The purpose of this letter and exhibits is to summarize the approach taken in master planning the
water and sewer facilities for the remaining parcels of the South Campus Overall Development
Plan (ODP) based on the City's comments and input. This letter is meant to summarize the
current facilities in the area and review the proposed extensions required to service the
development parcels.
Most of the utilities required to service the development parcels are already in place. The
following summary outlines how each parcel will be serviced by either existing or proposed
systems.
Parcels A & B
Parcels A and B are proposed to have office/commercial uses. Water service will be extended
into Parcel A either by the existing 12-inch water main in Centre Avenue or the existing 12-inch
water main in Research Boulevard. Parcel A sewer service will be provided by the existing 21-
inch sewer main in Centre Avenue and/or the existing 12-inch sewer main in Research
Boulevard. Water service will be extended into Parcel B from the existing 12-inch water main in
Centre Avenue. Parcel B sewer service will be provided by the existing 21-inch sewer main in
Centre Avenue.
Parcel C
Parcel C is proposed to have office/commercial uses and may include student housing. Parcel C
water service will be provided by the proposed 8-inch water main extension under Rolland Moore
Drive as the roadway is extended west from Centre Avenue to its current stub out east of Shields
Street. This will provide further looping of the system in the area. If the Northland Drive
extension is required connecting Rolland Moore Drive to Gilgalad Way an 8-inch line will also
be extended providing further looping to the area. The smaller western portion of Parcel C on the
north side of Rolland Moore Drive will obtain sewer service from the same 8-inch main in
Rolland Moore Drive.
420 SOUTH HOWES, SUITE 202 / FORT COLLINS, COLORADO 80521 / 970.221.4158 / FAX 970.221.4159
The principal portion of Parcel C south of Rolland Moore Drive will have the option of obtaining
sewer service from the existing 12-inch sewer stub out that is on site, which originally serviced
the Center for Advance Technology before the extension of Centre Avenue. It is our
understanding that the City intends to extend an 8-inch stub west from the existing 12-inch line
under the Rolland Moore Drive. Service to the eastern portion of Parcel C will be facilitated off
this extension. The smaller western portion of Parcel C on the north side of Rolland Moore Drive
will obtain sewer service from the existing 8-inch sewer line that runs under Rolland Moore
Drive. Portions of this sewer may have to be realigned to better conform to the proposed
roadway layout.
Parcel D
Parcel D is proposed office/ recreation/commercial/parking. Parcel D will obtain water service
from the existing 16-inch water main in Centre Avenue. Looping service to the 30-inch water
main, which crosses the southern portion of the site could also be considered if allowed by the
City. Parcel D sewer service will be obtained from the existing 18-inch sewer line that runs along
the southern portion of the site.
Parcel E
Parcel E is proposed office/ recreation/commercial/parking. Parcel E will obtain water service
from the existing 16-inch water main in Centre Avenue. Looping or connecting service to the 30-
inch water main, which crosses through the center of the site, could also be considered if allowed
by the City. Parcel E sewer service will be obtained from either the existing 18-inch sewer line or
the existing 27-inch sewer that runs through the site.
Parcel F
Parcel F is proposed for office/commercial development. Parcel F will obtain water service from
the existing eight -inch water main in Prospect Road. Parcel F sewer service will likely be
extended from the 15-inch sewer line which flows south along the west side of the Burlington
Northern Railroad embankment just off the southeast corner of the site.
Summary
In summary, the attached Master Utility Plan reflects the intended approach taken to provide
water and sanitary sewer service for the CSURF South Campus Overall Development Plan
outlined above. This approach utilizes all existing infrastructure while minimizing extension
costs.
I trust this report provides the information needed for the conceptual design approach for this
ODP submittal. If you have questions or need any clarification please do not hesitate to contact
our office.
Sincerely,
Stan A. Myers P.E.
Senior Project Manager
ti