Loading...
HomeMy WebLinkAboutHUGH M WOODS PUD - FINAL - 26-88E - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTDecember 2, 1994 Payless Cashways, Inc. P. O. Box 419466 Kansas City, Missouri 63141-0466 Attn: Mr. Barry Hilton • Empire Laboratories, Inc. A Division of The Terracon Companies, Inc. P.O. Box 503 • 301 No. Howes Fort Collins, Colorado 80522 (303) 484-0359 Fax (303) 484-0454 LJ`p", Chester Smith, P.E. Lary G. O'Dell, P.E. U DEC 0 5 199� Neil R. Sherrod, C.P.G. �. --------------------------- Re: Proposed Hugh M. Woods Building Materials Store Skyway Drive, South College Avenue and South Access Road Fort Collins, Colorado ELI Project No. 20945154 Gentlemen: We have received additional traffic data from the City of Fort Collins for the above -referenced project. This letter serves as an addendum to our geotechnical report dated September 8, 1994. The purpose of this addendum is to provide recommended pavement types and thicknesses for acceleration and deceleration lanes along Skyway Drive, the south access road and the deceleration lane along South College Avenue for the above -referenced project. The remaining types and thicknesses for the remaining streets within the project area along with overall recommendations for pavement subgrade preparation and pavement construction were addressed in our geotechnical engineering report. The following is a summary of the traffic data provided to us by Mr. Keith Meyer of the City of Fort Collins: Street Street Tyre ESA.L!dey Skyway Drive - Acceleration/Deceleration Lanes Collector 50 South Access Road Collector 90 College Avenue Deceleration Lane Arterial 160 Offices of The Terracon Companies, Inc. Geotechnical, Environmental and Materials Engineers Arizona ■ Arkansas ■ Colorado ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Minnesota Missouri E Montana M Nebraska ■ Nevada ■ Oklahoma ■ Texas ■ Utah ■ Wyoming QUALITY ENGINEERING SINCE 1965 Terracon Payless Cashways, Inc. December 2, 1994 The following data was used in the pavement designs: Street Percent Reliability Terminal Serviceability Index R Value K Value psUin Skyway Drive - Acceleration/Deceleration Lane 85 2.5 12 110 South Access Road 85 2.5 5 100 College Avenue Deceleration Lane 90 2.5 12 110 Recommended alternatives for flexible and rigid pavements, summarized for each traffic area, are as follows: Recommended Pavement Section Thickness (inches) Asphalt Aggregate Plant -Mixed Portland Traffic Alter- Area native Concrete Base Select Bituminous Cement Total Surface Course Subbase Base Concrete Skyway Drive A 4 9 13 Acceleration/ B 3 4'/2 7'/2 Deceleration Lane C 6'/2 6'/2 A 5 8 8 1 21 B 4 6 10 South Access Road C 7 7 College A 5 11 16 Avenue B 4 5 9 Deceleration Lane C 8 8 2 Terracon Payless Cashways, Inc. December 2, 1994 Additional recommendations for pavement subgrade preparation and pavement construction are included in our geotechnical engineering report. If you have any questions concerning this addendum or if we can be of further service to you, please do not hesitate to contact us. Sincerely, EMPIRE LABORATORIES, INC. A Division of The Terraco� Companies, Inc III Fi� / rod��f ; Senior Engineering Geologist Reviewed by: Chester C. Smith, P.E. Division Manager NRS/CCS/cic cc: RBD, Inc. - Mr. Dave Delaney 3 S�\'�ZE Of PROffys�o� X1\F1CATf YG` ,• plc ��: t�• �Jr BF�: Fo s •' AIPG 9 • •.Nr N R••ShrF rOOER G�a�o�sr���ti