December 17, 2021
Russ Lee
Ripley Design
419 Canyon Ave
Suite 200
Fort Collins, CO 80521
RE: Forty-Three Prime, FDP210019, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Forty-Three Prime. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Brandy Bethurem Harras via phone at 970 -416-2744 or
via email at bbethuremharras@fcgov.com.
Ripley Design Response:
Northern Engineering Response:
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 1 08/24/2021: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone conversations. Thank you!
Ripley Design Response: Acknowledged, thank you Brandy.
Comment Number: 2 12/14/2021: INFORMATION:
As part of your resubmittal you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
2
reference to specific project plans or explanations of why comments h ave not
been addressed, when applicable, avoiding responses like noted or acknowledged.
Ripley Design Response: Acknowledged. Comment responses will be included with the applicable party in this submittal.
Comment Number: 3 08/24/2021: INFORMATION:
Please follow the Electronic Submittal Requirements and File Naming
Standards found at https://www.fcgov.com/developmentreview/files/electronic
submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888.
File names should begin with the file type, followed by the project information,
and round number. Example: UTILITY PLANS_PROJECT NAME_PDP_Rd2.pdf
File type acronyms maybe appropriate to avoid extremely long file names.
Example: TIS for Traffic Impact Study, ECS for Ecological Characterization Study.
UPDATE: Please do not separate documents into different file categories. Thank you!
Ripley Design Response: The File Naming Standards will be followed for the next submittal.
Comment Number: 6 08/24/2021: INFORMATION:
LUC 2.211 Lapse, Rounds of Review: Applicants, within one hundred eighty
(180) days of receipt of written comments and notice to respond from t he City
on any submittal (or subsequent revision to a submittal) of an application for
approval of a development plan, shall file such additional or revised submittal
documents as are necessary to address such comments from the City. If the
additional submittal information or revised submittal is not filed within said
period of time, the development application shall automatically lapse and become null and void.
Ripley Design Response: Acknowledged, thank you.
Comment Number: 8 08/24/2021: FOR FINAL APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recordin g of this project.
I will provide a recording checklist and process information when we are closer to this step.
Ripley Design Response: Acknowledged, thank you Brandy.
Comment Number: 9 08/24/2021: INFORMATION:
LUC 2.211 Lapse, Term of Vested Right: Within a maximum of three (3) years
following the approval of a final plan or other site specific development plan, the
applicant must undertake, install and complete all engineering improvements
(water, sewer, streets, curb, gutter, street lights, fire hydrants and storm
drainage) in accordance with city codes, rules and regulations. The period of
time shall constitute the "term of the vested property right." Failure to undertake
and complete such engineering improvements within the term of the vested
property right shall cause a forfeiture of the vested property right and shall
require resubmission of all materials and reapproval of the same to be
processed as required by this Code.
Ripley Design Response: Acknowledged, thank you Brandy.
Comment Number: 4 09/02/2021: INFORMATION:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set,
3
and these must be removed prior to submittal as they can cause issues with the
PDF file. The default setting is "1" ("on") in AutoCAD. To change the setting
and remove this feature, type "EPDFSHX" in the command line and enter "0".
Read this article at Autodesk.com for more tips on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
Cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-AutoCAD.html
Ripley Design Response: Acknowledged and we will provide the documents to the specifications above.
Comment Number: 10 12/14/2021: INFORMATION:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cutoff for routing the same week. When you are ready to resubmit your-
plans, please notify me with as much advanced notice as possible.
Ripley Design Response: Acknowledged, thank you.
Department: Planning Services
Contact: Pete Wray, 970-221-6754, pwray@fcgov.com
Topic: General
Comment Number: 3 12/13/2021: INFORMATION:
Comments resolved, ready for approval.
Ripley Design Response: Acknowledged.
Department: Engineering Development Review
Contact: Sophie Buckingham, , sbuckingham@fcgov.com
Topic: General
Comment Number: 7 12/14/2021: DEVELOPMENT AGREEMENT:
A draft of the Development Agreement has been prepared and will be reviewed
by the City Attorney's Office before the next round of review. When the draft has
been accepted by the CAO, Brandy or I will share it with you for your review.
Ripley Design Response: Acknowledged, thank you Sophie.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com
Topic: General
Comment Number: 7 12/13/2021: FOR FINAL APPROVAL:
It is not clear what landscaping is proposed for the rain gardens along Trilby.
Please clarify proposed rain garden plantings/landscaping.
Ripley Design Response: A rain garden seed mix has been added to the Landscape Notes and Details sheet showing proposed
seed mix and percentages of each species.
Comment Number: 8 12/13/2021: FOR FINAL APPROVAL:
Thank you for the provided response letters and updates. It appears most
significant concerns have been addressed with this update; however, there are
several smaller items to address for approval. Please see redlines for specific
items. I encourage you to reach out with any questions or to review potential
revisions, and I’d be happy to set up a meeting or conference call to do so.
4
Please note: A full review of this submittal was not possible as several pieces of
the drainage report were not included.
Northern Engineering Response: Utility Plans and Drainage Report were updated per City comment and redlines.
Department: Erosion Control
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 11/22/2021: FOR FINAL APPROVAL - UPDATED:
The plan provided on this project was reviewed against the City Criteria
(FCDCM Ch 2 Section 6.1.3). The erosion control plan is missing key
components to meet City Criteria. Please review the provided comments and
redlines and address them accordingly.
FOR FINAL APPROVAL:
The report provided on this project was reviewed against the City Criteria
(FCDCM Ch 2 Section 6.1.4). The erosion control report was missing key
components to meet City Criteria. Please review the provided comments and
redlines and address them accordingly.
FOR FINAL APPROVAL:
The escrow calculation provided on this project was reviewed against the City
Criteria (FCDCM Ch 2 Section 6.1.5). Resolved: Upon review, the erosion
control escrow calculation was found meeting the City Criteria.
Northern Engineering Response: Erosion Control Report was updated per City comment and redlines.
Comment Number: 2
11/22/2021: INFORMATION:
Based upon the updated materials and information provided since the last
review comments, we have recalculated an Erosion Control Inspection fee
of $2107.72 and a Stormwater LID/WQ Inspections fee of $565. A copy of the calculation
spreadsheet will be provided. The fee will need to be provided at the time of erosion control escrow.
Northern Engineering Response: Acknowledged.
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
Topic: General
Comment Number: 2 08/24/2021: FOR DCP:
Prior to the DCP meeting, I will need to see C-1 forms and one-line diagrams
for all of the services. Thank you.
Ripley Design Response: Acknowledged, the developer is aware that C1 forms will be required prior to DCP.
Comment Number: 3 08/24/2021: INFORMATION:
Electric Capacity Fee, Building Site charges and any system modification
charges necessary will apply to this development.
Ripley Design Response: Acknowledged.
5
Comment Number: 4 08/24/2021: INFORMATION:
You may contact Austin Kreager, project engineering if you have questions.
(970) 2246152. -You may reference Light & Power’s Electric Service Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar
ds_FINAL_18November2016_Amendment.pdf
You may reference our policies, development charge processes, and use our
fee estimator at http://www.fcgov.com/utilities/business/buildersanddevelopers -.
Ripley Design Response: Acknowledged.
Department: Outside Agencies
Contact: Megan Harrity, Larimer County Office of the Assessor, 970-498-7065,
mharrity@larimer.org, ,
Topic: General
Comment Number: 1
12/14/2021: FOR FINAL APPROVAL - UNRESOLVED:
09/09/2021: FOR APPROVAL:
The legal description of the subject property needs updating.
The prelim plat has "Being a Replat of Lot 1, Provincetowne Filing Three, FTC Should be:
Lot 1, Block 14, Provincetowne Filing Three, FTC.
Looks like there are two references to the legal desc. that need updating.
Northern Engineering Response: The local standard practice, and approved by the City of Fort Collins, is to
include the phrase "Being a replat of” within the subtitle of all replats. The legal description correctly identifies
the subject property as “Lot 1, Block 14, Provincetowne Filing Three”.
Department: Environmental Planning
Contact: Scott Benton, (970)416-4290, sbenton@fcgov.com
Topic: General
Comment Number: 3 12/14/2021: FOR FINAL APPROVAL:
Two non-native tree species (one Austrian pine - Pinus nigra and one northern
catalpa - Catalpa speciose) are depicted on the western portion of additional
NHBZ. Please replace with native or naturalized species. Following Forestry's
guidance, asides from native tree species, two naturalized species that are
options include hackberry (Celtis occidentalis) and bur oak (Quercus macrocarpa).
Ripley Design Response: The two trees described above have been replaced with Prairie Sentinel Hackberry (Celtis occidentalis
“Prairie Sentinel.”
Comment Number: 4 12/14/2021: FOR FINAL APPROVAL:
Row 39 of the tree mitigation table says 'Request wildlife mitigation numbers
from Environmental Planning'. I do not have a record of discussing mitigation
numbers with the applicant, and I apologize for not catching this in FDP round 1.
Regardless, additional native shrub plantings are required. 8 --12 fruit bearing
native shrubs (Ribes spp., etc.) are required along the wetland margin.
Ripley Design Response: We have included an additional 5 Western Chokecherry and an additional 7 Golden Currant shrubs
along the wetland margin. Row 39 of the tree mitigation table has been updated as well to reflect the 8 -12 fruit bearing native
shrubs.
6
Comment Number: 5 12/14/2021: FOR FINAL APPROVAL:
Prior to the FDP approval please provide an estimate of the landscaping costs
for the NHBZ, including materials, labor, irrigation, and three years of restoration
and monitoring and weed mitigation. We will then use the approved estimate to
collect a security (bond or escrow) at 125% of the total amount.
Ripley Design Response: An estimate of the landscaping costs for the NHBZ was provided on January 6th, 2022. Please let us
know if you need any additional information.
Comment Number: 6 12/14/2021: FOR DCP ISSUANCE:
Prior to issuing a Development Construction Permit (DCP), the NHBZ security
for the approved amount is required to be submitted, as well as restoration plan.
The restoration plan should address the revegetation of all disturbed areas (soil
handling, monitoring methodology and timeline, success criteria, etc.) and weed
management of both the disturbed and undisturbed areas before, during, and following construction.
Ripley Design Response: Acknowledged.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: General
Comment Number: 1 12/14/2021: FOR FINAL APPROVAL – UNRESOLVED:
There are two proposed street trees that are less than 50 -ft from stop signs.
Please either adjust their spacing or omit the species to accommodate this new
separation requirement. Refer to redlines for additional information.
Ripley Design Response: The street tree at the intersection of Trilby Rd. and Autumn Ridge Dr. Has been adjusted to be at least
50’ from the existing stop sign.
Ripley Design Response: The street tree at the intersection of Autumn Ridge. Dr. And Candlewood Dr. Has been removed to
meet required separation from stop sign and close proximity to the existing American Linden.
8/24/2021: FOR FINAL APPROVAL
Standards for stop sign/tree separation have been updated. Please provide
50-ft between stop signs and new trees. Existing trees that do not meet this
separation standard are allowed to stay in place (if applicable).
10/16/2018:
PROVIDE AT FIRST ROUND FDP:
Show location of any stop signs and street lights. Identify these fixtures with a
distinct symbol. Space trees if needed as follows.
Stop Signs: 20 feet from sign
Street Light: 40 feet for canopy shade trees and 15 feet for ornamental trees.
Ripley Design Response: Stop signs and street lights have been identified on the Site and Landscape Plan sheet sets. The tree
clearances required above have been met.
Comment Number: 18 12/14/2021: FOR FINAL APPROVAL:
Is the telephone line along Trilby Road above ground or underground? If they are
above ground, will they be undergrounded? If not, the tree species along Trilby
7
will need to be changed to a smaller maturing species.
Ripley Design Response: The telephone line along Trilby Road is located underground.
Comment Number: 19 12/14/2021: FOR FINAL APPROVAL:
The species diversity table needs to be updated to only include proposed
species. Currently the table calculations include both proposed and existing
trees. Please update the percentages to include only proposed trees.
Ripley Design Response: The Tree Species Diversity table has been updated to only show proposed trees and their
corresponding percentages.
Comment Number: 21 12/14/2021: FOR FINAL APPROVAL:
Please change mitigation tree sizes to the following:
Canopy shade trees: 2” caliper B&B
Ornamental trees: 2” caliper B&B
Evergreen tree: 8-ft height B&B
Ripley Design Response: Tree sizes have been adjusted in the Planting Schedule to match the sizes above.
Comment Number: 22 12/14/2021: INFORMATION:
Please review Forestry redlines for additional information.
Ripley Design Response: Thank you for providing redlines. Comment responses will be included on the marked up PDF from
forestry.
Department: Building Services
Contact: Katy Hand, , khand@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 2. 12/13/2021: BUILDING PERMIT UPDATED-:
08/24/2021: BUILDING PERMIT:
Please note buildings B&C and B&D and are all closer than 20ft apart from
each and will require rated walls will limited openings/window and doors per
2018 IBC. Plan accordingly with elevation designs.
Ripley Design Response: The developer has met with the building services department and believes the elevations are in
compliance with the separations.
Comment Number: 6 12/13/2021: INFORMATION:
Exit stair enclosures cannot be used for any other purpose other than egress
(i.e. no bike racks, mail, or storage)
Ripley Design Response: Acknowledged.
Comment Number: 8 12/13/2021: BUILDING PERMIT:
Each detached structure requires a separate permit, this includes carports, bike
shelters, trellises, pergolas and garage buildings, and shade structures, and covered mail kiosks.
Ripley Design Response: Acknowledged.
Comment Number: 9 12/13/2021: BUILDING PERMIT:
Accessible parking shall be located on the shortest accessible route of travel
from adjacent parking to an accessible building entrance (-2018 IBC section 1106.6)
8
Ripley Design Response: Acknowledged.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 11/18/2021: BUILDING PERMIT:
Irrigation plans are required no later than at the time of building permit. The
irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of
the Land Use Code. Direct questions concerning irrigation requirements to Eric
Olson, at 221-6704 or eolson@fcgov.com
Ripley Design Response: Acknowledged, irrigation drawings are provided with the current FDP submittal.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
Comment Number: 1
12/13/2021: FOR FINAL APPROVAL-UPDATED:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter. If you have any specific questions about the redlines, please contact John
Von Nieda at 970-221-6565 or jvonnieda@fcgov.com
08/23/2021: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter. If you have any specific questions about the redlines, please contact John
Von Nieda at 970-221-6565 or jvonnieda@fcgov.com
Northern Engineering Response: Plat was updated per redlines. Specific comments to redlines are included in