July 24, 1996
RE: Box Elder Creek Aerial Crossing/Bored Crossing Cost Comparison
Dear Mitch:
As promised in our June 16, 1996 meeting with city staff we are pleased to present the cost
comparison for the Interstate Land Waterline Crossing of the Box Elder Creek. This cost
analysis involves comparing the costs of two alternate methods of crossing the creek. The first
is an aerial pipeline crossing adjacent to a proposed pedestrian bridge on an alignment
preferred by the city stormwater utilities staff. The second is a bored crossing at the original
location of the aerial crossing near the Harley Davidson parking lot.
The following table shows the cost for each alternate:
AERIAL CROSSING
Pipeline Crossing
$26,448.00
Additional Pipe and Fittings
$1,720.00
Pedestrian Bridge and Access Trail
$22,460.00
AERIAL CROSSING TOTAL
$50,628.00
BORED CROSSING TOTAL
$49,530.00
As shown the cost for each alternate is practically the same.
Costs for the aerial crossing include the cost of the pipeline and appurtenances necessary for
the aerial crossing, additional pipe and fittings for the revised alignment, the pedestrian bridge
and trail work to and 20 feet past the bridge. The source of costs for the pipeline crossing and
additional pipe and fittings is the bid amount from the Interstate Land Waterline Contract. The
Denver 303/458-5526
Mitch Haas Page 2
Interstate Land Waterline Box Elder Creek Crossing Cost Comparison Cont.
source for the bridge is an opinion of probable costs derived from existing cost data and price
estimates from pedestrian bridge fabricators.
The source of the costs for the bored crossing is a quote from the contractor under contract for
the Interstate Land Waterline Project. The quote is based on a preliminary alignment and
design of the bored crossing. The length of the bore is 105 feet with 5 feet minimum cover
between the top of the casing pipe and the channel invert. A minimum cover of 3 feet was
specified by stormwater utility staff but contractors experienced in this method of construction
suggest 5 feet of cover to insure maintaining the continuity of the channel bottom.
While this analysis does not guide us to any conclusion based on cost, we can conclude that as
long as the pipeline is deeper than 8 to 10 feet at the creek bank ELCO will not accept or
approve the design for construction. This position was stated by Webb Jones in a letter to the
developer Stan Whitaker and confirmed in a preliminary design review meeting July 22, 1996.
A copy of the letter is included for your information. Further investigation into other alternate
bored crossing locations along the creek in the vicinity of the Harley Davidson site produced
no acceptable alternate alignments.
Therefore we are proceeding to finalize the Interstate Land First Filing - Harley Davidson
submittal with the aerial pipeline crossing. The crossing alignment will be in the location
preferred by Mike Grimm and Basil Hamdan and will include the pedestrian bridge as
proposed by Eldon Ward to the Planning and Zoning Board.
If you have a need to discuss this further or have any questions please do not hesitate to
contact me at our office.
Sincerely,
RBD, Inc.
Bill Taylor
Enclosure
cc: Stan Whitaker, LGT
Eldon Ward, Cityscape
JUL-25-96 THU 10:59 AM ELCq*TER DIST
East Larimer County Water District
April 3, 1996
Stan Whitaker
LGT
3555 Stanford
Ft. Collins, CO 80525
FAX NO. J&493 1801 F. 2
RE: Boxelder Creek Crossing - Interstate Lands PUD
Dear Mr. Whitaker:
East Larimer County (ELCO) water District has facilities available
to serve the Interstate Lands PUD. Water service for the first
phase of the project requires that a 12" water line be installed
across Boxelder Creek in the vicinity of the proposed Harley
Davidson dealership.
The original plan was to install the 12" water line beneath
Boxelder Creek. A copy of the profile of the creek crossing that
was originally proposed is attached. If installed as originally
planned, the water line would have been approximately 19' below
finished grade and within the parking lot for the proposed
building. Construction of a water line that deep would have been
extremely difficult and disruptive to the surrounding area.
Maintenance of a water line within a parking lot at that depth is
impossible. It is just too deep.
To avoid problems associated with installing and maintaining a
large utility line 19' under a parking lot, an aerial crossing of
Boxelder Creek was designed. An aerial crossing is the only
reasonable solution to extending a water line across Boxelder Creek
at the location required to serve the proposed Harley Davidson
dealership.
Please contact me if you have any additional questions about ELCO's
requirements for the Boxelder Creek crossing.
Sincerely,
Webster Jones, P.E.
Manager, ELCO Water District
Enclosure
232 South Link Lane, P.C. Box 2044 • Fort Collins, Colorado 80522 • Phone (303) 493-2044 . Fax (303) 493-1801
No Text
RY
32' SPAN PEDESTRIAN i
BRIDGE AND SIDEWALK.
coi
►
=r
Cot
Proposed Waterline Alignment under ter'
Box Eder Cheek
z'
►
►
CDOT TYPE L INLET
CP-5
WATER QUALITY
POND OUTLET
STRUCTURE
CP-10
20' UTILITY
r*ACF►rCf%IT
I
►
r
X01
4905.8 . ... ........... .
4910.1
46
S
s'
Jam" 1A.
f
4
ft�
Y
P