCCUR,IT WILL BE IMMEDIATELY CLEANED BY THE CONTRACTOR a-a SP SIR POSTING(CONTACTS AND PERMITS) BB P LS 0 LS L$ ( PMIT REMOVED 12. PERMANENT WATER DUALIARE 0 BE CONTROL MEASURES p INSTALLED UPON CWPIETON WH WP WpYWT POSTING MARKETPLACE aF CoxsTRuenax sEDUexa Ix aROER To MINIMS NY POTEunAL YDuexrpnoN. & I LS 123,790 SF FlNAL EROSION CONTROL NOTES LOT 1 r W L�I 1. REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL BEST MANAGEMENT b PMTTYY PRACTICES(CONTROL MEASURES)AS INDICATED ON PLAN ONCE PERMANENT CONTROL PMIT N�2T1�AT PVMT y II MEASURES ARE IN PLACE(LMDSCAPING,PAVING,SEEDING) ti ZONING' N - - .lE.171 COMMERCIAL k W y ) LS Q D p II 2, STABILIZE ANY AREAS DISTURBED BY ME REMOVAL OL TEMPORARY CONTROL MEASURES, IP LS � U O O > 3 INSTALL PERMANENT SEED AND LANDSCAPING,FOR DETAILS SEE SHEETS LI.O L1 l REMIT i i �'I Q i ry a MARKED 'READY TO TERMINATE AND RPWSS UNIT TILE E FINAL Daly INSPECTION REPDT J < I MAIMED'READY i0 1ERMINp1E PERMIT,IS SIGNED BY ME CONSTRUCTION MANAGER AND LLI 23 1 I • U rc d SUBMLEES SYMP PLACED IN ME JOB SITE BINDER. P^ - LS ;._ S INLET FROTECTW SHALL REMAIN IN PLACE UNTIL TOA aTARLIZATION HAS BEEN REACHED.P W Q MIT V1 I� I 6, PROVIDE OWNER WEN COMPILER COPY OF AIB ETE EIDER. N J Q W� LL LL LL of r LS LS CITY 6 FCRT COl11NS EROSION CONTROL PLAN NOTES Q L1 W 0 REuavED CF I I 1B SEE SHEET C0.1-NOTES FOR FULL LIST OF CITY ECP NOTES Y LOD '}e LS a " n L U) PMTT e N II]I PMIT LS z Cn � J i 1 ~ REMOVED {® _ THE DEVELOPER SHALL HAVE A LICENSED PROFESSIONAL ENGINEER JQ Q a," IP T LS 'i: IP CERTIFY EACH STORMWATER DETENTION POND AND/OR WATER QUALITY (/� () p �a I' ,:;:.:•, CF DALE CONTROL MEASURES IS BUILT ACCORDING TO THE APPROVED PLANS AND efuDVED SPECIFICATIONS AND THE REQUIRED DETENTION VOLUME INCLUDING THE...::8 .___ LSO�� Q Q (D '.; "" WQCV WHEN USED,IS MET.THE CERTIFICATIONSHALL ALSO VERIFY ALL :. PERTINENT `! ELI �... m . e ENT DIMEN DNS,ELEVATIONS,REQUIRED CUTLET ORIFICE PLATES — a_ z .1 y FOR DETENTION AND WQCV AND OTHER PERMANENT CONTROL MEASURES z O J -I ___L �1— REQUIREMENTS ARE INSTALLED PER THE APPROVED PLANS AND C7 J 1 C F °,- LS I LS LS LS PM1T ' - SPECIFICATIONS,AND SHALL SHOW THE AS-BUILT VOLUMES FOR THE O W 1 O � I 1W-YEAR,10-YEAR STORM EVENTS,AND FOR THE WQCV AND O1HER (n J O R u•wLD LS `& ®e YPERTINENT DIMENSIONS, OC EVICT LS \ LS —50 ASSOCIATED WELL THE THEYO EVE USED. AD.THE ECERfl ONIROLSHALL BE SECTION Q Q O - LS U —_ — a.YM PMTr Y -- — —� SENIOR ENGINEER BEFORE A CERTIFICATE OF OCCUPANCY WILL BE ISSUED. z LS� �- LS� yy `i-• 'LL F IP Rg10VED T AON G ALL ON ND OFF-SITE ESAREASODISURBEDLE RDURING CONSTRUCTION,PERMANENTLY IWHETHER THESE 2a 36'aD - 6 f0 O FW. F I AREAS ARE SHOWN ON THE PLAN OR NOT,INCLUDING MAINTENANCE OF / P O e e . W SF F_ LOT Y SF / IF ALL CONTROL MEASURES UNTIL A NOTICE OF INACTIVATION HAS ACCEPTED P # Date Issuel Desm hDn IniL q iS 15420 OF BY THE STATE P flEMOVEG : J1 REMOVED REMOVED w + W REMOVED 0354 AS / 02103Y2021 19TCITY SUBMITTAL PLO © y� ZONING:(ENfRPl CONAERCIAI ( ED24I2021 2NDC FYGUBMETAL PJD BENCHMARK W W W W — \ P. LS .. W .i-W LOT 1BUD ,BLOCK 1 I / I' I _Bwl9rmzl aRDCTrweMITTAL wD JNFY LURE P.U.D. I PROJECT DANM: NAIVES 1 - \ L$ LS ' 23,338 aF ZONING:GENERAL COMMERDAL \ / OG19Y[022 4NCDYSUBMITTAL PJD ADAC M ONE STORY BUILDING o / ", BENCHMARK ITC322 VERTICAL CONTROL MONUMENTS ARE A 2"ALUMINUM CAP SET IN A SOLD _ — O LS 1 Dr CONCRETE STRUCTURE.ME MONUMENTS NE STAMMER C OF FORT GOWNS ffNONMARK" Y •i �` `- PJEMBVEDI CF REMOVED - 26 \ REMOVED _ / ALONG IN A DISTINCT IDENTIFYING NUMBER REFERENCED ABOVE. ' - \ VTC SSA -- LOD ELEvpnax.a9e9.w AEYOVID RMOVEG': REMOVED - — S PMIT 2s CW WE SIF PLEASE NOTE:NIS NAN SET Is USING NAW88 FOR A VERTICAL DATUM.SURROUNDING - — \ DEVELORIENTS HAVE USED NGVD29 UNADJUSTED DATUM(PRIOR GUY OF FORT COWNS DATUM) FEB 26 ) LS ® FOR MDR VERTICAL DATUMS. - — PS ... :. _ — _ -- ---- IF BE SE, HE FOLDOVI DATUM(PRIOR CITY ON FORT: NGW DATUM)IS REWIRED FOR ANY ' SP � '; __ PURPOSE,THE FOLLOWNG EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM(PRIOR � --0-_- - 'W Kmi� W W CITY A FORT COWxs DATUM)=NAVDBB DATUM-3.18', ° I BASIS OF BEARING `= D \REMOVED CF -- REMOVED RS RS REMOVED CF REMOVID - �IM ME EAST LINE OF THE GREEN—QUARTER OF SECTION 23,TOWNSHIP Z NORTIE RANGE 69 f RS � RS LO REMOVED REIAOVED LOD �� ���- �� �L6Da� LODW� WWI WW1 - _ - - - - - - _ _ - - - - - WEST OF ME 6M PM.BEING T ALUMINUM AT THE NORTH END TO A 2-N B ALUMINUM CUP, pmleM No: NSSOW14fi _ WWI GOUT ANT AT ME 264 END BY A 3"ALUMINUM CAP,IS ASSURED i0 BEAR N W18'W"W.WM A WWI ' - pSTNW 6 2840.81 FEET BETWEEN SAID MONUMENTS �,��W�-ppSLTB� t� ,301� U LOD •\ Orewn BY: RISKS ®` UICARC 1CUAU O CM1aoAeJ By: BUD SO w 0.VADES CAUTION — NOTICE TO CONTRACTOR Daa. MASUCU P2 STREET CLASS ARTERIAL 'x 1. EUTML°CROESTITMMDSRFABYY MAROPAIULITCOPANY AND REDUCE EROSION CONTROL AN°,1EPPROAMATE6 LOCA➢oN ONLYYY AND IS ME CONTRACTORS° PLAN-FINAL e REGIMES BLITY 70 FIELD VERIFY ME FIELD LOCATION OF ALL UTILITIES,PUBIC OR PRIVATE,WETHER SHOWN ON ME PLANS UP EST,x i0 ME ENGIINEER°CONPRIOAS TOOCTION CONSTRUCTIONR ANY OISCFEPANCIES 0 $ 0 3 2. WHERE A CONTRACTOR'S UTILITY CROSSES N D ARIF UTILITY IT IS /'� ./'� HOLE HORIZONTAL AND V RESPONSIBILITY TO FIELD VERIFY ME J( L EITHER TAU AND VERTICAL LOCATION CO SUCH EMS. UTILITY, OvwNaDBIO�. ETHER MNWGH E ENGINEER OR RIMMED MEMOS. NEPoRT INFORMATION i0 ME ENGXEER PRIOR 0 CONSIRUCnON, GII WMM<wi SM-3 Construction Fence(CF) Construction Fence(CF) SM-3 Concrete Washout Area(CWA) MM-1 MM-1 Concrete Washout Area(CWA) Ga@Soway COOL 1 wnsHDuT 6162 S,WHH,w Drive,SUite 320 Icn Gmeimmd Village,CO80111 0 nL L CF MNFNM FF4FF 4AIMFx.xFF xn < # CWA NFF 303.n0.B8Bd &. 1 u YIIF< GBII'NRYUS wm CAN"N C!BNPv FACX WORKDAY.NIO II.VNiNN HOT I IN EFFECT` 1 IAIR.NG CONDITON. J:1 41N 1.INSPEC!BNPv X. YpflN6<Y.Ni0 MNNTNN MFM M EFTEI SPERM.".COH0111 AS xASSIBIE I OF B I$XOVID BE FROM%`,NOi GG STO WIPE[!BMPe AS SOON AS IIIIIAVCE 0!BIM IT"' 9E RTOKIIVE,NOr RE*STO MSPEC!BNPf AS SOON A$ POSSIBLE MD KwAK wl CE}I XOUR51 F0.LOAIrvG A SIORu MA!C.WSFS SURfA<E POSSIBLE AND _. vnTHIN}I XOURS)F0.LOvnxG A SiORu THAT CAlI5E5 SURFME EROSION,µD PERFORM XECESSeX/NNHTExµCE. EROSKW,µ0 PERFORM NECESSMT YNMEX.MLE KHKLE TRMKING SNCOED STEEL 3.FREOUENr C6'NC ATOxs µD NSPECIO CE ARE n RRElTAv t0 SURIES Bull w 3.1 8%8 KIN. 31 GOg1RCt(SEE },FREOVExr OBSEINAnONs µ0 MNxrCIORS 0 OIRECNR r0 UIES P.Ix FEE PoSi EiiEG%`OPEMTNG CONp%Ox INSPEC%OXS µ0 CORRE<rrvE MEASURES SHOULD BE erC OEINL)OR CFfECIrYE CVCRAnxL CMgnOx IxSPECnOxS µ0 CORRECrM1E 4p5URfS SNOIILD BE COCUNE'Fe TgRWGXLY. pMER STABLE WCVYEHTEO INxIWLXLY. Sua-E ],WXERE BMPo HOVE FAILED.REPAIR OR REPLACENEIT SIKKILD BE INITIATED UPON 1.NNfRE B4M AUK FNLfD.REPAIR OR REPLME4Exr SXpJLD ME INIMIED VPON pICOKRT M ME f'L gSCOrERY OF ME_HE. MNK£HE5HET 1.CONSMUCTON FENCE S`tL BE REPAIRED OR REPVCED WxEry TxCRE ARE$IONS Ci J1 1.ME CWA SWLLL BE REPAIRED.CLFINEO.OR ENURGm A$xCCE55AM!O W1MNH CCNSTRVCr FT al. wMA4E SVCX R HIPS qi IS S.RIZED VL D FENLE 5 r0 RENNN IN 1ISD UNTL ME REIMIED IC 'HE NTE WISTE CONCRETE NATEfiI1S.MCVNVIATEO W RT.SXNL$ GpN� OR WFROK➢EOunL VPSrRFA4 DSNRBEO AAFA IS SMBIUZED µD MPROrED BT MF LOCK JUIdSDICTNM. yIry IYMOKD MCC ME 4A1CMK5 XAK RFpCHm A 5.""CMSTRUCTIM FENCES FAE gEYOVFD.ALL pSNRLED ARCS ASSOCOTm"'ME 5.COxCREIE wASxOVi wARII,wASRD MF<ES OF CONCRETE µD NL DMET DEBNS INsruunox,LwxrENAxcE,u10/aR REYOVK OF ME rtxcE swill BE coVFAm wIm S:9NCRETE WASHOUT AREA PLAN Ix ME SVNSVNFAF PIr SHALL AS THAxswgrED FRou ME JM SI.Ix A A. OH, TOPSOIL.SEEDED µD MULCXEO.OR OTHEAMSE STAERIZED AS APPROKO BY LOCK IA"TM. C04PACIm HERON AWUNO CMINNER µ0 p5Po5ED M PROPFALv. JURISO6o' ME PEINxETEq 1 ZI SA MOPE R.ME CWA SWL"MAN Try 4.ACE UNTIL AL CMCRET:FOR THE HiQIECT IS PIACm. 1'W. tl9IL uµv JVRISDICIIOrvS HwvE IMP CEINLS lw.r V.WY FROM BE E._EN OELULS. COn5VL1 wrtH LOCO JURISDICTIONS AS r0 WHKX DETUL SXOULD BE USED OMEN ------ ].FMEH Mf CWA IS RE=l.C-1 MF-FURRED uRE.L'AGM TOP SOIL.SEED µD DIFFERENCE$WE NOIm. ESE/ / - lI J'YN. �1 „� MULCH CR OMERNISE SIABRI"1 IN A MANNER APP 1 BY THE L JVRISOKTKW. T o RO'Wfl UNDISTURBED DR 2 SPKNO larxc Kwrzo riwu pax w coax.cream.wr NUAaz x wmuol [OUPACIED SOIL 6CIr YMIm Iw mnly muxn,cXuws 4u n[mV m r•wa,muAm.xtt uwuXr x wlcuq. a X e uw. `MIDI£TRMKINC CMIROL(SEE V!C CONS MVIY JVRISp[TMS HAK BMP DETAIL$IIYT EIRV S104 UDfCD STD RHEI OEINLS. SECTION A DErNL 7 p spL s1X NOFEE mcnoxs As ro WXKX ofTNL sxouLD eE usm wHfn COPYRIGHT THESE PLANS AREAN INSTRUMENT R SERVICE sTIIDDm SR6 CWA-1. CONCRETE WASHOUT AREA AND ARE THE PROPERTY OF GALLOWAY,AND MAY PEE POST NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED r 4w. CWA NsiuuTAN noms WNHOIIT THE WRNIEN CONSENT OF GALLOWAY. 1 SEE PIARS FM. COPYRIGHTS FEDANDAND PROECUTED TS WILL BE -LwA IxsTN1ArKK1 LOGnM. ENFORCEOIJJU PROSECUTED, },1 NET LOGT:µ UNVNED CwA wIMIx Ie0'OF Nlv w.NRK-NONE I--M WAIERBODY.CO NOr LCCAIE WIHIN I,ODO'CF ANY WELLS M pNXKING WAlpl SOURCES.IF SIZE CMSTRNxIS NYf M15 INFp51BLE.OR IF HKIxLY KRU_ S_S EX51 ON I. CF-1. PLASTIC MESH CONSTRUCTION FENCE EUAF.IONCC sruOUSE�%S1 THE u51Ncl IXp1'r%R�K.ATm COHCXFFNwA451 OUTT loEYiCEs)ORMA Uqm ABIa LRWNO srptw'E ME S BE USED, CIXI$%KICIpX FdLE INSruulgX ItlIE$ ].ME cwA SNAIL aE msreuEo FPoON rD cMMErz PINCEUBIr M BM. 1.SEE Bµ vlEw FOR: -LOGTM CP CMSMUCIIM FENCE. I.cWA SHNl IKWDE A FIAT SV9BIRFKE RT TYL II AT LEAST B BY e'MOPES LFMING Wr OF T{SVBSURfMF Rr SH41 BE J:I OR MTIER.ME Pn SwVl BE Ai }.Colte Eno.FORCE SNOMI Swu 9E NSTAd PARENT ro ANY RAIN D RBNO LEAST J DEEP. MIMTIES UHRU=t FE l BE NCE BW COMPOSED OF ONAKE.CMIPKICfl-ARM WTFROL S.--UXBNL BOSS AND BILK DF ME LYn SOUK)RYK MINIMUM HEHEIGHTOF 1'. IS STAT IFAST MGH.METH POSTS SHOULD IOK A PLAITS UP-SART'. 6,VEHICLE TRMNIN4 PID yWl BE SLOND}A iOMNNS ME CWA I.-Ir 17L 1.1 PoSR SHILL N UnUZm TO$UPKWT THE CONSTRUCTOR FENCE. ] 9Lrv5 SHNL BF 11EO Ar ME CMSIRUCTKx ENIPAIICE,Ar ME CWA µD LLUIIWY SPMINo FpR SIEEI TFF POST SHVl BE 10'. ELSEWXERE AS NECES i0 CIFARLY .FA ME=OH OF ME CMA TO__RE OF CONCRETE 11-I wD PuIP RIGS, 5,CONST %OX HENCE SWL BE Y<URELT FASrENEO r0 THE NP,YCIXE,AND BOTTOM Of FILM PoSr. 8,USE E%wVATED MAIfliK FGR PERIMETER BEEN CONSIRUCI CF-2 Udu,Duillage and Flood Control Doom Navember2010 November 2010 Urban Damage and Flood CODtrol D,,Oiet CF-3 November 2010 Urban D.m.ge and Flood Control Dial- CWA-3 CWA-0 Urban Dou.p utd Flood Control Dislnct November 2010 Urban SYrm Drainage Critma Manual Volume 3 Urban Slo ll Drainage Cnlena Manual Volume 3 Urbm Storm DFRmge Criteria Manuel Volume 3 Urban SYIm Dmimge Cnleda Manual Volume 3 LLJ (.0 SC-5 Rock Sock(RS) Rock Sock(RS) SC-5 Stabilized Staging Area(SSA) SM-6 SM-6 Stabilized Staging Area(SSA) U 'z J it O F/U-B,LF- O w RS RocK sxK uuxrtxuucF rvon-s UX axm[ SSA $TAa uzm$TM xG IMEA uNxlFxWrs xgrFS LLI Q c4HslmlcDax corvsMIK1AN IYI-(Nmus)cHUSHED ROLK IxsPEcr euM FAcx AORxw'e AND HWNiun MEM m EFFE<nK oPERAnNG cONO.ON. `XC1£ TquLEgs s.srFB, srAL. MFA s G BE EIiI.VRGEn a rvELEssIRY ra cMTNx PIIiYJHG, J 0 FNf OSm N vn E MEIN V5"(YNUS]CRV91Ep ROCK tlIIN�EX- OF B.1 SHOULD BE PRMCTM.NOT REACTN£. NSPECr 1 AS SOON AS pNenN4(i' STORAGE µD VrvLOeOING/LOADING OPERnTgNS. � LL POSSIBLE(µ0 NWAV$Wnwry}I NOURSI Fp1041NG I STORY MAi CILSES SUNf `NC`O9➢N NNE M`91 EROSIOL!µD PERFORu xECE55Nry NNNTENINCE. ��)' 6 ME SrneIUZED SInGIxG AREA SHALL BE RONETNuCTNOR `u0`.EO nl ME ExD Cf COxSTRUCnOx ME I1 WTI•£nE EM$ 1 FREOUEN!OBSERMATOHS AYD MNNTENNNE MC XECE55MRY LO 1WNTNN BMPo IH CS All- \ \\ GRINVLH SITE, D$HALL NE NEMOVEO OR. APPROKO 8Y ME LOC .ERSIMCTON, O Q W Ly Q VIED ON STE,µ0 ME eAU COVERED wIM rOP501L SEEDED AND uVLCxED OR EFFEC%K OPERAtING CONpTION INSPECMIHS N10 CORRECTS MEASURES SIKKILD R� OrXERWISE II LI 1m o n.-ER.wPROKO Br LOLL IURISOCTIOX. 1 -_j COCVUENTEO rMRWGxtY. 1 U) �( MICKNE55 tHIIE:uµv uMKIPKIDES%'C1 ME H1F OF RECYCLED COxI RE AS GR,WUW (�J U) FY/ ��l Q/ �r0 6'MAT(AT 1 WXFRE BNPa HOK FNIFD,flEPNfl OR flEP.ALENEH!SIKKIID BE INITIATED VPpN 1 rERV1� w GgµV4R W1ER4LL W1ERV1 CDR StµILIZm STAGING GS DVE t0 LYFFIC pLTES MM M-EST9IISNNEXT Cf � V' LL LL T pSLWERY N ME FNWRE $l UR/LS KGETATION IX MG$WrRERE RECYCLW CONCRETE Q Q O TD-M BEppG GR GROUND SVRfME CURBS,oMFRW15E STOIll12EO �� XAgO 411SME.3- ON F DEPENDING 1,gOCK$CCK$91LLL BE MPVLm IF TREY NFLp1E XGNLY SdIEO.OR ONAOGEO CMSIRV[TgX • B9Q:MANY JUHI501CTIONS N.VE NNP OETNLS IIV.T VMY FROM UCiLO SGWDMO OEIMLS. IN SCl M E#ECTED BEyOxO gfpuq. FMRNICE ISEE •;M. 4 CMSVLT IIH LOIN JURISBCTMS AS TO WN4R1 DETAIL SHOUID BE VYD WNFM c,6 SEDIMENT LOD DETAIL$VrC-1 - DIFFERENCES ME rvF- J Q K! 1 SEgMEXi MCVYUlA20 UPSIRBN CF ROCK 50'F$SM/11 BE RFAKhEO/5 rvEmm!0 TO Vro-J) yLT FENCE OR COrySIR W.•gOX O ROCK SOCK SECTION ROCK SOCK PLAN WwiNN Fuloa=w ME BMP,TYRCILLr wxm V aF AGCUIIUurm smwfxTssF/a�FErycINC AS NEEDED D_ E APFAOXINATELY 1}OF IF MI OF IS ROAN SOCK, N W E.ROCK$CCKS IRE TO REM11 IN PULE uMIL l UITFEMI ISINSE0 MG IS } �( W > rn .ART GW A!JpM$IRNL BE FILLm YM Ni MEpuTE 5p91UZm µO IFPROVFD 8Y THE LOCK JVRSOK'rMM. E%15IINC flDNWAT < v! NIWNT of m-(Yxusl CRVSHED ROCK.Mo WRAPPED _ _ SSA-lE STABILIZED STAGING AREA ~ (7 D- Q Z ITI RPX' SOCK. NE.FpiLE0 50CK AS µ�LTERN_OEFxIwrl'= TOPSOIL SECFD µD MULCHED OR OMERWSE S-LIZED AS RAGED BY LIXJL 11-FEE YM J W rW BEINFFX MIOININL-F SOCKS MM CRUSHED ROCK AHD JURISOKTION. $TARII I)Fn iTN'vxf.YK.wGTuixTnx xrllFG J O J IR 1] MpnONK WRE WRIWING.hf^K SOCKS Cµ BE L O J 0.fR4PPED(IYPICILLT I}-INCX OYfRVP)TO AWID CMS. IMns N.°I!Y mW ICr ry nuww.Cptw•W xp On n xpMr-NTaN.Mr wxuX[x wFGO) 1,SEE PUN E.FOR O -=G OF STAGING APEA(5). Ljj Coo NINY JURI$'V.,C%ON$XAK BMP DEAN LYS THAT VARY FROM UDFCD STINDIFD OELNIS. -THEI TOR FRA KVUST OGiKIN IAA 512E OF SLIlAN4 AREA N1TX Niit(IVN. O/ pIIbTICN DINT£ CONSVLL YnM tpl1 JURISDICnONS AS r0 nitn OEiuL I.I.BE VSEO%MEN FROM ME LOCAL JURISpCTOX. COV/ v DIFFERENCES NS N020. SE`SHE WS$FERCFNL PASSING ]. -31ILIZEO STAGING IAFA s1AV1D BE N'1%I_.TE I) ME NEEIIS M T%SITE. - 11 O SAWS MESH a- tlNE:ME OEiuIS IxCWDED wrtry 115 FONT St Sqw COuuOxNv S.I.0 CMYExTOxK OVERSIZINL RESULTS IN A IMCFR MFA i0 STIRIUZE FOLLOMIXG<CNS1RIlCigN. Z NCTHOOS OF ROCK SOeK MSTKUIpN IH ME OENVER MARKET ODFO AR .MERE ME ROCK SOCK JOINTING rA.• NOAllRP OTHER sI4IIM PRDFRIErMT PARF PN Dx ON NMKCT.EDFCD NMMFR ryGOftSEs J.sTA41N4 TAU sI VLL BE srABluzm PBpi 10 OTHER pSMiKIHs M IS GR SITE Z_ NOR OISCOU%E USE OF PROPRIEINRY%R01EC%ON PROOUCiS:XpNEYET.IN ME EKHT _ BO��1. BEOIN[WOEO dMIi1Da SOUR MODTXE BNP fiE NSiNNLE0PONl0 WJNiNKO ASSXO II T MA STAGING ARU SXNl[ONSIST OF A YINMUY]"TIICN GRNIUVA � C � 'n IN ME YANU_FuNER'S DETAILS. G V' ILL S 5.VNRE55 OTx'R SPECIFIEO BT R 111 a CrgN.ROCz SHWL CONSIST CE IF 5 SECT./]OJ.MSXTo EJ COARSE AGGREwTE ON C!(MINUS)ACC`. ROfK en^K IXciu�.OR MTF< WTLHES SPEC/1U1KN$PONT Na. I 6.AWITONPL PERIMERR hL3 MAY BE REWIRED INCLI%MHG BUT HOT LIMMO TO SILT [OAPSE IIF G E Fg 0.MREIE FENCE An0 COrv5TN11CTI0ry FE_Rl I.SEE PTµ VIEW iM' PFR AIGXN MI].NL flDCK BV1L BE -L=-"1S)OF ROCK SCCNS, FlVLNISD FACE.IAL 4DE5. cr NILI]%cr+rv�A4 n Hm c # Date Issue)DesaipOM IniL }.CIaISHED ROCK SHNL BE III-(yIUS)w LZE wIM A FgKN11 FNY(AIL IDES) InSPECr BIM EMH wORFw .1 NNMNN MEN In EFFFCTIE O1Fw RG CONDITM. _ogo312o21 15TCRYSUBMITTAL PJO µD SwJL COUPLv MM GRIWIKN SxpxN ON M15 IEEr(Ig"MINUS). MUN1ENµCE OF BMPs SHOUID BE PRCACDVE,rv0r RUCTK.INSPECT&JPs AS SOON A$ o312Al2o21 2NO CItt SJBMITTAL PJO ROSS-(TRIO NWAY$WITHIN}1 xOEflS]FOLLGMNG A STOflM TA DAMES EUIRFACE 3.MRE MESH SNARL BE FABRIGTEO OF 10 GALE POULTRY M6M.Oq EWIVNENT.YM A EROSION,AN0 PERFORM NECES-MNMENNICE. _o511]YN)21 BID PACKAGE PJD vAo.UN OPENING K IS.RE[CIMENOEO MINIMUM IKl1 Y]M K b" 2 FTSauENT CBSFMATOrvS µO uunTFhµCE ME xECF55MT TO uaniAlN BNM IN o5I19YL021 3RO CItt GUBMITTAL PJD MRE NESX I11LL BE$ENRED USING"HOG RING$"ON IRE 16 IT 8"CENTERS EfiEClIK OPEPATNG CONOInON MSPECTONS NiD CORflECRrE YEAlURES SXOUW BE NLNG Nl.XMNR NA Ai T[ENTERS On Fx05 OF SOCKS- LOCUMENTED TH-UGNL,. o5I19YN'}}dTH CIIYSUBMITTAL PJD 5.STOUTS MMKIP.WIIE$MIY NIAY ME VY OF FlLIFA FMRC AS IN KIEAXI.IM1E RIWHfflf BNP1 NAK iNtfO.REPAIR OR RFAACfIIEIT I—BE INIIWIEO UPDH YESN FOq ME ROLK EIR3119WE OISCbJERY OF ME FAILURE. - RS-1. ROCK SOCK PERIMETER CONTROL 1,RocK SHALL BE REAPPuSO M AEG gM A NECesswY IF RUTTMG OCCUNS ON - - IINOERLYING wBGRNK BECOMES E%Ii]SEO S RS-2 UFbRR D unaY and Flood Canlrol Diroin Novembcr2010 Novembu 2010 Urban D O mge and Flood Contra)Dismet RS-3 November 2010 Urban Duioage and Flood Control D,FRicr SSAJ SSAA Urban DoumY BM Flood Control District November2010 IUrbaa Storm Dmirege Criteria Manual V.I.3 UTbaa Storm D,umage Criteria Manual Volume 3 Urban Stmm Dmiluge Cntena Manual Volume 3 UFbMF Storm D ounage CHI OI,Manual Volume 3 2 E Pal.cl No- OF..By: RDG CNxIwtl BY PJD Dew'. MAV 19,2022 EROSION CONTROL Q PLAN-DETAILS-1 C3.3 B SC-6 Inlet Protection(IP) Inlet Protection(IP) SC-6 SC-6 Inlet Protection(IP) Vehicle Tracking Control(VTC) SM-4 Ga@Soway 5152 B.Wilbw Ddve,Suite 320 G.O-d Village,DO 80111 ® P cr DMR P VTC B08'NEqu A IN nnx IxCMu•1KM xmEs GellolreyUS.mmI SEEPVNNFNFOR'.OFK 4IPR02CnISEE ROCK SOCx OE9CN SEF RCCN SCCN CEINL RIPE OF nLEr PROIE<MN(P.1 P.1.IP3, P•,IP5.IP 6) 10 FWIROCNL FOR JpN11NG RIEN FOR-I S BE $DONS 16-CINDER la'CINDER -S 1. NLFr PROTECnW SAKE YSTHIN PRO4PRY MIER INLEr CONSINVCnCH CA FRANCA LESS IF CONst. BLOOMS BLWKS Is LWRFIE(1YPILNLY YMIN Aa XOIIM).IF A RNHFNL/RUNOFF EYEIir K FOREGSL, VENICL£5 µE _ NIT-IN-PROIECPCN IN-M-OF ESENr. P-CNIY FLOW "W"SOCK CONi1Nm ON 3.uµr A11SOICnONS w B4P DETARS TNr VNIY FRC4 UC SiµD RD OELNLS. WM SIDES) x'AR'WOOD snD DMIEi WIM LIX'1L JOR"'No""M MNKJI"I"SAWN RE"'Me' ICfIYMI(OR OMER ` DIfSERENCES ME Xo2D. PAVID suRFACE W FWT(ulx.) SORB IILLET N-FROTECTON NNNIEWNCF III. � SND I. NSPECr B"P•EACx WORKWY NO NANTNx MEY IN EFFECTYE CPERAnNG CON00,O. IP-1. BLOCK AND ROCK SOCK SUMP OR ON GRADE uNNRNANCt Dr eMp srquln eE PN__NOT RD,_ YSPFCT eul.AS spox AS >� POSSRLE(AYO ALWAK W INH$•"1.1 [11-1 A STORu MAT 1-1$V 1E } INLET PROTECTION IP-3. ROCK SOCK SUMP/AREA INLET PROTECTION ER05oI,NJG PmFOIN rvfcfs_NANRNANCE. . 'SA S•>b&S i 2.fn.OVEXT o05EM.nOxs-1 4uxrENAICE NIE XECE r "I Manton RAP. - E[[ECInE OPFRATIrvG CONpT10ry wSPECnOrvS µ0 DORRECirvE uFASVR[5 SNOVLD BE EIIE1 NTm M 11H. LY. I.SEE ROCK SOCK DESIGN pETML fYR INSTNUnON REWIRpJCNTS, 1.SEE ROC"WC"DESIGN MTAIL FOR MSTKIANON REWIRENENIS. ]WxERE BNPa ruvE-M,REPLAN OR REPLACENENT S4WLO W INIMrm IRON 1.CONCRETE-pWER'BLWKS SNNL W WD ON MEJR SIDES µWAD ME INLFT IN A psCOKRr OF ME FA'LVRE. N SINGLE ROW.ABURING ONE µOMEN WITX MC OPEN END fACINC AWAY FRCN ME CVRB. 1.STRAW WATTI£5/SEOIYENL CONTROL LOGS NAY BE USED IN PV.CE OF RCCN$DONS FOP pVBUL UNLESS OMERYSE SPEOFlm INLEI$IN PERJi0U4 MFIS.IxSTAIL PER DEdMENi CONTRW LOG DETNL. A.SEpYENT ACOL.UUIFD VPSTREAN M INLET PWrECTIpI VALL RE RE.-A$ WApWAY BY LWL JVRKOICigN.USE 3.GMYEL BAGS 5"Al1 BE PLACED AROUND CONCRETE ELOC"S,CLOSELY ABURING ONE NECESSwr IO NNNINN WJP EFFECnriNESS.IwIUUY WHEN SIpuLE vOw4E RFr4xE5 CWi SECr.,1]03.NSNTO/S µOMEfl µD JgNIm iWETXFR IN ACCgVOµCE WITX RWN SWN DE514N DETNL. INLET GRAtE SIN,xWaB4[S�IIY.A pEPM OF a'NHEN A. FENCE IS USm.CM K OF ME NEIGIr FON NrnNSERDALDKGKwR COPYRIGHT u1nIMIN OF THESE PLANSAREAN INSTILMENTR SERVICE TWO nJRe rY 5.INLR PRORttION I$TO A—IN PIACE uxnL ME VPSTRCW D15NRRm ARU K xaN-wONEn EO1ExnLE FAJNac AND ARE THE PROPERTY OF GALLOWAY,MDMAY _ SOCNS µpep%SO DEG. ELL µD NOCK SOUK INLET PERNNJENILx SIARIUZED Vxl£55 ME LWL JVmSdCTpN rPPNS25 EwuER REUWAL OF BETWEEN SOIL µD WCN NOTBE WPLICATFD,DISCLOSED,ORREFRDDUCED PWRCnOx(sfE OUTNL IP-I) bt❑W InIFM FWFfcnox m s1FEEIS. WFNM THE MITIEN CONSENT%GALLOWAY, L L 1 5Li iMCE IS SILT LS J FENTc OELE1 DETNL) R wx11 INLET PWIECnOry AM AKA INLETS Is RE40YED, E I SNRBED MFA s"NL BE COP RIGHTS NDINFRINGEMENTSWLLBE COVERED YM MCP E.,SEEDED µ0 NVLCXEO.OR OMEFMSE STABu1ED IN A MANNER UNLESS W RU$ OT MSE SPECIFIm BY LOCAL ENFORCED AND PROSECUTED, CURB WCN APl.-D BY ME LIXH JURISdLiILN. WSTHL p( E.MM JVRIY%CMH USE CWT SEC,.III__M FLOW (mr AW>nn Iw lo-�a owtA tmuw wa bn>.AVM mrnm.iul ura[n wrxrol OR S10W,OP OF PA-T OR BO N NUS RWK GGNEDATE x (_.) _ IP-4. SILT FENCE FOR SUMP INLET PROTECTION BOIL:NANI JURIWICIONS r MR DETALS THAI v moo ID[m STANDARD DETALS, CONSULT YM LOD L JURISpe,IONS A$t0 VMKN ORAL SROUIO RE USED YMEN pRERENCES ANE NOTED. T IP-2. CURB ROCK SOCKS UPSTREAM OF sLT FENCE YLR PRertcnex IxsruunW MrEs uEixo'E0 NlCi PROLTMEcnox m mi[p�r�ivESITE o!TCAXWAn�EALiNcne'Anc uA�_*L I�ccoRxnlE INLET PROTECTION PNOIZ11 1 INLET PIIMCIIN 4EMW5 0.ME 4ARKR WFm NOMEN ENDORSES NOR COMPACTED wWRADE 1.SEE SILT FENCE DESGN DETNL FOR INS,A NO"REWIRE4ENM5. p5C01RAGEs VSE OF PRC E1AAY INLET PROTEDDON;HOwflER,M THE EVORT SECTION A PROPRIETµY uEM0D5 JAE VSm,ME AWRpiMAME DEIUL FWN ME 4µUFACNRER MUST 1.PoSR SMKL BE MLm AT FACM CCAYER OF ME INLET µ0 AROUND ME LES W INCLUOm IN ME sw4P µ0 ME BNP NLKT fE INstNLfD µ0 NANt.NO.As 91GWN I,SEE ROCK SOCK DESIGN DETNL INSTKLATKN REQUIRE-M. AT A M.,.UA SPACING OF 3,ER. In ME"µVFACNRER S DETNLS. 1.PVLMENi DF ME SOCKS W APPIM%IIM,Flr to DEGREES EAOM RERPENOCUVA .EN IN PE"w0U55µIFA5.Tl SDINOLERS1 11 TIED 11 p l"LW DETNL.NL,FENCE FOR "ttE CnCE CxECKPIMTnE L-LIAGE OILOOR I. INO 1 THE NESV F ST fl SALES I"LROU WILT B B ® a IN ME OPPOSITE D1REttgN OF ROW. m02CPcry IS ACCFPTAgI£. 3.SOCKS ME TO BE FLIJSN MM ME 1UNSE AND SPADED A 4INAU1 IF 5 FEET APART. WC-1. AGGREGATE VEHICLE TRACKING CONTROL 4.AT(FAST MWO WRB SOCKS IN SERIES ARE REWIRED UPSM OF ON-GRADE INLETS. I1`4 Urben Drainage and FIIwd CI,MI Di51ric1 August 2013 August 2013 Ube,Drainage end Fluad Control DiI IP-5 IP-B Urben Drainage and Flood Control DuRld August 2013 November 2010 Urbm Draimge and Flood Comm]Dislncl VTC-3 Urben Storm Draimge CTi 1-,Dlnnual Volume 3 Ube.Storm Drainage Cdtena Manual Volume 3 UrbW Sloan Drainage Crilene Manual Volume 3 UrbW Stmm Drainage Criteria Manual Volume 3 W (.0 SM4 Vehicle Tracking Control(VTC) Silt Fence(SF) SC-1 SC-1 Silt Fence(SF) U 'z J it LLUU ,.SF£PIAx NEM FOR 'B 'b�)Eoppn �� I -I((Nr.2 IBJSr Ef--A,-Na NY.o'IM$LmIE M NLOYr FW W,MEx Y J -LOGIgN OF COX51RlK'neX EMRNMF(51/F%R(5). {QA£ppST�1 10 WIL PoMDW:AL} EN FCE A,ME rW 6 SLOPF SMOJLO YSFALLEO IH A Mf IFGnfYI F�/ -M'E OF CMSIMKIKN ENMR.WCE(5)/ENMS(5)(RIM/YIMU,WHEEL RASH. pApa AF lfASf SEVPAL FKF(1-5 FR 1R}L ME i0C C(fl(YO[(M NIIM RWY TM O POIIDOMx µD Of909IlOM1 O COJSIRUC110N WT OR M. 0 Q � w Q RLI FENCE 1 A UNNPY B'K 1'µDlgR TREMM SIYLL BE[KAWRD ULIG TRBKGNP OR XL G $.LONSIRWnOH WL d 1XY SLIAYlID CdI5IX11LTION ENIR.WLES AAE dILY LO BE LEOIEKnLE MR.IXSIIYATON(1[WCE.NO IIOq FA le.YCA-,.0R$!NM EDD"-SNµL G Y 1 VSW pR SMRi gFAnON RUDIS RYRCNLY RAxiXG FRpI A wEIX i0 A NWIIQ RIEN MERE HILL BE LI-1 N£NICVIMR AGLE4. E- I3.A SIA4uIm GORSIMCDQv ENIRWCE/Oar SXNL BE LCGIFD Ar ALL ICCE55 PoIX1S ].COWKT MggR DCNCN BI MMD MM A'-.c JACII OR.YIEEL ROlIK. /� A"KNIf1F5 ILCE55 ME CORSIRUCIg11$RE FROM PAYED RNM-Ci-WAYS. COIVKnON SLYLI Bf AIOI NNi RI FENCE RMS REYO PULLED Wr OF µCION V/ ♦.$TA-E.LOXSIRWnOX ENIRNRCE/ExII$SOLE RE MSI,WEp PRDR LO ANY IMN CWPACRO TREflI Br IWC Z L O pSNRBIrvG ACnVlllEs. BACKFlII A 4L,[FAKE 51RA1 BC-lira 1CM AS 1,rs AKnaRCD 10 Na STATES.rNOE sNOLL➢ Q LU C,6 J 5.ANON-wOKN cEOIE%IIIE FIBRK SNNL RE%ICID uNDFA tNE sLIHIl11E0 E N0 IYONCOA Wi_.-1-11"AS BEEN AKFgPFL i0}NC STN(ES O CdISTINICTpH ENIXINCE/IXIL PNldi iO 11E RACFNENI 6 RCLK. So 56,I-FABNC SWLL E µCNW40 III,Ne$I-S Il$MC 1'IE/.W DUTY SIA.HfS � F�/ B.UNIFSS OMERWIY SPEOMD BY LOl1 AMspC1gN.ROCK sW11 CpRYSi Cf Wr OM SONS Ynl I xfMR STAF{_R Ax0 N4L5 SROVI.O RE PLKm 3'uOC M[fMRK LI- N W �_ _ m. EDAM Mr($TAM. 1L1LI U) SECT.E1O3.AASMO/3 CNRSE CCREGKIE OR e'(MANS)RWK. •AI r1E MU Cf A RUM1 O'9Lr FFAl[KCNF A WNrO1M.ME Rr iERCE sR10AD E I- W Q vl' GROUNK) WIRED PfPOMOIRpAR re-Do-M CMAIL A'J__. TIE-.I-xX O f1 L IxsPEcr FNPa GCN wORKOAr,AAO Nuxwx rxFA IN EFFEnhE OPERAnNG COxpmox. EAIMFNONO PERNENE11nM r0 ME IOMQK SOULO E OF S�[1-1 LE WTI,O IrEFP 1 LL I 1 I 14VNIENANCE OF R4P5 SxOVID RE PWACPVE,NOT REACThE,MSPECt RNPF AS 5WH AS R•WF' RVHOFT F11M RDWKf AMIIMp MF EW Of ONE AT FENCE TPM 1 6- 211 J_ J O /VWF�I J Pos51dE(MID AWAYS WITNIN 2•xOVRS)F0.LGNIW A STORM TIUT UVSES sU13ALE (W >91LI fRkE SNNi E AJSINIID F4gR M NIY WO pSNRR14C A[1MfIfS. L O O EROSION.ANO PERFORM NECESSVPY 4uNTENM'CE. F IDE LYI •5(bU111TCXlINGG_Rm J x.FEOUENT OBSER✓*CI"µD NUNTEwrvCE µE NECESSµx TO N IE BNPa Ix 'r4L'9MLL E A•NY I MSPECT BM'F FKn-1.NO_RNNN Nal M ma"E o"Re"NO DONOR DR. O J E,FERM CPEMMING CO'IDInOry IxSPECTIONS•NO CORRECTrE YFASVREs SIg11LD BE Mm WN,ENAIOf OM RM0.$MAID E OELYOnVE,MOr R[ACTIK MPFCT BMPA 1--E S$0MR AS J Q rL O OOcu YExMEO MXamucNLr. Z Z 3.wAERE BY.IMK FNL£O.RE-DR RR'IACEYENT SAGA.RE INITMIFD UPox WSSMLL'(AND RMI MI.1•NOVYRS)FpLOYY'A$MR4 ONi UIr5f5 9JXFACF dSCOKRY OF Ne FNwRE. ERMKIN. 11O Pf RFdlu f35EAW NIEIW6R 2 FR[WMIT mSERVA , A•a)YNMpNK£ME EOtlSNLY M MA 11 BYh x O A.Rtt'N 5144E E IEWRIED pt REGRIDEO A5 MECESWtr i0 1NE STIRIV3ED EffFCTNE NEMIMO WNpIMM IXSP[CIIONS.Vb C01MCC1Nf 4USVRES 9KUD E c '/1 INTRAxcE/ExIT To NANrun A coxslsrEnr oErrN. SILT FENCE w0u4E"ILO 1"°"°IJc"LY V/ L.L 5.SEOINtxt IM[KED Ohio PAKp ROAOs K r0 RE RIYO.EO MRoucxOur ME Wr uR0 Ws15 sw11 OYptlAP 3 RMEIEE Bi.WAIF FNEO.RPWi OR RRYACdENT SROAD BE MIINRD UPOI AT ME ENO Cf MIC Mr M 9WYEUNG OR SW¢PINc.SEDIMENT wY".I RF WASRm µ JOXR ZO TMT D WyS ORS .R1 OF TE FNLDNE. Down STORM SERER OUA15. F JDRR E%Ki IH sLT,EW YOLENr ICCUNKLAIm UFSrREMA OF FNE U RACE 514LL E REYOYED A^L AfERD BDT[J N•NY JUMS JUMIS NAPE P RTOM 5 TIMT VCL FROM ram S rEN OETNIS. ET M AWMTMN 1M FWKTNNWILY O'M E,TYPIDMyV MIEN-Or ACCUYUUrm NMRET YM LO'K JURKpCMNS At i0 WNICH CETAL Sx0U1D E VSED wxEN SFOLCNR IF N4R0%IWI61 f pRERExCES µE Wim. O Date ssuel Desaipdpn RI(, WTAIE 5.R(PYR OI RERA(Z 9L1 FENCE M4.N(MEAD YRI SINS OF WEµ,LI,1/S•JlIAMC ��ARwY Na-Y ayyYy a�In wANa N Awv�RR SE[ORO IbRWO.Ot CNAPSE _0$1e312e21 15TCITY SUBMITTAL PJO PoS19 INNl E,Aim p C$I PONT 15 fO RENNN M%K.E VNR M[UPSMLW OKIURRm AREA IS SrAOUlFt _=240021 2WCITYWEBTTA. PLO SWAN.TOR IGFAIm 1M EG MCNE55 OF EOR.ItE IRS AND APPIIm�BY ML 1DCh hbSpICItV,CP IS EPVCFLA RY AN FOUTYNEMT PERY4IEN Ix 1-m-D OR SNOMR NO ONMR EEN E%MGFMtm,M eJ(OI 05F1}ROL BYP _DANTYIEN BID PACKAGE PLO NTO ME WOIRU J.YIEN 5LT FMKF IS PEYMED.ALL LLS1NRBm M6A5 S4LL BE a-WIIN MPSOL, D5I19YLO21 SROCITYWEIIIII PLO SECTION A SEEDED AND YxNDO 0R Ons_S,Aa_a APPRasn R+LaFu JuaKamOx. owlR'zm1 ATxcrosuelamAL PLO tKla NYARM RA I low Y Awo,tYMF r AN a NAYK a AMAWa.Xnewl •yn�0 YµY AURmIn.rRs xA.F MB ETALs rxAr vAL.rRaN uDICp srYnum EMNLS. SF-1. SILT FENCE R•/L+L�T M�M�D JUUNKpLnoNS A$To MIaR arNL sRouln E VSm WHEN - - S VTCfi ULbYI D,Rumq,and FINNd C➢ 1DOoid NovembLr2010 Noxember2010 UrbW Dodoop Yd Flood Coo-I Diamid SF-3 SFJ L',LAan Dn EF Rod t'NNd C'-Elul Us4iAl NuYeAIIter 2UIU _ _ IUrban SIDrm Dra IS,Criteria Manual V.I.3 Urhan Storm DIR rlge Criloria Manuel VUI4me 3 U.-IINR.OrvngA<LI IidRe Aloud Volume 3 g E $1 ple..No: NS500014fi Dawn By: RM Cbxl4tl By: PJD g De1e'. MAV 19,2022 g EROSION CONTROL PLAN-DETAILS-2 F C3.4 TRIANGULAR SILT DIKE INSTALLATION TRIANGULAR SILT DIKE INSTALLATION Gamoway fiee2 G.Wilbw DNve,Suite 320 FOR Gres nalVillaAe,C080111 303.TT0.8886 CONCRETE AND ASPHALT CONTINUOUS BARRIER Ga waYDswm .h.. 1. C Overlap n..A' OONSIRUCTION COPYRIGHT a •i THE SE PLANS ARE AN INSTRUMENT OF SERVICE *... AREA AND ARE IHE PROPERTY OF GPLLOWAY,AND MAY NOT—I'LICATED,DISCLOSED,OR REPRODUCED STOCKPILE WNNOUTTHEWRn1EN CONBENT%GALLO , Nola:If the aurfoce area fa • �.! • COPYRIGHTS AND INFRINGEMENTS WILL BE concrete,adheskes I �', MRON ON THIS SIDE ENFORCED ANO PRDSECUTED LA , au h os Ilquld nail �.. OF THE DIKE SHOD or sane bag.shall ' be used. If 11 fa an •A � if FOLDED UNDER THE DsphaR surface,a 9 •.�:.e_._ OULE SECTION AND n btn zed asphalt ' a STARED DOWN. emulsion can be used. 'P The tacking agent moat 'Y' _ be applied under the DIKE SEUON ONSTRUCTION - full length of the bartfar ' section and Ne apron. ' , Ap— A A T 10 dd ® e ARM DETAIL A—A UJ (.0 J LU DIM SECTION W Q J of O Q W W O O STARES SHALL K PLACED WHERE LL Y 0 —I ME UNITS Og41M1 AND IN iHf Y Q Q CENTER Of THE 2.Im L rT A$ z z Q (] O ISO- 0 ST S SHOWN ON THE DIAGRAAA Q LU c J G .� OSTARFS � Q � O ` U) uj U .:TIy?;Tip A}f:` R IGHHf-0E-WAY RETE CURBO0. LU Q z Lu H Z O (D J DETA L A-A J 0 CO J O) Q O1-- Z � Z Of v0 L� Y cn 0 # Date Issue l Desaipdon Init ovo3nozl ISTcm suawTrAL wo o3lzanozl 2NO cm SJBMITTAL PJD 05I1]YN)21 BID PACKAGE PJD OSII9YLD21 3RD CIW WMIDTAL PJD OSII9YLDl3 dTHCm SUBMITTAL PJD E 3 E E Pdea Na— Dr—By: RDG ChxMM BY: PJD g Dete'. MAV 19,2022 g EROSION CONTROL PLAN-DETAILS-3 B C3.5 Appendix C — Inspection Report State Inspection Report Template Galloway&Company, Inc. Page 39 of 41 10 ■ ^ Sk � ± � U 3 $ m E \ ¥ � a) 0ir \\ � «¢ % % a \\ 5 % a \ t% � \ \t �\ ■ � \ $ �4 \ « � \ \ o Z\ \ k 0 7 §k � kk G � \t \ o f � \0 ® m o 0 \5 6 0 � _ = m o% « � 0 e § m » � \ ƒ7f \ \ e « S \ 2 c \ e m � �0\ t% ƒ < 2a 3 t3 § % a $ 77 \ eS & 6 0 \f 7i » � . � $o $ y & 0 0 \ y & � //k vS7 # ® % f e < � Z� \& / 7 \ $ � � Go $ %\ gr ae & 3 U3 � �f \ y I.03 ul o \ 0: 5 2 U3 , ay � �© aJ m % _ # o 6O coka \ � � % 5 Z� i � ° a� a 3 05 cam^ 'L;j k ./• o 00 i Q7 C j •n � �+- O G V d V O Z ON O N o ✓ o '� o 3 m � •� '�•E o W � c a � v 3c m a c � Z (,5 L o o 15. N G E ✓ a� o � 0 ° y o o N a ✓ n++ No � d R 7 .r ✓ G y' i a ✓ G p O •L C 7 G � 4 o o s V ca on o G O " G Lb i E ° o c o � V � A "' o '✓ a ,rc G Q 3cd � v ° fd it o v �3t� � E �" Tom"' � °�' � •° o � a is ° ✓G N 4 J c fl O p U s0. O G 'Gu = oG ,, E �o ✓ v '' E � � c E •L O ) '7y ✓° J O � 7 = 0 7 CG -10, 010 '4 un J v- v� O O 033Nty " ER1 J t!� o R on!6 on ~ � o � G 2 A � ✓C u� a �.+J V u � .i N N ✓ to i- O �% to N mow... .O .r G ✓ d �, d � d °' c � � v � � dad a� �ay •o IOD 0 t OQ� � Z r After adequate corrective action(s) and maintenance have been taken, or where a report does not identify any incidents requiring corrective action or maintenance, the individual(s) designated as the Qualified Stormwater Manager, shall sign and certify the below statement: "I verify that, to the best of my knowledge and belief, all corrective action and maintenance items identified during the inspection are complete, and the site is currently in compliance with the permit." Name of Qualified Stormwater Manager Title of Qualified Stormwater Manager Signature of Qualified Stormwater Manager Date Notes/Comments Appendix D — Spill and Prevention Control Spill Prevention and Control Plan Site Spill Log Galloway&Company, Inc. Page 40 of 41 5 Ronald Reagan Blvd.,Suite Ga j owa 8 0 33 0- Gallo4 wayUS.co 970m 10 Y SPILL PREVENTION AND CONTROL PLAN Whenever significant quantities of fuels, materials, vehicle fluids, or other pollutants are to be used on site, specific procedures for material containment and spill prevention shall be developed and implemented. Introduction The following Spill Prevention and Response Plan shall be implemented during the construction of improvements at Midtown Gardens Marketplace — King Soopers # 146, and associated thereto. This plan will be implemented to meet the requirements of the City of Fort Collins and the State of Colorado. Materials On-Site Spill control procedures will be implemented when materials are stockpiled or when chemicals and/or fluids are used in the construction area. Stockpiles of Dry Materials The following spill prevention procedures shall be implemented: All materials shall be stockpiled in designated areas,with control measures used to reduce and minimize the runoff of contaminants. Control measures such as silt fence and sediment control logs will be installed according to City of Fort Collins criteria using the details shown on the SWMP plans. Loading and unloading operations shall be performed in a manner to limit materials from being spilled.Any spilled materials shall be swept up immediately after the operations are performed. Vehicle Fueling The following spill prevention procedures shall be implemented: All vehicle fueling will be done off-site as much as possible. All on-site fueling operations will be performed in designated areas. Measures will be taken where necessary to reduce and minimize spills during vehicle fueling operations. These measures may include the placement of a temporary berm around the fueling area, covering the fueling area under a temporary portable structure, and/or the placement of drip pans under valves and tank openings. Berms will be constructed around all fueling areas. An adequate supply of absorbents will also be stockpiled at each fueling area. Routine Vehicle and Equipment Maintenance The following spill prevention procedures shall be implemented: All vehicle maintenance will be performed off-site when possible. However, there may be occasions where construction equipment and vehicles may break down at the site and on-site repairs are more feasible. On-site vehicle and equipment maintenance, if needed, will be performed in designated areas, where practical, and enclosed by earthen berms.All maintenance areas will maintain an adequate supply of drip pans. These pans will be placed underneath vehicles as needed and absorbents will be used in the event of a minor spill or leak. SPILL RESPONSE Galloway&Company, Inc. Page 1 of 5 NOTE: IN CASE OF FIRE, EVACUATE ALL PERSONNEL FROM THE IMMEDIATE AREA, RENDER FIRST AID TO ANYONE WHO IS INJURED, AND DIAL 911 IMMEDIATELY. TAKE APPROPRIATE STEPS TO PROTECT HUMAN LIFE AND TO CONTROL FIRES FIRST. SPILL CONTROL IS A SECONDARY CONCERN. Cleanup and Removal Procedures • Upon detection of any spill,the first action to be taken is to ensure personal safety.All possible ignition sources, including running engines, electrical equipment (including cellular telephones, etc.), or other hazards will be immediately turned off or removed from the area. The extent of the spill and the nature of the spilled material will be evaluated to determine if remedial actions could result in any health hazards, escalation of the spill, or further damage that would intensify the problem. If such conditions exist, a designated employee will oversee the area of the spill and the construction supervisor will be notified immediately. • The source of the spill will be identified and if possible the flow of pollutants stopped if it can be done safely. However, no employee will attend to the source or begin cleanup of the spill until ALL emergency priorities (fire, injuries, etc.) have been addressed. Small Spills Small spills(usually<5 gallons)consist of minor quantities of gasoline, oil, anti-freeze, or other materials that can be cleaned up by a single employee using readily available materials. The following procedures shall be used for clean up of small spills: 1. Ensure personal safety, evaluate the spill, and if possible, stop the flow of pollutants. 2. Contain the spread of the spill using absorbents, portable berms,sandbags,or other available measures. 3. Spread absorbent materials on the area to soak up as much of the liquid as possible and to prevent or minimize infiltration into the soil. 4. Once the liquids have been absorbed, remove all absorbents from the spill and place the materials in a suitable storage container. On paved areas, wipe any remaining liquids from the surface and place the materials in a storage container. Do not spray or wash down the area using water. For open soil areas, excavate any contaminated soil as soon as possible and place the soil in a suitable storage container.All materials will then be transported off-site for disposal. 5. If immediate transfer and storage of the contaminated soil is not practical, excavate and place the contaminated soil on a double thickness sheet of 3-mil or higher polyethylene film. In addition, a small berm should be formed around the outer edges of the soil stockpile, underneath the polyethylene film, to ensure that contaminants are not washed from the site during precipitation events and that materials do not seep through the berm. 6. Record all significant facts and information about the spill, including the following: •Type of pollutant • Location •Apparent source • Estimated volume • Time of discovery • Actions taken to clean up spill Galloway&Company, Inc. Page 2 of 5 7. Notify the supervisor of the spill and provide the information from Item #6. The supervisor will then contact the City of Fort Collins and Larimer County. Medium to Large Spills Medium to large spills consist of larger quantities of materials (usually >5-25 gallons)that are used on site that cannot be controlled by a single employee. Generally, a number of facility personnel will be needed to control the spill and a response may require the suspension of other facility activities. The following procedure shall be used for the cleanup of medium to large spills: 1. Ensure personal safety, evaluate the spill, and if possible, stop the flow of pollutants. 2. Immediately dispatch a front-end loader or similar equipment to the spill and construct a berm or berms down gradient of the spill to minimize the spread of potential pollutants. On paved surfaces, portable berms,sandbags, booms, or other measures will be used to control the lateral spread of the pollutants. 3. When the spread of the spill has been laterally contained, contact the supervisor or designated facility employee and provide them information on the location, type, and amount of spilled material, and a briefing on the extent of the spread and measures undertaken to contain the contaminants. 4. Depending on the nature of the spill, mobilize additional resources as needed to contain the contaminants. 5. Cleanup will commence when the lateral spread has been contained and the notification to the supervisor has been made. 6. Freestanding liquid will be bailed or pumped into 55-gallon storage drums, steel tanks, or other suitable storage containers. When all the liquid has been removed from the pavement or soil layer, absorbents will be applied to the surface and transferred to the storage containers when they have soaked up as much of the spill as possible. 7. On paved surfaces, the remaining contaminants will be removed to the extent possible, with rags, sweeping, or similar measures. The area of the spill will not be sprayed or washed down using water. Any contaminant soaked materials will be placed into the storage containers with the other absorbents. 8. The remaining contaminated soils will be excavated and loaded into a dump truck(s) for disposal off-site at a designated facility. If transport off-site is not immediately available, the remaining soils will be stockpiled on a double thickness sheet of 3-mil or higher polyethylene film. In addition, a small berm will be formed around the outer edges of the soil stockpile, underneath the polyethylene film, to ensure that contaminants are not washed from the site during precipitation and do not seep through the berm. 9. Record all significant facts and information about the spill, including the following: • Type of pollutant • Location • Apparent source • Estimated volume • Time of discovery • Actions taken to clean up spill 10. Provide the supervisor (or designated employee) with the information from Item #9. The supervisor will then contact the City of Fort Collins and Larimer County. Galloway&Company, Inc. Page 3 of 5 NOTIFICATION Notification to the Colorado Department of Public Health & Environment (CDPHE) is required if there is any release or suspected release of any substance, including oil or other substances that spill into or threaten State waters. Unless otherwise noted, notifications are to be made by the supervisor and only after emergency responses related to the release have been implemented. This will prevent misinformation and assures that notifications are properly conducted. The notification requirements are as follows: 1. Spills into/or Threatens State Waters: Immediate notification is required for releases that occur beneath the surface of the land or impact or threaten waters of the State of threaten the public health and welfare. Notifications that will be made are: a. For any substance, regardless of quantity, contact CDPHE at 1-877-518-5608. State as follows: a) Give you name. b) Give location of spill (name of city). c) Describe the nature of the spill, type of products, and estimate size of spill. d) Describe type of action taken thus far, type of assistance or equipment needed. b. For any quantity of oil or other fluids, call the National Response Center at 1-800-424-8802. State as follows: a) Give your name. b) Give location of spill (name of city and state). c) Describe the nature of the spill, type of product, and estimate size of spill. d) Describe type of action taken thus far, type of assistance or equipment needed. 2. Reportable Quantity Spill on Land Surface: Immediate notification is required of a release upon the land surface of an oil in quantity that exceeds 25 gallons, or of a hazardous substance that equals or exceeds 10 pounds or its reportable quantity under Section 101(14) of the Comprehensive Environmental Response, Compensation Liability Act (CERCLA) of 1980 as amended (40 CFR Part 302) and Section 329c(F3)of the Emergency Planning and Community Right to Know Act of 1986(40 CFR Part 355)whichever is less. This requirement does apply at a minimum to the substances listed in Table A below. TABLE A Substances Requiring Notification SUBSTANCE REPORTABLE QUANTITY Motor Oil 25 Gallons Hydraulic Oil 25 Gallons Gasoline/Diesel Fuel 25 Gallons The notification procedures to be followed are: a) Give your name. b) Give location of spill (name of city and state). c) Describe nature of the spill, type of product, and estimate size of spill. d) Describe type of action taken thus far, type of assistance or equipment needed. e) Give name of land owner f) Specify department responsible for any facilities that may be impacted 3. Notification is not required for release of oil upon the land surface of 25 gallons or less -that will not constitute a threat to public health and welfare, the environmental or a threat of entering the waters of the State. Galloway&Company, Inc. Page 4 of 5 4. Notification, as required in paragraphs 1 and 2 above, will be made to the CDPHE using the 24-hour telephone number to report environmental spills. All information known about the release at the time of discovery is to be included, such as the time of occurrence, quantity and type of material, location and any corrective or clean-up actions presently being taken. Table B lists these phone numbers. SPILL RESPONSE CONTACTS TABLE B Emergency Notification Contacts Name/Agency Name/Agency Number Poudre Fire Authority 911 Fort Collins Police Department 911 Ambulance 911 Hospital 911 National Response Center 1-800-424-8802 CDPHE - Report Environmental Spills (24 1-877-518-5608 hrs/da Colorado Emergency Planning Committee 303-273-1622 Larimer County Sheriff's Office 970-498-5100 City of Fort Collins 970-416-2632 It is the responsibility of the supervisor to contact the City of Fort Collins and Larimer County, CDPHE, and/or the National Response Center. • The National Response Center is to be contacted when a release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR 110, 4- DFR 117, or 40CFR 302 occurs during a 24-hour period. • Notification to the CDPHE is required if there is any release or suspected release of any material, including oil or hazardous substances that spill into or threaten state waters. REPORTS The CDPHE requires written notification of a spill or discharge of oil or other substance that may cause pollution of the waters of the State of Colorado. A written report must be submitted to the Water Quality Control District(WQCD)within five days after becoming aware of the spill or discharge. The CDPHE requires a written final report within five days for all releases of an oil or hazardous substance that require implementation of a contingency plan. The CDPHE may also require additional reports on the status of the clean up until any required remedial action has been complete. Written notification of reports must contain at a minimum: 1. Date, time, and duration of the release. 2. Location of the release. 3. Person or persons causing and responsible for the release. 4. Type and amount of oil or substance released. 5. Cause of the release. 6. Environmental damage caused by the release. 7. Actions taken to respond, contain, and clean up the release. 8. Location and method of ultimate disposal of the oil or other fluids. 9. Actions taken to prevent a reoccurrence of the release. 10. Any known or anticipated acute or chronic health risks associated with the release. 11. When appropriate advice regarding medical attention necessary for exposed individuals. Galloway&Company, Inc. Page 5 of 5 Appendix E — Erosion Control Ecsrow Galloway&Company, Inc. Page 41 of 41 Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins Project: King Soopers#146 Disturbed Acres: 12.12 BMP Amount Estimated Unit Total EROSION CONTROL BMPS Units Quantity Price Price Silt Fence (SF) LF 2614 $2.50 $6,535.00 Inlet Protection (IP) Each 16 $150.00 $2,400.00 Concrete Washout (CW) Each 1 $200.00 $200.00 Vehicle Tracking Control (VTC) Each 1 $1,000.00 $1,000.00 Stabilized Staging Area (SSA) SY 1636 $2.00 $3,272.00 Rock Sock (RS) Each 12 $25.00 $300.00 Construction Fence LF 3123 $2.00 $6,246.00 (add all other BMPs for the site in this list) Sub-Total: $19,953.00 1.5 x Sub-Total: $29,929.50 Amount of security: $29,929.50 Reseeding Amount Total Acres x Price/acre: $18,180.00 Unit Price of Seeding per acre: $1,500.00 Sub-Total: $18,180.00 1.5 x Sub-Total: $27,270.00 Amount to Re-seed: $27,270.00 Miniumum Escrow Amount Minimum escrow amount: $3,000.00 Final Escrow Amount Erosion Control Escrow: $29,929.50 Fields in yellow should be amended for this project. "The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures,or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid,whichever is greater.In no instance,will the amount oJ'security be less than one thousand five hundred dollars($1,500)for residential development or three thousand dollars($3,000)for commercial development" 2/2/2021 9:13 PM c1users\phii_dai ympie\oesktop\KS 146 erosion control\escrow calculator xis