HomeMy WebLinkAboutINTERSTATE LAND PUD - PRELIMINARY - 34-88B - MINUTES/NOTES - MEETING COMMUNICATIONIR 025-3(89)
PROSPECT INT-CHANGE
Memorandum of Understanding
February 5, 1988
TO: Michael Byrne, G. T. Land Colorado, Inc.
Robert Hardt, Phillips Petroleum
Keene Smith, K/Z Enterprises
Tom Peterson, City of Fort Collins
FROM: Rex Touslee, State of Colorado, Division of Highways
DATE: February 5, 1988
RE: Consensus of Parties Directly Affected by Design of
the Interchange at I-25 and Prospect Road
It is our understanding that the five parties involved in our discussions of the
design of the Northwest Quadrant of the Prospect/I-25 interchange: The State Division
of Highways, the City of Fort Collins, G. T. Land, Phillips Petroleum, and K/Z Enterprises
have reviewed three alternative approaches to the alignment of the frontage road
at this location. It is further understood that the consensus of those parties
is that Alternative "C" - the "Preferred" Frontage Road Alignment (see attached
copy) is the desired alternative, with the following conditions:
- Overlook Farm Inc. (the property managed by G. T.) will dedicate the 80-foot
wide right of way for the realigned frontage road.
- Overlook Farm will also provide a mutually acceptable access easement from
the proposed frontage road to the northerly portion of the Phillips and K/Z
properties.
- The Phillips and K/Z properties will be allowed a shared right-in/right-out
access to their properties from. Prospect Road.
- Other reasonable access from the frontage road in the general locations shown
on the attached Development Concept Plan (exact locations may vary slightly
with final development plans) will also be allowed. Any additional access
needs will be determined through the review of Traffic Impact Analyses to be
provided by the applicant at the time of specific development proposals and
the Division of Highways' Access Code in effect at the time of application
for access.
IR 025-3(89)
Memorandum of Understanding
Page Two
If you concur with the above, please sign and return the attached copy of this
memorandum.
We feel that, if the above items are covered in the instrument dedicating the
frontage road right of way, no further documents need to be prepared, and work on
the design and construction of the interchange and the frontage road can continue
immediately.
Michael Byrne, President
G. T. Land Colorado, Inc.
3555 Stanford Road/Suite 100
Ft. Collins, CO 80525
Phone: 223-3933
Metro: 440-3433
Keene Smith
K/Z Enterprises
2345 7th Street
Denver, CO 80211
Phone: 458-5301
RT:mbc
Attachment
Robert Hardt
Phillips Petroleum
8055 East Tufts Ave. Parkway
Denver, CO 80237
Phone: 850-3029
Tom Peters -�'
City of rt Collins �leCZ11�� � N
P.O. Box 580
Ft. Collins, CO 80522
Phone: 221-6750
•
IR 025-3(89)
Memorandum of Understanding
Page Two
0
If you concur with the above, please sign and return the attached copy of this
memorandum.
We feel that, if the above items are covered in the instrument dedicating the
frontage road right of way, no further documents need to be prepared, and work on
the design and construction of the interchange and the frontage road can continue
immediately.
Michael Byrne, President
G. T. Land Colorado, Inc.
3555 Stanford Road/Suite 100
Ft. Collins, CO 80525
Phone: 223-3933
Metro: 440-3433
- - � 7�4
Keene Smith
K/Z Enterprises
2345 7th Street,t
Denver, CO 80211
RT:mbc
Attachment
Robert Hardt
Phillips Petroleum
8055 East Tufts Ave. Parkway
Denver, CO 80237
Phone: 850-3029
Tom Peterson
City of Fort Collins
P.O. Box 580
Ft. Collins, CO 80522
Phone: 221--6T50 �- 1
pti i
s
IR 025-3(89)
Memorandum of Understanding
Page Two
1 ti Y i. }y
If y6ii concur::-qith the above, please sign and return the attached copy of this
memorandum.
-i�
�_. feeT -that, 'IY-,t]je=above items are covered in the instrument dedicating the
-frontage-road--righ'4 --way, no further documents need to be prepared, and work on
-thedesign ana-'eonitiaiction of the interchange and the frontage road can continue
immediately:
Michael Byrne, President
G. T. Land Colorado, Inc.
3555 Stanford Road/Suite 100
Ft. Collins, CO 80525
Phone: 223-3933
Metro: 440-3433
Keene Smith
K/Z Enterprises
2345 7th Street
Denver, CO 80211
Phone: 458-5301
RT:mbc
Attachment
Robert Hardt
Phillips Petroleum
8055 East Tufts Ave. Parkway
Denver, CO 80237
Phone: 850-3029
Tom Peterson
City of Fort Collins
P-.0. Box 580
Ft. Collins, CO 80522
Phone: 221-6750
i
IR 025-3(89)
Memorandum of Understanding
Page Two
If you concur with the above, please sign and return the attached copy of this
memorandum.
We feel that, if the above items are covered in the instrument dedicating the
frontage road right of way, no further documents need to be prepared, and work on
the design and construction of the interchange and the frontage road can continue
immediately.
Michael Byrne, Presid t
G. T. Land Colorado, Inc.
3555 Stanford Road/Suite 100
Ft. Collins, CO 80525
Phone: 223-3933
Metro: 440-3433
Keene Smith
K/Z Enterprises
2345 7th Street
Denver, CO 80211
Phone: 458-5301
RT:mbc
Attachment
Robert Hardt
Phillips Petroleum
8055 East Tufts Ave. Parkway
Denver, CO 80237
Phone: 850-3029
Tom Peterson
City of Fort Collins
P.O. Box 580
Ft. Collins, CO 80522
Phone: 221-6750
O n+
� cry
�lOS'E C..) Q
' W
d �
,VA
W N
Z k\Q`
"PREFERRED" FRONTAGE ROAD,.
- DIRECT ( RIGHT IN/OUT ) ACCESS
TO PROSPECT
- BETTER LOCATION OF FULL
MOVEMENT ACCESS
- NEITHER PHILLIPS NOR K/Z
LOSES ADDITIONAL R.O.W.
\ v SAS-856� ;ul7
/ r /
0
INTERS-r E LAND
DEVELOPMENT CONCEPT
P L.� N
it
.1 r1
li r
PARCEL
ji
86 AC.
REGIONAL MALL
'I
PARCEL .
I
KEY:
EEI DEVELOPMENT AREA
PRIMARY ROADWAY
c� SECONDARY ACCESS
AMENITY/SITE FEATURE
�FAm EXISTING VEGETATION
a LSO LANDSCAPE BUFFER
DRAINAGE /OPEN SPACE
0 0 0 0 o PEDESTRIAN WAY
i
," • , PARCEL \
^'• ,23 AC.
BUSINESS
SERVICES /
ROSPECT ROA
LAND USE BREAKDOWN
NON-RFS.
FLOOn AREA
NON-RES. FLOOR
AREA RATIO
PARCEL
LAND USE
GROSS'
AREA
On
DWELLING UNITS
OR
DENSITY
A
REGIONAL MALL
60 AC.
750.000 SOFT.
5:1
B
BUSINESS SERVICES
.3 AC.
4.000 SOFT.
C
BUSINESS SERVICES
3 AC,
32.000 SO.FT,
4:1
0
BUSINESS SERVICES
23 AC.
200.000 SO.FT.
5:1
E
BUSINESS SERVICES
2 AC.
22.000 SU.FT,
4:1
F
BUSINESS SERVICES
3 AC.
32.000 SQ.FT.
4:1
Q
BUSINESS SERVICES
5 AC.
55.000 SOFT.
4:1
N
i
MULTI -FAMILY
20 AC.
336 O.U.
12 D.UJAC.
OPEN SPACE
41 AC.
N.A.
N.A.
TOTALS
122 AC.
1,051,000 SOFT.
360 O.U.
urban design
# INTERSTATE LAND IS LEGALLY OWNED
AS OVERLOOK FARM, WC.
u
3.G7! -1k
qb
DEPARTMENT OF HIGHWAYS
4201 East Arkansas Ave.
Denver, Colorado 80222
(303) 757-9011
Leon J. Witman
Division Administrator
FHWA, Colorado Division
Room 250, 555 Zang St.
Lakewood, CO 80228
Subject: Donation Credit
Dear Mr. Witman,
STATE OF! OLOKADO
Project No. IR 25-3(89)
Prospect Interchange — North =�
rF W
February 9, 1989
9�p1t 1213�4�
�A
CO/VS
FEB 1989
T,q SEC
Sr
�6z p QN 4 ��2titi
9Z SZ1i
The right of way for the above mentioned project was acquired by the
District entirely by donations. Pursuant to changes mandated by the Surface
Transportation and Uniform Relocation Assistance Act of 1987 the Department
would like to request a change in the pro -ration for the project to reflect the
value of the donated parcels, or whatever other bookkeeping method might apply.
The appraisals were all done without consideration of either damages or
benefits which is consistent with the law. They were done according to Title
III of the Uniforms Act, as amended and a Fair Market Value was set. All
donations were from the private sector and were received after April 2, 1987.
Following is a breakdown of the parcels involved and I have included a copy of
the donation forms and the Fair Market Values to aid you:
Parcel 1, AC-1, 1R - Sandy Investment Co.
Parcel 2, AC-2, 2R - Ghent
Parcel 5, E-5, TE-5, AC-5 - Minoan Ltd.
Parcel 6, E-6 - Overlook Farm, Inc.
$17,820dOL- /-'*7 �"3'l-r-
$25,415/0-- / le'90 �-
$21,570
$23, 325/ov
7 $88,130
ould you have any questions please feel free to call me.
Very truly yours,
ALBERT T. VONDERHEID
Staff Right of Way Manager
ATV/lc
cc: Siebels
k71 b �LA
&'Rames
�W'aK'vac r7`".. tom..•. .,•� ',
_Tolslee