Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY 2ND FILING~
~ 0 0
DATE: 1-14-87
PROJECT: C A T -BUSINESS PARK
JOB NUMBER: ?
DESIGN ENGINEER: BC
BASIN DESIGNATION = TOTAL SITE
DETERMINE EXISTING Q FOR 2 YEAR STORM
HISTORIC RUNOFF COEFFICIENT .2
BASIN SLOPE: 1.5 PERCENT
BASIN LENGTH 500 FEET
AREA: 4.01 ACRES
HIST TC = 1.87*(1.1-( 1 * .2
)>*SQRROOT 500 >)/ 1.5 ^ 1/
= 32.87992 MINUTES
HISTORIC RAINFALL INTENSITY: 1.421601 INCHES/HOUR
HISTORIC OUTFALL: 1.140174°' CUBIC FEET PER SECOND
DETERMINATION OF DETENTION POND VOLUME FOR DEVELOPED CONDITIONS
DEVELOPED STORM: 100
DEVELOPED RUNOFF COEFFICIENT
CCFAC = .67
*
= 3.358375
DURATION
GROSS VOL.
MIN
CU. FT.
5
9188,514
10
14145.48
15
18014.32
30
24905.71
45
29923.12
60
31555.29
90
34094.22
120
34819.63
180
37721.27
360
42073.73
REQUIRED DETENTION
V L IS
.641358 ACRE FEET
YEAR STORM
.67
1.25
OUTFLOW VOL.
CU. FT.
342.0372
684.0745
1026.112
2052.223
3078'335
4104.447
6156.67
8208,894
12313.34
24626.68
27937.55
*
DETENTION VOL.
CU. FT
B846.478
13461.4
16988.21
22853.49
26844.79
27450.85
27937.55
26610'74
25407.93
17447.04
CU. FT. OR
4.(