Loading...
HomeMy WebLinkAboutHUGH M WOODS PUD - PRELIMINARY - 26-88D - CORRESPONDENCE - DRAINAGE RELATED DOCUMENT09-23-1994 03:42PM FROM Jim Sell Design TO 2216378 P.01 0 0 MEMO TO: Barry Hilton, Hugh M. Woods FROM: Jim Sell, Jim Sell Design 3(t DATE: September 23, 1994 SUBJECT: Hugh M. Woods PUD: Storm Draingage The following three items must be responded to no later than 5:00 pm October 5, 1994. 1. Identify where surface water is going after it leaves the H.M. Woods site. 2. Find out if there are any existing drainage easements on that location. 3. Identify the impacts that will occur when the H.M. Woods site is developed as proposed. Steve Olt will give us further clarification on what is desired at this stage in the way pertaining to impact. These issues are urgent and very important, therefore requiring immediate attention primarily by RBD engineers. However, I will do my best to obtain further details from Steve Olt and Torn Shoemaker pertaining to item number three and specifically what is needed to address that issue. cc Stan Meyers, R13D Steve Fister, Realtec Steve Olt, City of Ft. Collins Planning Glen Schlueter, City of Ft. Collins Storm Drainage TOTAL P.01