Loading...
HomeMy WebLinkAboutEXECUTIVE AUTO CENTER PUD - PRELIMINARY & FINAL - 36-88 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWCITY OF FORT COLLINS OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT March 29, 1988 Rowland Griffith c/o Ric Hattman Gefroh-Hattman, Inc. 135 W. Swallow Fort Collins, CO 80526 Dear Sirs, For your information, attached is a copy of the Staff's comments concerning Executive Auto Center, which was presented before the Conceptual Review Team on March 28, 1988. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, Teek Ted Shepard Project Planner Attachment TS/bh xe: Tom Peterson, Director of Planning Mike Herzig, Development Coordinator Jim Faulhaber, Civil Engineer I Project Planner File 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6750 SERVICES, PLANNING CONCEPTUAL REVIEW STAFF COMMENTS NIEETING DATE: March 28. 1988 ITENI: Executive Auto Center, located in the West Harvard P.U.D. between the Executive Carwash and Solar One Office Building. APPLICANT: Rowland Griffith, c/o Ric Hattman of Gcfroh-Hattman, Inc., 135 W. Swallow Rd., Fort Collins, CO 80526 LAND USE DATA: Proposed P.U.D. on approximately one half acre featuring a three bay auto Tube shop and a four bay auto detail shop and shared access with the existing Executive Carwash and a new exit (curb cut) on Harvard. The proposal also includes moving the vacuum area of the carwash to the west of the existing bays, and adding a small office to carwash building. CONINIENTS: I. Be sure to keep the electrical meter outside the proposed office addition on the east side of the carwash. This structure is served by an existing transformer east of the building. 2. The two new buildings would be served by a transformer located to the west in the vicinity of Solar One Office. 3. The Building Department would classify both new buildings as B-2 occu- pancy. All buildings must be setback a minimum of 10 feet from all property lines. All buildings must be handicap accessible. 4. A final plat will be required along with the final P.U.D. , 5. The detail shop may have access problems for fire accessibility. Be sure to maintain adequate turning radii in the parking lot. Please show the location of the existing fire hydrant on the P.U.D. plan. 6. The Storm Drainage maps indicate a storm sewer line in the immediate vicinity. It is not clear, however, where the line is relative to the site. Nor is it clear where the pipe connects to the larger system. The submit- tal for P.U.D. must include a Drainage Report and a grading and drainage plan. With the amount of impervious surface, it is likely that there would have to be parking lot detention. If the property is to be regraded, be sure there is no impact on the neighboring property. t L Page 2 7. Please show an 8 foot utility easement adjacent to the right-of-way line along Harvard. 8. For detailed information on the street oversizing fee, please contact Mr. Matt Baker in the Engineering Department at 221-6605. 9. The P.U.D. submittal should address the operation of the curb cuts and the site circulation. 10. Please be aware that the east parking for the lube shop may become blocked by cars stacked in front of the service bays. 11. The P.U.D. submittal should address the number of employees and the available parking spaces. 12. Staff will expect the existing landscaping on the west side of the carwash site to be moved elsewhere within the P.U.D. Specifically, this includes the 24 upright evergreen shrubs. 13. Both the south and west property lines will be scrutinized for landscaping and buffering. 14. All signs must comply with the sign code. 15. Staff applauds the effort to save the existing trees. 16. The decision to allow a simultaneous preliminary and final submittal can only be made by the Planning Director. Please inform Mr. Tom Peterson of your request. • a -i