HomeMy WebLinkAboutINTERSTATE LAND PUD - PRELIMINARY - 34-88B - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS•
October 5, 1995
Steve Olt
Project Planner
City of Fort Collins
Planning Department
P.O. Box 580
Fort Collins, CO 80522
Dear Steve;
Cod � o 0
urban design, inc.
3555 stanford road, suite 105
fort collins, colorado 80525
(970) 226-4074
FAX (970) 226-4196
Attached are five prints of the Interstate Land Preliminary PUD revised in response to
Staff Comments. Specific responses include:
3. Items required at the time of Preliminary have been added to the revised plans.
7. We have revised the walks along the frontage road as per the Prospect Road
Streetscape Plan. It is our understanding that the walkway widths called for in
that plan (6' along the frontage road and 8' along Prospect) are correct, and the
City will reimburse for oversizing (over 4').
9. The building layout shown on the preliminary PUD is a realistic representation
of the mix of uses anticipated on the subject property; and is consistent with
the approved "highway business" zoning, and with the expectations listed in
the Prospect Road Streetscape Plan, which indicates that industrial, commercial,
and highway business uses will occur near the 1-25 interchange. The building
layout places smaller "pad" uses around the perimeter, and the central area is
planned to allow development "... into a 'campus or park' -like setting. (with)
Clustering of buildings into pedestrian oriented areas with shared parking...."
* Some of the engineering comments regarding site access are not consistent
with the conditions agreed upon by the City, CDOT, and area property owners
at the time the interchange and frontage road improvements were made. Also,
we believe many of the items listed on the engineering comments sheet are
required with the final plat and utility plans rather than the preliminary.
Reductions, rendered plans, and eight sets of prints will be provided by October 16th
as requested. We appreciate your assistance in this project. Please call if you need further
information.
Sincerely,
Eldon Ward, President
Cityscape Urban Design, Inc.
cc: Stan Whitaker, G.T. Land Colorado Inc
Randy Demario, Heath Construction
Stan Myers, RED Engineering Consultants