Loading...
HomeMy WebLinkAboutINTERSTATE LAND PUD - PRELIMINARY - 34-88B - CORRESPONDENCE - OTHER JURISDICTIONS• • THE LAKE CANAL COMPANY THE LAKE CANAL RESERVOIR COMPANY (970) 352-0222 Se_ 1995 Planning and Zoning Board Attn: Steve Olt P O Box 580 Ft Collins, Co 80522-0580 RE: Interstate Land PUD Mr. Olt: The Lake Canal Company exists in Larimer County and Weld County for the purpose of servicing stockholders with irrigation waters. Access is a major concern of canal companies for maintenance and operation of the canal. This at times requires wider access than a mere roadway for the use of heavy equipment, a place to temporarily store maintenance material and adequate space to allow excavation operations with minimal interference. Enough forethought has not always gone into these easements causing very poor access to exist along some current residential sections. As you are aware, we have frequently ask that paralleling utility easements be utilized to establish green belt borders to minimize future maintenance on the neighboring development. The Lake Canal Company has a major flume structure in the northeast corner of Lot 8 of Interstate Land PUD. The Lake Canal Company is requesting that their easement be established at seventy five (75) feet wide from the center of the existing canal on the service road increasing to one hundred (100) feet wide at the intersection of The Cache La Poudre Reservoir Company inlet canal. The Lake Canal Company is requesting this to accommodate the extensive maintenance and operation of the structure which includes periodic burns. One plan that has been utilized in development along the canal system has been to leave a green belt parallel to the canal. Starting from the center of the canal, allowing room for the canal itself and the paralleling maintenance road, a green belt area is designated at part of the covenants of the development and regulations written specifying that only native grasses are ever to be seeded in the green belt area. This green belt area is established to be wide enough to serve the needs of both the canal and the utilities. In viewing the plan, we are very alarmed to see trees located in the potential canal easement. It is absolutely essential that a buffer area parallel the canal that is restricted to native grass only to prevent future frictions due to maintenance and operation of the canal. 33040 Railroad Avenue • P.O. Box 104 • Lucerne. Colorado 80646 0 • Another concern is the additional exposure of the canal system to people. Exposure to water delivery and storage systems creates a considerable amount of risk. The Lake Canal Company is of the opinion that development along the system should not increase our liability. It is the hope of The Lake Canal Company that those who choose to develop along the system and those who choose to neighbor along the system will take such precautions as are reasonable to develop safety measures within their own real property and accesses. It is the practice of The Lake Canal Company to refuse drainage from developed properties to control exposure to undesirable contaminates that may exist in drainage waters. We request that it be made clear what the drainage plans are for this plat. The Lake Canal Company supports the rights of neighboring property owners to develop their property in an orderly manner consistent with the county and local master plans. It is the opinion of The Lake Canal Company that adjustments need to be made to the plans of Interstate Land PUD to accommodate adequate access for the maintenance and operation of the canals, to insure that adequate storm drainage is in place and to seed all easements to native grasses. If it is necessary for any services to cross the right-of-way of The Lake Canal Company, it will be necessary for each entity to contact the office of The Lake Canal Company, establish and record crossing agreements. It would be preferred that these crossings be established during planning and approved before The Lake Canal Company signs the final plat. S' cerely, Don Magnu o Superinte ent