Re: Proposed Hugh M. Woods Building Materials Store
Skyway Drive, South College Avenue and South Access Road
Fort Collins, Colorado
ELI Project No. 20945154
Gentlemen:
We have received additional traffic data from the City of Fort Collins for the above -referenced
project. This letter serves as an addendum to our geotechnical report dated September 8, 1994.
The purpose of this addendum is to provide recommended pavement types and thicknesses for
acceleration and deceleration lanes along Skyway Drive, the south access road and the
deceleration lane along South College Avenue for the above -referenced project. The remaining
types and thicknesses for the remaining streets within the project area along with overall
recommendations for pavement subgrade preparation and pavement construction were addressed
in our geotechnical engineering report.
The following is a summary of the traffic data provided to us by Mr. Keith Meyer of the City of
Fort Collins:
Street
Street Tyre
ESA.L!dey
Skyway Drive - Acceleration/Deceleration Lanes
Collector
50
South Access Road
Collector
90
College Avenue Deceleration Lane
Arterial
160
Offices of The Terracon Companies, Inc. Geotechnical, Environmental and Materials Engineers
Arizona ■ Arkansas ■ Colorado ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Minnesota
Missouri E Montana M Nebraska ■ Nevada ■ Oklahoma ■ Texas ■ Utah ■ Wyoming
QUALITY ENGINEERING SINCE 1965
Terracon
Payless Cashways, Inc.
December 2, 1994
The following data was used in the pavement designs:
Street
Percent
Reliability
Terminal
Serviceability
Index
R Value
K Value
psUin
Skyway Drive - Acceleration/Deceleration Lane
85
2.5
12
110
South Access Road
85
2.5
5
100
College Avenue Deceleration Lane
90
2.5
12
110
Recommended alternatives for flexible and rigid pavements, summarized for each traffic area, are
as follows:
Recommended Pavement Section Thickness (inches)
Asphalt
Aggregate
Plant -Mixed
Portland
Traffic
Alter-
Area
native
Concrete
Base
Select
Bituminous
Cement
Total
Surface
Course
Subbase
Base
Concrete
Skyway Drive
A
4
9
13
Acceleration/
B
3
4'/2
7'/2
Deceleration
Lane
C
6'/2
6'/2
A
5
8
8
1
21
B
4
6
10
South Access
Road
C
7
7
College
A
5
11
16
Avenue
B
4
5
9
Deceleration
Lane
C
8
8
2
Terracon
Payless Cashways, Inc.
December 2, 1994
Additional recommendations for pavement subgrade preparation and pavement construction are
included in our geotechnical engineering report.
If you have any questions concerning this addendum or if we can be of further service to you,
please do not hesitate to contact us.
Sincerely,
EMPIRE LABORATORIES, INC.
A Division of The Terraco� Companies, Inc
III Fi� / rod��f ;
Senior Engineering Geologist
Reviewed by:
Chester C. Smith, P.E.
Division Manager
NRS/CCS/cic
cc: RBD, Inc. - Mr. Dave Delaney
3
S�\'�ZE Of PROffys�o�