HomeMy WebLinkAboutINTERSTATE LAND PUD, 1ST FILING (HARLEY DAVIDSON) - FINAL - 34-88C - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (3)•
April 3, 1996
Mitchell Haas
Project Planner
City of Fort Collins
Planning Department
P.O. Box 580
Fort Collins, CO 80522
Dear Mitch;
C 0 y7S§@P(A�
urban design, inc.
3555 stanford road, suite 105
fort collins, colorado 80525
(970) 226-4074
FAX (970) 226-4196
Attached are five prints of the Interstate Land Final PUD, First Filing (Harley Davidson)
Final, reflecting additional revisions made in response to recent Staff Comments. Specific
revisions made on our plans and/or being completed on KBD's plat and utility plans include:
- Minor adjustments in the frontage road design (transition radii and striping) will be
reflected on RBD's plans, and on the PUD site plan mylars to be filed.
- Bank stabilization and revegetation at appropriate locations along Boxelder Creek - as
agreed with storm drainage and natural resources - will be included with this PUD;
pending our receipt of consistent direction from the affected City departments.
- It is our understanding that the required water line crossing of Boxelder Creek was
originally designed to go under the creek. It was redesigned - at City direction - to
cross above the 100 year water elevation. Now Natural Resources feels strongly that
it should go under the creek as originally designed. We need clear direction from the
City of Fort Collins on this item.
- Ditch company representative Don Magnuson has indicated to RBD that with the
revisions they are making to the easement and some minor construction details, he will
sign the plat.
- Consistent with the traffic report, we have deleted "restaurants" from the alternative
uses allowed in the building on Lot 2.
- We have added a note to the site plan indicating the applicant's commitment to
providing the turn lanes at the Prospect/Frontage Rcad intersection as per the Traffic
Study; and indicating that these improvements will be included in the utility plans and
development agreement for this PUD. With this note, there should be no need for a
P&Z condition of approval regarding these turn lanes.
- The water quality detention pond has been redesigned as requested by Storm Drainage.
•
urban design, inc.
Reductions, rendered plans, and eight sets of prints will be provided by April 15th. We
appreciate your assistance in this project. Please call if you need further information.
Sincerely,
Eldon Ward, President
Cityscape Urban Design, Inc.
cc: Stan Whitaker, G.T. Land Colorado Inc.
John Cockson, John's Harley Davidson
Randy Demario, Heath Construction
Bill Taylor RBD, Inc. Engineering Consultants