HomeMy WebLinkAboutINTERSTATE LAND PUD - PRELIMINARY - 34-88B - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT,]LIMIN CRY DRAINAGE AND
tOSION CONTROL REPORT
FOR
:STATE LANDS DEVELOPMENT
ART COLLINS, COLORADO
PRELIMINARY DRAINAGE AND
EROSION CONTROL REPORT
FOR
INTERSTATE LANDS DEVELOPMENT
FORT COLLINS, COLORADO
August 21, 1995
Prepared for:
G.T. Land
Stanford Plaza
Suite 100
3555 Stanford Road
Fort Collins, Colorado 80525
Prepared by:
RBD, Inc. Engineering Consultants
209 South Meldrum
Fort Collins, Colorado 80521
(970) 482-5922
RBD Job No. 226-042
N
RMINC.
Engineering Consultants
209 S. Meldrum
Fort Collins, Colorado 80521
303/482-5922
FAX:303/482-6368
August 21, 1995
Mr. Glen Schlueter
City of Fort Collins
Utility Services Stormwater
235 Mathews Street
Fort Collins, Colorado 80522
RE: Preliminary Drainage and Erosion Control Report for the Interstate Lands Development
Dear Mr. Schlueter:
We are pleased to submit to you, for your review and approval, this Preliminary Drainage and
Erosion Control Report for the Interstate Lands Development. All computations within this report
have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria.
We appreciate your tune and consideration in reviewing this submittal. Please call if you have.
any questions.
Respectfully,
RBD Inc. Engineering Consultants
Prepared by:
&av
Donald W. Baker, E.I.T.
Water Resources Engineer
David K. Delaney, P.E. '
Project Manager,,r
■cc: File
Reviewed by:
4), 77
Kevin W. Gingery, P.E.
Water Resources Project Manager
po REG/k
AIR"
28324
Denver 303/458-5526
TABLE OF CONTENTS
DESCRIPTION
PAGE
I. GENERAL LOCATION AND DESCRIPTION
1
II. DRAINAGE BASINS
1
III. DRAINAGE DESIGN CRITERIA
2
IV. DRAINAGE FACILITY DESIGN
3
V. STORM WATER QUALITY
10
VI. EROSION CONTROL
10
VII. CONCLUSIONS
10
REFERENCES
11
APPENDIX A
VICINITY MAP
A2
HYDROLOGY
A3
DETENTION
A10
DESIGN OF INLETS, STORM DRAIN, AND SWALES
A13
CHARTS, TABLES, AND FIGURES
A21
Total pages 30
APPENDIX B
EXISTING BOXELDER CREEK FLOODPLAIN B2
FUTURE BOXELDER CREEK FLOODPLAIN B46
Total Pages 69
IL
PRELIMINARY DRAINAGE STUDY
FOR INTERSTATE LANDS DEVELOPMENT
FORT COLLINS, COLORADO
I. GENERAL LOCATION AND DESCRIPTION
A. Location
The Interstate Lands development is bounded by I-25 on the east, the I-25 Frontage
Road on the west and north, and Prospect Road on the south.
The site location can also be described as situated in the Southeast 1/4 of Section
16, Township 7 North, Range 68 West of the 6th P.M., City of Fort Collins,
Larimer County, Colorado. The site location can be seen on page 2 of Appendix
A.
B. Description of Property
The Interstate Lands development will be located on approximately 35.2 acres of
land located at the northwest corner of I-25 and Prospect Road. Presently, the
property is undeveloped. The area was previously farmland and currently sits in
a fallow condition. The topography of the site generally slopes from the northeast
eto the southwest at approximately 0.74 percent.
II. DRAINAGE BASINS
■ A. Major Basin Description
. The proposed development lies within the Boxelder Creek Basin. Natural
drainageways run along the south and east boundaries of the development.
Boxelder Creek roughly parallels the west boundary of the development.
B. Sub -Basin Description
The Interstate Lands development has been broken into 14 sub -basins. Sub -basins
1-12 will be developed with commercial buildings, hotels, street improvements,
and drainage improvements. These sub -basins are shown on the Preliminary
Grading and Drainage Plan in the back of this report.
1
III. DRAINAGE DESIGN CRITERIA
A. Regulations
The City of Fort Collins Storm Drainage Design Criteria is being used for the
subject site.
B. Development Criteria Reference and Constraints
Runoff from the 10-year storm event is routed via curb and area inlets, and pipes
to two water quality capture ponds located within the development. The runoff
from the 100-year storm event that is not accommodated by the storm drain pipes
flows via streets and overland flow to Boxelder Creek located to the west of the
development.
C. Hydrological Criteria
The Rational Method was used to determine surface runoff for the project site.
The 10-year and 100-year storm event criteria, obtained by the City of Fort
Collins, were used in calculating runoff values. These calculations and criteria are
included in the Appendix A of this report.
D. Hydraulic Criteria
All hydraulic calculations within this report have been prepared in accordance with
the City of Fort Collins Drainage Criteria, and are also included in the Appendix
A.
E. Variances from Criteria
No variances are being sought for the proposed project site.
2
IV. DRAINAGE FACILITY DESIGN
A. General Concept
Each of the sub -basins within the development was graded to establish sump
conditions at the stormdrain inlets. As a result, the storm sewer inlets were
designed to collect the 10-year storm event runoff and route it through pipes to two
water quality capture ponds located within the development. The 100-year storm
event runoff will flow to the southwest via streets and overland flow to Boxelder
Creek. The proposed drainage and grading plans are included in the back pocket
of this report.
The Interstate Lands development has been broken into 14 sub -basins. The 10-
year storm event runoff from Sub -basins 7, 8, and 12 flows into a water quality
capture pond located near Sub -basin 12, and then into Boxelder Creek. The 10-
year storm event runoff from Sub -basins 1 through 6, 9, and 10 flows into a water
quality pond located near the northwest corner of the I-25 Frontage Road and
Prospect Road, and then into Boxelder Creek. Because the volume of the 10-year
storm event runoff is greater than the volume of the water quality pond, the 10-
year storm event runoff will overflow the water quality ponds and sheet flow
directly into Boxelder Creek. The water quality capture ponds were designed
using the Urban Drainage and Flood Control District of Denver and the City of
Fort Collins Drainage guidelines in order to capture the first flush of stormwater
and release it over a 40-hour drain time.
Flow from Sub -basin 11 will flow directly into Boxelder Creek via a swale. Flow
from Sub -basin 21 will flow west, cross the Frontage Road through a 24-inch
culvert, then flow into Boxelder Creek. Flow from Sub -basin 22 will flow from
I-25 through the existing irrigation ditch bordering the east portion of the
development to Prospect Road. The portion of the flow that does not pass under
Prospect Road through the existing 30-inch pipe will flow through Sub -basin 21
and to Boxelder Creek via the 24-inch pipe under the Frontage Road. Flows
exceeding the capacity of the 24-inch pipe under the Frontage Road will weir -flow
over the Frontage Road to Boxelder Creek.
The parking lots in Sub -basins 4, 6, and 7 have been graded to collect runoff near
the center of the parking lots using typical area inlets. The number of typical area
inlets required for each sub -basin was determined using a 12-inch ponding depth
over the inlet. The typical area inlet was defined as an inlet with a total inlet open
area of 1.88 square -feet. Using a 20 percent reduction factor to account for
clogging, the total flow per inlet was determined to be about 4.0 cubic feet per
second per inlet.
3 tip,.
Sub -basins 1, 2, 3, 5, 8, and 9 have been graded to route runoff from the
individual pads into the roadway where the runoff will be collected by the 10-year
storm sewer system using curb inlets. The curb inlets were sized using a 6-inch
water depth over the inlet.
B. Specific Details
The 10-year storm event runoff from Sub -basin 7 was determined to be 3.5 cfs,
and will be collected by two area inlets. One area inlet was determined to be
adequate to drain the sub -basin, however two area inlets were required at the
locations indicated on the drainage plan to maintain proper grading. The runoff
will then flow in a 15-inch RCP to the storm sewer pipe in Sub -basin 8. The 100-
year storm event runoff from Sub -basin 7 will flow through the parking lot and
overland to Sub -basin 8.
The runoff from the 10-year storm event in Sub -basin 8 was determined to be 9.4
cfs, and will be routed into the roadway where it will be collected by one 5-foot
curb inlet located on each side of the roadway. The runoff will then flow to the
water quality pond located near Sub -basin 12. A 21-inch RCP will be required to
carry the runoff to the intersection with the 15-inch RCP carrying runoff from Sub -
basin 7. A 24-inch RCP will be required to carry the runoff from Sub -basins 7 and
8 to the water quality pond. The 100-year storm event runoff will flow down the
roadway into Sub -basin 3.
The 10-year storm event runoff for Sub -basin 12 was determined to be 8.5 cfs. An
area inlet located near the loading dock of the proposed building will capture about
2.6 cfs. A 15-inch RCP will carry this runoff to the water quality pond located
near the southwestern corner of Sub -basin 12. The remainder of the runoff will
enter the water quality pond through a swale located at the southwestern corner of
Sub -basin 12. The 100-year storm event runoff will also enter the water quality
pond through the swale and by overland flow. Runoff volumes exceeding the
capacity of the water quality pond will sheet flow onto Boxelder Creek.
The runoff from Sub -basin 3 will be directed into the roadway running through the
middle of the sub -basin. The 10-year storm event runoff, determined to be 12.5
cfs will be collected by 5-foot curb inlets located on each side of the roadway. The
10-year runoff will then flow into Sub -basin 10 through a 24-inch RCP. The 100-
year storm event runoff will flow south down the roadway into Sub -basin 1.
Similar to Sub -basin 3, runoff from Sub -basin 1 is routed into the roadway where
the 10-year storm event runoff of 12.9 cfs will be collected by two 5-foot curb
inlets, one on each side of the street. The runoff then flows through a 30-inch
4
RCP into Sub -basin 2. The 100-year storm event runoff will flow through the
roadway into Sub -basin 2.
Sub -basin 2 is the largest sub -basin in the development at 3.71 acres. The sub -
basin contains a large grassy area that reduces the runoff coefficient to 0.74. The
runoff will flow from the back of the sub -basin to the roadway. The 10-year storm
event runoff was determined to be 13.4 cfs, and will be collected by 5-foot curb
inlets located on each side of the street, and by area inlets located in the grassy
area in the northern portion of the sub -basin. The area inlets were provided to
more efficiently transport the runoff to the 10-year storm sewer system, and to
maintain proper grading within the sub -basin. The 10-year runoff will flow from
Sub -basin 2 to Sub -basin 9 through a 36-inch RCP. The runoff collected from the
area inlets will flow through a 15-inch RCP to the 36-inch RCP. The 100-year
storm event runoff will flow in the street to Sub -basin 9.
The 10-year storm event runoff from Sub -basin 6 flows to the parking lot located
in that basin. The 10-year storm event runoff is collected by four area inlets
located in the parking lot. It was determined that two area inlets would be
adequate to drain the sub -basin, however four area inlets were required to maintain
proper grading. An 18-inch RCP will carry the 8.7 cfs 10-year runoff into Sub -
basin 4. The three upstream area inlets are connected by a 15-inch RCP, while the
two downstream inlets are connected by an 18-inch RCP. The 100-year storm
event runoff flows through the parking lot and overland to Sub -basin 4.
The 10-year storm event runoff from Sub -basin 4 also flows to the parking lot
located within that sub -basin. Two area inlets will be used to collect the 5.1 cfs
10-year storm event runoff. The runoff flows from Sub -basin 4 into Sub -basin 5
through a 24-inch RCP. The 100-year storm event runoff will flow through the
parking lot and overland into Sub -basin 5.
The 10-year storm event runoff from Sub -basin 5 was determined to be 1.6 cfs.
One area inlet will be used to collect this runoff. The runoff will flow to Sub -basin
9 through a 24-inch RCP. The 100-year storm event runoff will flow through the
parking lot and overland to Sub -basin 9.
Sub -basin 10 has been defined as the portion of the I-25 Frontage Road that will
convey water to the intersection of the Frontage Road and the main roadway
through the development. There are no inlets located in this sub -basin. The runoff
from the 10-year and 100-year storm events will flow through the curb and gutter
to Sub -basin 9. The 10-year storm runoff from this sub -basin was determined to
be 6.5 cfs.
5
Sub -basin 9 acts as the collection point for the stormwater runoff before it crosses
the I-25 Frontage Road and flows to the water quality pond and Boxelder Creek.
Two 20-foot curb inlets located at the intersection of the Frontage Road and the
development's main street collect runoff from both the 10-year and 100-year storm
events. The 100-year storm event runoff from sub -basins 1 through 8, and 10 will
flow to the low -point located at the intersection, where 48.5 cfs will be collected
by the curb inlets. The runoff is then passed under the Frontage Road through a
3'x4' concrete box culvert into the water quality pond. The portion of the runoff
from the 100-year storm event that does not pass through the box culvert will weir
flow over the Frontage Road into the water quality pond and Boxelder Creek.
C. Boxelder Creek Floodplain Study
Boxelder Creek borders the west side of the Interstate Land First Filing. It was
therefore necessary to determine the extent of the 100 year floodplain through the
site. A study performed by Simons, Li & Associates, Inc., 1981, (SLA 1981) was
used as the basis for the current Federal Emergency Management Agency Flood
Insurance Rate Maps (FEMA FIR Maps) for this reach of Boxelder Creek.
01 C.1 Existing Floodplain/Floodway
The original study by SLA 1981 did not determine the bounds of the 100
year floodway along this section of Boxelder Creek. It appears the
floodway was not determined downstream of the Boxelder Creek/Interstate
25 crossing, which is just upstream from this site, because flow patterns are
complicated by inflow from irrigation ditches immediately west of I-25 and
split flows and cross -over flows from the Cooper Slough are encountered
south of Prospect Road. However; the portion of Boxelder Creek which
borders the proposed project is below the irrigation ditches and north of
Prospect Road. It was determined, in a meeting with the City of Fort
Collins Stormwater Utility, the floodway was definable for this portion of
Boxelder Creek. Since no computer files of the original study were known
to exist, the model had to be recreated and verified against a hard copy
secured by RBD, Inc., before floodway computations could be performed.
A HEC-II model which consisted of cross -sections 11 through 18 of the
SLA 1981 study was generated and analysis results checked against the
original study. Once consistent results were obtained, Method 4 of the
floodway encroachment routines was used with a target maximum increase
in water surface elevation of 0.5 ft.
Included in the appendix of this report is a copy of the original SLA 1981
analysis results and the results from the regenerated model of sections 11-
6
7
18 including encroachment computations. Also included are two exhibits:
one shows the re -computed existing floodplain and floodway, and the other
is a copy of a portion of the current FEMA FIR Map for this region. The
analysis results concur with the FEMA map very well with the exception
of a backwater area along the north side of Prospect Road. The FEMA
map shows this area inundated, but the analysis does not consider this area
as part of the conveyance mechanism. This area within the floodplain is an
interpolation of the SLA 1981 results based upon the topography. The base
flood elevation at Section 14, just upstream from this inundated area, is
4901.62. Although the frontage road as constructed would contain the 100
year flood waters, the minimum opening elevation for all structures within
this area will be set at 4903.12. It should be noted, neither of the above
models consider the current frontage road alignment in the analysis.
C.2 Future Condition Floodplain
As shown in the SLA 1981 study, the existing structure which carries
Boxelder Creek under I-25 does not have the capacity to pass the entire
peak 100 year flow reaching the upstream side of the interstate of 3830 cfs.
As required by the City Stormwater Utility, the next part of the flood study
involved an investigation of flooding potential should the crossing at I-25
be improved to pass the entire 100 year discharge. The purpose of this
second study is to establish minimum finished floor or minimum opening
elevations which will avoid damage to structures should the future
improvements occur.
Since the analysis was in essence Master Planning of future drainage
improvements, it was also necessary to consider future improvements to the
Prospect Road crossing. This crossing controls the impact of flooding over
the subject tract which lies immediately upstream. A preliminary design
of required improvements to the culverts under Prospect Road was included
in the second HEC-II model. The frontage road was also included in the
model of the second study.
C.2.1 HEC-II Model Generation
Cross -sections used in the second model were surveyed in the field
at approximately same locations as those in the original study.
Cross -sections were extended to include the frontage road. In order
to avoid the complications introduced by the irrigation ditch
crossings at the north boundary of the site, this model ended at the
downstream side of the ditch crossings (approximately section 17.1
of SLA 1981 study). This was considered conservative since any
7
constriction of flows by the ditch crossings would only lessen the
impact downstream, thus reducing the floodplain across the
proposed development. Cross -sections 11-13 of the SLA 1981
study were extended to investigate the effect of the increased flows.
The total discharge reaching the upstream side of I-25 in the SLA
1981 study is 3830 cfs. An additional 440 cfs is shown to flow to
the south in the median of I-25 which is assumed will remain in the
median after improvements are made. Since the SLA 1981 study
increased the discharge from 1740 cfs to 1940 cfs between sections
12.1 and 12.2, the downstream and upstream sides of Prospect
Road respectively, the discharge for this second study was also
increased by 200 cfs from 3830 cfs to 4030 cfs at the same location.
This became the discharge required to pass under Prospect Road.
C.2.2 Prospect Road Improvements
Using the HEC-II Special Culvert option, an iterative process was
used to determine size and number of box culverts required to pass
the entire 100 year discharge (4030 cfs) beneath Prospect Road. A
profile of the centerline of Prospect Road indicated a minimum
elevation of 4901.12 towards the east end of the surveyed cross -
sections.
Cross-section 112 is approximately 110 feet downstream of
Prospect (corresponding to SLA 1981 Section 12). This section
showed the potential for a split flow condition. For the entire width
of the cross-section to be effective in conveying the discharge, flow
would have to leave the channel east bank upstream of the section
but downstream of the road since the Prospect crossing is designed
to pass the entire discharge without overtopping.
When flow is contained within the channel banks at Section 112, the
computed water surface elevation is above the minimum road
elevation, thus, overtopping of Prospect occurred regardless of the
culvert design. But, with overtopping of the road, the entire
Section 112 then would become effective for conveying flow.
Leaving the entire cross-section 112 effective for flow, a split flow
condition occurs at the section and the water surface elevation is
below the roadway with the entire discharge passing beneath
Prospect Road. The conclusion is, as the water surface elevation
rises in the channel at Section 112, the flood waters overflow the
east bank between Prospect Road and Section 112 before the
E
backwater can overtop the road. Thus, creating the split flow
situation and Section 112 is completely effective for conveying the
discharge.
For this situation, eight (8) - 5.5' x 9.5' box culverts, or a structure
of equivalent conveyance, will be required to pass the entire 4030
cfs beneath Prospect Road. An approximate sketch of the crossing
modeled in the HEC-II run is included in the appendix. Also
included, is the HEC-H results including plots of the cross -sections
along with an exhibit delineating the extent of the future floodplain.
C.3 Conclusions and Recommendations
The extent of the existing 100 year floodplain and floodway are shown on
the Drainage Plan in the folder at the back of this report. All proposed
structures situated within the existing floodplain will have minimum
finished floor and minimum opening elevations 18 inches or greater above
the base flood elevation.
Because of this site's proximity to Boxelder Creek, the peak stormwater
runoff generated from this site will reach Boxelder Creek and pass
downstream long before the peak of the 100 year hydrograph for Boxelder
Creek reaches the site (see rational calculations in Appendix A and copy of
SLA 1981 hydrograph contained in Appendix B of this report). In
addition, no development is proposed within the floodplain except for the
backwater area which was not considered part of the discharge conveyance
mechanism. Therefore, development of this area will not impact the
existing 100 year water surface elevation of Boxelder Creek, and onsite
detention of localized stormwater runoff is not required.
The proposed drainage system for the development will outlet just above
the flowline of Boxelder Creek channel. Because of the lag between peak
runoff from the site and peak discharge in Boxelder Creek, tailwater
effects on the drainage system design was not considered. All top of inlet
elevations for the drainage system are set above the 100 year base flood
elevation to avoid any potential impacts of flood water backing up in the
stormdrain pipes.
An investigation was performed to determine the impact on the 100 year
floodplain across this development should the structure carrying Boxelder
Creek beneath Interstate 25 be improved. With the improvements to the
culverts under Prospect Road, the frontage road acts as a levee containing
E
the flood waters. All finish floor elevations of structures in the site are set
above the future 100 year base flood elevation adjacent to the structure.
The recommended improvement to the culvert under Prospect Road is to
install eight (8) - 5.5' x 9.5' box culverts. This arrangement gives a base
flood elevation of 4901.07 at the upstream end of the culverts which is
below the minimum roadway elevation. The channel will require regrading
upstream and downstream of the culverts to form the flowline to the width
of the culvert system. Concrete aprons and wingwalls upstream and
downstream of the culverts are also recommended. The recommended box
culverts will not be constructed by this development, but rather they are
anticipated to be designed and constructed by the City of Fort Collins at
some future date.
V. STORM WATER QUALITY
A. General Concept
Beginning in October 1992, the water quality of storm water runoff was required
to be addressed on all final design utility plans. Since the construction of the
Interstate Lands development will begin after October 1992, we have sought to find
various Best Management Practices for the treatment of storm water runoff. The
Interstate Lands development will be provide two water quality ponds to help
improve the runoff water quality before it flows into Boxelder Creek.
VI. EROSION CONTROL
A. General Concept
During final design for this site, appropriate measures will be designed to control
erosion from the site. The first of these measures to limit erosion is to properly
reseed all disturbed areas which will not be paved.
All construction activities for this site must comply with the State of Colorado
permitting process for Stormwater Discharges Associated with Construction
Activity. A Colorado Department of Health NPDES Permit will be required
before any construction grading can begin.
VII. CONCLUSIONS
A. Compliance with Standards
N1
10
N1
All computations that have been completed within this report are in compliance
with the City of Fort Collins Erosion Control Reference Manual for Construction
Sites and the Storm Drainage Design Criteria Manual,
B. Drainage Concept
The proposed drainage concepts presented in this report and on the construction
plans adequately provide for the transmission of the developed on -site runoff to
Boxelder Creek located on the west edge of the development. The combination of
on -site street capacities in the curb and gutter, and the on -site storm sewer system
will provide for the 10-year, and the 100-year developed flows to reach the water
quality ponds and Boxelder Creek. Due to localized stormwater runoff reaching
Boxelder Creek long before the peak basin runoff in Boxelder Creek, no onsite
detention of localized stormwater runoff is required for this development.
C. Storm Water Quality Concept
Because storm water quality has become a requirement, the site has addressed this
storm water aspect. Two water quality ponds will be constructed to help improve
the stormwater runoff quality before it reaches Boxelder Creek.
D. Erosion Control Concept
Appropriate erosion control measures will be designed during the final design of
this site. All disturbed areas which will not be paved, will be reseeded to help
limit erosion from the site. All construction activities will comply with the State
of Colorado permitting process for Stormwater Discharges Associated with
Construction Activity. A Colorado Department of Health NPDES Permit will be
required before any construction grading begins.
REFERENCES
1. Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins,
Colorado, May 1984, Revised January 1991.
2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins,
Colorado, January 1991.
3. Simons, Li, & Associates, Inc., Cooper Slough Boxelder Creek Master Drainageway
Planning Study, August 1981.
11
a
M
CAp1E
\F. RESERVOIR INLET
SCALE 1 "=2000'