HomeMy WebLinkAboutINTERSTATE LAND PUD, 1ST FILING (HARLEY DAVIDSON) - FINAL - 34-88C - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTis
TRANSMITTAL LETTER
TO: Steve Olt
City of Fort Collins
Planning Department
P.O. Box 580
Fort Collins, CO 80522
DATE: October 16, 1995
urban design, inc.
3555 stanford road, suite 105
fort collins, colorado 80525
(970) 226-4074
FAX (970) 226-4196
PROJECT: Interstate Land First Filing Final PUD - Harley Davidson
PROJECT NO: 7265
We are transmitting the following:
1 each Submittal Package as per the Attached Checksheets for a Final PUD
BY MESSENGER
Sincerely, Received by:
Ci sca:,an Design, Inc.
1
Checksheet Interstate Land First Filing Final PUD - Harley Davidson
The following check sheet is to be used in the preparation of a complete submittal of a Final PUD Plan:
X 1. Application (1 copy).
X 2. Filing fee ($2,808.00 + $1,088.00 for the plat = $3,896.00)
X 3. Site plan (25 folded copies).
X 4. Landscape plan (16 folded copies).
X 5. Final subdivision plat (21 folded copies).
X 6. Utility plans (10 unfolded copies).
X 7. Final drainage report and plans and grading plans (4 copies).
X 8. Other documentation as determined by special circumstance.
Elevations (5 folded copies).
Land use breakdown (2 copies).
Property description (2 copies).
4.;b
:7
City of Fort Collins
Current Planning
SUBMITTAL CHECKSHEET
The following checksheet is to be used in the preparation of a complete submittal of a
Final PUD
1. Application form (1 copy) q
2. Filing Fee: $2808 + $10 per sheet of subdivision plat `
3. Site plan (25 folder copies)
4. Landscape plan (16 folded copies)
5. Final subdivision plat (21 folded copies)
✓ 6. Final utility plans (10 unfolded copies)
7. Final drainage report and plans and grading plans (4 copies)
�s
8. Other documentation as determined by special circumstances
9. Signage (circle one)
Large
S.F. 100 or more D.U.
M.F. 100 or more D.U.
Non -Res 50,000 S.F. or more
Non -Res w/regional impact
J�.C.V%. .
Small Wcr, Off''
S.F. up to 100 D.U.
M.F. up to 100 D.U.
Non -Res 25,000-50,000 S.F.
All other projects not listed