HomeMy WebLinkAboutHUGH M WOODS PUD - PRELIMINARY - 26-88D - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT;LIMINARY DRAINAGE STUDY
FOR
'FH M. WOODS DEVELOPMENT,
ORT COLLINS, COLORADO
■
■
■
0
■
L
a
RBD, Inc. Engineering Consultants
209 South Meldrum
Fort Collins, Colorado 80521
(303) 482-5922
RBD Job No. 638-001
0
IWIMC.
Engineering Consultants
209 S. Meldrum
Fort Collins, Colorado 80521
303/482-5922
FAX:303/482-6368
September 12, 1994
Mr. Glen Schlueter
City of Fort Collins
Utility Services Stormwater
235 Mathews Street
Fort Collins, Colorado 80522
RE: Preliminary Drainage Study for Hugh M. Woods Development
Dear Glen:
We are pleased to submit to you, for your review and approval, this Preliminary Drainage Study
for the Hugh M. Woods Development. All computations within this report have been completed
in compliance with the City of Fort Collins Storm Drainage Design Criteria.
We appreciate your time and consideration in reviewing this submittal. Please call if you have
any questions.
Respectfully,
RBD Inc. Engineering Consultants
Prepared by:
David K. Thaemert, E.I.T.
Water Resources Engineer
Ms. Kay Force
Mr. Barry Hilton
Reviewed by:
Stan A. Myers, P.E.
Project Manager
in
Denver 303/458-5526
TABLE OF CONTENTS
DESCRIPTION PAGE
I.
GENERAL LOCATION AND DESCRIPTION 1
A. Location 1
B. Description of Property 1
H.
DRAINAGE BASINS 1
A. Major Basin Description 1
B. Sub -basin Description 1
III.
DRAINAGE DESIGN CRITERIA 2
A. Regulations 2
B. Development Criteria Reference and Constraints 2
C. Hydrological Criteria 2
D. Hydraulic Criteria 2
E. Variances from Criteria 2
IV.
DRAINAGE FACILITY DESIGN 2
A. General Concept 2
B. Specific Details 3
V.
STORM WATER QUALITY 3
A. General Concept 3
VI.
EROSION CONTROL 3
A. General Concept 3
VII. CONCLUSIONS 3
A. Compliance with Standards 3
B. Drainage Concept 4
REFERENCES 4
APPENDIX
VICINITY MAP 2
HYDROLOGY 3
DETENTION 1
DESIGN OF INLETS, STORM SEWER AND SWALES 14
CHARTS, FIGURES AND TABLES 28
PRELIlVIINARY DRAINAGE STUDY
FOR THE HUGH M. WOODS DEVELOPMENT,
FORT COLLINS, COLORADO
I. GENERAL LOCATION AND DESCRIPTION
A. Location
The Hugh M. Woods development is bounded by Foothills Gateway on the west,
Skyway Drive on the north, South College Avenue (U.S. Highway 287) to the
east, and by Trilby Road and the remaining Timan P.U.D. on the south.
The site location can also be described as situated in Section 11, Township 6
North, Range 69 West of the 6th P.M., City of Fort Collins, Larimer County,
Colorado. The site location can be seen on page 2 of the Appendix.
B. Description of Property
The Hugh M. Woods development contains approximately 16.4 acres, more or
less. Presently, the property is undeveloped. The property is being proposed for
commercial development within the City of Fort Collins Zoning District and will
be developed consistent with the Timan P.U.D. Master Plan. Native grasses
presently cover the property. The topography of the site generally slopes from
west to east at approximately 5.1 percent.
H. DRAINAGE BASINS
A. Major Basin Description
The proposed development lies within the Fossil Creek Drainageway. A lateral
of the Louden Irrigation Ditch runs along the upper, western boundary of the
project. Runoff from the project area is routed by open channels and culverts
along the western edge of College Avenue or under College Avenue by existing
culverts.
B. Sub -basin Description
The Hugh M. Woods development has been divided into 12 sub -basins. All 12
basins will be developed consisting of proposed commercial buildings and street
improvements. These sub -basins are shown on the Preliminary Grading and
Drainage Plan in the back pocket of this report.
4
A
M. DRAINAGE DESIGN CRITERIA
A. Regulations
The City of Fort Collins Storm Drainage Design Criteria is being used for the
subject site.
B. Development Criteria Reference and Constraints
Runoff from this site is limited to the 2-year undeveloped flow condition.
Additional runoff is detained on -site and released at the 2-year undeveloped flow
rate.
C. Hydrological Criteria
The Rational Method for determining surface runoff was used for the project site.
The 2-year, 10-year, and 100-year storm event criteria, obtained by the City of
Fort Collins, were used in calculating runoff values. The 2-year storm event was
used only to determine allowable runoff based on historic conditions. These
calculations and criteria are included in the Appendix of this report.
D. Hydraulic Criteria
All hydraulic calculations within this report have been prepared in accordance
with the City of Fort Collins Drainage Criteria and are also included in the
Appendix.
E. Variances from Criteria
No variances are being sought for the proposed project site.
IV. DRAINAGE FACILITY DESIGN
A. General Concept
The on -site runoff produced by the proposed Hugh M. Woods development will
flow easterly to the potential on -site detention pond. The outflow from this
potential detention pond is then routed east via the existing culvert underneath
College Avenue. The proposed drainage, erosion control, and grading plans are
included in the back pocket of this report.
Pa
�7
B. Specific Details
The Hugh M. Woods development has been broken down into 12 sub -basins.
Runoff from sub -basins 1 through 7 and 11 will be conveyed northeasterly
towards College Avenue by a combination of gutter flows and a storm sewer
system. Runoff from sub -basins 8 through 10 will be conveyed southeasterly
towards College Avenue by gutter flows. At College Avenue, all developed
runoff will be detained in an existing wetland area, then released in an existing
culvert underneath College Avenue at the 2-year historic rate.
The downstream culvert and storm improvements have the available capacity for
the Hugh M. Woods development.
V. STORM WATER QUALITY
A. General Concept
Beginning in October 1992, the water quality of storm water runoff was required
to be addressed on all final design utility plans. The Hugh M. Woods
development is anticipating construction beginning in 1995. Therefore, final
design for this project will determine applicable Best Management Practices for
the treatment of storm water runoff. Existing wetlands on the downstream
portion of the Hugh M. Woods site will provide a mechanism for pollutants to
settle out of the storm water runoff before flows are directed further downstream.
VI. EROSION CONTROL
A. General Concept
During final design for this site, appropriate measures will be designed to control
erosion from the site. The first of these measures to limit erosion is to properly
reseed all disturbed areas which will not be paved.
All construction activities must comply with the State of Colorado permitting
process for Stormwater Discharges Associated with Construction Activity. A
Colorado Department of Health NPDES Permit will be required before any
construction grading can begin.
aVII. CONCLUSIONS
A. Compliance with Standards
All computations that have been completed within this report are in compliance
with the City of Fort Collins Erosion Control Reference Manual for Construction
3
2.
Sites and the Storm Drainage Design Criteria Manual. In addition, all
computations are in compliance with the Timan P.U.D. Master Plan prepared by
RBD, Inc.
B. Drainage Concept
The proposed drainage concepts presented in this report and on the construction
plans adequately provide for the transmission of developed on -site runoff to the
existing wetlands and drainage facilities at the eastern property line of the subject
site. The combination of onsite street capacities in the curb and gutter and the
onsite storm sewer system will provide for the 10-year and the 100-year
developed flows to reach the existing wetlands and proposed detention pond.
If, at the time of construction for some unforeseen reason, groundwater is
encountered, a Colorado Department of Health Construction Dewatering Permit
would be required.
REFERENCES
1
2
Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins,
Colorado, May 1984, Revised January 1991.
Timan P.U.D. Master Drainage and Utility Plan by RBD, Inc. Engineering Consultants.
In
u
4
4
APPENDIX
4
4
Ll
3 ----- vv
yy .
N� f a S CT
■
•
�c SPA 7 v .• .. �- Cr ••
■ ;� • � OQ O i
CORONA : •
Ct
tE`
L .•• \ R
;0 Werner
!', • j+� Elem. School
j i 177Ti • • .
r" !r c ■ Ir
C 7
CRE !' .
T - li, �� l ii r `lh�1�' ••�\) rUd,!i��'�r!r1
rr
_A 7-1AMR
�o G�sl� YYft'l-S
PL'T ' �' i.e : i••• o
r • .. ; c �'
YIDA • : 0 Ro �
OQPIJI RI d i 4 ,nn]u NI! inn or •
•
........... ;(t, •.�• •.■..�• •
14 •••7 � � W
/ ■•
• ♦• ■
..' lien: i:;r.�::/:��,�• e
.............................................
OAK
IS]
r
1101 E
`7