Loading...
HomeMy WebLinkAboutINTERSTATE LAND PUD, 1ST FILING (HARLEY DAVIDSON) - FINAL - 34-88C - CORRESPONDENCE - OTHER JURISDICTIONSTHE NEW CACHPLA POUDRE IRRIGATING AMPANY THE CACHE LA POUDRE RESERVOIR COMPANY (303) 352-0222 September 8, 1995 Planning and Zoning Board Attn: Steve Olt P 0 Box 580 Ft Collins, Co 80522-0580 RE. Intersta-e Land PUD Mr. 01t. The Cac_^.e La Poudre Reservoir Company exists in Larimer Count-7 for the purpose of servicing stockholders with irrigation waters. The Cache La Poudre Reservoir Company was not notified of t::e _ _anz of the Intarstate Land PUD. A major concern of The Cache La Poudre Reservoir Company is _,cass to the canal for maintenance and operation. This at tires -�:gyres wider access than a mere roadway for the use of hea-,y equ:.p ;e_ a place to temporarily store maintenance material and adequate space to allow excavation operations with minimal interference. We have become especially concerned about this issue due to poor access that exist along current residential sections. The Cache La Poudre Reservoir Company has two major canal structures on the northwest and northeast corners of Lot 8 of the Interstate Land PUD. It is a concern to have adequate access to these structures. The Cache La Poudre Reservoir Company is requesting a one hundred (100) foot easement along the whole north end of Lot 8. One plan that has been utilized in development along the canal system has been to leave a green belt parallel to the canal easement. A green belt area is designated as part of the covenants of the development and regulations written specifying that only native grasses are ever to be seeded in the green belt area. We request that the utility easement which parallels the canal easement be designated as a green belt and that only native grasses be allowed in_this area. It is our opinion that, i,f the covenants and restrictions are clear in defining the green belt, both the operational goals of The Cache La Poudre Reservoir Company and the goals of the neighboring development are met without creating future cause for friction. 33040 Railroad Avenue • P.O. Sox 104 9 Lucerne, Colorado 80646 Another concern of The Cache La Poudre Reservoir Company is the additional exposure of the canal system to people. Exposure to water delivery and storage systems creates a considerable amount of risk. The Cache La Poudre Reservoir Company is of the opinion that development along the system should not increase our liability. It is the hope of The Cache La Poudre Reservoir Company that those who choose to develop along the canal system and those who choose to neighbor along the canal system will take such precautions as are reasonable to develop safety measures within their own real property and accesses. The Cache La oudre Reservoir Company supports t he rights of neighboring property owners to develop their property in an order'y manner consistent with the county and local master plans. It is the opinion of The Cache La Poudre Raser-✓oir Company that this is a well planned development. We recuest that a clear, tree =ree canal access be restricted to native grasses by covenant. If it is necessary for any services to cross the canal right-of-way such as utilities, it will be necessary for each entity to contact The Cache La Poudre Reservoir Company office for a crossing agreement. For those crossings which are apparent during the planning process, the crossing agreements will have to be in place before The Cache La Poudre Reservoir Company signs off on the -inal plans. For those crossings which are initiated after the approval of the plans, the crossing agreements must be in place before any work is initiated. Please keep The Cache La Poudre Reservoir Company informed regarding any meetings or plans pertaining to this development. Scerely, Do aeus Superinte nt