Loading...
HomeMy WebLinkAboutMOUNTAIN PARK HOMES - CHANGE OF NON-CONFORMING USE - 37-88 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWCITY OF FORT COLLINS OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT March 23, 1988 Fort Collins Housing Authority c/o Jim Klein 1715 West Mountain Avenue Fort Collins, CO 80521 Dear Sir, For your information, attached is a copy of the Staff's comments concerning Mountain Park Homes, which was presented before the Conceptual Review Team on March 14, 1988. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, I LIXX'U" Debbie deBesche Project Planner Attachment DdB/bh xe: Tom Peterson, Director of Planning Mike Herzig, Development Coordinator Jim Faulhaber, Civil Engineer I L-Project Planner File 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221.6750 SERVICES, PLANNING CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: March 14, 1988 ITEM: Mountain Park Homes APPLICANT: Fort Collins Housing Authority, 1715 West Mountain Ave., Fort Collins, CO 80521 LAND USE DATA: Request to replace 19 existing trailers with 4 six-plexes or 2 twelve-plexes modular homes. COMMENTS: 1. Adequate power is available from the existing over head facility in the alley. Services will need to be placed underground and there will probably be some development charges. Easements may be needed. (Light and Power) 2. There is an existing 3/4 " and a 1" water line. It may be necessary for a new water service line or a combination of the two existing lines to provide water service to the project. Sewer service is available. Development fees will apply if you increase the size of service. (Water and Sewer) 3. The site is located in the Old Town Storm Drainage Basin and there are no fees, but there will be monthly O and M fees in the future. A drainage report will be needed for the application submittal. (Storm Drainage) 4. It is questionable if the width of the alley will meet fire access require- ments. 20' is the normal width. Please contact Warren Jones, Poudre Fire Authority, at 221-6570 for further information. (Fire) 5. Be careful to avoid rated construction. Building Inspection Staff suggests a preliminary review of the plans to insure* that all building code require- ments will be met. You will need to provide handicapped accessible units. Full development fees will be required at the time of obtaining building permits. (Building Inspection) 6. The alley will need to be improved ,-or vacating it may be a possibility. Driveways need to be handicapped accessible. A utility plan is needed at the time of submitting the application. (Engineering) 7. City parking lot standards will need to be met. Damaged sidewalks will need to be replaced by the developer. (Engineering) Conceptual Rev-0 Comments • Page 2 8. A traffic study is needed, but it does not need to be cxtcnsiN-c. Staff leas some concern with the number of curb cuts on Bryan, one access on Bryan would be more efficient. One space per bedroom seems appropriate. (Trans- portation) 9. On your site plan please show existing trees and major plantings. (Natural Resources) 10. Staff would like to see some special consideration for the existing lighting and some upgrading. (Police) 11. There are two different options for you to pursue for review approval. A PUD or a Non -Conforming Use Review. I have attached both requirements for your information. (Zoning) 12. A neighborhood meeting is needed and must take place prior to the applica- tion submittal. (Planning)