HomeMy WebLinkAboutBLOOM FILING TWO - PDP220002 - SUBMITTAL DOCUMENTS - ROUND 3 - OTHER WATER AND OR SANITATION DISTRICTS (2)3201 East Mulberry, Unit Q – P.O. Box 1518 • Fort Collins, Colorado 80522
Phone (970) 498-0604 •Fax (970) 498-0701 •www.boxeldersanitation.org
March 8, 2022
Brandy Bethurem Harras
City of Fort Collins Planning
P.O. Box 580
Fort Collins, CO 80522-0580
RE: Case Number: Bloom - Phase 2, Round Number 1
Title:
Owner/Applicant: Hartford Homes
Owner Contact: Patrick McMeekin Parcel Number(s):
8709000006,8709000004,8709000039
Boxelder Sanitation District (BSD) has reviewed Bloom Phase 1 PDP. This is a
is a Preliminary Design Review for the development of approximately 271 dwelling units
The District hereby advises as follows:
There is no objection to this proposal.
Responses required to comments below.
The District will respond at the hearing date of ______________.
Comments:
1) The PDP proposal is general in nature and more detailed review will occur during the
FDP stage. The nature of the development will require close coordination with all
utilities to assure the issue related to access and maintenance are addressed. We
anticipate that these issues will be addressed during FDP process.
2) Standalone easement will be required for all sewers that are not located in the public
R.O.W. and in alley tracts. The easements are necessary to address access and
maintenance issue that are not included on the plat. Standard easement width for
Boxelder is 30-feet. The alleys are only 26 feet so the easement width will need to be
discussed.
3) The location of the sewer is a problem in this plan. Currently the sewers are shown
along the edge of the interior alley which places the sewer close to building
foundations. In some cases, it is less than 15 feet to the building faces. The sewers
are the deepest utilities so they should be located as far away from the building as
possible in the event that excavation has to occur in the future. It is preferred and
S:\DEVELOPMENT\Basins\West_Basin\Cooper_Slough_Interceptor_Subbasin\Mulberry & Greenfield - BLOOM\Bloom - filing 2\Design
Review\Bloom Phase 2 PDP 1st review 3-8-22.doc
standard practice to put the sewers in the center of the roads. However, the valley
pans layout conflicts with this. The location of the sewers needs to be coordinated.
We look forward to review future submittals on this project. Please feel free to contact me
if you have any questions.
Sincerely,
Brian Zick, P.E.