HomeMy WebLinkAboutBLOOM FILING TWO - PDP220002 - SUBMITTAL DOCUMENTS - ROUND 3 - DRAINAGE REPORTPREPARED FOR:
Hartford Homes, LLC
4801 Goodman St.
Timnath, CO 80547
PREPARED BY:
Galloway & Company, Inc.
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
Contact: James Prelog, PE
DATE:
February 2nd, 2022
April 13th, 2022
June 1st, 2022
MULBERRY FILING 2
Fort Collins, CO
PRELIMINARY DRAINAGE REPORT
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 2 of 24
I. Introduction........................................................................................................................................... 3
General Location ......................................................................................................................... 3
Existing Site Info ......................................................................................................................... 3
II. Master Drainage Basin ........................................................................................................................ 4
Overall Basin Description ............................................................................................................ 4
Existing Drainage Facilities ......................................................................................................... 4
Floodplain ................................................................................................................................... 5
III. Project Description .............................................................................................................................. 6
Existing Conditions...................................................................................................................... 6
Proposed Conditions ................................................................................................................... 6
IV. Proposed Drainage Facilities .............................................................................................................. 7
General Concept ......................................................................................................................... 7
Proposed Drainage Basins .......................................................................................................... 7
Detention Pond ........................................................................................................................... 8
Water Quality .............................................................................................................................. 9
LID .............................................................................................................................................. 9
V. Drainage Design Criteria ................................................................................................................... 10
Directly Connected Impervious Area (DCIA) .............................................................................. 10
Development Criteria Reference and Constraints ...................................................................... 11
Hydrological Criteria .................................................................................................................. 11
Hydraulic Criteria ...................................................................................................................... 12
VI.EROSION AND SEDIMENT CONTROL MEASURES.................................................................. 12
Construction Material & Equipment ........................................................................................... 13
Maintenance ............................................................................................................................. 13
VII. Conclusions .................................................................................................................................... 14
Compliance with Standards ....................................................................................................... 14
Variances .................................................................................................................................. 14
Summary of Concepts ............................................................................................................... 14
VIII. References ..................................................................................................................................... 15
Appendices:
A. Exhibits and Figures
B. Master Plan and Peakview Excerpts
C. Hydrologic Computations
D. SWMM Model
E. Drainage Maps
TABLE OF CONTENTS
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 3 of 24
I. Introduction
General Location
The proposed Mulberry subdivision is located directly south of East Vine Drive and north of East Mulberry
Street, just west of I-25, to the east of the Mosaic Subdivision in Fort Collins, Colorado. The overall
Mulberry development is bordered to the north by East Vine Drive; to the east by the Imu-Tek Animal
Health Clinic and undeveloped land; to the south by East Mulberry Street; and to the west by East Ridge
Second Filing, also referred to as the Mosaic Subdivision. The project site is located in the Northwest
Quarter of Section 9, Township 7 N., Range 66 W. of the 6th P.M., City of Fort Collins, County of Larimer,
State of Colorado. A vicinity map is included in Appendix A for reference.
Existing Site Info
The project site consists of approximately 260 acres. It is currently a vacant and undeveloped tract of land
that is being used for farming. Existing grades across the site vary from 0.5 to 3 percent. The site
generally drains from north to south. There are existing train tracks across the northern portion of the site
that run diagonal from the northwest to the southeast. The project site is located within the Cooper
Slough/Boxelder Basin and the Cooper Slough channel is located just to the east of the project site. The
Lake Canal also cuts across the southwest corner of the site.
According to the Natural Resources Conservation (NRCS) Web Soil Survey, the project site consists of a
mix of soil types and Hydrologic Soil Groups (HSG) including:
- Ascalon Sandy Loam (33%), HSG ‘B’
- Fort Collins Loam (27%), HSG ‘C’
- Garrett Loam (23%), HSG ‘B’
And smaller percentages of various other soil types as shown on the soil map included in Appendix A.
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 4 of 24
II. Master Drainage Basin
Overall Basin Description
The project site is located in the lower portion of the Cooper Slough Watershed. The master plan for this
drainage basin is currently being updated but we were able to review a copy of the plan dated February
2021. This report is titled “City of Fort Collins Upper Cooper Slough Basin Selected Plan of
Improvements” prepared by Icon Engineering, Inc. (Master Plan). The Cooper Slough drainage basin
resides in northeast Fort Collins and unincorporated Larimer County, Colorado. The Master Plan
describes it as a long and slender watershed, flowing from north to south, comprising 28 square miles
which are tributary to Box Elder Creek and the Cache la Poudre River. The watershed begins at the
confluence with Box Elder Creek (about one-half mile south of Mulberry Street and slightly west of I-25)
and proceeds north for 20-miles to Larimer County Road 80 at a location northwest of the Town of
Wellington. The basin has a maximum width of 3.9-miles at a location just south of Wellington.
Predominant land uses are characterized by farmland and open space, with development occurring
mainly in the southern portion of the watershed, near northeast Fort Collins.
The Cooper Slough watershed has been divided into upper and lower portions by the Larimer & Weld
Canal. The project site is located in the lower portion of the watershed.
The Master Plan discusses improvements to the Cooper Slough and Lake Canals including culverts
installed in Vine and Mulberry, but these improvements lie outside of the boundaries of this project and
therefore are not a part of this project. There will be no changes to the Cooper Slough or Lake Canals as
part of this project.
The proposed development to the southwest of the project site, Peakview, has included a portion of a box
culvert that will eventually divert water from the Lake Canal to the Cooper Slough. The box culvert will be
designed, constructed, plugged, and buried until future master plan culvert improvements are
constructed.
Relevant excerpts from the Master Plan have been included in Appendix B.
Existing Drainage Facilities
A historic/existing basin map was developed with this drainage report, reference Appendix D, in order to
calculate the historic runoff from the site. A SWMM model was used to determine the existing runoff in
Filing 1 Preliminary Drainage Report and the 2-year and 100-year runoff values from the models are
included in the basin descriptions below. According to the Master Plan, future development with the area
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 5 of 24
of the site is to “Limit the release (both peak discharge and volume) associated with future development
within the Upper Cooper Slough Basin to the 100-year existing condition release rates into the lower
Cooper Slough area.”
Basin H-1 (±72 acres, Q2 = 4.0 cfs, Q100 = 26.0 cfs) is associated with the northeastern portion of the
site to the north of the Burlington Northern Railroad tracks. Runoff generally runs south toward the
railroad tracks and then is conveyed east into the Cooper Slough.
Basin H-2 (±22 acres, Q2 = 1.3 cfs, Q100 = 15.5 cfs) is associated with the northeastern portion of the
site on the south side of the Burlington Northern Railroad tracks. Runoff generally runs south into
undeveloped land.
Basin H-3 (±162 acres, Q2 = 8.7 cfs, Q100 = 52.0 cfs) is associated with the western portion of the site.
Runoff currently sheet flows south into the Lake Canal.
Basin H-4 (±6.5 acres, Q2 = 0.4 cfs, Q100 = 8.7 cfs) is associated with the southwest portion of the site.
Runoff currently sheet east into the adjacent property and then to the Lake Canal.
Floodplain
According to the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map Panels
982 (FIRM Number 08069C0982F) effective date December 19, 2006 and Panel 984 (FIRM Number
08069C0984H) effective date May 2, 2012, a portion of the site lies within Zone AE, area subject to
inundation by the 1% annual chance flood. In Zone AE, the base flood elevations (BFEs) have been
determined.
However, a LOMR became effective February 21, 2019, the Boxelder 6 LOMR (Case No. 17-08-1354P).
A separate floodplain study to revise the floodplain in these parcels is proposed as part of this
development, but not as part of this Filing (2). The development shall comply with Chapter 10 of City
Municipal Code.
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 6 of 24
III. Project Description
The Mulberry development encompasses approximately 260 acres and will include the development of
both single and multi-family homes, commercial use, and associated streets, utilities, and open space.
The project site is bordered to the west for East Ridge Second Filing, also referred to as the Mosaic
Subdivision, which is a single and multi-family development; to the north by the Trail Head Subdivision,
another single family development; to the southeast by the proposed Peakview development; and to the
south (south of Mulberry) and southwest by various commercial developments.
This report summarizes the concepts for Filing 2 including any storm sewer infrastructure and LID
features.
Existing Conditions
Filing 2 is 9.4 acres of vacant undeveloped farming land. Existing grades of the Site generally slope from
0.5 to 3 percent.
Proposed Conditions
Filing 2 of Mulberry encompasses ±9.4 acres within the boundary limits of Filing 1. It will include the
development of town homes and multi-family buildings, associated streets, utilities, and open space. All of
Filing 2 drains to two detention/irrigation ponds at grades of 0.5 to 4.0 percent. These ponds will outfall
into another offsite pond downstream where it will eventually outfall into the Cooper Slough.
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 7 of 24
IV. Proposed Drainage Facilities
General Concept
Runoff from the developed site will be conveyed via overland flow, bioretention, and curb and gutter to a
proposed storm drain system that will convey the major and minor event stormwater runoff to an offsite
detention pond. These ponds have been preliminarily sized in Filing 1.
The ODP has divided the project site into eight large basins, one for each detention pond. Filing 2 will
outfall into Pond E located in Filing 1. Pond E will release flows into Pond C as described in the Filing 1
Preliminary Drainage Report.
Water Quality will be provided onsite through Low Impact Development (LID) practices throughout Filing
2. City of Fort Collins requires at least 50% of newly added impervious areas are treated with LID’s
practices.
There are no offsite basins that impact the project site.
There are no proposed improvements to the Cooper Slough associated with the development of Filing 2.
Proposed Drainage Basins
Basin E14
Basin E14 comprises of approximately 3.1 acres. This area includes town homes and alley ways. The
developed runoff within these basins will drain into separate LID features throughout the basin until
eventually outfalling into the water quality detention pond within Pond E. In the Filing 1 report, it was
anticipated that the imperviousness to be 80%. It is anticipated that the imperviousness within Filing 2 is
62%, which less than in Filing 1.
Basin E19
Basin E comprises of approximately 2.9 acres. This area includes town homes and multi-family
development. The developed runoff within these basins will drain into separate LID features throughout
the basin until eventually outfalling into the water quality detention pond. In the Filing 1 report, it was
anticipated that the imperviousness to be 80%. It is anticipated that the imperviousness within Filing 2 is
68%, which less than in Filing 1.
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 8 of 24
Basin E26
Basin E26 comprises of approximately 2.6 acres. This area includes town homes and multifamily
development. The developed runoff within these basins will drain into separate LID features throughout
the site until eventually outfalling into the water quality detention pond. In the Filing 1 report, it was
anticipated that the imperviousness to be 80%. It is anticipated that the imperviousness within Filing 2 is
68%, which less than in Filing 1.
Basin E27
Basin E27 comprises of approximately 0.8 acres. This area includes town homes and multi-family
development. The developed runoff within these basins will drain into separate LID features throughout
the basin until eventually outfalling into the water quality detention pond located in Filing 1. In the Filing 1
report, it was anticipated that the imperviousness to be 80%. It is anticipated that the imperviousness
within Filing 2 is 55%, which less than in Filing 1.
Basin OS
Basin OS comprises of approximately 0.5 acres. This area includes landscaping and sidewalks. The
developed runoff within these basins will drain into inlets located in Filing 1, eventually outfalling into the
water quality detention pond.
Detention Pond
All flows directed to the LID features will eventually flow into Pond D and E. The preliminary sizing was
completed as apart of the Filing 1 preliminary drainage report. See below for a table of the anticipated
volume and release rates for the ponds within Filing 1.
Sizing of spillway, water quality orifice plates, water surface elevations, etc. will be determined at a Final
Design for Filing 1.
Detention
Pond
100-year Volume
Required (From SWMM
Model)
Allowable
Release Rate
Proposed Release
Rate (From SWMM
Model)
A 10.5 ac-ft / 460,000 cf
32.06 cfs*
17.2 cfs
31.8 cfs
B 6.6 ac-ft / 290,000 cf 11.9 cfs
C 4.6 ac-ft / 200,000 cf 31.9 cfs
D 6.4 ac-ft / 280,000 cf 1.9 cfs
E 5.1 ac-ft / 220,000 cf 9.4 cfs
* 0.2 cfs/acre (160.3 acres * 0.2)
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 9 of 24
Water Quality
The ODP has determined that water quality and detention will be required for the development of the Site.
Required “Water Quality Capture Volume (“WQCV”) was calculated using equation 7-1 and Equation 7-2
from FCSCM.
The preliminary design for the water quality detention pond has a 40-hr drain time to allow for
sedimentation to occur and can be found within the Filing 1 Preliminary Drainage Report.
LID
Permanent BMP’s are being considered in helping allow for runoff reduction throughout the site. The
usage of bioretention is the primary BMP to be placed in landscaping areas to provide both infiltration and
filtration for the minor storm events. All LID’s will act as bioretention. The implementation of LID BMP’s
throughout the site has met the treatment at least 75% of added impervious area, refer to Appendix C.
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 10 of 24
V. Drainage Design Criteria
Directly Connected Impervious Area (DCIA)
At this preliminary stage of the design process, we’ve developed a strategy for implementing ‘The Four-
Step Process’ for stormwater quality management. Each step is listed below and includes a brief narrative
describing the implementation strategy.
Step 1 -Employ runoff reduction practices
Developed runoff from the series of basins E14, E19, E26, and E27 will drain through multiple bio-
retention drainage facilities prior to entering the off-site detention facilities. The proposed bio-retention
facilities are to provide enough depth to capture WQCV volume of their respective basins. They are
designed to allow infiltration of the 2-year storm event and will provide bypass in larger storm events.
The design encourages settling of sediments, filtering, and infiltration. The UDFCD defines bio-retention
is an “engineered, depressed landscape area designed to capture and filter or infiltrate the water quality
capture volume (WQCV).”
The following table is a preliminary estimate of the newly added impervious area and a breakdown of
the total area treated by an EDB or an LID feature.
Description Area, acres Preliminary Proposed
Imperviousness, %
Newly added Impervious
Area, acres
Total F2 Site Area:9.4
Basin E14+OS Basins:3.2 ~62%2.0
Basin E19:2.9 ~68%1.9
Basin E26+OS Basin:2.6 ~69%1.8
Basin E27:0.8 ~55%0.4
Treated Total:8.6 Total: 6.1 acres
6% to EDB 0.4 acres
94% to LID 5.7 acres
Step 2 -Implement BMPs that provide a Water Quality Capture Volume (WQCV)
The developed runoff from the E14, E19, E26, and E27 basins will drain into an Extended Detention
Basin (EDB). The UDFCD defines an Extended Detention Basin as “An engineered basin with an outlet
structure designed to slowly release urban runoff over an extended time period to provide water quality
benefits and control peak flows for frequently occurring storm events. The basins are sometimes called
"dry ponds" because they are designed not to have a significant permanent pool of water remaining
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 11 of 24
between storm runoff events. Outlet structures for extended detention basins are sized to control more
frequently occurring storm events.”
Step 3 -Stabilize drainageways
Measures will be implemented to protect the Cooper Slough receiving outflow from the off-site detention
pond.
Step 4 -Implement site specific and other source control BMPS
Site specific considerations such as material storage and other site operations are addressed in the
Stormwater Management Plan (SWMP).
The City Rainfall Intensity-Duration-Frequency Curves as depicted in the FCSCM are utilized as the
source for all hydrologic computations associated with the development of the Site.
The Rational Method has been utilized to calculate stormwater runoff for the proposed condition sub-
basins within the Site. The coefficients tables along with frequency adjustment factors from FCSCM have
been utilized in support of these calculations.
Development Criteria Reference and Constraints
The project must release at historic rates for each drainage basin, however due to the site being located
on flat, farmland it has been determined that 0.2 cfs/acre would be a more appropriate release into the
Cooper Slough. The 2 year historic release rate from the proposed basin delineation which includes Basin
A, B, C, D, and E is 9.69 cfs. Instead of using the calculated 2 year historic, 0.2 cfs/acre is the methodology
in determining maximum allowable release rate. This was calculated to be 25.8 cfs for the northern portion
of the site and 44.4 cfs for total site. Pond D (Filing 1) and Future Pond A and Future Pond B will connect
into Pond C which will release at a controlled rate of 21.6 cfs. Pond E (Filing 1) will flow south into the
Peakview storm infrastructure that flows into the Cooper Slough at a rate of 11.4 cfs.
Hydrological Criteria
For urban catchments that are not complex and are generally 160 acres or less in size, it is acceptable that
the design storm runoff be analyzed using the Rational Method. The Rational Method is often used when
only the peak flow rate or total volume of runoff is needed (e.g., storm sewer sizing or simple detention
basin sizing). The Rational Method was used to estimate the peak flow at each design point. For preliminary
design, no routing (i.e., time attenuation) calculations were completed; this work will occur at Final Design.
When a total flow is reported within this preliminary drainage report, assume it is simply a summation of all
upstream flows.
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 12 of 24
The Rational Method is based on the Rational Formula:
Q = CiA
Where:
Q = the maximum rate of runoff, cfs
C = a runoff coefficient that is the ratio between the runoff volume from an area and the average
rate of rainfall depth over a given duration for that area
i = average intensity of rainfall in inches per hour for a duration equal to the Time of Concentration
(Tc)
A = area, acres
The one-hour rainfall Intensity-Duration-Frequency tables for use with the Rational Method of runoff
analysis are provided in Table 3.4-1 and Figure 3.4-1 (refer to Appendix B).
The 2-year and 100-year storm events are the basis for the preliminary drainage system design. The 2-
year storm is considered the minor storm event. It has a fifty percent probability of exceedance during any
given year. The 100-year storm is considered the major storm event. It has a one percent probability of
exceedance during any given year.
The 2-year drainage system, at a minimum, must be designed to transport runoff from the 2-year recurrence
interval storm event with minimal disruption to the urban environment. The 100-year drainage system, as a
minimum, must be designed to convey runoff from the 100-year recurrence interval flood to minimize life
hazards and health, damage to structures, and interruption to traffic and services.
The preliminary detention storage was estimated in Filing 1 Preliminary Drainage Report with EPA SWMM
5.1. Various input parameters were provided by Table 4.1-1 and Table 4.1.4. The total detention discharge
is 31.8 cfs.
Hydraulic Criteria
Hydraulic computations will be designed in the Final Drainage Plan
VI. EROSION AND SEDIMENT CONTROL MEASURES
A General Permit for Stormwater Discharge Associated with Construction Activities issued by the
Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division
(WQCD), will be acquired for the site. A Stormwater Management Plan (SWMP) should be prepared to
identity the Best Management Practices (BMPs) which, when implemented, will meet the requirements of
said General Permit. Below is a summary of SWMP requirements which may be implemented on-site.
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 13 of 24
The following temporary BMPs may be installed and maintained to control on-site erosion and prevent
sediment from traveling off-site during construction:
· Silt Fence – a woven synthetic fabric that filters runoff. The silt fence is a temporary barrier that is
placed at the base of a disturbed area.
· Vehicle Tracking Control – a stabilized stone pad located at points of ingress and egress on a
construction site. The stone pad is designed to reduce the amount of mud transported onto public
roads by construction traffic.
· Straw Wattles – wattles act as a sediment filter. They are a temporary BMP and require proper
installation and maintenance to ensure their performance.
· Inlet protection – Inlet protection will be used on all existing and proposed storm inlets to help prevent
debris from entering the storm sewer system. Inlet protection generally consists of straw wattles or
block and gravel filters.
Construction Material & Equipment
The contractor shall store all construction materials and equipment and shall provide maintenance and
fueling of equipment in confined areas on-site from which runoff will be contained and filtered.
Maintenance
The temporary BMPs will be inspected by the contractor at a minimum of once every two weeks and after
each significant storm event.
The property owner will be responsible for routine and non-routine maintenance of the temporary BMPs.
Routine maintenance includes:
· Remove sediment from the bottom of the temporary sediment basin when accumulated sediment
occupies about 20% of the design volume or when sediment accumulation results in poor
drainage.
· Lawn mowing-maintain height of grass depending on aesthetic requirements.
· Debris and litter removal-remove debris and litter to minimize outlet clogging and improve
aesthetics as necessary.
· Inspection of the facility-inspect the facility annually to ensure that it functions as initially intended.
· Cleaning and repair of BMP’s is required when sediment has built up or the BMP is not working
properly.
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 14 of 24
VII. Conclusions
Compliance with Standards
The design presented in this drainage report for the Mulberry development has been prepared in
accordance with the design standards and guidelines presented in the Fort Collins Stormwater Criteria
Manual.
Variances
No Variances are anticipated with Filing 2 development.
Summary of Concepts
The proposed storm drainage improvements should provide adequate protection for the developed site.
The proposed drainage system for the site should not negatively impact the existing downstream storm
drainage system.
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.Page 15 of 24
VIII. References
1.Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, January 2016
(with current revisions).
2.Fort Collins Stormwater Criteria Manual (Addendum to the Urban Drainage Storm Drainage
Criteria Manuals Volumes 1, 2, and 3),prepared by City of Fort Collins, Revised December 2018
3. Soil Map – Larimer County Area, Colorado as available through the Natural Resources
Conservation Service National Cooperative Soil Survey web site via Web Soil Survey 2.0.
4. Flood Insurance Rate Map – Larimer County, Colorado and Incorporated Areas Community
Panel No. 08069C0982F, Effective December 19, 2006 and 08069C0984H, Effective May 2,
2012.
5.City of Fort Collins Upper Cooper Slough Basin Selected Plan of Improvements, Icon
Engineering, Inc., February 2021.
6.Final Drainage Report for Peakview,United Civil Design Group, December 21, 2020.
7.Master Drainage Report for Mulberry, Galloway & Company, Inc., August 8, 2021
8.Preliminary Drainage Report for Mulberry, Galloway & Company, Inc., January 14, 2022
Mulberry Filing 2
Preliminary Drainage Report
Galloway & Company, Inc.
APPENDIX A
Exhibits and Figures
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300 •GallowayUS.com
VICINITY MAP
MULBERRY DEVELOPMENT
NOT TO SCALE
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
3/18/2021
Page 1 of 444922004492400449260044928004493000449320044934004493600449380044940004492200449240044926004492800449300044932004493400449360044938004494000498000498200498400498600498800499000499200499400
498000 498200 498400 498600 498800 499000 499200 499400
40° 35' 50'' N 105° 1' 26'' W40° 35' 50'' N105° 0' 24'' W40° 34' 47'' N
105° 1' 26'' W40° 34' 47'' N
105° 0' 24'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 450 900 1800 2700
Feet
0 100 200 400 600
Meters
Map Scale: 1:9,430 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 15, Jun 9, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 19, 2018—Aug
12, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
3/18/2021
Page 2 of 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
7 Ascalon sandy loam, 0
to 3 percent slopes
B 79.5 32.7%
8 Ascalon sandy loam, 3
to 5 percent slopes
B 6.1 2.5%
22 Caruso clay loam, 0 to 1
percent slope
D 0.5 0.2%
35 Fort Collins loam, 0 to 3
percent slopes
C 66.7 27.4%
36 Fort Collins loam, 3 to 5
percent slopes
C 7.4 3.0%
37 Fort Collins loam, 5 to 9
percent slopes
C 2.9 1.2%
40 Garrett loam, 0 to 1
percent slopes
B 56.2 23.1%
42 Gravel pits A 0.0 0.0%
53 Kim loam, 1 to 3 percent
slopes
B 11.7 4.8%
76 Nunn clay loam, wet, 1
to 3 percent slopes
C 0.4 0.1%
77 Otero sandy loam, 0 to 3
percent slopes
A 9.7 4.0%
81 Paoli fine sandy loam, 0
to 1 percent slopes
A 1.0 0.4%
94 Satanta loam, 0 to 1
percent slopes
C 0.1 0.1%
103 Stoneham loam, 5 to 9
percent slopes
B 1.3 0.5%
Totals for Area of Interest 243.5 100.0%
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
3/18/2021
Page 3 of 4
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
3/18/2021
Page 4 of 4
FLOOD HAZARD INFORMATION
NATIONAL FLOOD INSURANCE PROGRAMFLOOD INSURANCE RATE MAP
LARIMER COUNT Y, COLORADOand Incorporated Areas
Panel Contains:
COMMUNITY NUMBER PANEL SUFFIX
09840984 JJLARIMER COUNTYFORT COLLINS, CITY OF 080101080102
MAP NUMBER08069C0984J
VERSION NUMBER2.6.4.6
SCALE
0983 1003
0992
0982
1011
0981 1001
1000*
0984
0 1,000 2,000500feet
1 inch = 500 feet 1:6,000
Map Projection:
LARIMER COUNTY
0 250 500125meters
PANEL LOCATOR
* PANEL NOT PRINTED
NOTES TO USERS))))))))))))))))
ÑÑÑ ÑÑÑ ÑÑÑ ÑÑÑ
Ñ
Ñ
ÑÑ Ñ
Ñ
ÑÑ Ñ
Ñ
ÑÑ Ñ
Ñ
ÑÑ
Ñ
Ñ
ÑÑ Ñ
Ñ
ÑÑ Ñ
Ñ
ÑÑ Ñ
Ñ
ÑÑ
Ñ
Ñ
ÑÑ Ñ
Ñ
ÑÑ Ñ
Ñ
ÑÑ Ñ
Ñ
ÑÑ
Ñ
Ñ
ÑÑ Ñ
Ñ
ÑÑ Ñ
Ñ
ÑÑ Ñ
Ñ
ÑÑÑÑÑÑ
Larimer CountyUnincorporated Areas080101
Larimer County Unincorporated Areas 080101
Larimer County Unincorporated Areas 080101
City of Fort Collins 080102
City of Fort Collins 080102
City of Fort Collins 080102
City of Fort Collins 080102
City of Fort Collins 080102
City of Fort Collins 080102
4 9 0 349034905
4 8 9 2
48814 8 9 3
4900.5
4 8 9 9 .3
4930.7
4898.1
,D
4917.5
,E
4897.14893.04888.04883.5
,B
,X
4913.0
4945.6
4902.5
,C B
,A A
,P
,A4896.1
4923.1
,A
4913.6
4894.44919.9
4 8 9 3 .2
4900.3
,K
,D
4903.7
,O
4918.9
4920.7
4892.84928.3
,C
,B
4 9 2 0 .5
4
8
9
2.94894.0,C4892.3,H
,Y4909.14945.7
4902.7,Q
4895.7
4930.5
,A,N
4924.8
4909.04905.2
4 9 4 2 .0
,W
4937.7
4930.5
4 9 2 3 .0
4 8 9 8 .6
4920.6
4893.1,C
4886.0
,Z
,S
4894.4
4949.2
,V
4 8 9 8 .5
,R
,B
,E
4889.7
,B
4923.6
,F,CC
,J
,D
,B4896.74
9
0
9.7
,D
4900.0 4916.94916.9
,M
4902.3
4887.0
,C4902.1 4895.6,B ,T
,I4914.3
,F
,E
,C
4 8 9 8 .44892.7,C4895.7
4923.1
4900.9,A 4909.04883.3
4939.1
4916.9
4894.7
4892.3,U4894.3
Control Structure
Bridge
Bridge
Bridge
Bridge1 PCT AnnualChance Flood Discharge Contained in Structure
1 PCT Annual Chance Flood Discharge Contained in Structure
1 PCT Annual Chance Flood Discharge Contained in Structure
Culvert
Culvert
Cache La Poudre River- RProspect SFP
Cache LaPoudre River
Cache LaPoudre River- LPATH SFP
Cache La Poudre River Cooper SloughCooper Slough
Boxelder Creek
Boxelder Creek
Lake Canal
Cache La Poudre Reservoir Inlet
Lake CanalBox-elder Creek
Cache La Poudre River Reservoir Inlet
Cache La Poudre River Split - R Path
Box-elder Creek
Cooper Slough Overflow
Sherry Drive Overflow
Spring Creek
15
22
8
16
20
9
17
21
10
MAP AREA SHOW NON THIS PANEL ISLOCATED W ITHINTOWNSHIP 7 NORTH,RANGE 68 W EST.N TIMBERLINE RDGREENFIELDS CTE L I N C O L N A V E
JOHN DEERE DR
DONELLA CT ZEPPELINWAYSTIMBERLINERDSEFRONTAGERDINTERNATIONAL BLVD
E LOCUST ST
S W F R O N T A G E R DHORIZON AVEJENNIE DR
COUNTRY-SIDE DR
COUNTRY-SIDE CT
CRUSADER ST
RELIANT ST
VERDE AVEE MULBERRY ST EB
T
R
A
C
E
Y
P
K
WY
SE FRON-TAGE RDNEFRONTAGERDHARVESTER CT
P
L
E
A
S
A
N
T
A
C
R
E
S
D
R
E LINCOLN AVE
GREENBRIAR DR
¦25
WEICKER DR
DARREN CT
COMET ST
DASSAULT STCOLLINS AIRE LN
CLIFFORD CTTIGERCATWAY REDMAN DR
GREENBRIAR DRNWFRONTAGERDCOUNTRYSIDE DR
ANNABEL AVE SUPERCUB LN
DELOZIER RDLAKE CANAL CT
RIVERBENDDRCRUSADER ST
CONQUESTST
RIVERBEND CT S SUMMIT VIEW DRTANA DR
CENTRO WAYCHERLY ST
LAURA LN
FRONTAGE RD N
RENE DRMAX ST
KIMBERLY DRCOLEMAN ST
FRONTAGE RD S
¦25
BOXELDER DR
E PROSPECT RD
S
S
U
M
MIT
VIE
W
D
RSUNRISE AVE¦25
STEVEN DR
GREENFIELDS CTRAILROADQUINBY STMARQUISE ST
JOHN DEERE DRCANAL DR
FRONTAGE RD S
KENWOOD DR
BUCKEYE ST
E MULBERRY ST WB
TERRY DR
DARREN ST
SURREY LNDAWN AVESYKESDR
COMET ST
SW FRONTAGE RD
A
L
A
N S
T
SMITHFIELD DRVICOTWAYJAY DR
MARCH CTANDREASTSHARP POINT DR CLIFFORD DRJOANNE STSUMMIT CTFAIRCHILD STDELOZIER DRCONQ-UEST WAY
STOCKTON AVE
COUN-TRYS-IDE CIR
SW FRONTAGE RDSHERRY DRZONE AE
ZONE AE
ZONEAE
ZONE AE
ZONE AE(EL 4891)ZONE AE
ZONE AE
ZONE AE
ZONE AO(DEPTH 2)
ZONE AO(DEPTH 1)
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE AO (DEPTH 2)
ZONE AE
ZONE AE
ZONE AE
ZONE AE
LIMIT OF STUDY
105° 00' 00''40° 33' 45''40° 33' 45''
40° 35' 38''105° 01' 52''
105° 01' 52''
40° 35' 38''105° 00' 00''
1450000 FT
1455000 FT
3135000 FT
1450000 FT
1455000 FT
4493000m N
4492000m N
4491000m N
499000m E498000m E
PANEL 984 OF 1420
1/26/2021
Universal Transverse Mercator (UTM) Zone 13N; North American Datum 1983;Western Hemisphere; Vertical Datum: NAVD 88
SPECIAL FLOODHAZARD AREAS
OTHER AREAS OFFLOOD HAZARD
OTHERAREAS
GENERALSTRUCTURES
Without Base Flood Elevation (BFE)
With BFE or Depth
Regulator y Floodway
Area of Undetermined Flood Hazard
Area of Minimal Flood Hazard
Zone A,V, A99 Zone AE, AO, AH, VE, AR
Zone X
Zone D
HTTPS://MSC.FEMA.GOV
THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTINGDOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMAT AT
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
Cross Sections with 1% Annual ChanceWater Sur face Elevation
Coastal Transect
OTHERFEATURES
Prof ile BaselineHydrographic FeatureBase Flood Elevation Line (BFE)Limit of StudyJurisdiction Boundary
Coastal Tr ansect Baseline
17.5
0.2% Annual Chance Flood Hazard, Areas of 1% annual chance f lood with average depth less than one foot or with drainage areas of less than one square mileFuture Conditions 1% Annual Chance Flood HazardArea with Reduced Flood Risk due to LeveeSee Notes.
Zone X
Zone X
Zone X
!(8
%,E 18.2
NO SCREEN
Levee, Dike, or Floodwall
Channel, Culver t, or Storm Sewer
Area with Flood Risk due to Levee Zone D
For information and questions about this Flood Insurance Rate Map (FIRM), available products associated withthis FIRM, including historic versions, the current map date for each FIRM panel, how to order products, or theNational Flood Insurance Program (NFIP) in general, please call the FEMA Mapping and Insurance eXchange at1-877-FEMA-MAP (1-877-336-2627) or visit the FEMA Flood Map Service Center website athttps://msc.fema.gov. Available products may include previously issued Letters of Map Change, a FloodInsurance Study Report, and/or digital versions of this map. Many of these products can be ordered or obtaineddirectly from the website.
Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well asthe current FIRM Index. These may be ordered directly from the Flood Map Service Center at the number listedabove.
For community and countywide map dates refer to the Flood Insurance Study Report for this jurisdiction.
To determine if flood insurance is available in this community, contact your Insurance agent or call the NationalFlood Insurance Program at 1-800-638-6620.
Base map information shown on this FIRM was derived from the National Flood Hazard Layer (NFHL), dated2013 and digital data provided by Larimer County GIS Department, dated 2018.
PRELIMINARY1/26/2021
MAP REVISED
Mulberry Filing 2
Preliminary Drainage Report
APPENDIX B
Master Plan and Peakview Excerpts
ANHEUSER BUSCH (AB)
PLANT
Sod Farm Diversion
Q diverted = 752 cfs
Proposed Sod Farm Pond
S = 164 AF
Max WSE = 5033.2 ft
Berm along southern end at 5037.0 ft
Sod Farm Pond Outlet Pipe
into No. 8 Outlet Ditch
36" RCP with a 33.6" Orifice
Q = 54 cfs
Mountain Vista Diversion
From No8 Outlet Ditch
Q = 250 cfsQ
=
8
9
c
f
s
Assume Full Development
of AB Lands with 100yr ->
2yr Detention (On-Site)
Mountain Vista Diversion
May Be Conveyed In
Open Channel or Pipe through
Montava Development
Proposed C&S/ Crumb
Detention Pond (426)
S = 193 AF
WSE = 4987.0 ft
Qin = 903 cfs
New AB Pond Outfall
Overflow Flume
Discharges into Cooper Slough
Q = 304 cfs
Existing AB 425 Pond Outlet
Remains Connected to L&W Canal
Q = 385 cfs
Existing AB Pond 425
S = 47 AF
Max WSE = 4983.5
Qin = 732 cfs
Remove Existing Flow Spill At CSRR
Provide Open Channel to Convey
Flows on West Side of RR
Combined Outlow From
C&S/ Crumb and L&W Canal Spill
Q = 639 cfs
Proposed E. Vine Dr. Culverts
(3) 8' x 4' RCBC
Q = 678 cfs
Proposed E. Mulberry St. Culverts
(2) 6' x 11' RCBC
Q = 1050 cfsCOOPER SLOUGHCanal Spill to Dry Creek
Q = 0 cfs
Canal Spill
Q = 421 cfsQ = 778 cfsQ = 357 cfsQ
=
2
2
9
c
f
sQ = 339 cfsQ =
1002
c
fs
Q = 374 cfsNO. 8 OUTLET DITCHLARI
M
E
R
&
W
E
L
D
C
A
N
A
LCOLORADO & SOUTHERN RAILROADBOXELDER WATERSHED
DRY CREEK WATERSHED
COOPER SLOUGH WATERSHED
BLACK HOLLOW OUTFALL CHANNEL
IMPROVEMENTS FROM 2006 MASTER
PLAN NOT INCLUDED IN 2021 UPDATE
Q
=
2
5
0
c
f
s
N. Poudre Reservoir No. 6
Add 8-inch Iron Sill Plate to
Spillway
Q = 547 cfs
S = 679 AF
Max WSE = 5163.2'
Proposed (2) 6'x11' RCBC
to Lake Canal
SH-14
Proposed Channel
to Box Elder Creek
Channel and Bank Improvements
along Cooper Slough
Pond A
S = 82 AF
Max WSE = 5019.6 ft
Qout = 778 cfs
Montava Swale
Q = 778 cfs
Q = 149 cfsOverflow Pond
S = 20.3 AF
WSE = 4980.2 ft
Qin = 112 cfs
Proposed C&S/ Crumb Outfalls:
42" RCP to AB Pond = 102 cfs
3ft x 13.5ft RCBC to AB Pond
(3ft above Pond inv) = 331 cfs
Spill to Overflow Pond = 112cfs
Overflow Pond Outfall
into L&W Canal
48" RCP with a 44.4" Orifice
Qout = 103 cfs
Proposed (3) 3'x15' RCBC
under Lake Canal
Proposed Channel
Proposed culverts
for local drainage
MONTAVA
DEVELOPMENT
MT VISTA AND TIMBERLINE ROAD
MIXED-USED DEVELOPMENT
WATER'S EDGE
DEVELOPMENT
COUNTRY CLUB
RESERVE
DEVELOPMENT
Existing 24-in Culvert
Capaity = 21cfs
Culvert Crossing
(3) 10'X3' RCBC
Q = 888cfs
Proposed Channel
Formalize Spill from
Lake Canal
E VINE DR INTERSTATE 25 SBE MULBERRY ST GIDDINGS RDTURNBERRY RDRICHARDS LAKE RD
MOUNTAIN VISTA DR
E L
I
N
C
O
L
N
A
V
E
S TIMB
E
R
LI
N
E
R
D
COUNTRY CLUB RD
E COUNTY ROAD 48
§¨¦25
§¨¦25
Cooper Slough Selected Plan (2021)
Figure 3: Selected Plan Projects $
0 0.5
Miles
Legend
swale
Overflow_Pond
Pond_A
C&S_Pond
AB_Pond
CRUMB_OUTLET
Sod Farm Pond
Proposed_Channel
Proposed Culvert
Montava Dev Boundary
Waters Edge Dev Boundary
Cooper Slough Basin Boundary
MtVista
!! !! !Anheuser Busch Property
SHARED STORM 1 - PROFILESTA: 9+50 TO STA 18+50
4910
4915
4920
4925
4930
4935
4940
4945
4950
4910
4915
4920
4925
4930
4935
4940
4945
4950
9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+5018+0018+50 MH DP 1-2STA: 13+19.91RIM 4929.7±INV. IN 4924.03 (N)INV. IN 4922.01 (W)INV. OUT 4921.91 (E)FES DP 1-1STA: 10+00.00RIM 4923.6±INV. IN 4921.27 (W)STUB DP 1-3STA: 17+76.48RIM 4925.3±INV. OUT 4922.94 (E)PROPOSED GRADE EXISTING GROUND
456.6 LF 30" RCP @ 0.20%
319.9 LF 30" RCP @ 0.20%
5'(W) x 8'(L)
TYPE L RIPRAP
100-YR HGLSTART BOX CULVERTSTA: 10+01.55INV. OUT 4922.69 (E)INV. OUT 4922.69 (W)137.3 LF
4'X12' BOX CULVERT @ 0.20%END BOX CULVERTSTA: 9+95.51INV. IN 4922.41 (W)9+7510+0011+0012+0013+0014+0015+0016+0017+0018+00FRONTAGE ROAD LOT 2MULBERRY ST (CO HWY 14)FRONTAGE ROADGREENFIELDS DRIVESTA: 9+75.00N: 4440.56E: 4688.12START ALIGNMENTSTUB DP 1-3STA 9+99.20N: 4469.56E: 3887.42 FES DP 1-1STA 9+84.18N: 4442.19E: 4663.17319.9 LF 30" STORM456.6 LF 30" STORM MH DP 1-2STA 10+00.00N: 4463.10E: 4343.94DP STORM 1(SEE THIS SHEET)STA: 18+00.00N: 4469.89E: 3863.90ENDALIGNMENT GD STORM 1(SEE SHEET C4.11)GD STORM 1-3(SEE SHEET C4.11)FR STORM 1(SEE SHEET C4.13)WQ STORM 1(SEE SHEET C4.13)DP STORM 1(SEE SHEET C4.13)137.3 LF 4'X12' BOX CULVERTSTART BOX CULVERTSTA 10+01.55N: 4471.61E: 3906.00 END BOX CULVERTSTA 9+95.51N: 4463.39E: 4043.05PROPOSED BOX CULVERT(SEE SHEET C7.10 FOR MORE INFO)9+75 10+00 10+50MH DP 1-2STA 10+00.00N: 4463.10E: 4343.94 21.6 LF 12" STORMOUTLET DP 1-2.1STA 10+21.62N: 4484.71E: 4344.28 FRONTAGE ROADSTA: 9+75.00N: 4438.10E: 4343.55START ALIGNMENT STA: 10+50.00N: 4513.09E: 4344.74END ALIGNMENTMULBERRY ST (CO HWY 14)DP STORM 1 - PROFILESTA: 9+50 TO STA 11+00
4910
4915
4920
4925
4930
4935
4940
4945
4950
4910
4915
4920
4925
4930
4935
4940
4945
4950
9+50 10+00 10+50 11+00OUTLET DP 1-2.1STA: 10+21.62INV. OUT 4924.46 (S)MH DP 1-2STA: 10+00.00INV. IN 4924.03 (N)INV. IN 4922.01 (W)INV. OUT 4921.91 (E)PROPOSED GRADE
EXISTING GROUND
100-YR HGL
21.6 LF 12" RCP @ 2.00%VALLEY 14 LLC12/21/2020U18024
1" = 50'
1" = 5'PEAKVIEW PLDNORTH12/23/202011:06:53 AMC:\UNITED CIVIL DROPBOX\PROJECTS\U18024 - PEAKVIEW\CADD\CP\C4.10 - STORM PLAN & PROFILES.DWGC4.10 - STORM PLAN & PROFILESSMEJRSC4.10
67STORM PLAN & PROFILE0 50'100'
SCALE: 1" = 50'
25'PREPARED FOR:JOB NUMBER
SHEET NUMBER
SHEETSOF DATE SUBMITTED:VERTICAL:
HORIZONTAL:
SCALEPRELI
MI
NA
RY
PLANSNOT F
O
R
C
O
NST
R
U
CTI
O
N
PROJ. MGR:DRAWING NAME:PATH:DESIGNER:DATE:TIME:The engineer preparing these plans will not be responsible for, or liable for, unauthorizedchanges to or uses of these plans. All changes to the plans must be in writing and mustbe approved by the preparer of these plans.NO.BYDATECAUTIONREVISIONS:CIVIL ENGINEERING & CONSULTINGUNITED CIVILDesign Group19 OLD TOWN SQUARE #238FORT COLLINS, CO 80524(970) 530-4044www.unitedcivil.com
19
CABLE TV LINEELECTRIC LINEFIBER OPTIC LINEGAS LINEGGAS METERIRRIGATION LINESANITARY MANHOLESANITARY MAINSANITARY SERVICEFLARED END SECTIONSTORM INLETSTORM MANHOLESTORM OUTLETSTRUCTURESTORM PIPERIP RAPTELEPHONE LINEFIRE HYDRANTFIRELINEWATER FITTINGS
WATER MAIN
WATER SERVICE
WATER METER
THRUST BLOCK
GATE VALVE
FIBER, GAS, ELECTRIC, ORTELEPHONE PEDESTALLEGENDNKEYMAP
1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE FIELD
CONDITIONS ARE AS SHOWN IN THE DRAWINGS. IF THE
CONTRACTOR FINDS DISCREPANCIES THE CONTRACTOR SHALL
CONTACT THE ENGINEER.
2.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE
UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES
NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION.
EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT
LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR
SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC
AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT
UTILITY LOCATION.
3.THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS
IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS
PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES.
4.STORM SEWER SHALL BE CONSTRUCTED IN ACCORDANCE WITH
CITY OF FORT COLLINS SPECIFICATIONS AND DETAILS. SEE
ADDITIONAL NOTES ON SHEET C0.03.
5.STORM SEWER MAINS SHOWN ON THESE DRAWINGS AS HIGH
DENSITY POLYETHYLENE (HDPE) SHALL BE WATERTIGHT ADS-N12
OR APPROVED EQUAL.
6.ALL PIPE LENGTHS ARE FROM CENTER TO CENTER OF ADJACENT
STRUCTURES. DESIGN LENGTH OF THE PIPE INCLUDES THE LAYING
LENGTH OF FLARED END SECTIONS.
NOTES
CHECKED BY:CHECKED BY:CHECKED BY:APPROVED:CITY OF GREELEYREVIEWED BY:___________________________________________ LARIMER COUNTY ENGINEERING DATELARIMER COUNTY APPROVAL BLOCK NORTH
Mulberry Filing 2
Preliminary Drainage Report
APPENDIX C
Hydrologic Calculations
Tributary Area tc | 2-Year tc | 100-Year Q2 Q100
Sub-basin (acres)(min)(min)(cfs)(cfs)
E14.2 0.21 0.68 0.85 5.0 5.0 0.4 1.8
E14.3 0.59 0.83 1.00 5.0 5.0 1.4 5.9
E14.4 0.21 0.30 0.38 6.4 5.9 0.2 0.8
E14.5 0.12 0.62 0.77 5.0 5.0 0.2 0.9
E14.6 0.75 0.66 0.83 6.0 5.0 1.4 6.2
E14.7 0.53 0.60 0.75 9.3 8.1 0.7 3.4
E14.8 0.64 0.64 0.80 5.0 5.0 1.2 5.1
E19.1 0.30 0.84 1.00 5.0 5.0 0.7 3.0
E19.2 0.52 0.67 0.84 5.5 5.0 1.0 4.4
E19.3 0.26 0.43 0.53 6.5 5.7 0.3 1.3
E19.4 0.95 0.86 1.00 6.7 5.0 2.1 9.4
E19.5 0.34 0.36 0.45 6.7 5.9 0.3 1.5
E19.6 0.32 0.65 0.81 5.9 5.0 0.6 2.6
E19.7 0.16 0.75 0.94 5.0 5.0 0.3 1.5
E26.1 0.34 0.36 0.45 6.4 5.7 0.6 1.7
E26.2 0.20 0.71 0.89 7.0 5.6 0.3 11.0
E26.3 1.47 0.79 0.98 12.7 10.5 0.0 2.0
E26.4 0.26 0.64 0.80 7.6 6.0 0.3 2.6
E26.5 0.28 0.75 0.94 5.0 5.0 0.4 0.0
E27.1 0.28 0.52 0.65 6.5 5.4 0.0 2.0
E27.2 0.50 0.61 0.77 5.0 5.0 0.3 2.6
OS1 0.02 0.55 0.69 5.0 5.0 0.4 0.0
OS2 0.03 0.42 0.52 5.0 5.0 2.3 1.8
OS3 0.08 0.45 0.56 5.1 5.0 0.4 3.8
OS4 0.04 0.35 0.44 5.7 5.2 0.6 0.0
SITE TOTAL 9.40
(TO DETENTION
POND D)0.26 --0.3 1.3
(TO DETENTION
POND E)9.02 --15.2 70.0
TO LID 19 0.53
TO LID 20 1.01 --
TO LID 21 0.87 --
TO LID 23 0.82 --
TO LID 24 0.78 --
TO LID 26 1.77 --
TO LID 27 0.20 --
TO LID 28 0.34 --
TO LID 29 2.01 --
TO LID 30 0.28 --
TO LID 31 0.50 --
BASIN SUMMARY TABLE
C2 C100
H:\Hartford Homes\HFHLV0001.01 Timberline Vine Dr\3. Permit Const Docs\3.04 Grading-Drainage Studies\3.04.2 Proposed Drainage Reports-
Info\Hydrology\Rational\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
Subdivision:Mulberry Project Name:Mulberry Filing 2
Location:CO, Fort Collins Project No.:
Calculated By:MJP
Checked By:JP
INPUT User Input Date:2/2/22
OUTPUT Calculated Value Single-Family Alley-Loaded SF Duplex/AttachedMulti-Family
95%5%100%
E14.2 0.21 95 0.02 9 15 0.13 9 95 0.11 50 0.68
E14.3 0.59 95 0.24 39 15 0.09 2 95 0.26 42 0.83
E14.4 0.21 95 0.00 0 15 0.17 12 95 0.04 18 0.30
E14.5 0.12 95 0.00 0 15 0.05 6 95 0.07 55 0.62
E14.6 0.75 95 0.22 28 15 0.27 5 95 0.26 33 0.66
E14.7 0.53 95 0.06 11 15 0.23 7 95 0.24 43 0.60
E14.8 0.64 95 0.28 42 15 0.25 6 95 0.11 16 0.64
Total E14 Basins + OS1 OS2 OS3 3.18
E19.1 0.30 95 0.14 44 15 0.04 2 95 0.12 38 0.84
E19.2 0.52 95 0.15 27 15 0.18 5 95 0.19 35 0.67
E19.3 0.26 95 0.00 0 15 0.17 10 95 0.09 33 0.43
E19.4 0.95 95 0.39 39 15 0.11 2 95 0.45 45 0.86
E19.5 0.34 95 0.08 22 15 0.25 11 95 0.01 3 0.36
E19.6 0.32 95 0.02 6 15 0.12 6 95 0.18 53 0.65
E19.7 0.16 95 0.05 30 15 0.04 4 95 0.07 42 0.75
Total E19 2.85
E26.1 0.34 95 0.09 25 15 0.25 11 95 0.00 0 0.36
E26.2 0.20 95 0.02 10 15 0.06 5 95 0.12 57 0.71
E26.3 1.47 95 0.66 43 15 0.30 3 95 0.51 33 0.79
E26.4 0.26 95 0.01 4 15 0.10 6 95 0.15 55 0.64
E26.5 0.28 95 0.01 3 15 0.07 4 95 0.20 68 0.75
Total E26 + OS4 2.59
E27.1 0.28 95 0.01 3 15 0.15 8 95 0.12 41 0.52
E27.2 0.50 95 0.14 27 15 0.21 6 95 0.15 29 0.61
Total E27 0.78
OS1 0.02 95 0.01 48 15 0.01 8 95 0.00 0 0.55
OS2 0.03 95 0.01 32 15 0.02 10 95 0.00 0 0.42
OS3 0.08 95 0.03 36 15 0.05 9 95 0.00 0 0.45
OS4 0.04 95 0.01 24 15 0.03 11 95 0.00 0 0.35
Total OS 0.17
Total Site 9.40
COMPOSITE RUNOFF COEFFICIENTS
Area (ac)Area
Weighted
Asphalt + Concrete Walks Lawns, Sandy Soil
Area Weighted Runoff
Coefficient Area (ac)
HFH22
Area
Weighted
C2Basin ID Total Area (ac)Runoff
Coefficient Area (ac)
Roofs
Runoff
Coefficient
Page 2 of 6 4/13/2022
95%5%100%
Area (ac)Area
Weighted
Asphalt + Concrete Walks Lawns, Sandy Soil
Area Weighted Runoff
Coefficient Area (ac)Area
Weighted
C2Basin ID Total Area (ac)Runoff
Coefficient Area (ac)
Roofs
Runoff
Coefficient
%Imp
LID 19 (Tributary E14.7)0.53 58%
LID 20 (Tributary E14.2, E14.3,
E14.4)1.01 67%
LID 21 (Tributary E14.5, E14.6)0.87 64%
LID 23 (Tributary E19.1, E19.2)0.82 42%
LID 24 (Tributary E19.3)0.78 55%
LID 26 (Tributary E19.4, E19.5,
E19.6, E19.7)1.77 71%
LID 27 (Tributary E26.2)0.20 71%
LID 28 (Tributary E26.1)0.34 29%
LID 29 (Tributary E26.3, E26.4,
E26.5)2.01 76%
LID 30 (Tributary E27.1)0.28 49%
LID 31 (Tributary E27.2)0.50 59%
Page 3 of 6 4/13/2022
Subdivision:Mulberry Project Name:Mulberry Filing 2
Location:CO, Fort Collins Project No.:
Calculated By:MJP
Checked By:JP
Date:8/3/21
1 2 3 4 5 6 7 8 9 10 13 15 16 17 18 19 20 21 22 23 24
BASIN D.A.Hydrologic C2 C5 C100 L S Ti | 2-Year Ti | 100-Year L S Cv VEL.Tt COMP. Tc | 2-Year COMP. Tc | 100-Year TOTAL Urbanized Tc Tc | 2-Year Tc | 100-Year
ID (AC)Soils Group Cf=1.00 Cf=1.00 Cf=1.25 (FT)(%)(MIN)(MIN)(FT)(%)(FPS)(MIN)(MIN)(MIN)LENGTH(FT)(MIN)(MIN)(MIN)
0 #N/A B #N/A #N/A #N/A 10 2.00 #N/A #N/A 500 1.05 20 2.1 4.1 #N/A #N/A 510 12.8 #N/A #N/A
E14.2 0.21 B 0.68 0.68 0.85 28 2.00 3.3 2.0 131 1.00 20 3.4 0.6 3.9 2.6 159 10.9 5.0 5.0
E14.3 0.59 B 0.83 0.83 1.00 28 2.00 2.1 0.8 260 1.00 20 2.3 1.9 4.0 2.7 288 11.6 5.0 5.0
E14.4 0.21 B 0.30 0.30 0.38 28 2.00 6.3 5.7 50 25.00 20 4.6 0.2 6.4 5.9 78 10.4 6.4 5.9
E14.5 0.12 B 0.62 0.62 0.77 28 2.00 3.8 2.6 50 2.00 20 5.1 0.2 4.0 2.8 78 10.4 5.0 5.0
E14.6 0.75 B 0.66 0.66 0.83 28 2.00 3.4 2.1 360 1.00 20 2.3 2.6 6.0 4.7 388 12.2 6.0 5.0
E14.7 0.53 B 0.60 0.60 0.75 28 2.00 3.9 2.7 450 2.00 20 1.4 5.4 9.3 8.1 478 12.7 9.3 8.1
E14.8 0.64 B 0.64 0.64 0.80 28 2.00 3.6 2.4 110 2.00 20 3.5 0.5 4.2 2.9 138 10.8 5.0 5.0
E19.1 0.30 B 0.84 0.84 1.00 32 2.00 2.2 0.8 150 1.00 20 1.6 1.5 3.7 2.4 182 11.0 5.0 5.0
E19.2 0.52 B 0.67 0.67 0.84 32 2.00 3.6 2.2 190 1.00 20 1.6 2.0 5.5 4.1 222 11.2 5.5 5.0
E19.3 0.26 B 0.43 0.43 0.53 30 2.00 5.5 4.6 174 2.00 20 2.8 1.1 6.5 5.7 204 11.1 6.5 5.7
E19.4 0.95 B 0.86 0.86 1.00 60 2.00 2.8 1.1 300 1.00 20 1.3 3.9 6.7 5.0 360 12.0 6.7 5.0
E19.5 0.34 B 0.36 0.36 0.45 32 2.00 6.2 5.4 100 1.00 20 3.6 0.5 6.7 5.9 132 10.7 6.7 5.9
E19.6 0.32 B 0.65 0.65 0.81 40 2.00 4.2 2.7 170 1.00 20 1.7 1.7 5.9 4.4 210 11.2 5.9 5.0
E19.7 0.16 B 0.75 0.75 0.94 60 2.00 4.0 1.9 80 1.00 20 2.5 0.5 4.6 2.4 140 10.8 5.0 5.0
E26.1 0.34 B 0.36 0.36 0.45 20 1.00 6.2 5.4 90 1.00 20 5.6 0.3 6.4 5.7 110 10.6 6.4 5.7
E26.2 0.20 B 0.71 0.71 0.89 30 2.00 3.2 1.7 220 1.00 20 1.0 3.8 7.0 5.6 250 11.4 7.0 5.6
E26.3 1.47 B 0.79 0.79 0.98 100 2.00 4.7 1.7 380 1.00 20 0.7 8.7 13.4 10.5 480 12.7 12.7 10.5
E26.4 0.26 B 0.64 0.64 0.80 45 2.00 4.6 3.0 190 0.26 20 1.0 3.1 7.6 6.0 235 11.3 7.6 6.0
E26.5 0.28 B 0.75 0.75 0.94 40 2.00 3.3 1.5 10 0.50 20 4.5 0.0 3.3 1.6 50 10.3 5.0 5.0
E27.1 0.28 B 0.52 0.52 0.65 32 2.00 4.9 3.8 125 1.00 20 1.3 1.6 6.5 5.4 157 10.9 6.5 5.4
E27.2 0.50 B 0.61 0.61 0.77 32 2.00 4.1 2.8 125 1.00 20 3.1 0.7 4.8 3.5 157 10.9 5.0 5.0
OS1 0.02 B 0.55 0.55 0.69 15 2.00 3.2 2.4 20 1.00 20 7.7 0.0 3.2 2.4 35 10.2 5.0 5.0
OS2 0.03 B 0.42 0.42 0.52 15 2.00 3.9 3.3 2 1.00 20 24.5 0.0 3.9 3.3 17 10.1 5.0 5.0
OS3 0.08 B 0.45 0.45 0.56 15 2.00 3.7 3.1 200 1.00 20 2.4 1.4 5.1 4.5 215 11.2 5.1 5.0
OS4 0.04 B 0.35 0.35 0.44 15 2.00 4.3 3.8 200 1.00 20 2.4 1.4 5.7 5.2 215 11.2 5.7 5.2
NOTES:
Ti = (1.87*(1.1 - CCf)*(L)^0.5)/((S)^0.33), S in %Cv
Tt=L/60V 2.5
Velocity V=Cv*S^0.5, S in ft/ft 5
Tc Check = 10+L/180 7
For urbanized basins a minimum Tc of 5.0 minutes is required.10
For non-urbanized basins a minimum Tc of 10.0 minutes is required 15
20Paved Areas and Shallow Paved Swales
DATA
Type of Land Surface
Heavy Meadow
Tillage/Field
Short Pasture and Lawns
Nearly Bare Ground
Grassed Waterway
STANDARD FORM SF-2
TIME OF CONCENTRATION
SUB-BASIN Tc CHECK
HFH22
FINALINITIAL/OVERLAND
(Ti)
TRAVEL TIME
(URBANIZED BASINS)(Tt)
Page 4 of 6 4/13/2022
Project Name:Mulberry Filing 2
Subdivision:Mulberry Project No.:HFH22
Location:CO, Fort Collins Calculated By:MJP
Design Storm:Checked By:JP
Date:
TRAVEL TIME
STREET
DesignPointBasinIDArea(Ac)RunoffCoeff.|C2Tc|2-Year(min)C*A(Ac)I(in/hr)Q(cfs)Tc(min)C*A(Ac)I(in/hr)Q(cfs)Slope(%)StreetFlow(cfs)DesignFlow(cfs)Slope(%)PipeSize(inches)Length(ft)Velocity(fps)Tt(min)REMARKS
14.2 E14.2 0.21 0.68 5.0 0.14 2.85 0.4
14.3 E14.3 0.59 0.83 5.0 0.49 2.85 1.4
14.4 E14.4 0.21 0.30 6.4 0.06 2.66 0.2
14.5 E14.5 0.12 0.62 5.0 0.07 2.85 0.2
14.6 E14.6 0.75 0.66 6.0 0.50 2.72 1.4
14.7 E14.7 0.53 0.60 9.3 0.32 2.30 0.7
14.8 E14.8 0.64 0.64 5.0 0.41 2.85 1.2
19.1 E19.1 0.30 0.84 5.0 0.25 2.85 0.7
19.2 E19.2 0.52 0.67 5.5 0.35 2.78 1.0
19.3 E19.3 0.26 0.43 6.5 0.11 2.65 0.3
19.4 E19.4 0.95 0.86 6.7 0.81 2.64 2.1
19.5 E19.5 0.34 0.36 6.7 0.12 2.64 0.3
19.6 E19.6 0.32 0.65 5.9 0.21 2.74 0.6
19.7 E19.7 0.16 0.75 5.0 0.12 2.85 0.3
26.1 E26.1 0.34 0.36 6.4 0.12 2.67 0.3
26.2 E26.2 0.20 0.71 7.0 0.14 2.59 0.4
26.3 E26.3 1.47 0.79 12.7 1.16 2.03 2.3
26.4 E26.4 0.26 0.64 7.6 0.17 2.51 0.4
26.5 E26.5 0.28 0.75 5.0 0.21 2.85 0.6
27.1 E27.1 0.28 0.52 6.5 0.15 2.66 0.4
27.2 E27.2 0.50 0.61 5.0 0.31 2.85 0.9
OS1 OS1 0.02 0.55 5.0 0.01 2.85 0.0
OS2 OS2 0.03 0.42 5.0 0.01 2.85 0.0
OS3 OS3 0.08 0.45 5.1 0.04 2.84 0.1
OS4 OS4 0.04 0.35 5.7 0.01 2.76 0.0
DIRECT RUNOFF TOTAL RUNOFF STREET PIPE
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
2-Year
8/3/21
Page 1 of 2 4/13/2022
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
Project Name:Mulberry Filing 2
Subdivision:Mulberry Project No.:HFH22
Location:CO, Fort Collins Calculated By:MJP
Design Storm:Checked By:JP
Date:
TRAVEL TIME
STREET
DesignPointBasinIDArea(Ac)RunoffCoeff.|C100Tc|100-Year(min)C*A(Ac)I(in/hr)Q(cfs)Tc(min)C*A(Ac)I(in/hr)Q(cfs)Slope(%)StreetFlow(cfs)DesignFlow(cfs)Slope(%)PipeSize(inches)Length(ft)Velocity(fps)Tt(min)REMARKS
14.2 E14.2 0.21 0.85 5.0 0.18 9.95 1.8
14.3 E14.3 0.59 1.00 5.0 0.59 9.95 5.9
14.4 E14.4 0.21 0.38 5.9 0.08 9.57 0.8
14.5 E14.5 0.12 0.77 5.0 0.09 9.95 0.9
14.6 E14.6 0.75 0.83 5.0 0.62 9.95 6.2
14.7 E14.7 0.53 0.75 8.1 0.40 8.57 3.4
14.8 E14.8 0.64 0.80 5.0 0.51 9.95 5.1
19.1 E19.1 0.30 1.00 5.0 0.30 9.95 3.0
19.2 E19.2 0.52 0.84 5.0 0.44 9.95 4.4
19.3 E19.3 0.26 0.53 5.7 0.14 9.66 1.3
19.4 E19.4 0.95 1.00 5.0 0.95 9.94 9.4
19.5 E19.5 0.34 0.45 5.9 0.15 9.55 1.5
19.6 E19.6 0.32 0.81 5.0 0.26 9.95 2.6
19.7 E19.7 0.16 0.94 5.0 0.15 9.95 1.5
26.1 E26.1 0.34 0.45 5.7 0.15 9.64 1.5
26.2 E26.2 0.20 0.89 5.6 0.18 9.69 1.7
26.3 E26.3 1.47 0.98 10.5 1.45 7.61 11.0
26.4 E26.4 0.26 0.80 6.0 0.21 9.48 2.0
26.5 E26.5 0.28 0.94 5.0 0.26 9.95 2.6
27.1 E27.1 0.28 0.65 5.4 0.18 9.77 1.8
27.2 E27.2 0.50 0.77 5.0 0.38 9.95 3.8
OS1 OS1 0.02 0.69 5.0 0.01 9.95 0.1
OS2 OS2 0.03 0.52 5.0 0.02 9.95 0.2
OS3 OS3 0.08 0.56 5.0 0.05 9.95 0.4
OS4 OS4 0.04 0.44 5.2 0.02 9.87 0.2
100-Year
DIRECT RUNOFF TOTAL RUNOFF STREET
6/2/21
PIPE
Page 2 of 2 4/13/2022
Mulberry Filing 2
Preliminary Drainage Report
LID Calculations
Treated Added
Impervious
Area (acres)
Volume Provided
(cu.ft)
0.31 363
0.68 825
0.56 852
0.34 1595
0.43 525
1.25 2138
0.14 342
0.10 338
1.53 2625
0.14 375
0.29 688
5.76
Min. Treated
Area (acres)Total Percentage
Treated
4.60 94%
354
LID SUMMARY
Basin E14, E19, E26, E27, OS 6.14 5.76
Tributary Basin
Total added
Impervious
(acres)
0.20
0.34
Total Treated
Area (Acres)
277
204
2005
0.78
1.77
499
0.53
1.01
2484
231
Total Treatment E Basins
0.50 472
2.01
0.28
E26.3, E26.4, E26.5
E27.1
E27.2
30 - Bioretention
31 - Bioretention
E19.1, E19.2
E26.2
29 - Bioretention
28 - Bioretention
24 - Bioretention
26 - Bioretention
27 - Bioretention
23 - Bioretention
E26.1
Stormwater Quality Strategy
19 - Bioretention
20 - Bioretention
21 - Bioretention
Volume Req.
(cu.ft)
E19.3
E19.4, E19.5, E19.6, E19.7
Tributary
Area (acres)
769
632
4410.82
Tributary Basins
0.87
E14.7
E14.2, E14.3, E14.4
E14.5, E14.6
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =58.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.580
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.18 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area)Area =23,100 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =354 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region,VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =6 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =268 sq ft
D) Actual Flat Surface Area AActual =450 sq ft
E) Area at Design Depth (Top Surface Area)ATop =1000 sq ft
F) Rain Garden Total Volume VT=363 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =125.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =354 cu ft
iii) Orifice Diameter, 3/8" Minimum DO =3/16 in LESS THAN MINIMUM. USE DIAMETER OF 3/8"
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 19 (Tributary E14.7)
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
HFH22_UD-BMP_v3.07_LID_19.xlsm, RG 4/13/2022, 10:30 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 19 (Tributary E14.7)
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
HFH22_UD-BMP_v3.07_LID_19.xlsm, RG 4/13/2022, 10:30 AM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =67.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.670
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.21 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area)Area =43,995 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =769 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region,VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =6 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =590 sq ft
D) Actual Flat Surface Area AActual =1500 sq ft
E) Area at Design Depth (Top Surface Area)ATop =1800 sq ft
F) Rain Garden Total Volume VT=825 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =125.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =769 cu ft
iii) Orifice Diameter, 3/8" Minimum DO =1/4 in LESS THAN MINIMUM. USE DIAMETER OF 3/8"
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 20 (Tributary E14.2, E14.3, E14.4)
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
HFH22_UD-BMP_v3.07_LID_20.xlsm, RG 4/13/2022, 10:31 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 20 (Tributary E14.2, E14.3, E14.4)
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
HFH22_UD-BMP_v3.07_LID_20.xlsm, RG 4/13/2022, 10:31 AM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =64.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.640
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.20 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area)Area =37,897 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =632 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region,VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =6 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =485 sq ft
D) Actual Flat Surface Area AActual =1607 sq ft
E) Area at Design Depth (Top Surface Area)ATop =1800 sq ft
F) Rain Garden Total Volume VT=852 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =125.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =632 cu ft
iii) Orifice Diameter, 3/8" Minimum DO =1/4 in LESS THAN MINIMUM. USE DIAMETER OF 3/8"
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 21 (Tributary E14.5, E14.6)
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
HFH22_UD-BMP_v3.07_LID_21.xlsm, RG 4/13/2022, 10:32 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 21 (Tributary E14.5, E14.6)
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
HFH22_UD-BMP_v3.07_LID_21.xlsm, RG 4/13/2022, 10:32 AM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =42.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.420
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.15 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area)Area =35,719 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =441 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region,VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =12 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =300 sq ft
D) Actual Flat Surface Area AActual =1589 sq ft
E) Area at Design Depth (Top Surface Area)ATop =1600 sq ft
F) Rain Garden Total Volume VT=1,595 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =125.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =441 cu ft
iii) Orifice Diameter, 3/8" Minimum DO =3/16 in LESS THAN MINIMUM. USE DIAMETER OF 3/8"
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 23 Tributary (E19.2 E19.3)
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
HFH22_UD-BMP_v3.07_LID_23.xlsm, RG 4/13/2022, 10:09 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 23 Tributary (E19.2 E19.3)
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
HFH22_UD-BMP_v3.07_LID_23.xlsm, RG 4/13/2022, 10:09 AM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =55.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.550
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.18 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area)Area =33,976 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =499 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region,VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =6 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =374 sq ft
D) Actual Flat Surface Area AActual =1000 sq ft
E) Area at Design Depth (Top Surface Area)ATop =1100 sq ft
F) Rain Garden Total Volume VT=525 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =125.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =499 cu ft
iii) Orifice Diameter, 3/8" Minimum DO =1/4 in LESS THAN MINIMUM. USE DIAMETER OF 3/8"
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 24 (Tributary E19.3)
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
HFH22_UD-BMP_v3.07_LID_24.xlsm, RG 4/13/2022, 10:33 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 24 (Tributary E19.3)
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
HFH22_UD-BMP_v3.07_LID_24.xlsm, RG 4/13/2022, 10:33 AM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =71.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.710
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.22 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area)Area =77,101 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 =0.60 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region,VWQCV OTHER =2,005 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =9 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =1095 sq ft
D) Actual Flat Surface Area AActual =2000 sq ft
E) Area at Design Depth (Top Surface Area)ATop =3700 sq ft
F) Rain Garden Total Volume VT=2,138 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =335.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =2,005 cu ft
iii) Orifice Diameter, 3/8" Minimum DO =3/8 in
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 26 (Tributary E19.4 E19.5 E19.6 E19.7)
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
HFH22_UD-BMP_v3.07_LID_26.xlsm, RG 4/13/2022, 10:14 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 26 (Tributary E19.4 E19.5 E19.6 E19.7)
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
HFH22_UD-BMP_v3.07_LID_26.xlsm, RG 4/13/2022, 10:14 AM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =71.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.710
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.22 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area)Area =8,712 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 =0.60 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region,VWQCV OTHER =227 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =6 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =124 sq ft
D) Actual Flat Surface Area AActual =683 sq ft
E) Area at Design Depth (Top Surface Area)ATop =683 sq ft
F) Rain Garden Total Volume VT=342 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =30.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =227 cu ft
iii) Orifice Diameter, 3/8" Minimum DO =3/16 in LESS THAN MINIMUM. USE DIAMETER OF 3/8"
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 27 (Tributary E26.2)
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
HFH22_UD-BMP_v3.07_LID_27.xlsm, RG 4/13/2022, 10:17 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 27 (Tributary E26.2)
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
HFH22_UD-BMP_v3.07_LID_27.xlsm, RG 4/13/2022, 10:17 AM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =29.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.290
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.12 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area)Area =14,810 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 =0.60 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region,VWQCV OTHER =204 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =6 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =86 sq ft
D) Actual Flat Surface Area AActual =550 sq ft
E) Area at Design Depth (Top Surface Area)ATop =800 sq ft
F) Rain Garden Total Volume VT=338 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =30.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =204 cu ft
iii) Orifice Diameter, 3/8" Minimum DO =3/16 in LESS THAN MINIMUM. USE DIAMETER OF 3/8"
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 28 (Tributary E26.1)
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
HFH22_UD-BMP_v3.07_LID_28.xlsm, RG 4/13/2022, 10:22 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 28 (Tributary E26.1)
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
HFH22_UD-BMP_v3.07_LID_28.xlsm, RG 4/13/2022, 10:22 AM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =76.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.760
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.24 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area)Area =87,555 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 =0.60 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region,VWQCV OTHER =2,484 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =6 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =1331 sq ft
D) Actual Flat Surface Area AActual =5000 sq ft
E) Area at Design Depth (Top Surface Area)ATop =5500 sq ft
F) Rain Garden Total Volume VT=2,625 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =30.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =2,484 cu ft
iii) Orifice Diameter, 3/8" Minimum DO =11/16 in
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 27 (Tributary E26.3, E26.4, E26.5)
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
HFH22_UD-BMP_v3.07_LID_29.xlsm, RG 4/13/2022, 10:25 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 27 (Tributary E26.3, E26.4, E26.5)
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
HFH22_UD-BMP_v3.07_LID_29.xlsm, RG 4/13/2022, 10:25 AM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =49.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.490
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.16 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area)Area =12,196 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 =0.60 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region,VWQCV OTHER =231 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =6 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =120 sq ft
D) Actual Flat Surface Area AActual =700 sq ft
E) Area at Design Depth (Top Surface Area)ATop =800 sq ft
F) Rain Garden Total Volume VT=375 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =30.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =231 cu ft
iii) Orifice Diameter, 3/8" Minimum DO =3/16 in LESS THAN MINIMUM. USE DIAMETER OF 3/8"
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 30 (Tributary E27.1)
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
HFH22_UD-BMP_v3.07_LID_30.xlsm, RG 4/13/2022, 10:28 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 30 (Tributary E27.1)
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
HFH22_UD-BMP_v3.07_LID_30.xlsm, RG 4/13/2022, 10:28 AM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =59.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.590
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.19 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area)Area =21,780 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 =0.60 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region,VWQCV OTHER =472 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =6 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =257 sq ft
D) Actual Flat Surface Area AActual =1250 sq ft
E) Area at Design Depth (Top Surface Area)ATop =1500 sq ft
F) Rain Garden Total Volume VT=688 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =30.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =472 cu ft
iii) Orifice Diameter, 3/8" Minimum DO =5/16 in LESS THAN MINIMUM. USE DIAMETER OF 3/8"
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 31 (Tributary E27.2)
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
HFH22_UD-BMP_v3.07_LID_31.xlsm, RG 4/13/2022, 10:29 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
M. Pepin
Galloway
April 13, 2022
Mulberry Filing 2
LID 31 (Tributary E27.2)
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
HFH22_UD-BMP_v3.07_LID_31.xlsm, RG 4/13/2022, 10:29 AM
Mulberry Filing 2
Preliminary Drainage Report
APPENDIX D
SWMM Models
Mulberry Filing 2
Preliminary Drainage Report
Existing Condition SWMM Model
H1
H4
H3
H2
CooperSlough
LakeCanal O1
CityofFortCollins
Mulberry - Existing Conditions
SWMM 5.1 Page 1
Mulberry - Existing SWMM - Input
[TITLE]
;;Project Title/Notes
[OPTIONS]
;;Option Value
FLOW_UNITS CFS
INFILTRATION HORTON
FLOW_ROUTING KINWAVE
LINK_OFFSETS DEPTH
MIN_SLOPE 0
ALLOW_PONDING NO
SKIP_STEADY_STATE NO
START_DATE 03/19/2021
START_TIME 00:00:00
REPORT_START_DATE 03/19/2021
REPORT_START_TIME 00:00:00
END_DATE 03/19/2021
END_TIME 06:00:00
SWEEP_START 01/01
SWEEP_END 12/31
DRY_DAYS 0
REPORT_STEP 00:15:00
WET_STEP 00:05:00
DRY_STEP 01:00:00
ROUTING_STEP 0:00:30
RULE_STEP 00:00:00
INERTIAL_DAMPING PARTIAL
NORMAL_FLOW_LIMITED BOTH
FORCE_MAIN_EQUATION H-W
VARIABLE_STEP 0.75
LENGTHENING_STEP 0
MIN_SURFAREA 12.566
MAX_TRIALS 8
HEAD_TOLERANCE 0.005
SYS_FLOW_TOL 5
LAT_FLOW_TOL 5
MINIMUM_STEP 0.5
THREADS 1
[EVAPORATION]
;;Data Source Parameters
;;-------------- ----------------
CONSTANT 0.0
DRY_ONLY NO
[RAINGAGES]
;;Name Format Interval SCF Source
;;-------------- --------- ------ ------ ----------
CityofFortCollins INTENSITY 0:05 1.0 TIMESERIES FC_2year
[SUBCATCHMENTS]
;;Name Rain Gage Outlet Area %Imperv Width %Slope
CurbLen SnowPack
;;-------------- ---------------- ---------------- -------- -------- -------- --------
Mulberry - Existing SWMM - Input
FC_2year 1:35 0.15
FC_2year 1:40 0.15
FC_2year 1:45 0.14
FC_2year 1:50 0.14
FC_2year 1:55 0.13
FC_2year 2:00 0.13
;
FC_100yr 0:05 1.00
FC_100yr 0:10 1.14
FC_100yr 0:15 1.33
FC_100yr 0:20 2.23
FC_100yr 0:25 2.84
FC_100yr 0:30 5.49
FC_100yr 0:35 9.95
FC_100yr 0:40 4.12
FC_100yr 0:45 2.48
FC_100yr 0:50 1.46
FC_100yr 0:55 1.22
FC_100yr 1:00 1.06
FC_100yr 1:05 1.00
FC_100yr 1:10 0.95
FC_100yr 1:15 0.91
FC_100yr 1:20 0.87
FC_100yr 1:25 0.84
FC_100yr 1:30 0.81
FC_100yr 1:35 0.78
FC_100yr 1:40 0.75
FC_100yr 1:45 0.73
FC_100yr 1:50 0.71
FC_100yr 1:55 0.69
FC_100yr 2:00 0.67
[REPORT]
;;Reporting Options
SUBCATCHMENTS ALL
NODES ALL
LINKS ALL
[TAGS]
[MAP]
DIMENSIONS -2215.333 0.000 12215.333 10000.000
Units None
[COORDINATES]
;;Node X-Coord Y-Coord
;;-------------- ------------------ ------------------
CooperSlough 5799.537 4855.156
LakeCanal 3018.540 1714.948
O1 4327.926 1680.185
[VERTICES]
;;Link X-Coord Y-Coord
;;-------------- ------------------ ------------------
[Polygons]
Mulberry - Existing SWMM - Input
;;Subcatchment X-Coord Y-Coord
;;-------------- ------------------ ------------------
H1 2694.090 8621.089
H1 5938.586 5121.669
H1 5938.586 8574.739
H1 2636.153 8621.089
H4 2439.166 2387.022
H4 2358.053 2479.722
H4 2392.816 1460.023
H4 2949.015 1436.848
H4 2867.903 1958.285
H4 2439.166 2421.784
H3 2427.578 8551.564
H3 2392.816 2595.597
H3 3064.890 1946.698
H3 3227.115 1448.436
H3 4154.114 1448.436
H3 4130.939 5052.144
H3 4154.114 6848.204
H3 2427.578 8551.564
H2 4281.576 6709.154
H2 4281.576 6709.154
H2 4269.988 5098.494
H2 5730.012 5075.319
H2 4293.163 6720.742
[SYMBOLS]
;;Gage X-Coord Y-Coord
;;-------------- ------------------ ------------------
CityofFortCollins 4222.097 8895.152
[BACKDROP]
FILE "H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\Drain
Reports\Prop\Aerial\Aerial.jpg"
DIMENSIONS -2215.333 200.301 12215.333 9799.699
Mulberry - Existing SWMM - 2-yr Results
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.015)
--------------------------------------------------------------
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... NO
Water Quality .......... NO
Infiltration Method ...... HORTON
Starting Date ............ 03/19/2021 00:00:00
Ending Date .............. 03/19/2021 06:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:15:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 01:00:00
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation ...... 21.401 0.978
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 20.956 0.958
Surface Runoff ........... 0.408 0.019
Final Storage ............ 0.043 0.002
Continuity Error (%) ..... -0.027
Mulberry - Existing SWMM - 2-yr Results
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 0.408 0.133
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
External Inflow .......... 0.000 0.000
External Outflow ......... 0.408 0.133
Flooding Loss ............ 0.000 0.000
Evaporation Loss ......... 0.000 0.000
Exfiltration Loss ........ 0.000 0.000
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.000 0.000
Continuity Error (%) ..... 0.000
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------------------------------------------
------
Total Total Total Total Imperv Perv Total Total Peak
Runoff
Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff
Coeff
Subcatchment in in in in in in in 10^6 gal CFS
------------------------------------------------------------------------------------------------------------------------
------
H1 0.98 0.00 0.00 0.96 0.02 0.00 0.02 0.04 4.11
0.019
H4 0.98 0.00 0.00 0.96 0.02 0.00 0.02 0.00 0.38
0.022
H3 0.98 0.00 0.00 0.96 0.02 0.00 0.02 0.08 8.73
0.019
H2 0.98 0.00 0.00 0.96 0.02 0.00 0.02 0.01 1.27
0.020
Mulberry - Existing SWMM - 2-yr Results
Analysis begun on: Mon Apr 5 09:34:48 2021
Analysis ended on: Mon Apr 5 09:34:48 2021
Total elapsed time: < 1 sec
Mulberry - Exist.SWMM - 100-yr Results
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.015)
--------------------------------------------------------------
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... NO
Water Quality .......... NO
Infiltration Method ...... HORTON
Starting Date ............ 03/19/2021 00:00:00
Ending Date .............. 03/19/2021 06:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:15:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 01:00:00
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation ...... 80.263 3.669
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 60.314 2.757
Surface Runoff ........... 18.525 0.847
Final Storage ............ 1.457 0.067
Continuity Error (%) ..... -0.042
Mulberry - Exist.SWMM - 100-yr Results
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 18.525 6.037
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
External Inflow .......... 0.000 0.000
External Outflow ......... 18.525 6.037
Flooding Loss ............ 0.000 0.000
Evaporation Loss ......... 0.000 0.000
Exfiltration Loss ........ 0.000 0.000
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.000 0.000
Continuity Error (%) ..... 0.000
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------------------------------------------
------
Total Total Total Total Imperv Perv Total Total Peak
Runoff
Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff
Coeff
Subcatchment in in in in in in in 10^6 gal CFS
------------------------------------------------------------------------------------------------------------------------
------
H1 3.67 0.00 0.00 2.62 0.07 0.98 1.05 2.05 34.47
0.286
H4 3.67 0.00 0.00 1.98 0.07 1.62 1.69 0.30 8.73
0.460
H3 3.67 0.00 0.00 2.90 0.07 0.59 0.66 2.92 51.96
0.181
H2 3.67 0.00 0.00 2.38 0.07 1.22 1.29 0.77 15.53
0.352
Mulberry - Exist.SWMM - 100-yr Results
Analysis begun on: Mon Apr 5 09:35:43 2021
Analysis ended on: Mon Apr 5 09:35:43 2021
Total elapsed time: < 1 sec
A
D
E C
G
H
B
I
C1
C2
C3
C4Pond_H_Outlet
Pond_D_Outlet
Pond_E_Outlet
Pond_B_Outlet
Pond_C_Outlet
Pond_A_Outlet
6
Pond_I_Outlet
J2
J1
J3
J4 Peakview_Storm_Stub
CooperSlough
Lake_Canal
CooperSloughNorth
Pond_A
Pond_B
Pond_C
Pond_D
Pond_E
Pond_G
Pond_HPond_I
CityofFortCollins
CoFC_2yr
03/19/2021 00:15:00
SWMM 5.1 Page 1
***Existing Conditions 2-Year Event***
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.015)
--------------------------------------------------------------
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... NO
Water Quality .......... NO
Infiltration Method ...... HORTON
Starting Date ............ 03/19/2021 00:00:00
Ending Date .............. 03/19/2021 06:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:15:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 01:00:00
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation ...... 21.002 0.978
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 20.544 0.957
Surface Runoff ........... 0.422 0.020
Final Storage ............ 0.043 0.002
Continuity Error (%) ..... -0.035
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 0.422 0.138
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
External Inflow .......... 0.000 0.000
External Outflow ......... 0.422 0.138
Flooding Loss ............ 0.000 0.000
Evaporation Loss ......... 0.000 0.000
Exfiltration Loss ........ 0.000 0.000
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.000 0.000
Continuity Error (%) ..... 0.000
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------
------------------------------------------
Total Total Total Total Imperv
Perv Total Total Peak Runoff
Precip Runon Evap Infil Runoff
Runoff Runoff Runoff Runoff Coeff
Subcatchment in in in in in
in in 10^6 gal CFS
------------------------------------------------------------------------------------
------------------------------------------
A 0.98 0.00 0.00 0.96 0.02
0.00 0.02 0.03 3.22 0.020
I 0.98 0.00 0.00 0.96 0.02
0.00 0.02 0.00 0.38 0.022
H 0.98 0.00 0.00 0.96 0.02
0.00 0.02 0.02 2.30 0.020
C 0.98 0.00 0.00 0.96 0.02
0.00 0.02 0.01 1.27 0.020
B 0.98 0.00 0.00 0.96 0.02
0.00 0.02 0.01 0.89 0.021
D 0.98 0.00 0.00 0.96 0.02
0.00 0.02 0.02 2.02 0.020
E 0.98 0.00 0.00 0.96 0.02
0.00 0.02 0.02 1.86 0.021
G 0.98 0.00 0.00 0.96 0.02
0.00 0.02 0.03 2.93 0.020
Analysis begun on: Wed Aug 11 15:22:57 2021
Analysis ended on: Wed Aug 11 15:22:57 2021
Total elapsed time: < 1 sec
***Existing Conditions 100-Year Event***
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.015)
--------------------------------------------------------------
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... NO
Water Quality .......... NO
Infiltration Method ...... HORTON
Starting Date ............ 03/19/2021 00:00:00
Ending Date .............. 03/19/2021 06:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:15:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 01:00:00
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation ...... 78.765 3.669
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 50.951 2.373
Surface Runoff ........... 27.829 1.296
Final Storage ............ 0.043 0.002
Continuity Error (%) ..... -0.073
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 27.829 9.069
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
External Inflow .......... 0.000 0.000
External Outflow ......... 27.829 9.069
Flooding Loss ............ 0.000 0.000
Evaporation Loss ......... 0.000 0.000
Exfiltration Loss ........ 0.000 0.000
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.000 0.000
Continuity Error (%) ..... 0.000
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------
------------------------------------------
Total Total Total Total Imperv
Perv Total Total Peak Runoff
Precip Runon Evap Infil Runoff
Runoff Runoff Runoff Runoff Coeff
Subcatchment in in in in in
in in 10^6 gal CFS
------------------------------------------------------------------------------------
------------------------------------------
A 3.67 0.00 0.00 2.49 0.07
1.11 1.18 1.79 32.92 0.321
I 3.67 0.00 0.00 1.98 0.07
1.62 1.69 0.30 8.73 0.460
H 3.67 0.00 0.00 2.46 0.07
1.14 1.21 1.32 24.82 0.330
C 3.67 0.00 0.00 2.38 0.07
1.22 1.29 0.77 15.53 0.352
B 3.67 0.00 0.00 2.15 0.07
1.45 1.52 0.63 15.66 0.415
D 3.67 0.00 0.00 2.39 0.07
1.20 1.28 1.21 24.11 0.348
E 3.67 0.00 0.00 2.21 0.07
1.39 1.46 1.27 29.53 0.397
G 3.67 0.00 0.00 2.38 0.07
1.22 1.29 1.78 35.78 0.352
Analysis begun on: Wed Aug 11 15:23:25 2021
Analysis ended on: Wed Aug 11 15:23:25 2021
Total elapsed time: < 1 sec
Mulberry Filing 2
Preliminary Drainage Report
Proposed SWMM Model
A
D
E C
G
H
B
I
C1
C2
C3
C4Pond_H_Outlet
Pond_D_Outlet
Pond_E_Outlet
Pond_B_Outlet
Pond_C_Outlet
Pond_A_Outlet
6
Pond_I_Outlet
J2
J1
J3
J4 Peakview_Storm_Stub
CooperSlough
Lake_Canal
CooperSloughNorth
Pond_A
Pond_B
Pond_C
Pond_D
Pond_E
Pond_G
Pond_HPond_I
CityofFortCollins
CoFC_2yr
03/19/2021 00:15:00
SWMM 5.1 Page 1
***2-Year Storm Event***
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.015)
--------------------------------------------------------------
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... YES
Ponding Allowed ........ NO
Water Quality .......... NO
Infiltration Method ...... HORTON
Flow Routing Method ...... KINWAVE
Starting Date ............ 03/19/2021 00:00:00
Ending Date .............. 03/20/2021 00:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:15:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 01:00:00
Routing Time Step ........ 30.00 sec
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation ...... 18.140 0.978
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 5.291 0.285
Surface Runoff ........... 11.579 0.624
Final Storage ............ 1.322 0.071
Continuity Error (%) ..... -0.288
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 11.579 3.773
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
External Inflow .......... 0.000 0.000
External Outflow ......... 11.459 3.734
Flooding Loss ............ 0.000 0.000
Evaporation Loss ......... 0.000 0.000
Exfiltration Loss ........ 0.000 0.000
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.112 0.037
Continuity Error (%) ..... 0.065
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
*************************
Routing Time Step Summary
*************************
Minimum Time Step : 30.00 sec
Average Time Step : 30.00 sec
Maximum Time Step : 30.00 sec
Percent in Steady State : 0.00
Average Iterations per Step : 1.00
Percent Not Converging : 0.00
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------
------------------------------------------
Total Total Total Total Imperv
Perv Total Total Peak Runoff
Precip Runon Evap Infil Runoff
Runoff Runoff Runoff Runoff Coeff
Subcatchment in in in in in
in in 10^6 gal CFS
------------------------------------------------------------------------------------
------------------------------------------
A 0.98 0.00 0.00 0.29 0.62
0.00 0.62 0.94 35.83 0.631
D 0.98 0.00 0.00 0.53 0.41
0.00 0.41 0.37 22.22 0.417
E 0.98 0.00 0.00 0.45 0.48
0.00 0.48 0.42 17.45 0.487
C 0.98 0.00 0.00 0.10 0.79
0.00 0.80 0.48 22.13 0.813
G 0.98 0.00 0.00 0.10 0.79
0.00 0.79 0.87 29.79 0.810
H 0.98 0.00 0.00 0.19 0.71
0.00 0.71 0.32 21.49 0.727
B 0.98 0.00 0.00 0.29 0.62
0.00 0.62 0.26 13.91 0.634
I 0.98 0.00 0.00 0.19 0.71
0.00 0.71 0.12 9.41 0.728
******************
Node Depth Summary
******************
---------------------------------------------------------------------------------
Average Maximum Maximum Time of Max Reported
Depth Depth HGL Occurrence Max Depth
Node Type Feet Feet Feet days hr:min Feet
---------------------------------------------------------------------------------
J2 JUNCTION 0.00 0.00 4935.00 0 00:00 0.00
J1 JUNCTION 0.00 0.00 4943.00 0 00:00 0.00
J3 JUNCTION 0.00 0.00 4927.00 0 00:00 0.00
J4 JUNCTION 0.00 0.00 4923.00 0 00:00 0.00
Peakview_Storm_Stub OUTFALL 0.00 0.00 4922.94 0 00:00 0.00
CooperSlough OUTFALL 0.00 0.00 4938.00 0 00:00 0.00
Lake_Canal OUTFALL 0.00 0.00 0.00 0 00:00 0.00
CooperSloughNorth OUTFALL 0.00 0.00 4940.00 0 00:00 0.00
Pond_A STORAGE 0.41 2.59 4948.09 0 01:48 2.59
Pond_B STORAGE 0.92 3.94 4946.44 0 03:38 3.94
Pond_C STORAGE 0.71 2.94 4941.44 0 01:28 2.94
Pond_D STORAGE 0.55 0.88 4944.88 0 02:36 0.88
Pond_E STORAGE 0.27 1.38 4937.38 0 01:53 1.38
Pond_G STORAGE 0.59 3.45 4931.45 0 02:02 3.45
Pond_H STORAGE 0.85 2.63 4925.63 0 02:15 2.63
Pond_I STORAGE 1.83 2.77 4925.27 0 02:30 2.77
*******************
Node Inflow Summary
*******************
------------------------------------------------------------------------------------
-------------
Maximum Maximum Lateral
Total Flow
Lateral Total Time of Max Inflow
Inflow Balance
Inflow Inflow Occurrence Volume
Volume Error
Node Type CFS CFS days hr:min 10^6 gal 10^6
gal Percent
------------------------------------------------------------------------------------
-------------
J2 JUNCTION 0.00 4.57 0 01:59 0
0.755 0.000
J1 JUNCTION 0.00 0.81 0 02:36 0
0.338 0.000
J3 JUNCTION 0.00 7.73 0 02:02 0
0.867 0.000
J4 JUNCTION 0.00 9.01 0 02:06 0
1.19 0.000
Peakview_Storm_Stub OUTFALL 0.00 9.01 0 02:06 0
1.19 0.000
CooperSlough OUTFALL 0.00 17.32 0 01:28 0
2.42 0.000
Lake_Canal OUTFALL 0.00 0.24 0 02:30 0
0.122 0.000
CooperSloughNorth OUTFALL 0.00 0.00 0 00:00 0
0 0.000 gal
Pond_A STORAGE 35.83 35.83 0 00:45 0.938
0.938 0.050
Pond_B STORAGE 13.91 20.14 0 00:45 0.258
1.2 0.006
Pond_C STORAGE 22.13 29.32 0 00:45 0.475
2.43 0.053
Pond_D STORAGE 22.22 22.22 0 00:40 0.373
0.373 0.006
Pond_E STORAGE 17.45 17.45 0 00:45 0.417
0.417 0.069
Pond_G STORAGE 29.79 29.79 0 00:45 0.867
0.867 0.022
Pond_H STORAGE 21.49 21.49 0 00:40 0.321
0.321 0.036
Pond_I STORAGE 9.41 9.41 0 00:40 0.124
0.124 0.009
*********************
Node Flooding Summary
*********************
No nodes were flooded.
**********************
Storage Volume Summary
**********************
------------------------------------------------------------------------------------
--------------
Average Avg Evap Exfil Maximum Max Time
of Max Maximum
Volume Pcnt Pcnt Pcnt Volume Pcnt
Occurrence Outflow
Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days
hr:min CFS
------------------------------------------------------------------------------------
--------------
Pond_A 5.964 1 0 0 55.545 12 0
01:48 9.52
Pond_B 8.998 3 0 0 51.324 17 0
03:38 7.60
Pond_C 2.753 1 0 0 24.172 12 0
01:28 17.32
Pond_D 20.870 5 0 0 42.116 11 0
02:35 0.81
Pond_E 4.269 2 0 0 29.455 13 0
01:53 3.78
Pond_G 5.852 1 0 0 51.283 12 0
02:02 7.73
Pond_H 8.630 4 0 0 32.948 16 0
02:15 1.29
Pond_I 6.901 7 0 0 14.313 14 0
02:29 0.24
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg Max Total
Freq Flow Flow Volume
Outfall Node Pcnt CFS CFS 10^6 gal
-----------------------------------------------------------
Peakview_Storm_Stub 99.51 1.85 9.01 1.188
CooperSlough 99.55 3.77 17.32 2.424
Lake_Canal 99.13 0.19 0.24 0.122
CooperSloughNorth 0.00 0.00 0.00 0.000
-----------------------------------------------------------
System 74.55 5.81 26.43 3.734
********************
Link Flow Summary
********************
-----------------------------------------------------------------------------
Maximum Time of Max Maximum Max/ Max/
|Flow| Occurrence |Veloc| Full Full
Link Type CFS days hr:min ft/sec Flow Depth
-----------------------------------------------------------------------------
C1 DUMMY 0.81 0 02:36
C2 DUMMY 4.57 0 01:59
C3 DUMMY 7.73 0 02:02
C4 DUMMY 9.01 0 02:06
Pond_H_Outlet ORIFICE 1.29 0 02:15 0.00
Pond_D_Outlet ORIFICE 0.81 0 02:36 0.00
Pond_E_Outlet ORIFICE 3.78 0 01:53 0.00
Pond_B_Outlet ORIFICE 7.60 0 03:38 0.00
Pond_C_Outlet ORIFICE 17.32 0 01:28 0.00
Pond_A_Outlet ORIFICE 9.52 0 01:48 0.00
6 ORIFICE 7.73 0 02:02 0.00
Pond_I_Outlet ORIFICE 0.24 0 02:30 0.00
*************************
Conduit Surcharge Summary
*************************
No conduits were surcharged.
Analysis begun on: Tue Nov 9 15:33:53 2021
Analysis ended on: Tue Nov 9 15:33:53 2021
Total elapsed time: < 1 sec
***100-Year Storm Event***
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.015)
--------------------------------------------------------------
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... YES
Ponding Allowed ........ NO
Water Quality .......... NO
Infiltration Method ...... HORTON
Flow Routing Method ...... KINWAVE
Starting Date ............ 03/19/2021 00:00:00
Ending Date .............. 03/20/2021 00:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:15:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 01:00:00
Routing Time Step ........ 30.00 sec
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation ...... 68.032 3.669
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 11.153 0.602
Surface Runoff ........... 55.823 3.011
Final Storage ............ 1.323 0.071
Continuity Error (%) ..... -0.392
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 55.823 18.191
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
External Inflow .......... 0.000 0.000
External Outflow ......... 50.282 16.385
Flooding Loss ............ 0.000 0.000
Evaporation Loss ......... 0.000 0.000
Exfiltration Loss ........ 0.000 0.000
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 5.523 1.800
Continuity Error (%) ..... 0.031
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
*************************
Routing Time Step Summary
*************************
Minimum Time Step : 30.00 sec
Average Time Step : 30.00 sec
Maximum Time Step : 30.00 sec
Percent in Steady State : 0.00
Average Iterations per Step : 1.00
Percent Not Converging : 0.00
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------
------------------------------------------
Total Total Total Total Imperv
Perv Total Total Peak Runoff
Precip Runon Evap Infil Runoff
Runoff Runoff Runoff Runoff Coeff
Subcatchment in in in in in
in in 10^6 gal CFS
------------------------------------------------------------------------------------
------------------------------------------
A 3.67 0.00 0.00 0.62 2.51
0.48 2.99 4.55 233.48 0.815
D 3.67 0.00 0.00 1.17 1.65
0.82 2.47 2.25 132.38 0.672
E 3.67 0.00 0.00 1.07 1.94
0.62 2.55 2.23 112.80 0.696
C 3.67 0.00 0.00 0.15 3.23
0.22 3.45 2.06 138.82 0.939
G 3.67 0.00 0.00 0.16 3.22
0.20 3.43 3.75 194.95 0.934
H 3.67 0.00 0.00 0.31 2.87
0.43 3.30 1.49 119.43 0.900
B 3.67 0.00 0.00 0.54 2.51
0.56 3.08 1.28 85.59 0.838
I 3.67 0.00 0.00 0.30 2.88
0.44 3.31 0.58 49.26 0.903
******************
Node Depth Summary
******************
---------------------------------------------------------------------------------
Average Maximum Maximum Time of Max Reported
Depth Depth HGL Occurrence Max Depth
Node Type Feet Feet Feet days hr:min Feet
---------------------------------------------------------------------------------
J2 JUNCTION 0.00 0.00 4935.00 0 00:00 0.00
J1 JUNCTION 0.00 0.00 4943.00 0 00:00 0.00
J3 JUNCTION 0.00 0.00 4927.00 0 00:00 0.00
J4 JUNCTION 0.00 0.00 4923.00 0 00:00 0.00
Peakview_Storm_Stub OUTFALL 0.00 0.00 4922.94 0 00:00 0.00
CooperSlough OUTFALL 0.00 0.00 4938.00 0 00:00 0.00
Lake_Canal OUTFALL 0.00 0.00 0.00 0 00:00 0.00
CooperSloughNorth OUTFALL 0.00 0.00 4940.00 0 00:00 0.00
Pond_A STORAGE 2.47 6.98 4952.48 0 02:27 6.98
Pond_B STORAGE 6.15 8.97 4951.47 0 09:18 8.97
Pond_C STORAGE 3.52 7.90 4946.40 0 02:13 7.90
Pond_D STORAGE 3.05 3.86 4947.86 0 03:10 3.86
Pond_E STORAGE 1.84 5.96 4941.96 0 02:28 5.96
Pond_G STORAGE 3.21 7.75 4935.75 0 02:27 7.75
Pond_H STORAGE 5.63 8.36 4931.36 0 02:26 8.36
Pond_I STORAGE 5.02 5.54 4928.04 0 02:41 5.54
*******************
Node Inflow Summary
*******************
------------------------------------------------------------------------------------
-------------
Maximum Maximum Lateral
Total Flow
Lateral Total Time of Max Inflow
Inflow Balance
Inflow Inflow Occurrence Volume
Volume Error
Node Type CFS CFS days hr:min 10^6 gal 10^6
gal Percent
------------------------------------------------------------------------------------
-------------
J2 JUNCTION 0.00 11.32 0 02:32 0
3.33 0.000
J1 JUNCTION 0.00 1.95 0 03:10 0
1.09 0.000
J3 JUNCTION 0.00 12.14 0 02:27 0
3.75 0.000
J4 JUNCTION 0.00 14.50 0 02:27 0
4.97 0.000
Peakview_Storm_Stub OUTFALL 0.00 14.50 0 02:27 0
4.97 0.000
CooperSlough OUTFALL 0.00 31.80 0 02:13 0
11.2 0.000
Lake_Canal OUTFALL 0.00 0.35 0 02:41 0
0.21 0.000
CooperSloughNorth OUTFALL 0.00 0.00 0 00:00 0
0 0.000 gal
Pond_A STORAGE 233.48 233.48 0 00:40 4.55
4.55 0.025
Pond_B STORAGE 85.59 96.09 0 00:40 1.28
5.82 0.004
Pond_C STORAGE 138.82 151.28 0 00:40 2.06
11.2 0.024
Pond_D STORAGE 132.38 132.38 0 00:40 2.25
2.25 0.000
Pond_E STORAGE 112.80 112.80 0 00:40 2.23
2.23 0.039
Pond_G STORAGE 194.95 194.95 0 00:40 3.75
3.75 0.015
Pond_H STORAGE 119.43 119.43 0 00:40 1.49
1.49 0.006
Pond_I STORAGE 49.26 49.26 0 00:40 0.576
0.576 -0.000
*********************
Node Flooding Summary
*********************
No nodes were flooded.
**********************
Storage Volume Summary
**********************
------------------------------------------------------------------------------------
--------------
Average Avg Evap Exfil Maximum Max Time
of Max Maximum
Volume Pcnt Pcnt Pcnt Volume Pcnt
Occurrence Outflow
Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days
hr:min CFS
------------------------------------------------------------------------------------
--------------
Pond_A 121.686 26 0 0 460.663 99 0
02:26 17.16
Pond_B 170.372 58 0 0 292.337 99 0
09:17 11.92
Pond_C 52.816 27 0 0 192.547 97 0
02:13 31.80
Pond_D 212.289 54 0 0 281.818 72 0
03:10 1.95
Pond_E 56.787 25 0 0 220.679 99 0
02:28 9.39
Pond_G 115.478 28 0 0 387.512 93 0
02:27 12.14
Pond_H 104.166 52 0 0 180.314 89 0
02:26 2.37
Pond_I 59.753 57 0 0 73.530 70 0
02:40 0.35
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg Max Total
Freq Flow Flow Volume
Outfall Node Pcnt CFS CFS 10^6 gal
-----------------------------------------------------------
Peakview_Storm_Stub 99.58 7.72 14.50 4.971
CooperSlough 99.62 17.40 31.80 11.203
Lake_Canal 99.44 0.33 0.35 0.210
CooperSloughNorth 0.00 0.00 0.00 0.000
-----------------------------------------------------------
System 74.66 25.45 46.62 16.384
********************
Link Flow Summary
********************
-----------------------------------------------------------------------------
Maximum Time of Max Maximum Max/ Max/
|Flow| Occurrence |Veloc| Full Full
Link Type CFS days hr:min ft/sec Flow Depth
-----------------------------------------------------------------------------
C1 DUMMY 1.95 0 03:10
C2 DUMMY 11.32 0 02:32
C3 DUMMY 12.14 0 02:27
C4 DUMMY 14.50 0 02:27
Pond_H_Outlet ORIFICE 2.37 0 02:26 0.00
Pond_D_Outlet ORIFICE 1.95 0 03:10 0.00
Pond_E_Outlet ORIFICE 9.39 0 02:28 0.00
Pond_B_Outlet ORIFICE 11.92 0 09:18 0.00
Pond_C_Outlet ORIFICE 31.80 0 02:13 0.00
Pond_A_Outlet ORIFICE 17.16 0 02:27 0.00
6 ORIFICE 12.14 0 02:27 0.00
Pond_I_Outlet ORIFICE 0.35 0 02:41 0.00
*************************
Conduit Surcharge Summary
*************************
No conduits were surcharged.
Analysis begun on: Tue Nov 9 15:33:21 2021
Analysis ended on: Tue Nov 9 15:33:21 2021
Total elapsed time: < 1 sec
Preliminary Pond Volumes and Release Rates
A 10.5 ac-ft / 460,000 cf 17.2 cfs
B 6.6 ac-ft / 290,000 cf 11.9 cfs
C 4.6 ac-ft / 200,000 cf 31.9 cfs
D 6.4 ac-ft / 280,000 cf 1.9 cfs
E 5.1 ac-ft / 220,000 cf 9.4 cfs
G 8.9 ac-ft / 390,000 cf 12.1 cfs
H 4.1 ac-ft / 180,000 cf** 2.4 cfs
I 1.7 ac-ft / 75,000 cf 0.38 cfs*0.35 cfs 0.35 cfs
* 2-year runoff from Basins H1 and H2 in Existing Conditions SWMM Model
** Half detention provided by site other half by commercial development
Detention
Pond
Proposed Release Rate
(From SWMM Model)
32.06 cfs*
14.6 cfs*
31.8 cfs
14.5 cfs
100-year Volume Required
(From SWMM Model)
Allowable
Release Rate
Mulberry - Existing SWMM - Input
-------- ----------------
H1 CityofFortCollins CooperSlough 72 2 1000 1.5 0
H4 CityofFortCollins LakeCanal 6.5 2 400 1.0 0
H3 CityofFortCollins O1 162 2 1200 1.0 0
H2 CityofFortCollins CooperSlough 22 2 600 1.0 0
[SUBAREAS]
;;Subcatchment N-Imperv N-Perv S-Imperv S-Perv PctZero RouteTo
PctRouted
;;-------------- ---------- ---------- ---------- ---------- ---------- ----------
----------
H1 0.016 0.25 0.1 0.3 1 OUTLET
H4 0.016 0.25 0.1 0.3 1 OUTLET
H3 0.016 0.25 0.1 0.3 1 OUTLET
H2 0.016 0.25 0.1 0.3 1 OUTLET
[INFILTRATION]
;;Subcatchment Param1 Param2 Param3 Param4 Param5
;;-------------- ---------- ---------- ---------- ---------- ----------
H1 0.51 0.5 6.48 7 0
H4 0.51 0.5 6.48 7 0
H3 0.51 0.5 6.48 7 0
H2 0.51 0.5 6.48 7 0
[OUTFALLS]
;;Name Elevation Type Stage Data Gated Route To
;;-------------- ---------- ---------- ---------------- -------- ----------------
CooperSlough 0 FREE NO
LakeCanal 0 FREE NO
O1 0 FREE NO
[TIMESERIES]
;;Name Date Time Value
;;-------------- ---------- ---------- ----------
FC_2year 0:05 0.29
FC_2year 0:10 0.33
FC_2year 0:15 0.38
FC_2year 0:20 0.64
FC_2year 0:25 0.81
FC_2year 0:30 1.57
FC_2year 0:35 2.85
FC_2year 0:40 1.18
FC_2year 0:45 0.71
FC_2year 0:50 0.42
FC_2year 0:55 0.35
FC_2year 1:00 0.30
FC_2year 1:05 0.20
FC_2year 1:10 0.19
FC_2year 1:15 0.18
FC_2year 1:20 0.17
FC_2year 1:25 0.17
FC_2year 1:30 0.16
Mulberry Filing 2
Preliminary Drainage Report
APPENDIX E
Drainage Maps
26.5
26.2
26.3
26.4
26.1
19.719.5
19.219.1
19.4
19.3
19.6
E27.1
acres
E19.1
0.84
1.0
0.30
acres
E19.2
0.67
0.84
0.52 acres
E19.3
0.43
0.53 0.26
acres
E19.4
0.86
1.0
0.95
acres
E26.2
0.80
1.0
0.59
acres
E19.5
0.36
0.45 0.34
acres
E19.6
0.65
0.81
0.32
acres
E26.4
0.75
0.94
0.26
acres
E26.5
0.75
0.94
0.28
acres
E26.1
0.36
0.45
0.34
acres
E26.3
0.79
0.98
1.47
acres
E19.7
0.75
0.94
0.16
acres
OS4
0.80
1.0
0.59
26.2
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\PDP_F2\HFH022_C6.0_Drainage.dwg - Matthew Pepin - 5/31/2022Init.#Issue / DescriptionDateBLOOM FILING TWOPRELIMINARY DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
HFH045
06.01.2022
DRAINAGE PLAN
C10.0CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
SCALE: 1"=40'
0 20 40
C10.0
C10.1
MATCHLINE-SEE SHEET C10.1MATCHLINE-SEE SHEET C10.1DESIGN POINT
DETENTION POND BASIN BOUNDARY
(i.e., MHFD-Detention_v4.03 and/or SWMM)
SUB-BASIN BOUNDARY (i.e., Rational Method)
OVERLAND FLOW DIRECTION
(I.E., LANDSCAPING)
DIRECT FLOW DIRECTION
(I.E., PAVEMENT, CURB AND
GUTTER)
BASIN ID
2-YR RUNOFF
COEFFICIENT
BASIN AREA
(ACRES)
acres
A1
0.05
0.35
2.50
A
APPROXIMATE DETENTION POND
OVERFLOW PATH
100-YR RUNOFF
COEFFICIENT
BASE FLOOD ELEVATION
FLOODWAY RESTRICTIONS
1.NO FILL IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS SHOWS "NO-RISE".
2.No MANUFACTURED HOMES, EXECPT IN AN EXISTING PARK, CAN BE PLACED IN THE FLOODWAY.
3.NO CHANGING A NONCONFORMING NON-RESIDENTIAL OR MIXED USE SSTRUCTURE TO A RESIDENTIAL STRUCTURE
4.LANDSCAPING MEETS REQUIREMENTS FOR NO ENCROACHMENT IN THE FLOODAY WITHOUT A HYDRAULIC ANALYSIS TO SHOW "NO-RISE".
5.NO STORAGE OF MATERIALS OR EQUIPMENT
NOTES:
1.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE
PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN LIMITS.
STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN THE
FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
2.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK
POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES.
3.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE
FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.
4.AN APPROVED FEMA ELEVATION CERTIFICATE COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS
CONSTRUCTED TO THE REQUIRED ELEVATION IS REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING
ISSUED.
MJP
JEP
CENTERLINE
DITCH
DIRT DITCH
14.4
14.3
14.6
14.5
14.7
14.8
27.1 27.2
14.2
acres
E14.2
0.68
0.85
0.21
acres
E14.3
0.83
1.0
0.59 acres
E14.6
0.66
0.83
0.75
acres
E14.4
0.30
0.38
0.21
acres
E14.5
0.62
0.77
0.12
acres
E14.7
0.60
0.75
0.53
acres
OS3
0.45
0.56
0.08 acres
E14.8
0.64
0.80
0.64
acres
E27.1
0.52
0.65
0.28
acres
E27.2
0.61
0.77
0.50
acres
OS1
0.42
0.52
0.02
acres
OS2
0.42
0.52
0.03
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\3-CD\PDP_F2\HFH022_C6.0_Drainage.dwg - Matthew Pepin - 5/31/2022Init.#Issue / DescriptionDateBLOOM FILING TWOPRELIMINARY DEVELOPMENT PLANFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
HFH045
06.01.2022
DRAINAGE PLAN
C10.1CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
SCALE: 1"=40'
0 20 40
MATCHLINE-SEE SHEET C10.0DESIGN POINT
DETENTION POND BASIN BOUNDARY
(i.e., MHFD-Detention_v4.03 and/or SWMM)
SUB-BASIN BOUNDARY (i.e., Rational Method)
OVERLAND FLOW DIRECTION
(I.E., LANDSCAPING)
DIRECT FLOW DIRECTION
(I.E., PAVEMENT, CURB AND
GUTTER)
BASIN ID
2-YR RUNOFF
COEFFICIENT
BASIN AREA
(ACRES)
acres
A1
0.05
0.35
2.50
A
APPROXIMATE DETENTION POND
OVERFLOW PATH
100-YR RUNOFF
COEFFICIENT
BASE FLOOD ELEVATION
FLOODWAY RESTRICTIONS
1.NO FILL IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS SHOWS "NO-RISE".
2.No MANUFACTURED HOMES, EXECPT IN AN EXISTING PARK, CAN BE PLACED IN THE FLOODWAY.
3.NO CHANGING A NONCONFORMING NON-RESIDENTIAL OR MIXED USE SSTRUCTURE TO A RESIDENTIAL STRUCTURE
4.LANDSCAPING MEETS REQUIREMENTS FOR NO ENCROACHMENT IN THE FLOODAY WITHOUT A HYDRAULIC ANALYSIS TO SHOW "NO-RISE".
5.NO STORAGE OF MATERIALS OR EQUIPMENT
NOTES:
1.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE
PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN LIMITS.
STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN THE
FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
2.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK
POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES.
3.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE
FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.
4.AN APPROVED FEMA ELEVATION CERTIFICATE COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS
CONSTRUCTED TO THE REQUIRED ELEVATION IS REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING
ISSUED.
C10.0
C10.1
MJP
JEP
S
S
S
S
S
S
S
26.5
26.2
26.3
26.4
19.7
19.5
19.1
19.4
19.6
E14.8
E27.1
E27.2
acres
E19.1
0.84
1.0
0.30
acres
E19.2
0.67
0.84
0.52 acres
E19.3
0.43
0.53
0.26
acres
E19.4
0.86
1.0
0.95
acres
E26.2
0.80
1.0
0.20
acres
E19.6
0.65
0.81
0.32
acres
E26.4
0.75
0.94
0.26
acres
E26.5
0.75
0.94
0.28
acres
E26.1
0.36
0.45
0.34
acres
E26.3
0.79
0.98
1.47
acres
E19.7
0.75
0.94
0.16
26.1
acres
E19.5
0.36
0.45
0.34
19.2
19.3
acres
OS4
0.35
0.44
0.04
LID EXHIBIT
EX1.0CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
SCALE: 1"=40'
0 20 40
EX1.0
EX1.1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\7-Exhibit\HFH022_LID Exhibit_F2.dwg - Matthew Pepin - 4/13/2022Init.#Issue / DescriptionDateBLOOM FILING TWOEXHIBITSFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
HFH045
04.13.2022
MJP
JEP
CENTERLINE DITCH
CENTERLINE
DITCH
DIRT DITCH
SS
S
S
S
S
14.3
14.6
14.5
14.8
27.1
14.2
acres
E14.2
0.68
0.85 0.21
acres
E14.3
0.83
1.0
0.59 acres
E14.6
0.66
0.83
0.75
acres
E14.4
0.30
0.38
0.21
acres
E14.5
0.62
0.77
0.12
acres
E14.7
0.60
0.75
0.53
acres
OS3
0.45
0.56
0.08 acres
E14.8
0.64
0.80
0.64
acres
E27.1
0.52
0.65
0.28
acres
E27.2
0.61
0.77 0.50
acres
OS1
0.42
0.52
0.02
acres
OS2
0.42
0.52
0.03
14.4
27.2
14.7
LID EXHIBIT
EX1.1CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
SCALE: 1"=40'
0 20 40
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:\Hartford Homes\CO Fort Collins HFH22 - Mulberry\0CIV\7-Exhibit\HFH022_LID Exhibit_F2.dwg - Matthew Pepin - 5/31/2022Init.#Issue / DescriptionDateBLOOM FILING TWOSIGHT TRIANGLE EXHIBITFORT COLLINS, COTHESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PRELIMINARYNOT FOR BIDDINGNOT FOR CONSTRUCTIONDate:
Drawn By:
Project No:
Checked By:
HFH045
06.01.2022
EX1.0
EX1.1
MJP
JEP