Loading...
HomeMy WebLinkAboutTIMAN PUD MASTER PLAN - 26-88B - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW (2)Develoloent Services • Planning Department November 14, 1988 Mr. Frank Vaught Vaught*Frye Architects 2900 South College Fort Collins, CO 80525 Dear Sir, For your information, attached is a copy of the Staff's comments concerning Timan Master Plan and First Phase Preliminary - Parcel "C", which was presented before the Conceptual Review Team on November 14, 1988. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, Linda Ripley Senior Planner Attachment LR/bh xc: Tom Peterson, Director of Planning Mike Herzig, Development Coordinator Jim Faulhaber, Civil Engineer I Project Planner File 300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 AIEETTNG DATE: November 14, 19SS ITEi\I: Timan Master Plan and First Phase Prcliminary - Parcel "C" APPLICANT: Frank Vaught, Vaught*Frye Architects, 2900 South College, Fort Collins, CO 80525. LAND USE DATA: Master Plan for approximately 53 acres consisting of retail, office and business service land uses located on the west side of South College Avenue between Skvway Drive and Trilby Road. 'Parcel "C" is a request for a gas station /convenience store on approximately 1.5 acres, located west of South College Avenue and south of Skvwav Drivc. CONINfENTS: MASTER PLAN 1. The proposed signalized access location north of Trilby Road should be located as close as possible to 600 feet north of Trilby Road. The South College Access Plan does not address collector street locations along the Kclmar strip. Skyway Drive will continue as a collector street on the cast side of College in the future. The "left in" located approximately 700 feet south of Skyway Drive will work for the short term. In the future left turn access may be restricted by a median. (Traffic) 2. The Director of Planning is willing to waive the requirement for a first phase preliminary plan - for ;the Tinian Master Plan. (Planning) 3. The State Highway requires a 70 foot half ROW along College Avenue in this area. A 50 foot half ROW is required for Trilby Road. (Engineering) PARCEL "C" 1. There is an existing power line which runs north/south adjacent to the Burlington Northern Railroad west of this property. The city could extend power from this line down Skyway Drive to serve the north end of the property or down Trilby Road to serve the south end. If a project develops within one year and ninety days from the time it was annexed, the city will extend power to the site. The developer may be requested to obtain off -site easements. (Light and Power) 2. The topography shown on the out parcel is incorrect. A drainage report will be required. Erosion control and protection of the wetlands area from gas Page 3 and oil pollutants will be specil is concerns «ith this dc,.'clopmcnt. (Storm Drainage) 3. Water and sewer service for this site %,,,ill be by the Fort Col- lins/Lowland Water District and the South Fort Collins Sanitation Dis- trict respectively. (Water and Sewer)