HomeMy WebLinkAboutFORTY-THREE PRIME - FDP210019 - SUBMITTAL DOCUMENTS - ROUND 3 - LANDSCAPE PLANDRAWING NUMBER:ISSUEDPROJECT No.:DRAWN BY:REVIEWED BY:SEAL:PREPARED BY:No.DESCRIPTIONDATEREVISIONSNo.DESCRIPTIONDATEPlotted By: Spencer Bernard Layout: I-100 Printed On: 1/28/2022 8:21 AM File Name: P-43PRIME.dwg
ORIGINAL SIZE 24X36ENTITLEMENTDRAWINGSNOT FORCONSTRUCTION 419 Canyon Ave. Suite 200 Fort Collins, CO 80521phone 970.224.5828 | fax 970.225.6657 | www.ripleydesigninc.comNORTH0051020SCALE: 1"=10'-0"OWNERPDP09/26/2018FORTY-THREE PRIMEFDP SUBMITTALFORT COLLINS, COPDPFDP11/14/201807/28/2021RIPLEY DESIGN INC.Russ Lee419 Canyon Ave. Suite 200Fort Collins, CO 80521p. 970.224.5828HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979ENGINEERARCHITECTURELAND PLANNERNORTHERN ENGINEERINGFred Wegert301 N. Howes StreetSuite 100Fort Collins, CO 80521p. 970.221.4158HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979OWNERFDP11/17/2021SJBCBKI-100 OF 7IRRIGATIONCOVER SHEETGENERAL DESCRIPTIONFLAG NOTES12345LEGENDA-151"12MFQANOZZLE NUMBERARC - QUARTER (Q), HALF (H), FULL (F)30HB.5RESSS.25GENERAL NOTES03FDP03/23/2022
H2OELECELECELECELECF
ESFESFESFESLIDLIDSLIDSSSSSDDDDDDDSSSSSSDSSSSS WWWWSGMGM GM
GM
GMGMIRWWPOINT-OF-CONNECTION *SIZE: 1.5-INCH *FLOW (MAXIMUM): 43 GPM *MINIMUM PRESSURE REQUIRED: xx PSI *AVAILABLE PRESSURE: xx PSI2"1.5"1.25"1.25"1.25"2"1.5"1.25"1.25"2"2"1.25"1.25"1.25"2"2"1.5"1.5"1.25"1.25"2"1.5"1.25"2"1.5"1.25"1.5"1.25"2"1.25"1.25"2"1.5"1.5"1.25"1.25"2"1.5"1.5"1.25"1.25"2"1.5"1.25"1.25"1.25"2"1.5"1.5"1.5"1.25"1.25"1.5"1.25"1.25"2"1.5"1.5"1.5"1.25"1.25"1.5"1.25"1.25"2"1.25"1.25"1.25"2"2"1.5"1.25"1.25"2"2"1.25"1.25"1.25"1.25"1.5"1.25"31.25"1.25"1.25"1.25"2"2"2"2"2"2"2"2"2"2"2"2"2"1.25"1.25"1.25"2"1.25"1.25"1.25"2"1.25"1.5"1.25"1.25"2"1.25"35H35Q35H35H35H35H35H35H35H35H35H35Q35H35H35H35H35H35H35H35Q35H35Q35Q35F35F35F35F30Q30Q35H30H35H35Q35H25H25H25H35Q35H35H35Q35H35H35H35H35H35H35Q35H35H35H35Q35H35H35H35Q35H35H35Q35H35Q35H35H35H30Q35H30Q35H35H35H35H35H35H35H35H35H30H30F30F30F30F30F30F30F30F30F30F30F35F35F35F35F25F25F30F30F25FAA-261.5"28-A-271"-A-281"18-A-291"22-A-301.5"41-A-311.5"42-A-321"-A-331.5"39-A-341.5"42-A-351"-A-11.5"38-A-31"13-A-41"25-A-51.5"35-A-61"-A-91.5"42-A-111.5"39-A-101.5"40-A-81.5"34-A-131"23-A-141.5"38-A-151.5"39-A-161"-A-171.5"36-A-181.5"38-A-191.5"38-A-201.5"42-A-211"24-A-231.5"36-A-251"15-MFB1A-361"23-A-241"-245555555A-21"22-QQQQQA-161"-.5.5.5.5.25.25.5.5.25.25.25.5.5.25.25.25.25.25.25.25.5A-71"8-.25RDRAWING NUMBER:ISSUEDPROJECT No.:DRAWN BY:REVIEWED BY:SEAL:PREPARED BY:No.DESCRIPTIONDATEREVISIONSNo.DESCRIPTIONDATEPlotted By: Spencer Bernard Layout: I-200 Printed On: 1/28/2022 8:21 AM File Name: P-43PRIME.dwg
ORIGINAL SIZE 24X36ENTITLEMENTDRAWINGSNOT FORCONSTRUCTION 419 Canyon Ave. Suite 200 Fort Collins, CO 80521phone 970.224.5828 | fax 970.225.6657 | www.ripleydesigninc.comNORTH0051020SCALE: 1"=10'-0"OWNERPDP09/26/2018FORTY-THREE PRIMEFDP SUBMITTALFORT COLLINS, COPDPFDP11/14/201807/28/2021RIPLEY DESIGN INC.Russ Lee419 Canyon Ave. Suite 200Fort Collins, CO 80521p. 970.224.5828HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979ENGINEERARCHITECTURELAND PLANNERNORTHERN ENGINEERINGFred Wegert301 N. Howes StreetSuite 100Fort Collins, CO 80521p. 970.221.4158HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979OWNERFDP11/17/2021SJBCBKIRRIGATIONPLAN1" =30'0'15'30'60'30'I-200 OF 703FDP03/23/2022
DRAWING NUMBER:ISSUEDPROJECT No.:DRAWN BY:REVIEWED BY:SEAL:PREPARED BY:No.DESCRIPTIONDATEREVISIONSNo.DESCRIPTIONDATEPlotted By: Spencer Bernard Layout: I-300 Printed On: 1/28/2022 8:21 AM File Name: P-43PRIME.dwg
ORIGINAL SIZE 24X36ENTITLEMENTDRAWINGSNOT FORCONSTRUCTION 419 Canyon Ave. Suite 200 Fort Collins, CO 80521phone 970.224.5828 | fax 970.225.6657 | www.ripleydesigninc.comNORTH0051020SCALE: 1"=10'-0"OWNERPDP09/26/2018FORTY-THREE PRIMEFDP SUBMITTALFORT COLLINS, COPDPFDP11/14/201807/28/2021RIPLEY DESIGN INC.Russ Lee419 Canyon Ave. Suite 200Fort Collins, CO 80521p. 970.224.5828HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979ENGINEERARCHITECTURELAND PLANNERNORTHERN ENGINEERINGFred Wegert301 N. Howes StreetSuite 100Fort Collins, CO 80521p. 970.221.4158HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979OWNERFDP11/17/2021SJBCBKIRRIGATIONDETAILSNOTE:1. FURNISH FITTINGS AND PIPING SIZED IDENTICALLY WITH NOMINAL BACKFLOW PREVENTION DEVICE.ABCDEFGHIJKA.BACKFLOW PREVENTER ENCLOSURE (SIZEAS NECESSARY)B.BACKFLOW PREVENTION DEVICEC.C x M COPPER ADAPTER (1 OF 2)D.TYPE K COPPER PIPE (TYPICAL) (LENGTH ASREQUIRED)E.CL200 PVC PIPE SLEEVE (1 OF 2)F.4" THICK CONCRETE PAD 6" LARGER IN ALLDIMENSIONS THAN ENCLOSUREG.FINISH GRADE/TOP OF MULCHH.COPPER FEMALE ADAPTERI.SCH 40 PVC MALE ADAPTERJ.PVC MAINLINEK.TYPE K COPPER PIPEABCDEFGHIJKA.TRACING WIREB.12" VALVE BOX WITH COVERC.FINISH GRADE/TOP OF MULCHD.SENSOR DECODERE.WIRE SLICE, TYPICALF.FLOW SENSORG.TWO WIRE CABLEH.FILTER FABRICI.PVC PIPEJ.BRICK (1 OF 4)K.3" MINIMUM DEPTH OF 3/4"WASHED GRAVELNOTES:1. ALLOW 10 PIPE DIAMETERS UPSTREAM AND 5 PIPE DIAMETERS DOWNSTREAM OFSTRAIGHT RUN OF PIPE TO ACHIEVE PROPER FLOW REGIME.2. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TOSECURE FABRIC TO PIPE AND VALVE BOX.3. DO NOT CUT OUT ENDS OF VALVE BOX UNNECESSARILY.4. INSTALL SO THAT GRAVEL IS ONLY IN CONTACT WITH BOTTOM OF SENSOR ASSEMBLY.NOTES:1. USE VALVE BOX EXTENSION AS NECESSARY TO ACHIEVE MINIMUM DIMENSIONS ABOVE ASSEMBLY.2. NOMINAL SIZE OF ALL COMPONENTS ARE TO BE THE SAME NOMINAL SIZE AS THE SOLENOID VALVE(SIZED AS SHOWN).3. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TO SECURE FABRIC TOPIPE AND VALVE BOX.4. DO NOT CUT OUT ENDS OF VALVE BOX UNNECESSARILY.5. POSITION VALVE BOX OVER VALVE TO ALLOW ACCESS TO SOLENOID.6. INSTALL SO THAT NO GRAVEL IS IN CONTACT WITH VALVE ASSEMBLY.ABCDEFGHIJKLA.TRACING WIREB.FINISH GRADE/TOP OF MULCHC.STANDARD RECTANGULAR VALVE BOX W/EXTENSIOND.WIRE SPLICE, TYPICALE.DECODERF.SOLENOID VALVEG.TWO-WIRE CABLEH.PVC MAINLINEI.BRICK (1 OF 4)J.FILTER FABRICK.3" MINIMUM DEPTH OF 3/4" WASHEDGRAVELL.PVC SCH 40 MALE ADAPTERLABCDEFGA.WARNING TAPEB.FINISH GRADEC.BACKFILLD.LATERAL/MANIFOLD PIPEE.TWO-WIRE CABLEF.MAINLINE PIPEG.TRACING WIREREFER TOSPECIFICATIONSREFER TOSPECIFICATIONSNOTES:1. FURNISH NOMINAL PIPE AND FITTING SIZES IDENTICAL WITH NOMINAL TAP SIZEUNLESS OTHERWISE NOTED.2. THIS ASSEMBLY IS INTENDED TO BE USED FOR WINTERIZATION OF BACKFLOWPREVENTION, MASTER VALVE, AND FLOW SENSOR.ABCDEFGHIJA.12" STANDARD VALVE BOX WITH COVERB.FINISH GRADE/TOP OF MULCHC.1/4" THREADED BRASS CAPD.1/2" REDUCING MALE ADAPTERE.1/2" COPPER PIPE (LENGTH AS REQUIRED)F.6" PVC CL 200 PIPE (LENGTH AS REQUIRED)G.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELH.BRICK (1 OF 4)I.COPPER PIPE TO BACKFLOW PREVENTIONASSEMBLY (LENGTH AS REQUIRED)J.COPPER TEEK.COPPER MALE ADAPTER (1 OF 2)L.CURB STOP VALVE WITH COPPER SERVICE,THREAD BOTH ENDSM.COPPER PIPE TO EXISTING COPPER PIPEOUTSIDE EXISTING WATER METER1WINTERIZATIONASSEMBLYN.T.S.2BACKFLOW ASSEMBLY(2.5" AND SMALLER)N.T.S.3MASTER VALVEASSEMBLYN.T.S.4FLOW SENSORASSEMBLYN.T.S.6TRENCHINGN.T.S.5BLOW OUT ASSEMBLYN.T.S.NOTE:1. FURNISH NOMINAL PIPE AND FITTING SIZES IDENTICAL WITH NOMINALTAP SIZE UNLESS OTHERWISE NOTED.ABCDEFGHIJKLKA.12" STANDARD VALVE BOX WITH COVERB.FINISH GRADE/TOP OF MULCHC.1" BRONZE BALL VALVE FEMALETHREADED ENDSD.1" COPPER MALE ADAPTERE.1" COPPER PIPE (LENGTH AS REQUIRED)F.3" MIN. DEPTH OF 3/4" WASHED GRAVELG.BRICK (1 OF 4)H.COPPER FEMALE THREADED ADAPTERI.SCH. 40 PVC MALE THREADED ADAPTERJ.PVC MAINLINEK.COPPER PIPEL.COPPER TEEHIJMFBI-300 OF 703FDP03/23/2022
DRAWING NUMBER:ISSUEDPROJECT No.:DRAWN BY:REVIEWED BY:SEAL:PREPARED BY:No.DESCRIPTIONDATEREVISIONSNo.DESCRIPTIONDATEPlotted By: Spencer Bernard Layout: I-301 Printed On: 1/28/2022 8:21 AM File Name: P-43PRIME.dwg
ORIGINAL SIZE 24X36ENTITLEMENTDRAWINGSNOT FORCONSTRUCTION 419 Canyon Ave. Suite 200 Fort Collins, CO 80521phone 970.224.5828 | fax 970.225.6657 | www.ripleydesigninc.comNORTH0051020SCALE: 1"=10'-0"OWNERPDP09/26/2018FORTY-THREE PRIMEFDP SUBMITTALFORT COLLINS, COPDPFDP11/14/201807/28/2021RIPLEY DESIGN INC.Russ Lee419 Canyon Ave. Suite 200Fort Collins, CO 80521p. 970.224.5828HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979ENGINEERARCHITECTURELAND PLANNERNORTHERN ENGINEERINGFred Wegert301 N. Howes StreetSuite 100Fort Collins, CO 80521p. 970.221.4158HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979OWNERFDP11/17/2021SJBCBKIRRIGATIONDETAILSAA.TWO-WIRE CABLEB.VALVE BOX (10" ROUND OR AS NECESSARY)C.REMOTE CONTROL VALVED.5/8" X 8' U.L. LISTED GROUND RODE.DECODERF.LINE SURGE PROTECTORG.BARE AWG #8 COPPER WIREH.S-6 SPLIT BOLTI.BARE COPPER CONNECTION ("CADWELD")J.REMOTE CONTROL VALVE ASSEMBLY500' MAX OR 5 DECODERSBETWEEN GROUND POINTSWHICHEVER IS FIRSTGROUND ALL DEAD ENDS25' AND LONGERSPHERE OFINFLUENCEWIRE PATHOUTSIDE SPHEREOF INFLUENCE(10' MIN.)GROUND TWO WIRE CABLE NEARCONTROLLER PER MANUFACTURER'SGUIDELINESNOTES:1. ALL WIRE CONNECTION SHALL BE MADE WITH APPROVED CONNECTORS.2. MAKE ALL WIRE SPLICES IN VALVE BOXES.3. LEAVE A MINIMUM OF 5' EXTRA WIRE AT ALL SPLICE POINTS.4. TEST EARTH TO GROUND RESISTANCE AT ALL GROUND POINTS.5. EARTH TO GROUND RESISTANCE MUST MEET OR EXCEED MANUFACTURERREQUIREMENTS.6. INSTALL ALL GROUND ASSEMBLIES IN VALVE BOXES.7. INSTALL GROUNDING EQUIPMENT AS INDICATED ON THE IRRIGATIONDOCUMENTS AND AS RECOMMENDED BY THE MANUFACTURER.CDAJBEGHFIB+-WR2WIRELESS SENSORNOTES:1. MOUNT RAIN/FREEZE SENSOR IN SUITABLE LOCATION ON BUILDING EAVE OR WALL PER MANUFACTURER'SINSTRUCTIONS.2. CONNECT INTERFACE TO CONTROLLER PER MANUFACTURER'S GUIDELINES.3. CONFIRMATION NOTE: ENSURE WIRELESS COMMUNICATIONS OPERATE BETWEEN SENSOR AND INTERFACEUNIT PRIOR TO INSTALLATION. IF WIRELESS COMMUNICATIONS ARE NOT SUFFICIENT SUBSTITUTE WIRELESSSENSOR FOR A WIRED SENSOR (HUNTER MINI-CLIK). INCLUDE HUNTER STAINLESS STEEL ENCLOSURE SG-MCAND NECESSARY MOUNTING HARDWARE FOR WIRED SENSOR. INSTALL 1-INCH CONDUIT IF WIRED SENSOR ISREQUIRED.ABCDEA.EAVE OR WALLB.MOUNTING BRACKETC.RAIN/FREEZE SENSOR INTERFACED.RAIN/FREEZE SENSORE.IRRIGATION CONTROLLER ASSEMBLYFINISHED GRADEELEVATION VIEWPLAN VIEWNOTES:1. COPPER TRACING WIRE WILL START AT THE MASTER VALVE ANDWILL BE ROUTED WITH ALL MAINLINE PIPE.2. SPLICE TRACING WIRE IN IRRIGATION MAINLINE COMPONENT VALVEBOXES WHEN POSSIBLE, OTHERWISE, PLACE SPLICE IN SEPARATEVALVE BOX.ABCDEFGHA.10" ROUND VALVE BOXB.INSTALL TRACING WIRE TO THETOP OF VALVE BOXC.WATER PROOF CONNECTION(SEE SPECIFICATIONS)D.PIPE SLEEVE SEE VALVE DETAILE.TAPE COPPER WIRE TO TOP OFPIPE EVERY 10 FT.F.CONTINUOUS LOOP COPPERTRACING WIRE (SEESPECIFICATIONS)G.PVC PIPEH.VALVE (TYPICAL)AABCDEA.IRRIGATION CONTROLLER WALL MOUNTB.3" PVC SCH 40 CONDUIT AND FITTINGSC.JUNCTION BOXD.TWO WIRE CABLE TO REMOTE CONTROL VALVESE.1" PVC SCH 40 CONDUIT AND FITTINGS TO POWER SUPPLYWALL1.2.3.4.1/2"5.NOTE:1. VISUALLY CHECK THAT CONNECTOR IS BELOW LOCKING "FINGERS".1. STRIP ENDS OF WIRE2. SECURE WIRES INTO WIRE NUT3. INSERT WIRE NUT INTO GEL-FILLED TUBE4. POSITION WIRES INTO CHANNELS5. CLOSE SPLICE KIT FOR SECURED SEAL2TRACING WIREN.T.S.3CONTROLLERASSEMBLYN.T.S.4TWO WIRE CABLESCHEMATICN.T.S.5WIRESPLICEN.T.S.6RAIN SENSORASSEMBLYN.T.S.12" MINIMUMNOTE:1. INSTALL SLEEVE SO THAT ITS LOWEST ELEVATION OCCURS AT ONE OR BOTHENDS - NOT ALONG ITS LENGTH.ABCDA.FINISHED GRADE OFPAVED SURFACEB.SLEEVE FORLATERAL PIPEC.SLEEVE FORMAINLINE PIPED.SLEEVE FOR TWOWIRE CABLE1SLEEVINGN.T.S.AI-301 OF 703FDP03/23/2022
DRAWING NUMBER:ISSUEDPROJECT No.:DRAWN BY:REVIEWED BY:SEAL:PREPARED BY:No.DESCRIPTIONDATEREVISIONSNo.DESCRIPTIONDATEPlotted By: Spencer Bernard Layout: I-302 Printed On: 1/28/2022 8:21 AM File Name: P-43PRIME.dwg
ORIGINAL SIZE 24X36ENTITLEMENTDRAWINGSNOT FORCONSTRUCTION 419 Canyon Ave. Suite 200 Fort Collins, CO 80521phone 970.224.5828 | fax 970.225.6657 | www.ripleydesigninc.comNORTH0051020SCALE: 1"=10'-0"OWNERPDP09/26/2018FORTY-THREE PRIMEFDP SUBMITTALFORT COLLINS, COPDPFDP11/14/201807/28/2021RIPLEY DESIGN INC.Russ Lee419 Canyon Ave. Suite 200Fort Collins, CO 80521p. 970.224.5828HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979ENGINEERARCHITECTURELAND PLANNERNORTHERN ENGINEERINGFred Wegert301 N. Howes StreetSuite 100Fort Collins, CO 80521p. 970.221.4158HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979OWNERFDP11/17/2021SJBCBKIRRIGATIONDETAILSNOTES:1. USE VALVE BOX EXTENSION AS NECESSARY TO ACHIEVE MINIMUM DIMENSIONS ABOVE ASSEMBLY.2. NOMINAL SIZE OF ALL COMPONENTS ARE TO BE THE SAME NOMINAL SIZE AS THE SOLENOID VALVE(SIZED AS SHOWN).3. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TO SECURE FABRIC TOPIPE AND VALVE BOX.4. TRANSITION TO PROPER LATERAL PIPE BURIAL DEPTH USING 45° ELBOW FITTINGS DOWNSTREAMOF REMOTE CONTROL VALVE ASSEMBLY.5. DO NOT CUT OUT ENDS OF VALVE BOX UNNECESSARILY.6. POSITION VALVE BOX OVER VALVE TO ALLOW ACCESS TO SOLENOID AND PROPER OPERATION OFBALL VALVE.7. COIL 3-FEET OF WIRE FOR EACH DECODER FOR SERVICE PURPOSES.ABCDEFGIKLMNOPQRSTUVJHA.DECODERB.WIRE FROM DECODER TO VALVE SEE SPECIFICATIONSC.PVC BALL VALVED.REMOTE CONTROL VALVEE.WIRE CONNECTOR FROM TWO-WIRE CABLE TODECODER (1 OF 2)F.CHRISTY ID TAGG.FINISH GRADEH.PVC SCH 80 CLOSE NIPPLEI.WIRE CONNECTOR FROM DECODER TO SOLENOIDVALVE (1 OF 2)J.PVC SCH 40 MALE ADAPTERK.12" STANDARD VALVE BOX WITH COVERL.PVC LATERAL PIPEM.FILTER FABRICN.PVC SCH 80 TOE NIPPLE (LENGTH AS REQUIRED)O.PVC SCH 40 ELP.PVC SCH 40 PIPE (LENGTH AS REQUIRED)Q.BRICK (1 OF 4)R.PVC MAINLINES.TWO-WIRE CABLET.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELU.TEE OR EL: SEE SPECIFICATIONS FOR MATERIALSV.PVC SCH 80 TOE NIPPLE (LENGTH AS REQUIRED,HIDDEN) AND PVC SCH 40 ELNOTE:1. NOMINAL SIZE OF GATE VALVE TO MATCH NOMINAL MAINLINE SIZE.ABCDEFGHIA.FINISH GRADE/TOP OF MULCHB.10" ROUND VALVE BOX WITH COVERC.6" PVC CL 200 PIPE (LENGTH AS REQUIRED)D.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELE.BRICK (1 OF 2)F.THREADED BRONZE GATE VALVE WITH SOLIDWEDGE, NON-RISING STEMG.PVC MAINLINEH.PVC SCH 40 MALE ADAPTER (1 OF 2)I.TRACING WIREABCDEFGHIA.FINISH GRADE/TOP OF MULCHB.QUICK-COUPLING VALVEC.10" ROUND VALVE BOX WITH COVERD.HARCO QUICK COUPLER ANCHORE.PVC SCH 80 TOE NIPPLE (LENGTH ASREQUIRED)F.BRICK (1 OF 2)G.PRE-FABRICATED UNITIZED SWING JOINT 1"MIPT INLET X SOC OUTLETH.TEE OR EL: SEE SPECIFICATIONS FORMATERIALSI.PVC MAINLINE PIPEJ.TRACING WIRENOTES:1. FURNISH FITTINGS AND PIPING NOMINALLY SIZED IDENTICAL TO NOMINAL QUICKCOUPLING VALVE INLET SIZE.2. INSTALLATION HEIGHT OF QUICK COUPLER VALVE IN VALVE BOX MUST ASSURE PROPEROPERATION OF QUICK COUPLER KEY.3. INSTALL SWING JOINT LAY ARM BETWEEN 30° AND 45° OF LATERAL PIPE IN ORDER TOABSORB DOWNWARD IMPACT.JSEE NOTE #1NOTE:1. INSTALL SWING JOINT LAY ARM BETWEEN 30° AND 45° OF LATERAL PIPE TO ABSORBDOWNWARD IMPACT.ABCDEA.FINISH GRADEB.POP-UP ROTOR SPRINKLERC.PRE-FABRICATED PVC SWING JOINTMIPT INLET x MIPT OUTLETD.PVC LATERAL PIPEE.PVC SCH 40 TEE OR ELABCDEFA.FINISH GRADE/TOP OF MULCHB.POP-UP SPRAY SPRINKLERC.SWING PIPE, 12" LENGTHD.1/2" MALE NPT x BARB ELE.PVC SCH 40 TEE OR ELF.PVC LATERAL PIPEDABCDEFGHIJA.JUMBO VALVE BOX WITH EXTENSION ANDCOVER (HEIGHT AS REQUIRED)B.FINISH GRADE/TOP OF MULCHC.AIR VACUUM RELIEF VALVED.PVC SCH 80 NIPPLE (LENGTH AS REQUIRED)E.PVC SCH 40 BALL VALVE (SIZE 1")F.PVC SCH 80 NIPPLE (LENGTH AS REQUIRED)G.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELH.BRICK (1 OF 4)I.PVC MAINLINE PIPEJ.TEE OR EL: SEE SPECIFICATIONS FORMATERIALSK.TRACING WIRENOTES:1. OPEN BALL VALVE IN ASSEMBLY 1/4 TURN UNTIL IRRIGATION SYSTEM IS FULLY CHARGED WITH WATER.2. CLOSE VALVE DURING WINTERIZATION AND OPEN 1/2 TURN AFTER WINTERIZATION OF SYSTEM TOPROTECT VALVE DURING FREEZING WEATHER.3. REPLACE PVC BALL VALVE WITH BRASS BALL VALVE IN THE EVENT AN AIR VACUUM RELIEF VALVE WITHMALE INLET IS USED.K1AIR\VACUUM RELIEFVALVE ASSEMBLYN.T.S.2ISOLATION GATE VALVE ASSEMBLY(2.5" AND SMALLER)N.T.S.3QUICK COUPLING VALVEASSEMBLYN.T.S.4REMOTE CONTROL VALVEASSEMBLYN.T.S.5POP-UP SPRAY SPRINKLERASSEMBLYN.T.S.6POP-UP ROTOR SPRINKLERASSEMBLYN.T.S.QI-302 OF 703FDP03/23/2022
DRAWING NUMBER:ISSUEDPROJECT No.:DRAWN BY:REVIEWED BY:SEAL:PREPARED BY:No.DESCRIPTIONDATEREVISIONSNo.DESCRIPTIONDATEPlotted By: Spencer Bernard Layout: I-303 Printed On: 1/28/2022 8:21 AM File Name: P-43PRIME.dwg
ORIGINAL SIZE 24X36ENTITLEMENTDRAWINGSNOT FORCONSTRUCTION 419 Canyon Ave. Suite 200 Fort Collins, CO 80521phone 970.224.5828 | fax 970.225.6657 | www.ripleydesigninc.comNORTH0051020SCALE: 1"=10'-0"OWNERPDP09/26/2018FORTY-THREE PRIMEFDP SUBMITTALFORT COLLINS, COPDPFDP11/14/201807/28/2021RIPLEY DESIGN INC.Russ Lee419 Canyon Ave. Suite 200Fort Collins, CO 80521p. 970.224.5828HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979ENGINEERARCHITECTURELAND PLANNERNORTHERN ENGINEERINGFred Wegert301 N. Howes StreetSuite 100Fort Collins, CO 80521p. 970.221.4158HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979OWNERFDP11/17/2021SJBCBKIRRIGATIONDETAILSROOT BALLABCDEFGHIA.WATER BASINB.BUBBLER NOZZLEC.FINISH GRADED.POP-UP SPRAY SPRINKLER W/ BUBBLERE.1/2" MALE NPT x 0.490" BARB ELF.SWING PIPE, 12" LENGTHG.1/2" MALE NPT x 0.49" BARB ELH.PVC LATERAL PIPEI.PVC SCH. 40 TEE OR ELABCDEFHQKLMNOPQRSTIGJA.PRESSURE REGULATING FILTERB.WIRE FROM DECODER TO VALVE SEESPECIFICATIONSC.DECODERD.WIRE CONNECTOR FROM TWO-WIRE CABLETO DECODER (1 OF 2)E.CHRISTY I.D. TAGF.JUMBO VALVE BOX WITH COVERG.PVC BALL VALVEH.FINISH GRADE/TOP OF MULCHI.PVC SCH 80 NIPPLEJ.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELK.REMOTE CONTROL VALVEL.PVC SCH 80 TOE NIPPLEM.PVC SCH 40 ELN.PVC SCH 40 PIPE (TYPICAL) (LENGTH ASREQUIRED)O.FILTER FABRICP.BRICK (1 OF 4)Q.MANIFOLD/DRIP LATERAL. SEE NOTE 8.R.TWO-WIRE CABLES.TEE OR EL: SEE SPECIFICATIONS FORMATERIALST.PVC SCH 80 TOE NIPPLE (LENGTH ASREQUIRED, HIDDEN) AND PVC SCH 40 ELNOTES:1. USE VALVE BOX EXTENSION AS NECESSARY TO ACHIEVE MINIMUM DIMENSIONS ABOVE ASSEMBLY.2. NOMINAL SIZE OF ALL COMPONENTS ARE TO BE THE SAME NOMINAL SIZE AS THE SOLENOID VALVE(SIZED AS SHOWN).3. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TO SECURE FABRICTO PIPE AND VALVE BOX.4. TRANSITION TO PROPER LATERAL PIPE BURIAL DEPTH USING 45° ELBOW FITTINGS DOWNSTREAMOF REMOTE CONTROL VALVE ASSEMBLY.5. DO NOT CUT OUT ENDS OF VALVE BOX UNNECESSARILY.6. POSITION VALVE BOX OVER VALVE TO ALLOW ACCESS TO SOLENOID, AND PROPER OPERATION OFBALL VALVE.7. COIL 3-FEET OF WIRE FOR EACH DECODER FOR SERVICE PURPOSES.8. IN CASES OF DIRECT DRIP LATERAL PIPE CONNECTION INSTALL SCH. 40 PVC BARB FITTING TOPRESSURE REGULATING BASKET. SECURE CONNECTION WITH STAINLESS STEEL PINCH CLAMPS.9. SEE DECODER GROUNDING SCHEMATIC FOR ADDITIONAL DECODER GROUNDING INFORMATION.XXXXXXXXXXXXXXXXXXXXXXXXNOTES:1. EMITTERS SHALL BE LOCATED IMMEDIATELY ADJACENT TO PERENNIALS AND ATTHE OUTSIDE PERIMETER OF THE PLANTING PIT OF ALL SHRUBS AND TREES.2. INSTALL FOUR 1 GPH EMITTERS PER DECIDUOUS TREE.3. INSTALL THREE 1 GPH EMITTER PER CONIFEROUS TREE.4. INSTALL TWO 1 GPH EMITTER PER SHRUB.5. INSTALL ONE 1 GPH EMITTER PER PERENNIAL.ABCDEFA.DRIP LATERAL PIPEB.CONIFEROUS TREEC.DECIDUOUS TREED.EMITTERE.SHRUBF.PERENNIALNOTE:1. INSTALL FLUSH CAP ASSEMBLY AT THE END OF EACHDRIP LATERAL SEGMENT.ABCDEFA.FINISH GRADE/TOP OF MULCHB.6" ROUND VALVE BOX WITH COVERC.FLUSH CAP WITH HOSE THREAD CAPD.DRIP IRRIGATION LATERALE.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELF.BRICK (1 OF 2)ABCDEFGHIJKLMNOA.6" ROUND VALVE BOX WITH COVERB.FINISH GRADE/TOP OF MULCHC.PVC SCH. 40 ELD.PVC BALL VALVEE.PVC SCH. 40 TRANSITION NIPPLE(MIPTxMHT)F.COMPRESSIONxFEMALE HOSESWIVEL ADAPTERG.DRIP LATERAL PIPINGH.3" MINIMUM DEPTH OF 3/4" WASHEDGRAVELI.BRICK (1 OF 2)J.PVC SCH 80 NIPPLE (LENGTH ASREQUIRED, 1 OF 2)K.PVC SCH 40 ELL.PVC SCH 40 STREET EL (1 OF 2)M.PVC DRIP MANIFOLD PIPEN.PVC SCH 40 TEE OR ELO.PVC SCH 80 NIPPLE (LENGTH ASREQUIRED)1POP-UP BUBBLER ASSEMBLYN.T.S.2DRIP REMOTE CONTROLVALVE ASSEMBLYN.T.S.3ZONE CONTROLVALVE ASSEMBLYN.T.S.4TYPICAL DRIP LAYOUTN.T.S.5FLUSH CAPASSEMBLYN.T.S.I-303 OF 703FDP03/23/2022
DRAWING NUMBER:ISSUEDPROJECT No.:DRAWN BY:REVIEWED BY:SEAL:PREPARED BY:No.DESCRIPTIONDATEREVISIONSNo.DESCRIPTIONDATEPlotted By: Spencer Bernard Layout: I-304 Printed On: 1/28/2022 8:21 AM File Name: P-43PRIME.dwg
ORIGINAL SIZE 24X36ENTITLEMENTDRAWINGSNOT FORCONSTRUCTION 419 Canyon Ave. Suite 200 Fort Collins, CO 80521phone 970.224.5828 | fax 970.225.6657 | www.ripleydesigninc.comNORTH0051020SCALE: 1"=10'-0"OWNERPDP09/26/2018FORTY-THREE PRIMEFDP SUBMITTALFORT COLLINS, COPDPFDP11/14/201807/28/2021RIPLEY DESIGN INC.Russ Lee419 Canyon Ave. Suite 200Fort Collins, CO 80521p. 970.224.5828HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979ENGINEERARCHITECTURELAND PLANNERNORTHERN ENGINEERINGFred Wegert301 N. Howes StreetSuite 100Fort Collins, CO 80521p. 970.221.4158HARVEST LAND COMPANY855 NORWAY MAPLE DRIVELOVELAND, CO 80538p. 970.227.979OWNERFDP11/17/2021SJBCBKIRRIGATIONDETAILS1HYDRAULIC ESTIMATEN.T.S.2ANNUAL WATER USE CHARTDETAILN.T.S.3IRRIGATION CONTROLLERPEAK IRRIGATION SCHEDULENOTES:1. THE PEAK SEASON RUN TIME HAS BEEN CALCULATED ASSUMING AN IRRIGATION EFFICIENCY OF 70% AND A PEAKSEASON ETo OF 0.21 INCHES/DAY. THE CROP COEFFICIENT IS ASSUMED TO BE 0.8 FOR TURF.2. THE POC SIZE WAS CALCULATED FOR A 8 HR X 6 DAYS/WEEK IRRIGATION WINDOW TO IRRIGATE THE TURF GRASS.3. ADJUST INDIVIDUAL STATION RUN TIMES AS NECESSARY TO ACCOMMODATE TURF/PLANT ESTABLISHMENT, TURF TYPE,TURF/PLANT SOLAR EXPOSURE, SOIL TYPES, WIND, AND SLOPE.4. ADJUST DRIP RUN TIMES AS NECESSARY FOR PLANT ESTABLISHMENT. RECORD RUN TIMES ON THE RECORD DRAWINGS.5. BLANK ITEMS TO BE COMPLETED ON AS-BUILT DRAWINGS BY CONTRACTOR. SOIL TYPE - CLAY, SAND, LOAM, ETC. SLOPE- NONE, GENTLE, MILD, STEEP. MICROCLIMATE - SHADE, PARTIAL SUN/SHADE, FULL SUN.6. PROVIDE LAMINATED COPY OF PEAK IRRIGATION SCHEDULE WITHIN IRRIGATION CONTROLLER ENCLOSURE.I-304 OF 703FDP03/23/2022