Loading...
HomeMy WebLinkAboutVOICE OF TRUTH TABERNACLE - PDP200011 - SUBMITTAL DOCUMENTS - ROUND 3 - EROSION CONTROL LETTER/REPORT Erosion Control Report for Voice of Truth Tabernacle Subdivision (Tract Two, Dix Amended Plat) Fort Collins, Colorado Prepared for: Voice of Truth Tabernacle P.O. Box 273491 Fort Collins, CO 80527 Attn: Tito Moreira Prepared by: SHEAR ENGINEERING CORPORATION Project No: 2978-01-18 Date: April 2022 TABLE OF CONTENTS Title Page Vicinity Map Table of Contents I. PROJECT DESCRIPTION AND NATURE OF CONSTRUCTION ............................. 1 A. Site location and contact information .......................................................................... 1 B. Existing Site Condition .................................................................................................. 1 C. Proposed Construction Activities ................................................................................. 3 II. POTENTIAL POLLUTANT SOURCES…………………………………………………3 III. INSTALLATION AND REMOVAL SEQUENCE OF CONTROL MEASURES…….8 IV. FINAL VEGETATION AND STABILIZATION AND EROSION CONTROL ESCROW………………………………………………………………………………….10 V. CONCLUSIONS ................................................................................................................. 10 A. Compliance with Standards ........................................................................................ 10 VI. REFERENCES………………………………………………………………………… …11 Project: Disturbed Acres:3.17 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price EA. 1 $825.00 $825.00 L.F. 1,140 $2.75 $3,135.00 EA. 6 $150.00 $900.00 EA. 1 $1,925.00 $1,925.00 Sub-Total: $6,785.00 1.5 x Sub-Total: $10,177.50 Amount of security: $10,177.50 Total Acres x Price/acre: 3106.6 $980.00 Sub-Total: $3,106.60 1.5 x Sub-Total: $4,659.90 Amount to Re-seed: $4,659.90 Minimum escrow amount: $3,000.00 Erosion Control Escrow:$10,177.50 Fields in yellow should be amended for this project. “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Vehicle Tracking Control (VTC) Reseeding Unit Price of Seeding per acre: Minimum Escrow Amount Final Escrow Amount Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins Voice of Truth Tabernacle Subdivision; Fort Collins, Colorado BMP Amount Concrete Washout (CW) Wattle (W) Rock Sock (CSP) 4/26/2022 9:02 AM\\server\Clients\V-Clients\Voice of Truth Tabernacle (Tito Moreira) - Copy\2978-01-18 Voice of Truth Tabernacle Sub\Documents\Drainage and floodplain\Erosion Control\Voice of Truth Escrow April 2022.xls