ITEM NO. 19
MEETING DATE 1/21/97
STAFF Mike Ludwig
City of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Park South PUD, 3rd Replat, Preliminary and Final, #46-88G.
APPLICANT: Marc Middel Enterprises
c/o Linda Ripley
V-F-Ripley
1113 Stoney Hill Drive CpIJT� ll
Fort Collins, CO 80525
OWNER: Marc Middel
1407 South College Avenue
Fort Collins, CO 80524
PROJECT DESCRIPTION:
This is a request for 73 single-family lots on 13.34 acres known as Parcel A-1 of the Park
South Amended Overall Development Plan; a residential density of 5.47 dwelling units per
acre. The property is located at the southwest corner of West Horsetooth Road and
Manhattan Avenue and is zoned R-L-P, Low Density Planned Residential.
RECOMMENDATION: Approval with a variance and a condition.
EXECUTIVE SUMMARY:
This request for Preliminary and Final PUD approval:
• is consistent with the City's Comprehensive Plan and the land use designated for
Parcel A-1 of the Park South Amended Overall Development Plan; and
• achieves 90% of the maximum applicable points (90 base points) on the Residential
Uses Activity Chart (Point Chart H), exceeding the minimum required 60 points for
a proposed density of 5.47 dwelling units per acre and exceeding the minimum
required 40 base points; and
• satisfies all applicable All -Development Criteria of the LDGS except for A-1.1 "Solar
Orientation"; and
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT
Park South PUD, 3rd Replat, Preliminary and Final, #46-88G
January 27, 1997 P&Z Meeting
Page 2
Park South PUD, 3rd Replat, Preliminary and Final, #46-88G
January 27, 1997 P&Z Meeting
Page 2
can be granted a variance to All -Development Criteria A-1.1 "Solar Orientation" on
the basis that granting of the variance would neither be detrimental to the public
good nor impair the intent and purposes of this section; and that the plan submitted
is equal to or better than such plan incorporating the provision for which a variance
is requested; and
is compatible with surrounding land uses; and
complies with the City's Transportation policies for traffic volumes and levels of
service.
COMMENTS
Background:
The surrounding zoning and land uses are as follows:
N: R-L-P;
Horsetooth Road, existing church (Southside Baptist Church), existing
single-family residential (Foothills Park Subdivision)
R-P;
Horsetooth Road, existing single-family residential (Warren Farms),
vacant (planned residential and commercial)
S: R-L-P;
existing single-family residential (Park South PUD)
E: H-B;
existing movie theater (Carmike 10), railroad (Burlington Northern),
varied commercial (Bowling Alley, Creger Plaza, etc.)
W: R-L-P;
existing single-family residential (Four Seasons)
The property was originally part of the Park South P.U.D. approved in Larimer County on
April 3, 1978. The property was annexed in 1980 with the agreement that the County
approved P.U.D. had legal validity. This County approved P.U.D. plan called for 143
single-family, zero lot line homes, with common landscaped areas and served by private
drives. Two street improvements were constructed to serve the original P.U.D.: Manhattan
Avenue and Stream Court.
In August of 1988, the Planning and Zoning Board denied a request to amend the Park
South Master Plan to allow 44 single-family lots, 14 zero lot line units and 233,000 square
feet of office, commercial, and retail uses. This denial was based on the finding that the
proposed land uses would create demands on the transportation facilities which would
exceed the capacity of the existing and future transportation network of the City. In
November of 1988, the City Council upheld this denial on appeal.
•
0
Park South PUD, 3rd Replat, Preliminary and Final, #46-88G
January 27, 1997 P&Z Meeting
Page 3
On September 23, 1991 the Planning and Zoning Board approved the Park South
Amended Overall Development Plan on 34.3 acres.
On December 16, 1991, the Planning and Zoning Board approved the first residential filing
based on the Park South P.U.D. Amended Overall Development Plan. This filing was
referred to as Four Seasons Seventh Filing and consisted of nine single family lots on two
acres of Parcel C, a residential density of 4.5 dwelling units per acre. The identification to
Four Seasons and not Park South was due to the orientation of to Benthaven Drive and
inclusion to the Four Seasons Homeowner's Association.
On March 23, 1992 the Planning and Zoning Board approved the Park South P.U.D., First
Replat to allow 23 single family lots on 3.91 acres of Parcel C, a residential density of 5.88
dwelling units per acre.
On July 27, 1992 the Planning and Zoning Board approved the Park South P.U.D., Second
Replat to allow 91 single-family dwelling units on 15.54 acres of Parcel C, a residential
density of 5.86 dwelling units per acre.
On September 9, 1996 the Planning and Zoning Board approved, by a vote of 3-2, an
amendment to the Park South Amended Overall Development Plan (thereby creating the
existing ODP). The amendment allowed a change of uses on the subject 13.34 acres from
neighborhood convenience shopping center and duplex housing or offices to single family
housing. The approval by the Planning and Zoning Board was upheld by the City Council
on appeal by a vote of 4-2 on November 12, 1996. The Resolution making findings of fact
and conclusions regarding the appeal of the Planning and Zoning Board's approval was
approved by the City Council by a vote of 6-0 on November 19, 1996.
2. Land Use:
This is a request for 73 single-family lots on 13.34 acres known as Parcel A-1 of the Park
South Amended Overall Development Plan; a residential density of 5.47 dwelling units per
acre. The property is located at the southwest corner of West Horsetooth Road and
Manhattan Avenue and is zoned R-L-P, Low Density Planned Residential.
A. Overall Development Plan:
The existing Park South Amended Overall Development Plan allows a maximum of 75
single-family dwelling units on Parcel A-1. The request for 73 single-family dwelling units
is consistent with the approved Park South Amended Overall Development Plan. In
approving the existing Park South Amended Overall Development Plan, the City
determined that the Amended ODP was in compliance with the City's Comprehensive Plan.
By virtue of being consistent with the Amended Overall Development Plan, the Park South
PUD, 3rd Replat is also consistent with the City's Comprehensive Plan.
Park South PUD, 3rd Replat, Preliminary and Final, #46-88G
January 27, 1997 P&Z Meeting
Page 4
B. Residential Uses Activity Chart (Point Chart H):
The request was evaluated against the Residential Uses Activity Chart (Point Chart H) of
the Land Development Guidance System and earns 90% of the maximum applicable
points, exceeding the minimum required 60 points for a residential density of 5.47 dwelling
units per acre. All 90 point are earned from the Base/Locational Criteria, exceeding the
minimum required 40 points. Points were awarded for the following criterion:
a. being located within 2, 000 feet of an existing neighborhood shopping center-
20 points.
The entire project is within 2,000 feet of Creger Plaza (Albertson's
Supermarket and other retail stores).
C. being located within 4,000 feet of an existing community and regional
shopping center, or a community/regional shopping center to constructed as
part of the project - 10 points.
The entire project is located within 4,000 feet of Foothills Fashion Mall.
d. being located within 3,500 feet of an existing neighborhood or community
park, or community facility (except golf courses) - 20 points.
The entire project is within 3,500 feet of Troutman Park.
e. being located within 2,500 feet of an existing school, meeting all
requirements of the State of Colorado compulsory education laws - 10
points.
The entire project is within 2,500 feet of Lopez Elementary School.
having a boundary contiguous to existing urban development - 30 points.
Approximately 78% of the project boundary is contiguous to existing urban
(city) development. Only 50% contiguity is required for the full 30 points.
C. All -Development Criteria:
This Preliminary and Final PUD request satisfies all applicable All -Development Criteria of
the LDGS except for A-1.1 "Solar Orientation".
Park South PUD, 3rd Replat, Preliminary and Final, #46-88G
January 27, 1997 P&Z Meeting
Page 5
All development Criteria A-1.1 requires at least 65% of the lots less than fifteen thousand
(15,000) square feet in area in single- and two-family residential developments to conform
to the definition of a "solar oriented lot" in order to preserve the potential solar energy
usage. Only 29% (21 of 73) of the lots within the proposed PUD are meet the definition
of "solar oriented" lot. Attached is a variance request dated January 8, 1997, from Lucia
Liley on behalf of the developer, Marc Middel.
D. Variance Request:
Section K, Variance Procedures, of the LDGS states:
"The Planning and Zoning Board is empowered to grant variances to the provisions of this
section (the LDGS). The decision of the Planning and Zoning Board on any application for
a variance shall be set forth in writing in the minutes of the meeting of the Board. Variance
requests may be granted if the Board determines that the granting of the variance would
neither be detrimental to the public good nor impair the intent and purposes of this section
and if the applicant demonstrates:
(1) That by reason of exceptional topographical, soil or other subsurface
conditions or other conditions peculiar to the site, undue hardship would be
caused to a subdivider by the strict application of any provisions of this
section, or
(2) That by reason of exceptional conditions or difficulties with regard to solar
orientation or access, undue hardship would be caused to a subdivider by
the strict application of any provisions of this section, or
(3) That the plan as submitted is equal to or better than such plan incorporating
the provision for which a variance is requested, or
(4) The granting of a variance from the strict application of any provision would
result in a substantial benefit to the City by reason of the fact that the
proposed project would help satisfy a defined community need (such as
affordable housing or historic preservation) or would alleviate an existing
problem (such as traffic congestion or urban blight), and the strict application
of such a provision would render the project practically unfeasible."
As stated in Ms. Liley's Variance request, this property is the final phase of an in -fill
development. The parcel has only two fixed points of access (Haven Drive from Manhattan
Avenue on the east and Rockaway Street on the southwest). Strict compliance with the
solar orientation criteria would require streets to have an east/west alignment rather than
a north/south alignment. The east/west alignment would cause some lots to be extremely
deep and would cause a reduction in the number of dwelling units and density. Staff feels
Park South PUD, 3rd Replat, Preliminary and Final, #46-88G
January 27, 1997 P&Z Meeting
Page 6
that a reduction in density would be more detrimental to City Policies than the loss of solar
oriented lots.
Therefore, Staff recommends approval of the applicant's variance request on the basis that
granting of the variance would neither be detrimental to the public good nor impair the
intent and purposes of this section; and that the plan submitted is equal to or better than
such plan incorporating the provision for which a variance is requested.
3. Dec:
The proposed layout of the Park South PUD, 3rd Replat basically consists of three
north/south oriented cul-de-sacs. This PUD application was submitted prior to the adoption
of the new City Street Standards. Therefore, 36 foot wide residential streets with roll-over
curbs and five foot wide attached sidewalks are proposed. One street tree is proposed per
lot behind the sidewalk. Five foot wide sidewalk connections are provided from the end of
each cul-de-sac to the sidewalk along West Horsetooth Road. A six foot high wood fence
is proposed along the north, west and east property lines. This fence will taper down to a
four foot height at each of the sidewalk connections at the ends of the cul-de-sacs. Street
trees to be maintained by the City of Fort Collins are proposed between the curb and
detached sidewalk along Manhattan Avenue.
4. Neighborhood Compatibility:
On September 9, 1996 the Planning and Zoning Board approved the current, Park South
Amended Overall Development Plan by a 3-2 vote. In making it's decision to amend the
previous ODP, the Board determined that single-family residential housing was compatible
with the surrounding land uses. The Planning and Zoning Board's approval was upheld
on appeal by the City Council on November 12, 1996.
A neighborhood meeting was held on March 14, 1996 regarding this request to amend the
Overall Development Plan to allow 75 single-family lots. Minutes of the neighborhood
meeting are attached. Concerns expressed at the neighborhood meeting were generally
related to the proposed density (too high), the height of houses and number of houses
along the west property line, and storm drainage issues.
The main issues that remain for the appellants of the ODP decision are as follows: the
number of houses proposed along the west property line (10); the setback distance of the
houses from the rear property line (building envelope is 15 feet from the rear property line);
the height of the houses (request that all houses along the west property line be limited to
one-story); and the building materials (request that they be brick units that are similar to
the Village at Four Seasons).
Park South PUD, 3rd Replat, Preliminary and Final, #46-88G
January 27, 1997 P&Z Meeting
Page 7
Staff has evaluated the neighbors' concerns and offers the following response:
First, there is no land use conflict between the two properties as the Village at Four
Seasons are duplex units and the Park South 3rd Replat is single-family residential.
Second, fifteen feet is the minimum rear yard set back distance for the R-L Zoning
District. If the applicant wasn't proposing a PUD, they would be able to submit a
use -by -right subdivision subject to this minimum setback distance. To mandate
more has no basis.
Third, the duplex units of the Village at four seasons are approximately 19 to 20 feet
at their peak height. However, the finished floor elevation of these units are
approximately 5 feet higher than the lots proposed on the Park South 3rd Replat.
From the Park South property, the Village at Four Seasons units have a relative
height of approximately 25 feet. A typical two-story single-family unit (as proposed
in the Park South PUD 3rd Replat) is approximately 26 feet tall. Therefore the
buildings on both properties will have the appearance of being the same height.
Fourth, the only criteria the City has regarding building heights are A-2.8 "Building
Heights and Views", and A-2.9 "Shading". A-2.8 is not applicable as no building will
be greater than 40 feet. A-2.8 is satisfied in that a two-story house setback a
minimum of 15 feet from the rear property line will not cast a shadow greater than
a 25-foot hypothetical wall on the property line.
Fifth, the applicant is providing two trees per lot along the west property line. In
addition, attached is a letter of agreement signed by Marc Middel and the Board of
Directors of the Four Seasons Homeowner's Association which states that the two
parties will share equally the cost of constructing a new 6 foot high wood fence
along the west property line (on the Four Seasons Village property).
Sixth, City Staff cannot specify building materials on the proposed Park South PUD
3rd Replat dwelling units as Staff does not review single-family housing building
elevations in the PUD process. Therefore, All -Development Criteria A-2.7 is not
applicable.
Staff recommends that the Park South PUD, 3rd Replat is compatible with surrounding
land uses as proposed.
5. Transportation:
Vehicular access is proposed from Manhattan Avenue (via Haven Drive) and from
Rockaway Street at the southwest corner of the property. Pedestrian access is provided
to Horsetooth Road from the ends of each of the cul-de-sacs. Approximately 695 average
daily vehicle trips will be generated by the 73 single-family dwelling units. All intersections
studied will operate at acceptable levels of service.
Park South PUD, 3rd Replat, Preliminary and Final, #46-88G
January 27, 1997 P&Z Meeting
Page 8
6. Stormwater:
The need for stormwater detention resulted in a loss of two lots from the 75 dwelling units
anticipated on the overall development plan. In addition to handling all on -site flows
according to Stormwater Utility Criteria, the development will be receiving off -site flows
from the west, thereby alleviating storm drainage problems for the Villages at Four
Seasons. All Stormwater Utility criteria are satisfied.
FINDINGS OF FACT/CONCLUSION:
The Park South PUD, 3rd Replat, Preliminary and Final, #46-88G is consistent with
the City's Comprehensive Plan and the land use designated for Parcel A-1 of the
Park South Amended Overall Development Plan.
2. The Park South PUD, 3rd Replat, Preliminary and Final, #46-88G achieves 90% of
the maximum applicable points (90 base points) on the Residential Uses Activity
Chart (Point Chart H), exceeding the minimum required 60 points for a proposed
density of 5.47 dwelling units per acre and exceeding the minimum required 40
base points.
3. The Park South PUD, 3rd Replat, Preliminary and Final, #46-88G satisfies all
applicable All -Development Criteria of the LDGS except for A-1.1 "Solar
Orientation".
4. The Park South PUD, 3rd Replat, Preliminary and Final, #46-88G can be granted
a variance to All -Development Criteria A-1.1 "Solar Orientation" on the basis that
granting of the variance would neither be detrimental to the public good nor impair
the intent and purposes of this section; and that the plan submitted is equal to or
better than such plan incorporating the provision for which a variance is requested.
5. The Park South PUD, 3rd Replat, Preliminary and Final, #46-88G is compatible with
surrounding land uses.
6. The Park South PUD, 3rd Replat, Preliminary and Final, #46-88G complies with the
City's Transportation policies for traffic volumes and levels of service.
RECOMMENDATION:
Staff recommends denial of the Park South PUD, 3rd Replat, Preliminary and Final, #46-
88G with following condition:
Park South PUD, 3rd Replat, Preliminary and Final, #46-88G
January 27, 1997 P&Z Meeting
Page 9
The Planning and Zoning Board approves this planned unit development final
plan upon the condition that the development agreement, final utility plans,
and final P.U.D., plans for the planned unit development be negotiated
between the developer and City staff and executed by the developer prior to
the second monthly meeting (March 24, 1997) of the Planning and Zoning
Board following the meeting at which this planned unit development final plan
was conditionally approved; or, if not so executed, that the developer, at said
subsequent monthly meeting, apply to the Board for an extension of time. The
Board shall not grant any such extension of time unless it shall first find that
there exists with respect to said planned unit development final plan certain
specific unique and extraordinary circumstances which require the granting
of the extension in order to prevent exceptional and unique hardship upon the
owner or developer of such property and provided that such extension can be
granted without substantial detriment to the public good.
If the staff and the developer disagree over the provisions to be included in
the development agreement, the developer may present such dispute to the
Board for resolution if such presentation is made at the next succeeding or
second succeeding monthly meeting of the Board. The Board may table any
such decision, until both the staff and the developer have had reasonable time
to present sufficient information to the Board to enable it to make its decision.
(If the Board elects to table the decision, it shall also extend the term of this
condition until the date such decision is made).
If this condition is not met within the time established herein (or as extended,
as applicable), then the final approval of this planned unit development shall
become null and void and of no effect. The date of final approval for this
planned unit development shall be deemed to be the date that the condition
is met, for purposes of determining the vesting of rights. For purposes of
calculating the running of time for the filing of an appeal pursuant to Chapter
2, Article II, Division 3, of the City Code, the "final decision" of the Board shall
be deemed to have been made at the time of this conditional approval;
however, in the event that the dispute is presented to the Board for resolution
regarding provisions to be included in the development agreement, the
running of time for the filing of an appeal of such "final decision" shall be
counted from the date of the Board's decision resolving such dispute.
0
MARCH & MYATT, P.C.
ATTORNEYS AND COUNSELORS AT LAW
ARTHUR E. MARCH, JR. 110 EAST OAK STREET
RAMSEY D. MYATT
FORT COLLINS, COLORADO 80524-2880
ROBERT W. BRANDES, JR.
RICHARD S. GAST
(970) 482-4322
LUCIA A. LILEY
TELECOPIER (970) 482-3038
J. BRADFORD MARCH
LINDA S. MILLER
JEFFREY J. JOHNSON
MATTHEW J. DOUGLAS
January 21, 1997
Planning and Zoning Board
City of Fort Collins
300 LaPorte Avenue
Fort Collins, CO 80521
ARTHUR E. MARCH
1909-1981
MAILING ADDRESS:
P.O. BOX 469
FORT COLLINS, CO 80522-0469
JAN 21 RECD
HAND DELIVERED
Re: Park South P.U.D. Third Replat, Preliminary and Final
Request for Solar Orientation Variance
Dear Planning and Zoning Board Members:
The purpose of this correspondence is to clarify that the
request for solar orientation variance filed January 8, 1997 on
behalf of Horsetooth, Ltd., Marc Middel and Middel Enterprises,
Inc. is based on Sections (2) and (3) of LDGS §29-526 (K) .
By:
LAL/jpk
pc: Horsetooth, Limited
Sincerely,
MARCH & MYATT, P.C.