HomeMy WebLinkAboutFORT COLLINS NISSAN-KIA - PDP210017 - SUBMITTAL DOCUMENTS - ROUND 3 - TRAFFIC STUDY DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Streets ............................................................................................................................. 2
Existing Traffic ................................................................................................................. 5
Existing Operation ........................................................................................................... 5
Pedestrians Facilities ...................................................................................................... 8
Bicycle Facilities .............................................................................................................. 8
Transit Facilities .............................................................................................................. 8
III. PROPOSED DEVELOPMENT ................................................................................. 9
Trip Generation ............................................................................................................... 9
Trip Distribution ............................................................................................................... 9
Background Traffic Projections ..................................................................................... 12
Trip Assignment/Total Traffic ........................................................................................ 12
Signal Warrants ............................................................................................................. 12
Geometry ...................................................................................................................... 18
Operation Analysis ........................................................................................................ 18
Pedestrian Level of Service ........................................................................................... 24
Bicycle Level of Service ................................................................................................ 24
Transit Level of Service ................................................................................................. 26
IV. CONCLUSIONS/RECOMMENDATIONS .............................................................. 27
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 7
2. Trip Generation ......................................................................................................... 9
3. Short Range (2026) Background Peak Hour Operation .......................................... 21
4. Long Range (2040) Background Peak Hour Operation ........................................... 22
5. Short Range (2026) Total Peak Hour Operation ..................................................... 23
6. Long Range (2040) Total Peak Hour Operation ...................................................... 25
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Intersection Geometry.................................................................................. 4
3. Recent Peak Hour Traffic .......................................................................................... 6
4. Site Plan .................................................................................................................. 10
5. Trip Distribution ....................................................................................................... 11
6. Short Range (2026) Background Peak Hour Traffic ................................................ 13
7. Long Range (2040) Background Peak Hour Traffic................................................. 14
8. Site Generated Peak Hour Traffic ........................................................................... 15
9. Short Range (2026) Total Peak Hour Traffic ........................................................... 16
10. Long Range (2040) Total Peak Hour Traffic ............................................................ 17
11. Short Range (2026) Geometry ................................................................................ 19
12. Long Range (2040) Geometry ................................................................................. 20
APPENDICES
A. Base Assumptions Packet
B. Recent Peak Hour Traffic
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS
Standards
D. Peak Hour Signal Warrant
E. Short Range (2026) Background Peak Hour Operation
F. Long Range (2040) Background Peak Hour Operation
G. Short Range (2026) Total Peak Hour Operation
H. Long Range (2040) Total Peak Hour Operation
I. Pedestrian/Bicycle Level of Service
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 1
I. INTRODUCTION
This Transportation Impact Study (TIS) addresses the capacity, geometric, and
control requirements at and near the proposed Fort Collins Nissan/Kia development. Fort
Collins Nissan/Kia site is located west of College Avenue (US287) at Crestridge Drive in
Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the project
developer (TCC Corporation), the project engineer (TB Group), the project architect
(Infusion Architects, LLC), and the Fort Collins Traffic Engineering staff. This study
generally conforms to the format set forth in the Fort Collins transportation impact study
guidelines contained in the “Larimer County Urban Area Street Standards” (LCUASS).
Appendix A contains the Transportation Impact Study Base Assumptions form and
related attachments for the Fort Collins Nissan/Kia development. The study involved the
following steps:
• Collect physical, traffic, and development data;
• Perform trip generation, trip distribution, and trip assignment;
• Determine morning and afternoon peak hour traffic volumes;
• Conduct capacity and operational level of service analyses on key intersections;
• Analyze signal warrants;
• Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation.
This TIS is a revision of the “Fort Collins Nissan/Kia Transportation Impact Study”
dated July 2021. It addresses City and CDOT staff comments.
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of Fort Collins Nissan/Kia site is shown in Figure 1. It is important that
a thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily residential and commercial. There are
residential uses west of the site. There are commercial uses to the south and east of the
site. There is open space to the north of the site. Land adjacent to the site is flat (<2%
grade) from a traffic operations perspective. Crestridge Drive and Smokey Street are at
the crest of a vertical curve on College Avenue. The center of Fort Collins is to the north of
Fort Collins Nissan/Kia site.
Streets
The primary streets near Fort Collins Nissan/Kia site are College Avenue
(US287), Bueno Drive, Crestridge Drive, and Smokey Street. Figure 2 shows the
current geometry at the key intersections.
College Avenue (US287) is east of (adjacent to) the proposed Fort Collins
Nissan/Kia site. College Avenue is a north-south street designated as a six-lane arterial
street on the Fort Collins Master Street Plan and classified as a non-rural arterial (N-RA)
by CDOT. Currently, College Avenue has a four-lane cross section (with a center lane)
in this area. At the College/Bueno intersection, College Avenue has a two-way left-turn
lane and two through lanes in each direction. At the College/Crestridge intersection,
College Avenue has a two-way left-turn lane and two through lanes in each direction.
At the College/Smokey intersection, College Avenue has a two-way left-turn lane and
two through lanes in each direction. College Avenue has large shoulders in this area
(approximately 12 feet), that are often used as right-turn lanes. During, data collection,
it was observed that most vehicles making a left turn from the minor street were using
the two-way left-turn lane as a refuge. Therefore, the intersections were analyzed as a
two-step left-turns. It was observed that there were no left turn conflicts on College
Avenue due to the offset intersections of Smokey Street and Crestridge Drive. The
College/Bueno, College/Crestridge, and College/Smokey intersections have stop sign
control on Bueno Drive, Crestridge Drive, and Smokey Street, respectively. The posted
speed limit on College Avenue is 55 mph in this area.
Bueno Drive is to the north of the proposed Fort Collins Nissan/Kia site. It is an
east-west street classified as a local street according to the Fort Collins Master Street
Plan. Currently, Bueno Drive has a two-lane cross section. At the College/Bueno
intersection, Bueno Drive has movements combined into single lanes. There is no
posted speed limit in this area of Bueno Drive.
287
SCALE: 1"=1000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Fort Collins Nissan/Kia TIS, April 2022
Page 3College AvenueSkyway Drive
Bueno Drive
Smokey Street
Fossil Parkway
Trilby Road
EXISTING INTERSECTION GEOMETRY Figure 2
DELICH
ASSOCIATES
Crestridge Drive
Smokey Street
Bueno DriveCollege Avenue (US287)STOPSTOPSTOP- Denotes Lane
Fort Collins Nissan/Kia TIS, April 2022
Page 4
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 5
Crestridge Drive is north of the existing Fort Collins Nissan site. It is an east-
west street classified as a local street according to the Fort Collins Master Street Plan.
Currently, Crestridge Drive has a two-lane cross section. At the College/ Crestridge
intersection, Crestridge Drive has movements combined into single lanes. The posted
speed limit in this area of Crestridge Drive is 35 mph.
Smokey Street is to the southeast of the proposed Fort Collins Nissan/Kia site. It
is an east-west street classified as a local street according to the Fort Collins Master
Street Plan. Currently, Smokey Street has a two-lane cross section. At the
College/Smokey intersection, Smokey Street has movements combined into single
lanes. The posted speed limit in this area of Smokey Street is 35 mph
Existing Traffic
Recent peak hour traffic volumes at the College/Bueno, College/Crestridge, and
College/Smokey intersections are shown in Figure 3. The counts at the College/Bueno,
College/Crestridge, and College/Smokey intersections were obtained in March 2021.
Raw traffic data is provided in Appendix B.
Existing Operation
The College/Bueno, College/Crestridge, and College/Smokey intersections were
evaluated using techniques provided in the 2016 Highway Capacity Manual, 6th Edition.
Using the morning and afternoon peak hour traffic shown in Figure 4, the peak hour
operation is shown in Table 1. Calculations forms are provided in Appendix C. A
description of level of service for signalized and unsignalized intersections from the 2016
Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS
Standards (Intersections) are also provided in Appendix C. Acceptable operation at
signalized intersections during the peak hours is defined as level of service E or better for
each movement and leg, and level of service D or better overall. At arterial/arterial and
collector/collector stop sign controlled intersections, acceptable operation is considered to
be at level of service E, overall and level of service F, for any approach leg. At
arterial/collector, arterial/local, collector/local, and local/local stop sign controlled
intersections; acceptable operation is considered to be at level of service D, overall and
level of service F, for any approach leg.
The College/Bueno and College/Crestridge intersections currently meet the Fort
Collins operational criteria with existing control and geometry in the morning and
afternoon peak hours. At the College/Smokey intersection, the westbound approach
does not meet the Fort Collins operational criteria with existing control and geometry in
the afternoon peak hour. At the College/Smokey intersection as a stop sign controlled
intersection, the calculated delay for the westbound approach is commensurate with
level of service F in the afternoon peak hour.
RECENT PEAK HOUR Figure 3
DELICH
ASSOCIATES
Fort Collins Nissan/Kia TIS, April 2022
Page 6
Crestridge Drive
AM/PM
Smokey Street
Bueno Drive
15/11246/139046/21864/146625/18
6/12 901/149315/41272/14229/314/29
6/11
831/142039/581242/131749/6419/74
21/37College Avenue (US287)
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 7
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM (delay)
College/Bueno
(stop sign)
WB LT/RT C D
SB LT B B
OVERALL A A
College/Crestridge
(stop sign)
EB LT/RT D E (42.7 secs)
NB LT B C
OVERALL A A
College/Smokey
(stop sign)
WB LT/RT D F (63.3 secs)
SB LT B C
OVERALL A A
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 8
Pedestrian Facilities
There are no sidewalks in this area. Sidewalks will be incorporated within and
adjacent to this development.
Bicycle Facilities
The shoulders along College Avenue serve as bicycle lanes. Local streets are
not striped with bike lanes.
Transit Facilities
Currently, this area of Fort Collins is not served by Transfort except for the FLEX
route that runs along College Avenue with stops at the College/Skyway intersection.
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 9
III. PROPOSED DEVELOPMENT
Fort Collins Nissan/Kia development is a proposed 29,408 square foot Kia Car
Dealership south of Crestridge Drive (existing Nissan location) and 40,630 square foot
Nissan Dealership north of Crestridge Drive. Figure 4 shows the site plan of Fort
Collins Nissan/Kia site. The short range analysis (Year 2026) includes development of
Fort Collins Nissan/Kia and an appropriate increase in background traffic, due to normal
growth, and other approved developments in the area. The long range future is
considered to be 2040. The site plan shows that Fort Collins Nissan/Kia will have
access to/from College Avenue and Venus Drive. Venus Drive will be extended to
College Avenue. The Crestridge Drive (vacated) will become right-in/right-out and will
be a private access to the Fort Collins Nissan/Kia development. The College/Smokey
intersection will become right-in/right-out.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. Trip generation information contained in
Trip Generation, 10th Edition, ITE was used to estimate trips that would be generated by
the proposed/expected use at Fort Collins Nissan/Kia site. A trip is defined as a one-way
vehicle movement from origin to destination. Table 2 shows the expected trip generation
on a daily and peak hour basis. The trip generation of Fort Collins Nissan/Kia resulted in
1,950 daily trip ends, 131 morning peak hour trip ends, and 170 afternoon peak hour trip
ends.
TABLE 2
Trip Generation
Code Use Size AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
840 New Car Sales
(Nissan) 40.63 KSF 27.84 1132 1.37 55 0.50 21 0.97 40 1.46 59
840 New Car Sales (Kia) 29.41 KSF 27.84 818 1.37 40 0.50 15 0.97 28 1.46 43
Total 1950 95 36 68 102
Trip Distribution
Trip distribution for Fort Collins Nissan/Kia was based on existing/future travel
patterns, land uses in the area, consideration of trip attractions/productions in the area,
and engineering judgment. Figure 5 shows the trip distribution for the short range (2026)
and long range (2040) analysis futures. The trip distribution was agreed to by City of Fort
Collins staff.
SITE PLAN Figure 4
DELICH
ASSOCIATES
Fort Collins Nissan/Kia TIS, April 2022
Page 10College Avenue (US287)Venus DriveApproximate Scale
1"=300'
TRIP DISTRIBUTION Figure 5
DELICH
ASSOCIATES
Fort Collins Nissan/Kia TIS, April 2022
Page 11College Avenue (US287)Smokey Street
Bueno Drive
30%
70%Venus Drive
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 12
Background Traffic Projections
Figures 6 and 7 show the short range (2026) and long range (2040) background
traffic projections at the key intersections, respectively. Background traffic projections
for the short range (2026) and long range (2040) future horizons were obtained by
reviewing CDOT 20-year traffic factor, the North Front Range Regional Transportation
Plan, and various traffic studies prepared for this area of Fort Collins. The CDOT 20-
year traffic factor for College Avenue (US287) is 1.19. It was determined that minor
street traffic volumes would increase by approximately 2% per year plus other
developments in the area. In the short range (2026) future, the background traffic
redistributed assuming that Venus Avenue would connect to College Avenue across
from Bueno Drive, Crestridge Drive would become a right-in/right-out site access, and
Smokey Street would become right-in/right-out. The potential apartment development is
included in the long range (2040) future.
Trip Assignment/Total Traffic
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Figure 8 shows the site generated peak hour traffic assignment. Figures 9
and 10 show the short range (2026) and long range (2040) total (site plus background)
peak hour traffic assignment, respectively.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location until such time
that signal installation warrants are met according to the Manual on Uniform Traffic Control
Devices. For roads in the vicinity of the Fort Collins Nissan/Kia, four hour and/or eight
hour signal warrants are applicable. These warrants require much data and are applied
when the traffic is actually on the area road system. It is acknowledged that peak hour
signal warrants should not be applied, but since the peak hour forecasts are readily
available in a traffic impact study, it is reasonable to use them to estimate whether other
signal warrants may be met. If peak hour signal warrants will not be met at a given
intersection, it is reasonable to conclude that it is not likely that other signal warrants would
be met. If peak hour signal warrants are met, it merely indicates that further evaluation
should occur in the future as development occurs. However, a judgment can be made that
some intersections will likely meet other signal warrants. Using the short range (2026)
total peak hour traffic (Figure 9), the peak hour signal warrant will likely be met in the
afternoon peak hour at the College/Venus-Bueno intersection. Using the long range
(2040) total peak hour traffic (Figure 10), the peak hour signal warrant will likely be met in
the morning and afternoon peak hours. The peak hour signal warrant analyses are
provided in Appendix D. The following operational analyses assumed that the
College/Venus-Bueno intersection would be signalized.
SHORT RANGE (2026) BACKGROUND
PEAK HOUR TRAFFIC Figure 6
DELICH
ASSOCIATES
Fort Collins Nissan/Kia TIS, April 2022
Page 13
Site Access
AM/PM
Smokey Street
Bueno Drive
1336/14390/0924/15420/0
924/15421315/135854/7021/81College Avenue (US287)Venus Avenue
11/01315/143610/332/19887/148460/6827/7
NOM
7/5
15/32
NOM
30/53
LONG RANGE (2040) BACKGROUND
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
Fort Collins Nissan/Kia TIS, April 2022
Page 14
Site Access
Smokey Street
Bueno Drive
1435/15600/01040/16450/0
1040/16451405/145075/9530/110College Avenue (US287)Venus Avenue
30/401390/151515/570/90955/154585/95100/50
NOM
45/30
20/45
NOM
40/70
AM/PM
Rounded to Nearest
5 Vehicles
SITE GENERATED
PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
Fort Collins Nissan/Kia TIS, April 2022
Page 15
Site Access
AM/PM
Smokey Street
Bueno Drive
30/2165/471/330/21College Avenue (US287)30/214/362/4726/74
1/3
10/29
11/32
SHORT RANGE (2026) TOTAL
PEAK HOUR TRAFFIC Figure 9
DELICH
ASSOCIATES
Fort Collins Nissan/Kia TIS, April 2022
Page 16
Site Access
AM/PM
Smokey Street
Bueno Drive
1366/146065/47925/154510/29
935/15741345/137954/7021/81College Avenue (US287)Venus Avenue
41/211315/143610/336/22952/153160/6853/81
NOM
8/8
15/32
NOM
30/53
LONG RANGE (2040) TOTAL
PEAK HOUR TRAFFIC Figure 10
DELICH
ASSOCIATES
Fort Collins Nissan/Kia TIS, April 2022
Page 17
Site Access
Smokey Street
Bueno Drive
1465/158065/501040/165010/30
1050/16801435/147075/9530/110College Avenue (US287)Venus Avenue
60/601390/151515/575/951020/159585/95125/125
NOM
45/35
20/45
NOM
40/70
AM/PM
Rounded to Nearest
5 Vehicles
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 18
Geometry
Figure 11 shows a schematic of the short range (2026) intersection geometry. At
the College/Venus-Bueno intersection, left-turn lanes are required on all legs. At the
College/Site Access intersection, a southbound right-turn lane is required based on the
traffic volumes. Auxiliary turn lane lengths are provided on the geometry figures.
Figure 12 shows a schematic of the long range (2040) geometry. The geometry at
the key intersections in the long range future was determined based upon achieving
acceptable operation, meeting the geometric criteria in LCUASS, and the City of Fort
Collins Master Street Plan. Three through lanes were assumed along College Avenue as
reflected in the South College Avenue Access Control Plan and other documents.
Operation Analysis
Operation analyses were performed at the College/Venus-Bueno, College/Site
Access, and College/Smokey intersections. The operation analyses were conducted for
the short range analysis, reflecting a year 2026 condition, and for the long range
analysis, reflecting a year 2040 condition. It is acknowledged that the Venus Drive
connection to College Avenue and signal would not occur without the Fort Collins
Nissan/Kia development. However, for analysis purposes the background traffic
analyses reflect these improvements in order to compare the project impacts. For the
short range future, the operational analyses at the College/Venus-Bueno intersection
include signal control and stop sign control. The long range (2040) analysis is provided
for informational purposes and to identify potential operational and/or geometric issues.
Using the short range (2026) background traffic volumes shown in 6, the
College/Venus-Bueno and College/Smokey intersections operate as indicated in Table
3. Calculation forms for these analyses are provided in Appendix E. The
College/Venus-Bueno intersection meets the Fort Collins criteria with regard to
operation using the recommended control and geometry. At the College/Venus-Bueno
intersection as a stop sign controlled intersection, the calculated delay for the
eastbound and westbound approaches is commensurate with level of service F in the
morning and afternoon peak hours.
Using the long range (2040) background traffic volumes shown in Figure 7, the
College/Venus-Bueno and College/Smokey intersections operate as indicated in Table
4. Calculation forms for these analyses are provided in Appendix F.
Using the short range (2026) total traffic volumes shown in Figure 9, the
College/Venus-Bueno, College/Site Access, and College/Smokey intersections operate
as indicated in Table 5. Calculation forms for these analyses are provided in Appendix
G. The College/Venus-Bueno, College/Site Access, and College/Smokey intersections
meet the Fort Collins criteria with regard to operation using the recommended control
and geometry. At the College/Venus-Bueno intersection, the overall level of service
does not meet the Fort Collins operational criteria in the morning and afternoon peak
hours with stop sign control.
SHORT RANGE (2026)
INTERSECTION GEOMETRY Figure 11
DELICH
ASSOCIATES
Fort Collins Nissan/Kia TIS, April 2022
Page 19
Site Access
Smokey Street
Bueno DriveCollege Avenue (US287)STOP- Denotes Lane
Venus Avenue
STOP50 feet
100 feet 625 feet, inc. BT 18.5:1650 feet, inc. BT 18.5:1600 feet, inc. BT 18.5:1
LONG RANGE (2040)
INTERSECTION GEOMETRY Figure 12
DELICH
ASSOCIATES
Fort Collins Nissan/Kia TIS, April 2022
Page 20
Site Access
Smokey Street
Bueno DriveCollege Avenue (US287)STOP- Denotes Lane
Venus Avenue
STOP50 feet
100 feet
650 feet, inc. BT 18.5:1625 feet, inc. BT 18.5:1
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 21
TABLE 3
Short Range (2026) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM (delay)
College/Venus-Bueno
(signal)
EB LT D D
EB T/RT D D
EB APPROACH D D
WB LT D E (58.0 secs)
WB T/RT D D
WB APPROACH D E (57.6 secs)
NB LT A A
NB T A A
NB T/RT A A
NB APPROACH A A
SB LT A A
SB T A A
SB T/RT A A
SB APPROACH A A
OVERALL A A
College/Venus-Bueno
(stop sign)
EB LT F (421.8 secs) F (1082.3 secs)
EB T/RT B C
EB APPROACH F (337.6 secs) F (638.8 secs)
WB LT F (77.2 secs) F (226.5 secs)
WB T/RT C C
WB APPROACH F (56.9 secs) F (148.2 secs)
NB LT B A
SB LT C C
OVERALL A A
College/Smokey
(stop sign)
WB RT C C
OVERALL A A
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 22
TABLE 4
Long Range (2040) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM (delay)
College/Venus-Bueno
(signal)
EB LT D E (55.2 secs)
EB T/RT D D
EB APPROACH D D
WB LT D E (57.1 secs)
WB T/RT D D
WB APPROACH D E (56.7 secs)
NB LT A A
NB T A A
NB T/RT A A
NB APPROACH A A
SB LT A A
SB T A A
SB T/RT A A
SB APPROACH A A
OVERALL A A
College/Smokey
(stop sign)
WB RT C D
OVERALL A A
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 23
TABLE 5
Short Range (2026) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM (delay)
College/Venus-Bueno
(signal)
EB LT D E (56.5 secs)
EB T/RT D D
EB APPROACH D E (56.2 secs)
WB LT D D
WB T/RT D D
WB APPROACH D D
NB LT A A
NB T A A
NB T/RT A A
NB APPROACH A A
SB LT A A
SB T A A
SB T/RT A A
SB APPROACH A A
OVERALL A B
College/Venus-Bueno
(stop sign)
EB LT F (1271.7 secs) F (7890.6 secs)
EB T/RT B C
EB APPROACH F (1106.6 secs) F (7183 secs)
WB LT F (1138.3 secs) F (5414.8 secs)
WB T/RT C C
WB APPROACH F (764.3 secs) F (3383.3 secs)
NB LT B C
SB LT C C
OVERALL E (41.0 secs) F (285.2 secs)
College/Site Access
(stop sign)
EB RT B C
OVERALL A A
College/Smokey
(stop sign)
WB RT C C
OVERALL A A
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 24
Using the traffic volumes shown in Figure 11, the College/Venus-Bueno,
College/Site Access, and College/Smokey intersections operate in the long range
(2040) total condition as indicated in Table 6. Calculation forms for these analyses are
provided in Appendix H.
Pedestrian Level of Service
Appendix I shows a map of the area that is within 1320 feet of Fort Collins
Nissan/Kia site. There are three destination areas within 1320 feet of the proposed Fort
Collins Nissan/Kia: 1) the residential neighborhood/commercial area to the south of the
site; 2) the commercial/residential area to the east of the site; and 3) the Fossil Creek
Trail to the north of the site. The minimum level of service for “transit corridor” is LOS C
for all measure categories, except for Directness and Security at LOS B.
Directness – The distance ratio to all pedestrian destinations is less than 1.6
(LOS C), since there will be the opportunity to have a pedestrian crossing of
College Avenue with the signal at the College/Venus-Bueno intersection.
Continuity – The continuity to the pedestrian destinations 1, 2, and 3 will be at
LOS E, since there are no sidewalks along College Avenue.
Street Crossings – The street crossings to pedestrian destinations 1 and 3 will
be acceptable at LOS B, since the street crossings are all at local residential
streets. The street crossing to pedestrian destination 2 is at LOS C, since it
requires crossing College Avenue.
Visual Interest and Amenity – The visual interest and amenity to pedestrian
destinations 1, 2, and 3 is at LOS E, since there are no sidewalks in this area of
College Avenue.
Security - The security to pedestrian destinations 1, 2, and 3 is at LOS D, since
there are no sidewalks in this area of College Avenue.
Acceptable pedestrian level of service is not met, since sidewalks are sporadic
[do not existing] in this area. The Pedestrian LOS Worksheet is provided in Appendix I.
Fort Collins Nissan/Kia development will install the ultimate curb & gutter and sidewalk
along the College Avenue adjacent to the site.
Bicycle Level of Service
Based upon Fort Collins bicycle LOS criteria, there is one destination area within
1320 feet of Fort Collins Nissan/Kia: The Fossil Creek Trail. The Bicycle LOS
Worksheet is provided in Appendix I. The minimum level of service for this site is C.
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 25
TABLE 6
Long Range (2040) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM (delay)
College/Venus-Bueno
(signal)
EB LT D E (55.1 secs)
EB T/RT D D
EB APPROACH D D
WB LT D D
WB T/RT D D
WB APPROACH D D
NB LT A A
NB T A A
NB T/RT A A
NB APPROACH A A
SB LT A A
SB T A A
SB T/RT A A
SB APPROACH A A
OVERALL A A
College/Site Access
(stop sign)
EB RT B C
OVERALL A A
College/Smokey
(stop sign)
WB RT C D
OVERALL A A
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 26
Transit Level of Service
Currently, this area of Fort Collins is served by the FLEX bus service with stops
at the College/Skyway intersection. Based on the Fort Collins Transit Master Plan
dated April 2019, there will be local service (30 minutes all day) in the 5 year plan along
Trilby Road. Transfort will determine where bus stops should be located based on likely
ridership.
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 27
IV. CONCLUSIONS/RECOMMENDATIONS
This study assessed the impacts of Fort Collins Nissan/Kia development on the
street system in the vicinity of the proposed development in the short range (2026) and
long range (2040) futures. As a result of this analysis, the following is concluded:
• The development of Fort Collins Nissan/Kia site is feasible from a traffic
engineering standpoint. At full development, Fort Collins Nissan/Kia will
generate the following traffic: 1,950 daily trip ends, 131 morning peak hour trip
ends, and 170 afternoon peak hour trip ends.
• Currently, the College/Bueno and College/Crestridge intersections meet the Fort
Collins operational criteria with existing control and geometry in the morning and
afternoon peak hours. At the College/Smokey intersection, the westbound
approach does not meet the Fort Collins operational criteria with existing control
and geometry in the afternoon peak hour. At the College/Smokey intersection as
a stop sign controlled intersection, the calculated delay for the westbound
approach is commensurate with level of service F in the afternoon peak hour.
• The peak hour signal warrant will likely be met at the College/Venus-Bueno
intersection in the afternoon peak hour in the short range (2026) future. The peak
hour signal warrant will be met at the College/Venus-Bueno intersection in the
morning and afternoon peak hours in the long range future.
• In the short range (2026) future, given development of Fort Collins Nissan/Kia
and an increase in background traffic, the College/Venus-Bueno, College/Site
Access, and College/Smokey intersections will meet the Fort Collins operational
criteria with the recommended control and geometry. At the College/Venus-
Bueno intersection, the overall level of service does not meet the Fort Collins
operational criteria in the morning and afternoon peak hours with stop sign
control.
• In the long range (2040) future, given development of Fort Collins Nissan/Kia and
an increase in background traffic, the key intersections will meet the Fort Collins
operational criteria, overall, with the recommended geometry and control.
• The short range (2026) geometry is shown in Figure 11. At the College/Venus-
Bueno intersection, left-turn lanes are required on all legs. At the College/Site
Access intersection, a southbound right-turn lane is required based on the traffic
volumes.
• Figure 12 shows a schematic of the long range (2040) geometry. Three through
lanes were assumed along College Avenue as reflected in the South College
Avenue Access Control Plan and other documents.
DELICH Fort Collins Nissan/Kia TIS, April 2022 ASSOCIATES Page 28
• Acceptable level of service is achieved for bicycle, and transit modes based upon
the measures in the multi-modal transportation guidelines. In the short range
(2026) future, some pedestrian level of service categories cannot be achieved
due to a lack of sidewalks and street connections. As this area redevelops and
becomes more urban in the future, it is expected that there will be sidewalks
along the existing and future streets. Based on the Fort Collins Transit Master
Plan dated April 2019, there will be local service (30 minutes all day) in the 5
year plan along Trilby Road. Transfort will determine where bus stops should be
located based on likely ridership.
• The South College Avenue Access Control Plan shows a future signal at the
College/Crestridge-Smokey intersection. With this development, that signal will
be relocated to the College/Venus-Bueno intersection. An amendment to the
South College Avenue Access Control Plan will be prepared in a separate
document.
APPENDIX A
1
2
3
4
5
APPENDIX B
6
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 3/3/2021 Observer: vh
Day: Wednesday Jurisdiction: Fort Collins
R = right turn Intersection: College/Bueno
S = straight
L = left turn
Time Northbound: Southbound: Total Eastbound: Westbound: Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 346 2 348 2 213 215 563 0 1 3 4 4 567
7:45 358 3 361 2 250 252 613 0 2 3 5 5 618
8:00 271 1 272 6 229 235 507 0 1 5 6 6 513
8:15 297 3 300 5 209 214 514 0 2 3 5 5 519
7:30-8:30 0 1272 9 1281 15 901 0 916 2197 0 0 0 0 6 0 14 20 20 2217
PHF n/a 0.89 0.75 0.89 0.63 0.9 n/a 0.91 n/a n/a n/a n/a 0.75 n/a 0.7 0.83 0.9
4:30 343 0 343 2 381 383 726 0 1 7 8 8 734
4:45 351 1 352 1 341 342 694 0 3 7 10 10 704
5:00 360 1 361 0 364 364 725 0 5 12 17 17 742
5:15 368 1 369 1 407 408 777 0 2 3 5 5 782
4:30-5:30 0 1422 3 1425 4 1493 0 1497 2922 0 0 0 0 11 0 29 40 40 2962
PHF n/a 0.97 0.75 0.97 0.5 0.92 n/a 0.92 n/a n/a n/a n/a 0.55 n/a 0.6 0.59 0.957
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 3/2/2021 Observer: vh
Day: Tuesday Jurisdiction: Fort Collins
R = right turn Intersection: College/Crestridge
S = straight
L = left turn
Time Northbound: Southbound: Total Eastbound: Westbound: Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 1 272 273 181 16 197 470 4 1 5 0 5 475
7:45 12 373 385 261 17 278 663 7 4 11 0 11 674
8:00 0 275 275 230 8 238 513 7 1 8 0 8 521
8:15 2 326 328 192 5 197 525 7 0 7 0 7 532
7:30-8:30 15 1246 0 1261 0 864 46 910 2171 25 0 6 31 0 0 0 0 31 2202
PHF 0.31 0.84 n/a 0.82 n/a 0.83 0.68 0.82 0.89 n/a 0.38 0.7 n/a n/a n/a n/a 0.82
4:30 1 326 327 359 4 363 690 6 5 11 0 11 701
4:45 0 344 344 322 4 326 670 2 3 5 0 5 675
5:00 0 359 359 379 4 383 742 6 1 7 0 7 749
5:15 0 361 361 406 9 415 776 4 3 7 0 7 783
4:30-5:30 1 1390 0 1391 0 1466 21 1487 2878 18 0 12 30 0 0 0 0 30 2908
PHF 0.25 0.96 n/a 0.96 n/a 0.9 0.58 0.9 0.75 n/a 0.6 0.68 n/a n/a n/a n/a 0.938
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 3/2/2021 Observer: vh
Day: Tuesday Jurisdiction: Fort Collins
R = right turn Intersection: College/Smokey
S = straight
L = left turn
Time Northbound: Southbound: Total Eastbound: Westbound: Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 263 2 265 4 178 182 447 0 5 10 15 15 462
7:45 382 11 393 8 257 265 658 0 5 3 8 8 666
8:00 271 20 291 20 211 231 522 0 6 4 10 10 532
8:15 326 16 342 7 185 192 534 0 5 2 7 7 541
7:30-8:30 0 1242 49 1291 39 831 0 870 2161 0 0 0 0 21 0 19 40 40 2201
PHF n/a 0.81 0.61 0.82 0.49 0.81 n/a 0.82 n/a n/a n/a n/a 0.88 n/a 0.48 0.67 0.83
4:30 310 18 328 12 352 364 692 0 7 17 24 24 716
4:45 328 14 342 12 313 325 667 0 11 16 27 27 694
5:00 339 12 351 17 363 380 731 0 11 20 31 31 762
5:15 340 20 360 17 392 409 769 0 8 21 29 29 798
4:30-5:30 0 1317 64 1381 58 1420 0 1478 2859 0 0 0 0 37 0 74 111 111 2970
PHF n/a 0.97 0.8 0.96 0.85 0.91 n/a 0.9 n/a n/a n/a n/a 0.84 n/a 0.88 0.9 0.939
APPENDIX C
10
HCM 6th TWSC
1: College & Bueno Recent AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 6 14 1212 9 15 901
Future Vol, veh/h 6 14 1212 9 15 901
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 200 -
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 7 16 1426 11 18 1060
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1998 719 0 0 1437 0
Stage 1 1432 -----
Stage 2 566 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 52 371 - - 468 -
Stage 1 186 -----
Stage 2 532 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 50 371 - - 468 -
Mov Cap-2 Maneuver 142 -----
Stage 1 186 -----
Stage 2 512 -----
Approach WB NB SB
HCM Control Delay, s 20.9 0 0.2
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 250 468 -
HCM Lane V/C Ratio - - 0.094 0.038 -
HCM Control Delay (s) - - 20.9 13 -
HCM Lane LOS - - C B -
HCM 95th %tile Q(veh) - - 0.3 0.1 -
11
HCM 6th TWSC
1: College & Bueno Recent PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.4
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 11 29 1422 3 4 1493
Future Vol, veh/h 11 29 1422 3 4 1493
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 200 -
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 13 34 1673 4 5 1756
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2563 839 0 0 1677 0
Stage 1 1675 -----
Stage 2 888 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 21 309 - - 378 -
Stage 1 137 -----
Stage 2 362 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 21 309 - - 378 -
Mov Cap-2 Maneuver 98 -----
Stage 1 137 -----
Stage 2 357 -----
Approach WB NB SB
HCM Control Delay, s 29.4 0 0
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 194 378 -
HCM Lane V/C Ratio - - 0.243 0.012 -
HCM Control Delay (s) - - 29.4 14.6 -
HCM Lane LOS - - D B -
HCM 95th %tile Q(veh) - - 0.9 0 -
12
HCM 6th TWSC
2: College & Crestridge Recent AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 25 6 15 1246 864 46
Future Vol, veh/h 25 6 15 1246 864 46
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 200 - - -
Veh in Median Storage, # 1 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 29 7 18 1466 1016 54
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1812 535 1070 0 - 0
Stage 1 1043 -----
Stage 2 769 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 70 490 647 - - -
Stage 1 300 -----
Stage 2 418 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 68 490 647 - - -
Mov Cap-2 Maneuver 187 -----
Stage 1 292 -----
Stage 2 418 -----
Approach EB NB SB
HCM Control Delay, s 25.5 0.1 0
HCM LOS D
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h)647 - 212 - -
HCM Lane V/C Ratio 0.027 - 0.172 - -
HCM Control Delay (s) 10.7 - 25.5 - -
HCM Lane LOS B - D - -
HCM 95th %tile Q(veh) 0.1 - 0.6 - -
13
HCM 6th TWSC
2: College & Crestridge Recent PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 12 1 1390 1466 21
Future Vol, veh/h 18 12 1 1390 1466 21
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 200 - - -
Veh in Median Storage, # 1 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 21 14 1 1635 1725 25
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 2558 875 1750 0 - 0
Stage 1 1738 -----
Stage 2 820 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 22 292 354 - - -
Stage 1 127 -----
Stage 2 393 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 22 292 354 - - -
Mov Cap-2 Maneuver 95 -----
Stage 1 127 -----
Stage 2 393 -----
Approach EB NB SB
HCM Control Delay, s 42.7 0 0
HCM LOS E
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h)354 - 130 - -
HCM Lane V/C Ratio 0.003 - 0.271 - -
HCM Control Delay (s) 15.2 - 42.7 - -
HCM Lane LOS C - E - -
HCM 95th %tile Q(veh) 0 - 1 - -
14
HCM 6th TWSC
3: College & Smokey Recent AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.8
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 21 19 1242 49 39 831
Future Vol, veh/h 21 19 1242 49 39 831
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 200 -
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 25 22 1461 58 46 978
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2071 760 0 0 1519 0
Stage 1 1490 -----
Stage 2 581 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 47 349 - - 435 -
Stage 1 173 -----
Stage 2 522 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 42 349 - - 435 -
Mov Cap-2 Maneuver 130 -----
Stage 1 173 -----
Stage 2 467 -----
Approach WB NB SB
HCM Control Delay, s 31 0 0.6
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 185 435 -
HCM Lane V/C Ratio - - 0.254 0.105 -
HCM Control Delay (s) - - 31 14.2 -
HCM Lane LOS - - D B -
HCM 95th %tile Q(veh) - - 1 0.4 -
15
HCM 6th TWSC
3: College & Smokey Recent PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2.7
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 37 74 1317 64 58 1420
Future Vol, veh/h 37 74 1317 64 58 1420
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 200 -
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 44 87 1549 75 68 1671
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 2559 812 0 0 1624 0
Stage 1 1587 -----
Stage 2 972 -----
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver ~ 22 322 - - 397 -
Stage 1 153 -----
Stage 2 327 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 18 322 - - 397 -
Mov Cap-2 Maneuver 97 -----
Stage 1 153 -----
Stage 2 271 -----
Approach WB NB SB
HCM Control Delay, s 63.3 0 0.6
HCM LOS F
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 182 397 -
HCM Lane V/C Ratio - - 0.718 0.172 -
HCM Control Delay (s) - - 63.3 15.9 -
HCM Lane LOS - - F C -
HCM 95th %tile Q(veh) - - 4.5 0.6 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
16
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
17
Table 4-3
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Intersection type
Land Use (from structure plan)
Commercial
corridors
Other corridors within:
Mixed use
districts
Low density
mixed use
residential
All other
areas
Signalized intersections
(overall)
D E* D D
Any Leg E E D E
Any Movement E E D E
Stop sign control
(arterial/arterial,
arterial/collector or local-
any approach leg)
N/A F** F** E
Stop sign control
(collector/local--any
approach leg)
N/A C C C
* mitigating measures required
** considered normal in an urban environment
18
APPENDIX D
19
300 400 500 600 700 800 900 1000 1100 1200 1300100200300400500*75*1001 LANE & 1 LANE2 OR MORE LANES & 1 LANE2 OR MORE LANES & 2 OR MORE LANESAM 2414 VPHEB AM 53 VPHPM 3081 VPHEB PM 81 VPHWB AM 30 VPHWB PM 53 VPH(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 70 KM/H (40 MPH) ON MAJOR STREET)MINOR STREET APPROACH - VPH MAJOR STREET - TOTAL OF BOTH APPROACH -VEHICLES PER HOUR (VPH)*Note: 100 vph applies as the lower threshold volume for a minor-streetapproach with two or more lanes and 75 vph applies as the lower threshold volume for a minor-street approach with one lane.SHORT RANGE (2026) TOTAL PEAK HOUR WARRANT AT COLLEGE/BUENO-VENUSMUTCD, 2003 EDITION, PAGE 4C-7 20
300 400 500 600 700 800 900 1000 1100 1200 1300100200300400500*75*1001 LANE & 1 LANE2 OR MORE LANES & 1 LANE2 OR MORE LANES & 2 OR MORE LANESAM 2640 VPHEB AM 125 VPHPM 3170 VPHEB PM 125 VPHWB AM 40 VPHWB PM 70 VPH(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 70 KM/H (40 MPH) ON MAJOR STREET)MINOR STREET APPROACH - VPH MAJOR STREET - TOTAL OF BOTH APPROACH -VEHICLES PER HOUR (VPH)*Note: 100 vph applies as the lower threshold volume for a minor-streetapproach with two or more lanes and 75 vph applies as the lower threshold volume for a minor-street approach with one lane.LONG RANGE (2040) TOTAL PEAK HOUR WARRANT AT COLLEGE/BUENO-VENUSMUTCD, 2003 EDITION, PAGE 4C-7 21
APPENDIX E
22
HCM 6th Signalized Intersection Summary
1: College & Venus/Bueno Short Background AM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 27 0 7 30 0 15 11 1315 10 60 887 32
Future Volume (veh/h) 27 0 7 30 0 15 11 1315 10 60 887 32
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 32 0 6 35 0 6 13 1547 12 71 1044 37
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, %222222222222
Cap, veh/h 120 0 67 120 0 67 480 2871 22 349 2870 102
Arrive On Green 0.04 0.00 0.04 0.04 0.00 0.04 0.01 0.79 0.79 0.04 0.82 0.82
Sat Flow, veh/h 1410 0 1585 1410 0 1585 1781 3614 28 1781 3501 124
Grp Volume(v), veh/h 32 0 6 35 0 6 13 760 799 71 530 551
Grp Sat Flow(s),veh/h/ln 1410 0 1585 1410 0 1585 1781 1777 1865 1781 1777 1848
Q Serve(g_s), s 2.5 0.0 0.4 2.7 0.0 0.4 0.2 16.9 16.9 0.7 8.4 8.4
Cycle Q Clear(g_c), s 2.9 0.0 0.4 3.1 0.0 0.4 0.2 16.9 16.9 0.7 8.4 8.4
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.02 1.00 0.07
Lane Grp Cap(c), veh/h 120 0 67 120 0 67 480 1412 1482 349 1457 1515
V/C Ratio(X) 0.27 0.00 0.09 0.29 0.00 0.09 0.03 0.54 0.54 0.20 0.36 0.36
Avail Cap(c_a), veh/h 297 0 267 297 0 267 542 1412 1482 399 1457 1515
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 52.0 0.0 50.6 52.1 0.0 50.6 2.2 4.1 4.1 3.2 2.5 2.5
Incr Delay (d2), s/veh 1.2 0.0 0.6 1.3 0.0 0.6 0.0 1.5 1.4 0.3 0.7 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.9 0.0 0.2 1.0 0.0 0.2 0.0 5.1 5.4 0.2 2.3 2.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 53.1 0.0 51.2 53.4 0.0 51.2 2.2 5.5 5.5 3.5 3.2 3.2
LnGrp LOS D A D D A D AAAAAA
Approach Vol, veh/h 38 41 1572 1152
Approach Delay, s/veh 52.8 53.1 5.5 3.3
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.9 91.9 9.2 6.1 94.7 9.2
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 7.5 70.5 18.5 5.5 72.5 18.5
Max Q Clear Time (g_c+I1), s 2.7 18.9 4.9 2.2 10.4 5.1
Green Ext Time (p_c), s 0.0 18.0 0.0 0.0 9.5 0.1
Intersection Summary
HCM 6th Ctrl Delay 5.9
HCM 6th LOS A
23
Timing Report, Sorted By Phase
1: College & Venus/Bueno Short Background AM
Synchro 11 Light Report
Phase Number 124568
Movement SBL NBTL EBTL NBL SBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None C-Max None
Maximum Split (s)12 75 23 10 77 23
Maximum Split (%) 10.9% 68.2% 20.9% 9.1% 70.0% 20.9%
Minimum Split (s)9.5 22.5 22.5 9.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)111111
Minimum Initial (s)555555
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s)7 7 7 7
Flash Dont Walk (s)11 11 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s)98 0 75 98 108 75
End Time (s)0 75 98 108 75 98
Yield/Force Off (s) 105.5 70.5 93.5 103.5 70.5 93.5
Yield/Force Off 170(s) 105.5 59.5 82.5 103.5 59.5 82.5
Local Start Time (s)98 0 75 98 108 75
Local Yield (s)105.5 70.5 93.5 103.5 70.5 93.5
Local Yield 170(s) 105.5 59.5 82.5 103.5 59.5 82.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Splits and Phases: 1: College & Venus/Bueno
24
Queues
1: College & Venus/Bueno Short Background AM
Synchro 11 Light Report
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 32 8 35 18 13 1559 71 1082
v/c Ratio 0.31 0.03 0.33 0.08 0.03 0.54 0.24 0.36
Control Delay 55.0 0.1 55.9 0.7 1.9 6.2 3.5 3.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 55.0 0.1 55.9 0.7 1.9 6.2 3.5 3.6
Queue Length 50th (ft) 22 0 24 0 1 222 6 63
Queue Length 95th (ft) 49 0 52 0 4 291 14 160
Internal Link Dist (ft) 394 408 704 428
Turn Bay Length (ft) 100 100 200 200
Base Capacity (vph) 233 435 235 364 469 2868 313 3032
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.14 0.02 0.15 0.05 0.03 0.54 0.23 0.36
Intersection Summary
25
HCM 6th Signalized Intersection Summary
1: College & Venus/Bueno Short Background PM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 7 0 5 53 0 32 0 1436 3 68 1484 19
Future Volume (veh/h) 7 0 5 53 0 32 0 1436 3 68 1484 19
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 8 0 6 62 0 6 0 1689 4 80 1746 21
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, %222222222222
Cap, veh/h 140 0 95 140 0 95 261 2868 7 305 3110 37
Arrive On Green 0.06 0.00 0.06 0.06 0.00 0.06 0.00 0.79 0.79 0.04 0.86 0.86
Sat Flow, veh/h 1410 0 1585 1410 0 1585 1781 3637 9 1781 3596 43
Grp Volume(v), veh/h 8 0 6 62 0 6 0 825 868 80 861 906
Grp Sat Flow(s),veh/h/ln 1410 0 1585 1410 0 1585 1781 1777 1869 1781 1777 1863
Q Serve(g_s), s 0.6 0.0 0.4 5.2 0.0 0.4 0.0 22.0 22.0 0.9 15.3 15.4
Cycle Q Clear(g_c), s 1.1 0.0 0.4 5.6 0.0 0.4 0.0 22.0 22.0 0.9 15.3 15.4
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.02
Lane Grp Cap(c), veh/h 140 0 95 140 0 95 261 1401 1474 305 1537 1611
V/C Ratio(X)0.06 0.00 0.06 0.44 0.00 0.06 0.00 0.59 0.59 0.26 0.56 0.56
Avail Cap(c_a), veh/h 272 0 244 272 0 244 341 1401 1474 347 1537 1611
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 53.7 0.0 53.2 55.9 0.0 53.2 0.0 5.0 5.0 4.8 2.1 2.1
Incr Delay (d2), s/veh 0.2 0.0 0.3 2.2 0.0 0.3 0.0 1.8 1.7 0.5 1.5 1.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 0.2 1.9 0.0 0.2 0.0 7.1 7.5 0.5 3.4 3.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 53.9 0.0 53.5 58.0 0.0 53.5 0.0 6.8 6.7 5.3 3.6 3.6
LnGrp LOS D A D E A D AAAAAA
Approach Vol, veh/h 14 68 1693 1847
Approach Delay, s/veh 53.7 57.6 6.8 3.7
Approach LOS D E A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 9.2 99.1 11.7 0.0 108.3 11.7
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 7.5 80.5 18.5 5.5 82.5 18.5
Max Q Clear Time (g_c+I1), s 2.9 24.0 3.1 0.0 17.4 7.6
Green Ext Time (p_c), s 0.1 21.8 0.0 0.0 25.1 0.1
Intersection Summary
HCM 6th Ctrl Delay 6.3
HCM 6th LOS A
26
Timing Report, Sorted By Phase
1: College & Venus/Bueno Short Background PM
Synchro 11 Light Report
Phase Number 124568
Movement SBL NBTL EBTL NBL SBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None C-Max None
Maximum Split (s)12 85 23 10 87 23
Maximum Split (%) 10.0% 70.8% 19.2% 8.3% 72.5% 19.2%
Minimum Split (s)9.5 22.5 22.5 9.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)111111
Minimum Initial (s)555555
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s)7 7 7 7
Flash Dont Walk (s)11 11 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s)108 0 85 108 118 85
End Time (s)0 85 108 118 85 108
Yield/Force Off (s) 115.5 80.5 103.5 113.5 80.5 103.5
Yield/Force Off 170(s) 115.5 69.5 92.5 113.5 69.5 92.5
Local Start Time (s) 108 0 85 108 118 85
Local Yield (s)115.5 80.5 103.5 113.5 80.5 103.5
Local Yield 170(s) 115.5 69.5 92.5 113.5 69.5 92.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Splits and Phases: 1: College & Venus/Bueno
27
Queues
1: College & Venus/Bueno Short Background PM
Synchro 11 Light Report
Lane Group EBL EBT WBL WBT NBT SBL SBT
Lane Group Flow (vph) 8 6 62 38 1693 80 1768
v/c Ratio 0.07 0.03 0.50 0.16 0.61 0.33 0.58
Control Delay 48.9 0.2 64.9 1.5 8.6 5.5 4.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 48.9 0.2 64.9 1.5 8.6 5.5 4.2
Queue Length 50th (ft) 6 0 47 0 291 8 176
Queue Length 95th (ft) 20 0 84 0 390 19 251
Internal Link Dist (ft) 394 408 704 428
Turn Bay Length (ft) 100 100 200
Base Capacity (vph) 210 331 216 332 2782 260 3043
Starvation Cap Reductn 0000000
Spillback Cap Reductn 0000000
Storage Cap Reductn 0000000
Reduced v/c Ratio 0.04 0.02 0.29 0.11 0.61 0.31 0.58
Intersection Summary
28
HCM 6th TWSC
1: College & Venus/Bueno Short Background AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 6.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 27 0 7 30 0 15 11 1315 10 60 887 32
Future Vol, veh/h 27 0 7 30 0 15 11 1315 10 60 887 32
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 100 - - 100 - - 200 - - 200 - -
Veh in Median Storage, # - 0 - - 1 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 32 0 8 35 0 18 13 1547 12 71 1044 38
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 2005 2790 541 2243 2803 780 1082 0 0 1559 0 0
Stage 1 1205 1205 - 1579 1579 -------
Stage 2 800 1585 - 664 1224 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 -------
Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 -------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 35 18 485 ~ 23 18 338 640 - - 420 - -
Stage 1 195 255 - 114 168 -------
Stage 2 345 167 - 416 250 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 28 15 485 ~ 19 15 338 640 - - 420 - -
Mov Cap-2 Maneuver ~ 28 15 - 83 88 -------
Stage 1 191 212 - 112 165 -------
Stage 2 320 164 - 340 208 -------
Approach EB WB NB SB
HCM Control Delay, s$ 337.6 56.9 0.1 0.9
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h)640 - - 28 485 83 338 420 - -
HCM Lane V/C Ratio 0.02 - - 1.134 0.017 0.425 0.052 0.168 - -
HCM Control Delay (s) 10.7 - -$ 421.8 12.6 77.2 16.2 15.3 - -
HCM Lane LOS B - - F B F C C - -
HCM 95th %tile Q(veh) 0.1 - - 3.7 0.1 1.7 0.2 0.6 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
29
HCM 6th TWSC
1: College & Venus/Bueno Short Background PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 6.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 0 5 53 0 32 0 1436 3 68 1484 19
Future Vol, veh/h 7 0 5 53 0 32 0 1436 3 68 1484 19
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 100 - - 100 - - 200 - - 200 - -
Veh in Median Storage, # - 0 - - 1 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 8 0 6 62 0 38 0 1689 4 80 1746 22
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 2762 3610 884 2724 3619 847 1768 0 0 1693 0 0
Stage 1 1917 1917 - 1691 1691 -------
Stage 2 845 1693 - 1033 1928 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 -------
Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 -------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 9 5 288 ~ 10 5 305 349 - - 373 - -
Stage 1 70 114 - 97 148 -------
Stage 2 324 147 - 249 112 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 7 4 288 ~ 8 4 305 349 - - 373 - -
Mov Cap-2 Maneuver ~ 7 4 - ~ 62 52 -------
Stage 1 70 90 - 97 148 -------
Stage 2 284 147 - 192 88 -------
Approach EB WB NB SB
HCM Control Delay, s$ 638.8 148.2 0 0.7
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h)349 - - 7 288 62 305 373 - -
HCM Lane V/C Ratio - - - 1.176 0.02 1.006 0.123 0.214 - -
HCM Control Delay (s) 0 - -$ 1082.3 17.8 226.5 18.5 17.3 - -
HCM Lane LOS A - - F C F C C - -
HCM 95th %tile Q(veh) 0 - - 1.8 0.1 4.9 0.4 0.8 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
30
HCM 6th TWSC
3: College & Smokey Short Background AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 21 1315 54 0 924
Future Vol, veh/h 0 21 1315 54 0 924
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 0 25 1547 64 0 1087
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 806 0 0 - -
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.94 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.32 ----
Pot Cap-1 Maneuver 0 325 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 325 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach WB NB SB
HCM Control Delay, s 17 0 0
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h)- - 325 -
HCM Lane V/C Ratio - - 0.076 -
HCM Control Delay (s) - - 17 -
HCM Lane LOS - - C -
HCM 95th %tile Q(veh) - - 0.2 -
31
HCM 6th TWSC
3: College & Smokey Short Background PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.6
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 81 1358 70 0 1542
Future Vol, veh/h 0 81 1358 70 0 1542
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 0 95 1598 82 0 1814
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 840 0 0 - -
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.94 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.32 ----
Pot Cap-1 Maneuver 0 309 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 309 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach WB NB SB
HCM Control Delay, s 21.8 0 0
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h)- - 309 -
HCM Lane V/C Ratio - - 0.308 -
HCM Control Delay (s) - - 21.8 -
HCM Lane LOS - - C -
HCM 95th %tile Q(veh) - - 1.3 -
32
APPENDIX F
33
HCM 6th Signalized Intersection Summary
1: College & Venus/Bueno Long Background AM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 100 1 45 40 1 20 30 1390 15 85 955 70
Future Volume (veh/h) 100 1 45 40 1 20 30 1390 15 85 955 70
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 105 1 5 42 1 5 32 1463 15 89 1005 69
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 196 26 130 196 26 130 478 3851 39 369 3675 252
Arrive On Green 0.10 0.10 0.10 0.10 0.10 0.10 0.03 0.74 0.74 0.04 0.75 0.75
Sat Flow, veh/h 1410 271 1355 1410 271 1355 1781 5211 53 1781 4880 334
Grp Volume(v), veh/h 105 0 6 42 0 6 32 956 522 89 701 373
Grp Sat Flow(s),veh/h/ln 1410 0 1626 1410 0 1626 1781 1702 1861 1781 1702 1810
Q Serve(g_s), s 8.0 0.0 0.4 3.1 0.0 0.4 0.5 11.2 11.2 1.3 7.0 7.1
Cycle Q Clear(g_c), s 8.4 0.0 0.4 3.4 0.0 0.4 0.5 11.2 11.2 1.3 7.0 7.1
Prop In Lane 1.00 0.83 1.00 0.83 1.00 0.03 1.00 0.18
Lane Grp Cap(c), veh/h 196 0 156 196 0 156 478 2516 1375 369 2564 1363
V/C Ratio(X) 0.54 0.00 0.04 0.21 0.00 0.04 0.07 0.38 0.38 0.24 0.27 0.27
Avail Cap(c_a), veh/h 375 0 362 375 0 362 549 2516 1375 512 2564 1363
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 48.9 0.0 45.1 46.7 0.0 45.1 3.2 5.2 5.2 3.5 4.2 4.2
Incr Delay (d2), s/veh 2.3 0.0 0.1 0.5 0.0 0.1 0.1 0.4 0.8 0.3 0.3 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.9 0.0 0.2 1.1 0.0 0.2 0.1 3.5 4.0 0.4 2.1 2.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 51.2 0.0 45.2 47.2 0.0 45.2 3.2 5.6 6.0 3.9 4.5 4.7
LnGrp LOS D A D D A D AAAAAA
Approach Vol, veh/h 111 48 1510 1163
Approach Delay, s/veh 50.9 47.0 5.7 4.5
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 9.2 85.8 15.0 7.6 87.3 15.0
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 13.5 58.5 24.5 7.5 64.5 24.5
Max Q Clear Time (g_c+I1), s 3.3 13.2 10.4 2.5 9.1 5.4
Green Ext Time (p_c), s 0.1 14.9 0.2 0.0 9.5 0.1
Intersection Summary
HCM 6th Ctrl Delay 7.7
HCM 6th LOS A
34
Timing Report, Sorted By Phase
1: College & Venus/Bueno Long Background AM
Synchro 11 Light Report
Phase Number 124568
Movement SBL NBTL EBTL NBL SBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None C-Max None
Maximum Split (s)18 63 29 12 69 29
Maximum Split (%) 16.4% 57.3% 26.4% 10.9% 62.7% 26.4%
Minimum Split (s)9.5 22.5 22.5 9.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)111111
Minimum Initial (s)555555
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s)7 7 7 7
Flash Dont Walk (s)11 11 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s)92 0 63 92 104 63
End Time (s)0 63 92 104 63 92
Yield/Force Off (s) 105.5 58.5 87.5 99.5 58.5 87.5
Yield/Force Off 170(s) 105.5 47.5 76.5 99.5 47.5 76.5
Local Start Time (s)92 0 63 92 104 63
Local Yield (s)105.5 58.5 87.5 99.5 58.5 87.5
Local Yield 170(s) 105.5 47.5 76.5 99.5 47.5 76.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Splits and Phases: 1: College & Venus/Bueno
35
Queues
1: College & Venus/Bueno Long Background AM
Synchro 11 Light Report
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 105 48 42 22 32 1479 89 1079
v/c Ratio 0.61 0.20 0.25 0.10 0.08 0.41 0.30 0.29
Control Delay 60.0 14.0 45.3 17.2 3.7 7.9 5.7 6.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 60.0 14.0 45.3 17.2 3.7 7.9 5.7 6.0
Queue Length 50th (ft) 71 1 27 1 4 147 11 92
Queue Length 95th (ft) 122 33 59 23 13 220 28 139
Internal Link Dist (ft) 394 408 704 428
Turn Bay Length (ft) 100 100 200 200
Base Capacity (vph) 308 390 301 371 438 3604 395 3706
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.34 0.12 0.14 0.06 0.07 0.41 0.23 0.29
Intersection Summary
36
HCM 6th Signalized Intersection Summary
1: College & Venus/Bueno Long Background PM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 50 1 30 70 1 45 40 1515 5 95 1545 90
Future Volume (veh/h) 50 1 30 70 1 45 40 1515 5 95 1545 90
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 53 1 6 74 1 5 42 1595 5 100 1626 91
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 158 17 101 157 20 99 308 4070 13 346 3876 217
Arrive On Green 0.07 0.07 0.07 0.07 0.07 0.07 0.03 0.77 0.77 0.04 0.78 0.78
Sat Flow, veh/h 1410 231 1389 1409 271 1355 1781 5255 16 1781 4948 277
Grp Volume(v), veh/h 53 0 7 74 0 6 42 1033 567 100 1118 599
Grp Sat Flow(s),veh/h/ln 1410 0 1620 1409 0 1626 1781 1702 1867 1781 1702 1821
Q Serve(g_s), s 4.4 0.0 0.5 6.2 0.0 0.4 0.6 11.8 11.8 1.3 12.7 12.7
Cycle Q Clear(g_c), s 4.8 0.0 0.5 6.7 0.0 0.4 0.6 11.8 11.8 1.3 12.7 12.7
Prop In Lane 1.00 0.86 1.00 0.83 1.00 0.01 1.00 0.15
Lane Grp Cap(c), veh/h 158 0 118 157 0 118 308 2636 1446 346 2666 1426
V/C Ratio(X) 0.34 0.00 0.06 0.47 0.00 0.05 0.14 0.39 0.39 0.29 0.42 0.42
Avail Cap(c_a), veh/h 331 0 317 330 0 319 393 2636 1446 505 2666 1426
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.0 0.0 51.8 54.9 0.0 51.8 3.0 4.4 4.4 3.0 4.2 4.2
Incr Delay (d2), s/veh 1.2 0.0 0.2 2.2 0.0 0.2 0.2 0.4 0.8 0.5 0.5 0.9
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.6 0.0 0.2 2.3 0.0 0.2 0.2 3.6 4.1 0.4 3.8 4.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 55.2 0.0 52.0 57.1 0.0 51.9 3.2 4.8 5.2 3.5 4.7 5.1
LnGrp LOS E A D E A D AAAAAA
Approach Vol, veh/h 60 80 1642 1817
Approach Delay, s/veh 54.9 56.7 4.9 4.8
Approach LOS D E A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 9.3 97.4 13.2 8.3 98.5 13.2
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 15.5 67.5 23.5 9.5 73.5 23.5
Max Q Clear Time (g_c+I1), s 3.3 13.8 6.8 2.6 14.7 8.7
Green Ext Time (p_c), s 0.2 17.7 0.1 0.0 20.7 0.1
Intersection Summary
HCM 6th Ctrl Delay 6.8
HCM 6th LOS A
37
Timing Report, Sorted By Phase
1: College & Venus/Bueno Long Background PM
Synchro 11 Light Report
Phase Number 124568
Movement SBL NBTL EBTL NBL SBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None C-Max None
Maximum Split (s)20 72 28 14 78 28
Maximum Split (%) 16.7% 60.0% 23.3% 11.7% 65.0% 23.3%
Minimum Split (s)9.5 22.5 22.5 9.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)111111
Minimum Initial (s)555555
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s)7 7 7 7
Flash Dont Walk (s)11 11 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s)100 0 72 100 114 72
End Time (s)0 72 100 114 72 100
Yield/Force Off (s) 115.5 67.5 95.5 109.5 67.5 95.5
Yield/Force Off 170(s) 115.5 56.5 84.5 109.5 56.5 84.5
Local Start Time (s) 100 0 72 100 114 72
Local Yield (s)115.5 67.5 95.5 109.5 67.5 95.5
Local Yield 170(s) 115.5 56.5 84.5 109.5 56.5 84.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Splits and Phases: 1: College & Venus/Bueno
38
Queues
1: College & Venus/Bueno Long Background PM
Synchro 11 Light Report
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 53 33 74 48 42 1600 100 1721
v/c Ratio 0.41 0.18 0.55 0.24 0.17 0.42 0.35 0.44
Control Delay 58.6 18.2 65.8 16.7 4.1 6.8 5.8 6.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 58.6 18.2 65.8 16.7 4.1 6.8 5.8 6.3
Queue Length 50th (ft) 39 1 56 1 4 154 11 166
Queue Length 95th (ft) 78 31 103 36 13 234 26 237
Internal Link Dist (ft) 394 408 704 428
Turn Bay Length (ft) 100 100 200 200
Base Capacity (vph) 264 337 268 348 300 3808 396 3944
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.20 0.10 0.28 0.14 0.14 0.42 0.25 0.44
Intersection Summary
39
HCM 6th TWSC
3: College & Smokey Long Background AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 30 1405 75 0 1040
Future Vol, veh/h 0 30 1405 75 0 1040
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 32 1479 79 0 1095
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 779 0 0 - -
Stage 1 ------
Stage 2 ------
Critical Hdwy - 7.14 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.92 ----
Pot Cap-1 Maneuver 0 291 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 291 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach WB NB SB
HCM Control Delay, s 18.9 0 0
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h)- - 291 -
HCM Lane V/C Ratio - - 0.109 -
HCM Control Delay (s) - - 18.9 -
HCM Lane LOS - - C -
HCM 95th %tile Q(veh) - - 0.4 -
40
HCM 6th TWSC
3: College & Smokey Long Background PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.9
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 110 1450 95 0 1645
Future Vol, veh/h 0 110 1450 95 0 1645
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 116 1526 100 0 1732
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 813 0 0 - -
Stage 1 ------
Stage 2 ------
Critical Hdwy - 7.14 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.92 ----
Pot Cap-1 Maneuver 0 276 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 276 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach WB NB SB
HCM Control Delay, s 27.2 0 0
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h)- - 276 -
HCM Lane V/C Ratio - - 0.42 -
HCM Control Delay (s) - - 27.2 -
HCM Lane LOS - - D -
HCM 95th %tile Q(veh) - - 2 -
41
APPENDIX G
42
HCM 6th Signalized Intersection Summary
1: College & Venus/Bueno Short Total AM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 53 0 8 30 0 15 41 1315 10 60 952 36
Future Volume (veh/h) 53 0 8 30 0 15 41 1315 10 60 952 36
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 62 0 5 35 0 6 48 1547 12 71 1120 41
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, %222222222222
Cap, veh/h 150 0 101 151 0 101 454 2796 22 337 2723 100
Arrive On Green 0.06 0.00 0.06 0.06 0.00 0.06 0.03 0.77 0.77 0.04 0.78 0.78
Sat Flow, veh/h 1410 0 1585 1411 0 1585 1781 3614 28 1781 3496 128
Grp Volume(v), veh/h 62 0 5 35 0 6 48 760 799 71 569 592
Grp Sat Flow(s),veh/h/ln 1410 0 1585 1411 0 1585 1781 1777 1865 1781 1777 1847
Q Serve(g_s), s 4.8 0.0 0.3 2.6 0.0 0.4 0.6 18.6 18.7 0.9 11.5 11.5
Cycle Q Clear(g_c), s 5.1 0.0 0.3 3.0 0.0 0.4 0.6 18.6 18.7 0.9 11.5 11.5
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.02 1.00 0.07
Lane Grp Cap(c), veh/h 150 0 101 151 0 101 454 1375 1443 337 1384 1439
V/C Ratio(X) 0.41 0.00 0.05 0.23 0.00 0.06 0.11 0.55 0.55 0.21 0.41 0.41
Avail Cap(c_a), veh/h 310 0 281 311 0 281 481 1375 1443 387 1384 1439
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 50.8 0.0 48.4 49.8 0.0 48.4 2.7 4.9 4.9 4.0 4.0 4.0
Incr Delay (d2), s/veh 1.8 0.0 0.2 0.8 0.0 0.2 0.1 1.6 1.5 0.3 0.9 0.9
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.8 0.0 0.1 1.0 0.0 0.2 0.2 6.0 6.3 0.2 3.6 3.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 52.7 0.0 48.6 50.6 0.0 48.7 2.8 6.5 6.5 4.3 4.9 4.8
LnGrp LOS D A D D A D AAAAAA
Approach Vol, veh/h 67 41 1607 1232
Approach Delay, s/veh 52.4 50.3 6.4 4.8
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.9 89.6 11.5 8.3 90.2 11.5
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 7.5 69.5 19.5 5.5 71.5 19.5
Max Q Clear Time (g_c+I1), s 2.9 20.7 7.1 2.6 13.5 5.0
Green Ext Time (p_c), s 0.0 17.7 0.1 0.0 10.6 0.1
Intersection Summary
HCM 6th Ctrl Delay 7.4
HCM 6th LOS A
43
Timing Report, Sorted By Phase
1: College & Venus/Bueno Short Total AM
Synchro 11 Light Report
Phase Number 124568
Movement SBL NBTL EBTL NBL SBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None C-Max None
Maximum Split (s)12 74 24 10 76 24
Maximum Split (%) 10.9% 67.3% 21.8% 9.1% 69.1% 21.8%
Minimum Split (s)9.5 22.5 22.5 9.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)111111
Minimum Initial (s)555555
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s)7 7 7 7
Flash Dont Walk (s)11 11 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s)98 0 74 98 108 74
End Time (s)0 74 98 108 74 98
Yield/Force Off (s) 105.5 69.5 93.5 103.5 69.5 93.5
Yield/Force Off 170(s) 105.5 58.5 82.5 103.5 58.5 82.5
Local Start Time (s)98 0 74 98 108 74
Local Yield (s)105.5 69.5 93.5 103.5 69.5 93.5
Local Yield 170(s) 105.5 58.5 82.5 103.5 58.5 82.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Splits and Phases: 1: College & Venus/Bueno
44
Queues
1: College & Venus/Bueno Short Total AM
Synchro 11 Light Report
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 62 9 35 18 48 1559 71 1162
v/c Ratio 0.48 0.03 0.27 0.07 0.12 0.57 0.26 0.43
Control Delay 58.7 0.1 50.1 0.5 2.9 8.2 4.5 6.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 58.7 0.1 50.1 0.5 2.9 8.2 4.5 6.4
Queue Length 50th (ft) 42 0 23 0 5 244 7 149
Queue Length 95th (ft) 79 0 51 0 13 332 17 207
Internal Link Dist (ft) 394 408 704 428
Turn Bay Length (ft) 100 100 200 200
Base Capacity (vph) 246 431 248 376 400 2727 296 2727
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.25 0.02 0.14 0.05 0.12 0.57 0.24 0.43
Intersection Summary
45
HCM 6th Signalized Intersection Summary
1: College & Venus/Bueno Short Total PM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 81 0 8 53 0 32 21 1436 3 68 1531 22
Future Volume (veh/h) 81 0 8 53 0 32 21 1436 3 68 1531 22
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 95 0 5 62 0 6 25 1689 4 80 1801 25
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, %222222222222
Cap, veh/h 178 0 138 179 0 138 243 2770 7 290 2788 39
Arrive On Green 0.09 0.00 0.09 0.09 0.00 0.09 0.02 0.76 0.76 0.04 0.78 0.78
Sat Flow, veh/h 1410 0 1585 1411 0 1585 1781 3637 9 1781 3589 50
Grp Volume(v), veh/h 95 0 5 62 0 6 25 825 868 80 890 936
Grp Sat Flow(s),veh/h/ln 1410 0 1585 1411 0 1585 1781 1777 1869 1781 1777 1861
Q Serve(g_s), s 7.9 0.0 0.3 5.1 0.0 0.4 0.4 24.8 24.8 1.1 26.9 27.1
Cycle Q Clear(g_c), s 8.4 0.0 0.3 5.4 0.0 0.4 0.4 24.8 24.8 1.1 26.9 27.1
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.03
Lane Grp Cap(c), veh/h 178 0 138 179 0 138 243 1353 1423 290 1380 1446
V/C Ratio(X) 0.53 0.00 0.04 0.35 0.00 0.04 0.10 0.61 0.61 0.28 0.64 0.65
Avail Cap(c_a), veh/h 272 0 244 273 0 244 282 1353 1423 332 1380 1446
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 54.0 0.0 50.2 52.6 0.0 50.2 5.8 6.4 6.4 6.0 6.0 6.0
Incr Delay (d2), s/veh 2.5 0.0 0.1 1.1 0.0 0.1 0.2 2.1 2.0 0.5 2.3 2.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.9 0.0 0.1 1.8 0.0 0.2 0.1 8.6 9.0 0.5 9.0 9.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 56.5 0.0 50.3 53.8 0.0 50.3 5.9 8.4 8.3 6.6 8.3 8.3
LnGrp LOS E A D D A D AAAAAA
Approach Vol, veh/h 100 68 1718 1906
Approach Delay, s/veh 56.2 53.5 8.3 8.2
Approach LOS E D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 9.2 95.9 15.0 7.3 97.7 15.0
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 7.5 80.5 18.5 5.5 82.5 18.5
Max Q Clear Time (g_c+I1), s 3.1 26.8 10.4 2.4 29.1 7.4
Green Ext Time (p_c), s 0.1 21.4 0.1 0.0 25.1 0.1
Intersection Summary
HCM 6th Ctrl Delay 10.3
HCM 6th LOS B
46
Timing Report, Sorted By Phase
1: College & Venus/Bueno Short Total PM
Synchro 11 Light Report
Phase Number 124568
Movement SBL NBTL EBTL NBL SBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None C-Max None
Maximum Split (s)12 85 23 10 87 23
Maximum Split (%) 10.0% 70.8% 19.2% 8.3% 72.5% 19.2%
Minimum Split (s)9.5 22.5 22.5 9.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)111111
Minimum Initial (s)555555
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s)7 7 7 7
Flash Dont Walk (s)11 11 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s)108 0 85 108 118 85
End Time (s)0 85 108 118 85 108
Yield/Force Off (s) 115.5 80.5 103.5 113.5 80.5 103.5
Yield/Force Off 170(s) 115.5 69.5 92.5 113.5 69.5 92.5
Local Start Time (s) 108 0 85 108 118 85
Local Yield (s)115.5 80.5 103.5 113.5 80.5 103.5
Local Yield 170(s) 115.5 69.5 92.5 113.5 69.5 92.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Splits and Phases: 1: College & Venus/Bueno
47
Queues
1: College & Venus/Bueno Short Total PM
Synchro 11 Light Report
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 95 9 62 38 25 1693 80 1827
v/c Ratio 0.62 0.03 0.40 0.14 0.13 0.65 0.35 0.68
Control Delay 67.9 0.2 55.7 1.1 4.3 10.6 7.0 10.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 67.9 0.2 55.7 1.1 4.3 10.6 7.0 10.1
Queue Length 50th (ft) 71 0 45 0 3 328 10 372
Queue Length 95th (ft) 117 0 82 0 9 426 22 463
Internal Link Dist (ft) 394 408 704 428
Turn Bay Length (ft) 100 100 200 200
Base Capacity (vph) 210 327 215 332 197 2611 242 2691
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.45 0.03 0.29 0.11 0.13 0.65 0.33 0.68
Intersection Summary
48
HCM 6th TWSC
1: College & Venus/Bueno Short Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 41
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 53 0 8 30 0 15 41 1315 10 60 952 36
Future Vol, veh/h 53 0 8 30 0 15 41 1315 10 60 952 36
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 100 - - 100 - - 200 - - 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 62 0 9 35 0 18 48 1547 12 71 1120 42
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 2153 2938 581 2351 2953 780 1162 0 0 1559 0 0
Stage 1 1283 1283 - 1649 1649 -------
Stage 2 870 1655 - 702 1304 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 -------
Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 -------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver ~ 27 15 457 ~ 19 14 338 597 - - 420 - -
Stage 1 175 234 - 103 155 -------
Stage 2 313 154 - 395 229 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 21 11 457 ~ 15 11 338 597 - - 420 - -
Mov Cap-2 Maneuver ~ 21 11 - ~ 15 11 -------
Stage 1 161 194 - 95 143 -------
Stage 2 273 142 - 321 190 -------
Approach EB WB NB SB
HCM Control Delay, s$ 1106.6 $ 764.3 0.3 0.9
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h)597 - - 21 457 15 338 420 - -
HCM Lane V/C Ratio 0.081 - - 2.969 0.021 2.353 0.052 0.168 - -
HCM Control Delay (s) 11.6 - -$ 1271.7 13$ 1138.3 16.2 15.3 - -
HCM Lane LOS B - - F B F C C - -
HCM 95th %tile Q(veh) 0.3 - - 8.1 0.1 5.1 0.2 0.6 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
49
HCM 6th TWSC
1: College & Venus/Bueno Short Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 285.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 81 0 8 53 0 32 21 1436 3 68 1531 22
Future Vol, veh/h 81 0 8 53 0 32 21 1436 3 68 1531 22
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length 100 - - 100 - - 200 - - 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 95 0 9 62 0 38 25 1689 4 80 1801 26
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 2869 3717 914 2802 3728 847 1827 0 0 1693 0 0
Stage 1 1974 1974 - 1741 1741 -------
Stage 2 895 1743 - 1061 1987 -------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 -------
Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 -------
Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - -
Pot Cap-1 Maneuver ~ 8 4 276 ~ 8 4 305 331 - - 373 - -
Stage 1 ~ 64 106 - 90 139 -------
Stage 2 302 139 - 239 105 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 6 3 276 ~ 6 3 305 331 - - 373 - -
Mov Cap-2 Maneuver ~ 6 3 - ~ 6 3 -------
Stage 1 ~ 59 83 - 83 128 -------
Stage 2 245 128 - 181 83 -------
Approach EB WB NB SB
HCM Control Delay, s$ 7183 $ 3383.3 0.2 0.7
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h)331 - - 6 276 6 305 373 - -
HCM Lane V/C Ratio 0.075 - -15.882 0.03410.392 0.123 0.214 - -
HCM Control Delay (s) 16.8 - -$ 7890.6 18.5$ 5414.8 18.5 17.3 - -
HCM Lane LOS C - - F C F C C - -
HCM 95th %tile Q(veh) 0.2 - - 13.8 0.1 9.5 0.4 0.8 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
50
HCM 6th TWSC
2: College & Crestridge Short Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 10 0 1366 925 65
Future Vol, veh/h 0 10 0 1366 925 65
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - 200
Veh in Median Storage, # 1 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 0 12 0 1607 1088 76
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 544 - 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.94 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.32 ----
Pot Cap-1 Maneuver 0 483 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 483 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 12.6 0 0
HCM LOS B
Minor Lane/Major Mvmt NBTEBLn1 SBT SBR
Capacity (veh/h)- 483 - -
HCM Lane V/C Ratio - 0.024 - -
HCM Control Delay (s) - 12.6 - -
HCM Lane LOS - B - -
HCM 95th %tile Q(veh) - 0.1 - -
51
HCM 6th TWSC
2: College & Crestridge Short Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 29 0 1460 1545 47
Future Vol, veh/h 0 29 0 1460 1545 47
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - 200
Veh in Median Storage, # 1 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 0 34 0 1718 1818 55
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 909 - 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.94 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.32 ----
Pot Cap-1 Maneuver 0 278 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 278 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 19.8 0 0
HCM LOS C
Minor Lane/Major Mvmt NBTEBLn1 SBT SBR
Capacity (veh/h)- 278 - -
HCM Lane V/C Ratio - 0.123 - -
HCM Control Delay (s) - 19.8 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.4 - -
52
HCM 6th TWSC
3: College & Smokey Short Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 21 1345 54 0 935
Future Vol, veh/h 0 21 1345 54 0 935
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 0 25 1582 64 0 1100
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 823 0 0 - -
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.94 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.32 ----
Pot Cap-1 Maneuver 0 317 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 317 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach WB NB SB
HCM Control Delay, s 17.3 0 0
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h)- - 317 -
HCM Lane V/C Ratio - - 0.078 -
HCM Control Delay (s) - - 17.3 -
HCM Lane LOS - - C -
HCM 95th %tile Q(veh) - - 0.3 -
53
HCM 6th TWSC
3: College & Smokey Short Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.6
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 81 1379 70 0 1574
Future Vol, veh/h 0 81 1379 70 0 1574
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 0 95 1622 82 0 1852
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 852 0 0 - -
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.94 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.32 ----
Pot Cap-1 Maneuver 0 303 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 303 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach WB NB SB
HCM Control Delay, s 22.2 0 0
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h)- - 303 -
HCM Lane V/C Ratio - - 0.315 -
HCM Control Delay (s) - - 22.2 -
HCM Lane LOS - - C -
HCM 95th %tile Q(veh) - - 1.3 -
54
APPENDIX H
55
HCM 6th Signalized Intersection Summary
1: College & Venus/Bueno Long Total AM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 125 1 45 40 1 20 60 1390 15 85 1020 75
Future Volume (veh/h) 125 1 45 40 1 20 60 1390 15 85 1020 75
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 132 1 5 42 1 5 63 1463 15 89 1074 74
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 224 31 156 224 31 156 450 3749 38 359 3527 243
Arrive On Green 0.12 0.12 0.12 0.12 0.12 0.12 0.04 0.72 0.72 0.04 0.72 0.72
Sat Flow, veh/h 1410 271 1355 1410 271 1355 1781 5211 53 1781 4878 336
Grp Volume(v), veh/h 132 0 6 42 0 6 63 956 522 89 749 399
Grp Sat Flow(s),veh/h/ln 1410 0 1626 1410 0 1626 1781 1702 1861 1781 1702 1810
Q Serve(g_s), s 10.1 0.0 0.4 3.0 0.0 0.4 1.0 12.0 12.0 1.4 8.6 8.6
Cycle Q Clear(g_c), s 10.4 0.0 0.4 3.4 0.0 0.4 1.0 12.0 12.0 1.4 8.6 8.6
Prop In Lane 1.00 0.83 1.00 0.83 1.00 0.03 1.00 0.19
Lane Grp Cap(c), veh/h 224 0 188 224 0 188 450 2449 1339 359 2461 1309
V/C Ratio(X) 0.59 0.00 0.03 0.19 0.00 0.03 0.14 0.39 0.39 0.25 0.30 0.30
Avail Cap(c_a), veh/h 413 0 407 413 0 407 519 2449 1339 502 2461 1309
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 47.8 0.0 43.2 44.7 0.0 43.2 3.7 6.0 6.0 4.2 5.4 5.4
Incr Delay (d2), s/veh 2.5 0.0 0.1 0.4 0.0 0.1 0.1 0.5 0.9 0.4 0.3 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.7 0.0 0.1 1.1 0.0 0.1 0.3 3.9 4.5 0.4 2.8 3.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 50.3 0.0 43.3 45.1 0.0 43.3 3.8 6.5 6.9 4.5 5.7 6.0
LnGrp LOS D A D D A D AAAAAA
Approach Vol, veh/h 138 48 1541 1237
Approach Delay, s/veh 50.0 44.9 6.5 5.7
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 9.2 83.6 17.2 8.8 84.0 17.2
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 13.5 55.5 27.5 8.5 60.5 27.5
Max Q Clear Time (g_c+I1), s 3.4 14.0 12.4 3.0 10.6 5.4
Green Ext Time (p_c), s 0.1 14.5 0.3 0.0 10.4 0.1
Intersection Summary
HCM 6th Ctrl Delay 8.8
HCM 6th LOS A
56
Timing Report, Sorted By Phase
1: College & Venus/Bueno Long Total AM
Synchro 11 Light Report
Phase Number 124568
Movement SBL NBTL EBTL NBL SBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None C-Max None
Maximum Split (s)18 60 32 13 65 32
Maximum Split (%) 16.4% 54.5% 29.1% 11.8% 59.1% 29.1%
Minimum Split (s)9.5 22.5 22.5 9.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)111111
Minimum Initial (s)555555
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s)7 7 7 7
Flash Dont Walk (s)11 11 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s)92 0 60 92 105 60
End Time (s)0 60 92 105 60 92
Yield/Force Off (s) 105.5 55.5 87.5 100.5 55.5 87.5
Yield/Force Off 170(s) 105.5 44.5 76.5 100.5 44.5 76.5
Local Start Time (s)92 0 60 92 105 60
Local Yield (s)105.5 55.5 87.5 100.5 55.5 87.5
Local Yield 170(s) 105.5 44.5 76.5 100.5 44.5 76.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Splits and Phases: 1: College & Venus/Bueno
57
Queues
1: College & Venus/Bueno Long Total AM
Synchro 11 Light Report
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 132 48 42 22 63 1479 89 1153
v/c Ratio 0.67 0.18 0.22 0.09 0.17 0.42 0.30 0.33
Control Delay 60.2 12.9 42.1 16.0 4.8 9.1 6.5 7.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 60.2 12.9 42.1 16.0 4.8 9.1 6.5 7.9
Queue Length 50th (ft) 89 1 27 1 9 160 12 110
Queue Length 95th (ft) 145 32 57 22 24 239 31 169
Internal Link Dist (ft) 394 408 704 428
Turn Bay Length (ft) 100 100 200 200
Base Capacity (vph) 346 432 338 414 407 3499 389 3495
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.38 0.11 0.12 0.05 0.15 0.42 0.23 0.33
Intersection Summary
58
HCM 6th Signalized Intersection Summary
1: College & Venus/Bueno Long Total PM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 125 1 35 70 1 45 60 1515 5 95 1595 95
Future Volume (veh/h) 125 1 35 70 1 45 60 1515 5 95 1595 95
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 132 1 5 74 1 5 63 1595 5 100 1679 96
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 216 31 155 216 31 155 286 3853 12 328 3641 208
Arrive On Green 0.11 0.11 0.11 0.11 0.11 0.11 0.04 0.73 0.73 0.04 0.74 0.74
Sat Flow, veh/h 1410 271 1355 1410 271 1355 1781 5255 16 1781 4941 282
Grp Volume(v), veh/h 132 0 6 74 0 6 63 1033 567 100 1156 619
Grp Sat Flow(s),veh/h/ln 1410 0 1626 1410 0 1626 1781 1702 1867 1781 1702 1820
Q Serve(g_s), s 11.0 0.0 0.4 5.9 0.0 0.4 1.0 14.0 14.0 1.6 16.2 16.3
Cycle Q Clear(g_c), s 11.4 0.0 0.4 6.3 0.0 0.4 1.0 14.0 14.0 1.6 16.2 16.3
Prop In Lane 1.00 0.83 1.00 0.83 1.00 0.01 1.00 0.16
Lane Grp Cap(c), veh/h 216 0 186 216 0 186 286 2496 1369 328 2508 1341
V/C Ratio(X) 0.61 0.00 0.03 0.34 0.00 0.03 0.22 0.41 0.41 0.31 0.46 0.46
Avail Cap(c_a), veh/h 378 0 373 378 0 373 377 2496 1369 456 2508 1341
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 52.3 0.0 47.3 50.1 0.0 47.3 4.7 6.1 6.1 4.4 6.3 6.3
Incr Delay (d2), s/veh 2.8 0.0 0.1 0.9 0.0 0.1 0.4 0.5 0.9 0.5 0.6 1.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.1 0.0 0.2 2.1 0.0 0.2 0.3 4.6 5.2 0.5 5.4 5.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 55.1 0.0 47.3 51.0 0.0 47.3 5.0 6.6 7.1 5.0 6.9 7.4
LnGrp LOS E A D D A D AAAAAA
Approach Vol, veh/h 138 80 1663 1875
Approach Delay, s/veh 54.8 50.7 6.7 7.0
Approach LOS D D A A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 9.3 92.5 18.2 8.9 92.9 18.2
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 13.5 65.5 27.5 10.5 68.5 27.5
Max Q Clear Time (g_c+I1), s 3.6 16.0 13.4 3.0 18.3 8.3
Green Ext Time (p_c), s 0.1 17.4 0.3 0.1 20.9 0.2
Intersection Summary
HCM 6th Ctrl Delay 9.6
HCM 6th LOS A
59
Timing Report, Sorted By Phase
1: College & Venus/Bueno Long Total PM
Synchro 11 Light Report
Phase Number 124568
Movement SBL NBTL EBTL NBL SBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max None None C-Max None
Maximum Split (s)18 70 32 15 73 32
Maximum Split (%) 15.0% 58.3% 26.7% 12.5% 60.8% 26.7%
Minimum Split (s)9.5 22.5 22.5 9.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)111111
Minimum Initial (s)555555
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s)7 7 7 7
Flash Dont Walk (s)11 11 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s)102 0 70 102 117 70
End Time (s)0 70 102 117 70 102
Yield/Force Off (s) 115.5 65.5 97.5 112.5 65.5 97.5
Yield/Force Off 170(s) 115.5 54.5 86.5 112.5 54.5 86.5
Local Start Time (s) 102 0 70 102 117 70
Local Yield (s)115.5 65.5 97.5 112.5 65.5 97.5
Local Yield 170(s) 115.5 54.5 86.5 112.5 54.5 86.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Splits and Phases: 1: College & Venus/Bueno
60
Queues
1: College & Venus/Bueno Long Total PM
Synchro 11 Light Report
Lane Group EBL EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 132 38 74 48 63 1600 100 1779
v/c Ratio 0.69 0.15 0.38 0.18 0.28 0.46 0.38 0.50
Control Delay 66.7 14.5 50.9 13.6 7.2 10.0 8.0 9.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 66.7 14.5 50.9 13.6 7.2 10.0 8.0 9.5
Queue Length 50th (ft) 99 1 53 1 9 186 15 214
Queue Length 95th (ft) 157 31 95 34 25 285 36 313
Internal Link Dist (ft) 394 408 704 428
Turn Bay Length (ft) 100 100 200 200
Base Capacity (vph) 309 393 312 400 282 3480 346 3577
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.43 0.10 0.24 0.12 0.22 0.46 0.29 0.50
Intersection Summary
61
HCM 6th TWSC
2: College & Crestridge Long Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 10 0 1465 1040 65
Future Vol, veh/h 0 10 0 1465 1040 65
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 1 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 11 0 1542 1095 68
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 582 - 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 7.14 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.92 ----
Pot Cap-1 Maneuver 0 391 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 391 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 14.5 0 0
HCM LOS B
Minor Lane/Major Mvmt NBTEBLn1 SBT SBR
Capacity (veh/h)- 391 - -
HCM Lane V/C Ratio - 0.027 - -
HCM Control Delay (s) - 14.5 - -
HCM Lane LOS - B - -
HCM 95th %tile Q(veh) - 0.1 - -
62
HCM 6th TWSC
2: College & Crestridge Long Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 30 0 1580 1650 50
Future Vol, veh/h 0 30 0 1580 1650 50
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 1 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 32 0 1663 1737 53
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 895 - 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 7.14 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.92 ----
Pot Cap-1 Maneuver 0 244 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 244 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 21.9 0 0
HCM LOS C
Minor Lane/Major Mvmt NBTEBLn1 SBT SBR
Capacity (veh/h)- 244 - -
HCM Lane V/C Ratio - 0.129 - -
HCM Control Delay (s) - 21.9 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.4 - -
63
HCM 6th TWSC
3: College & Smokey Long Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 30 1435 75 0 1050
Future Vol, veh/h 0 30 1435 75 0 1050
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 32 1511 79 0 1105
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 795 0 0 - -
Stage 1 ------
Stage 2 ------
Critical Hdwy - 7.14 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.92 ----
Pot Cap-1 Maneuver 0 284 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 284 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach WB NB SB
HCM Control Delay, s 19.3 0 0
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h)- - 284 -
HCM Lane V/C Ratio - - 0.111 -
HCM Control Delay (s) - - 19.3 -
HCM Lane LOS - - C -
HCM 95th %tile Q(veh) - - 0.4 -
64
HCM 6th TWSC
3: College & Smokey Long Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.9
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 110 1470 95 0 1680
Future Vol, veh/h 0 110 1470 95 0 1680
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 116 1547 100 0 1768
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 824 0 0 - -
Stage 1 ------
Stage 2 ------
Critical Hdwy - 7.14 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.92 ----
Pot Cap-1 Maneuver 0 271 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 271 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach WB NB SB
HCM Control Delay, s 27.8 0 0
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h)- - 271 -
HCM Lane V/C Ratio - - 0.427 -
HCM Control Delay (s) - - 27.8 -
HCM Lane LOS - - D -
HCM 95th %tile Q(veh) - - 2 -
65
APPENDIX I
66
SCALE: 1"=500'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES College AvenueSkyway Drive
Bueno Drive
Smokey Street
67
Pedestrian LOS Worksheet
Project Location Classification: Transit Corridor
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Level of Service (minimum based on project location classification)
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Residential/Commercial
to the south
Residential/
Commercial
Minimum B C C C B
1 Actual D E A C B
Proposed D E A C B
Residential/Commercial
to the east
Residential/
Commercial
Minimum B C C C B
2 Actual B E B C B
Proposed B E B C B
Fossil Creek Trail to the
north Recreational
Minimum B C C C B
3 Actual B E A C B
Proposed B E A C B
Minimum
4 Actual
Proposed
Minimum
5 Actual
Proposed
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
68
SCALE: 1"=500'
DELICH
ASSOCIATES College AvenueSkyway Drive
Bueno Drive
Smokey Street
BICYCLE INFLUENCE AREA
69
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C C C
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Fossil Creek Trail to the
north Recreational B C C 1
2
3
4
70