HomeMy WebLinkAboutPOUDRE VALLEY PLAZA MIXED-USE - FDP220001 - SUBMITTAL DOCUMENTS - ROUND 3 - SUPPORTING DOCUMENTATIONPROJECT NAME:
DATE:
LF 0 $0.00 $0.00 $2.25 $0.00
EACH 0 $0.00 $0.00 $170.00 $0.00
EACH 0 $0.00 $0.00 $150.00 $0.00
EACH 2 $0.00 $0.00 $230.00 $460.00
Sanitary Sewer Inspection Fees $460.00
LF 0 $0.00 $0.00 $2.45 $0.00
EACH 4 $0.00 $0.00 $255.00 $1,020.00
EACH 0 $0.00 $0.00 $150.00 $0.00
EACH 0 $0.00 $0.00 $105.00 $0.00
EACH 0 $0.00 $0.00 $85.00 $0.00
EACH 1 $0.00 $0.00 $130.00 $130.00
EACH 2 $0.00 $0.00 $130.00 $260.00
EACH 0 $0.00 $0.00 $130.00 $0.00
EACH 0 $0.00 $0.00 $400.00 $0.00
EACH 0 $0.00 $0.00 $400.00 $0.00
EACH 0 $0.00 $0.00 $255.00 $0.00
LF 38 $0.00 $0.00 $2.45 $93.10
EACH 0 $0.00 $0.00 $85.00 $0.00
Water Inspection Fees $1,503.10
LF 0 $0.00 $0.00 $1.50 $0.00
LF 0 $0.00 $0.00 $2.95 $0.00
LF 0 $0.00 $0.00 $2.95 $0.00
EACH 0 $0.00 $0.00 $230.00 $0.00
EACH 0 $0.00 $0.00 $230.00 $0.00
EACH 0 $0.00 $0.00 $170.00 $0.00
Public Storm Inspection Fees $0.00
LS 0 $0.00 $0.00
SY 0 $0.00 $0.00 $2.55 $0.00
SY 0 $0.00 $0.00 $2.55 $0.00
LF 0 $0.00 $0.00 $2.55 $0.00
LF 130 $0.00 $0.00 $2.55 $331.50
EACH 3 $0.00 $0.00 $100.00 $300.00
SY 0 $0.00 $0.00 $0.65 $0.00
SY 11 $0.00 $0.00 $1.40 $50.00
SY 24 $0.00 $0.00 $2.55 $61.20
SY 0 $0.00 $0.00 $1.40 $0.00
LF 0 $0.00 $0.00 $2.95 $0.00
LF 0 $0.00 $0.00 $2.30 $0.00
LF 0 $0.00 $0.00 $2.30 $0.00
LF 0 $0.00 $0.00 $2.30 $0.00
Street System Inspection Fees $742.70
LS 0 $45.00 $0.00
EACH 0 $0.00 $0.00 $30.00 $0.00
LF 0 $0.00 $0.00 $0.40 $0.00
SF 0 $0.00
Pavement Age 0 Excavation Permit Fees $0.00
TOTAL INSPECTION FEES $2,705.80
$0.00
Water Meter Pit (1 1/2")
Water Meter Pit (3" )
INFRASTRUCTURE
CONSTRUCTION COST
PER UNIT
(COST ESTMATE APPROVED BY THE
CITY)
TOTAL ESTIMATED
INFRASTRUCTURE COST
INSPECTION FEE PER
UNIT
(SET BY THE CITY)
TOTAL INSPECTION FEE
Wednesday, March 30, 2022
Poudre Valley Plaza Mixed-Use, FDP220001
UNIT OF
MEASURE
ESTIMATED
QUANTITY
(PROVIDED BY PROJECT
ENGINEER)
TOTAL PUBLIC INFRASTRUCTURE COST
Boring
Concrete Pavement
Application
Potholing
Pavement Impact Fees
Curb & Gutter
Drive Approach
Trench - Storm
Trench - Sewer
Trench - Water
Excavation Permit
Retaining Wall (Concrete, Masonry, Stone)
Asphalt Pavement
Sidewalk**
Pedestrian Ramps
Apron
Gutter Cross Pan
Fire Access Grass Crete
Water Connection/Disconnect
Grading
Fire Line Fitting (Bend/Tee/Cross)*
Public Storm Sewer System
Storm Reinforced Concrete Pipe
Storm Concrete Headwall/Wing Walls
Box Culvert
Storm Chase
Storm Inlet All Types
Storm Manhole
Street System & Trenching
Water Fire Hydrant
Water Valves
Water Meter Pit (3/4" )
* PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED IN THE TOTAL
INFRASTRUCTURE COST FOR BONDING
** INCREASE SIDEWALK LENGTH FOR ANY SIDEWALKS WIDER THAN 4.5' IN WIDTH. STANDARD SIDEWALK INSPECTION FEE WIDTH IS 4.5'
DESCRIPTION
(ALL PUBLIC & APPLICABLE PRIVATE* IMPROVEMENTS)
Sanitary Sewer System
Sewer Main
Sewer Manhole
Water Main (Fire Line)*
Water Meter Pit (2" )
Water Meter Pit (1")
Water Fitting (Bend/Tee/Cross)
Sewer Service Line Stub
Sewer Main Connection/Disconnect
Water System
Water Main
Water Service Line Stub