THE LAKE CANAL COMPANY
THE LAKE CANAL RESERVOIR COMPANY
(970) 352-0222
Se_
1995
Planning and Zoning Board
Attn: Steve Olt
P O Box 580
Ft Collins, Co 80522-0580
RE: Interstate Land PUD
Mr. Olt:
The Lake Canal Company exists in Larimer County and Weld County for
the purpose of servicing stockholders with irrigation waters.
Access is a major concern of canal companies for maintenance and
operation of the canal. This at times requires wider access than
a mere roadway for the use of heavy equipment, a place to
temporarily store maintenance material and adequate space to allow
excavation operations with minimal interference. Enough
forethought has not always gone into these easements causing very
poor access to exist along some current residential sections. As
you are aware, we have frequently ask that paralleling utility
easements be utilized to establish green belt borders to minimize
future maintenance on the neighboring development. The Lake Canal
Company has a major flume structure in the northeast corner of Lot
8 of Interstate Land PUD. The Lake Canal Company is requesting
that their easement be established at seventy five (75) feet wide
from the center of the existing canal on the service road
increasing to one hundred (100) feet wide at the intersection of
The Cache La Poudre Reservoir Company inlet canal. The Lake Canal
Company is requesting this to accommodate the extensive maintenance
and operation of the structure which includes periodic burns.
One plan that has been utilized in development along the canal
system has been to leave a green belt parallel to the canal.
Starting from the center of the canal, allowing room for the canal
itself and the paralleling maintenance road, a green belt area is
designated at part of the covenants of the development and
regulations written specifying that only native grasses are ever to
be seeded in the green belt area. This green belt area is
established to be wide enough to serve the needs of both the canal
and the utilities.
In viewing the plan, we are very alarmed to see trees located in
the potential canal easement. It is absolutely essential that a
buffer area parallel the canal that is restricted to native grass
only to prevent future frictions due to maintenance and operation
of the canal.
33040 Railroad Avenue • P.O. Box 104 • Lucerne. Colorado 80646
0 •
Another concern is the additional exposure of the canal system to
people. Exposure to water delivery and storage systems creates a
considerable amount of risk. The Lake Canal Company is of the
opinion that development along the system should not increase our
liability. It is the hope of The Lake Canal Company that those who
choose to develop along the system and those who choose to neighbor
along the system will take such precautions as are reasonable to
develop safety measures within their own real property and
accesses.
It is the practice of The Lake Canal Company to refuse drainage
from developed properties to control exposure to undesirable
contaminates that may exist in drainage waters. We request that it
be made clear what the drainage plans are for this plat.
The Lake Canal Company supports the rights of neighboring property
owners to develop their property in an orderly manner consistent
with the county and local master plans. It is the opinion of The
Lake Canal Company that adjustments need to be made to the plans of
Interstate Land PUD to accommodate adequate access for the
maintenance and operation of the canals, to insure that adequate
storm drainage is in place and to seed all easements to native
grasses.
If it is necessary for any services to cross the right-of-way of
The Lake Canal Company, it will be necessary for each entity to
contact the office of The Lake Canal Company, establish and record
crossing agreements. It would be preferred that these crossings be
established during planning and approved before The Lake Canal
Company signs the final plat.
S' cerely,
Don Magnu o
Superinte ent