[3/22/22 RESPONSES IN RED BELOW EACH COMMENT] fcgov.com/developmentreview
March 11, 2022
Brian Carnahan
3006 ROCKBOROUGH CT
Fort Collins, CO 805252335
RE: 3006 Rockborough Court ‑ REPLAT, BDR220001, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of 3006 Rockborough Court ‑ REPLAT. If you have questions
about any comments, you may contact the individual commenter or direct your questions
through your Development Review Coordinator, Brandy Bethurem Harras via phone at
970‑416‑2744 or via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970‑416‑2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 1
02/14/2022: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
NOTED, NO RESPONSE.
Comment Number: 2
02/14/2022: INFORMATION:
As part of your resubmittal, you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable, avoiding responses like noted or acknowledged.
NOTED, NO RESPONSE.
Comment Number: 3
02/14/2022: INFORMATION:
Please follow the Electronic Submittal Requirements and File Naming
Standards found at https://www.fcgov.com/developmentreview/files/electronic
submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888.
File names should begin with the file type, followed by the project information,
and round number.
Example: UTILITY PLANS_PROJECT NAME_PDP_Rd2.pdf
File type acronyms maybe appropriate to avoid extremely long file names.
Example: TIS for Traffic Impact Study, ECS for Ecological Characterization Study.
*Please disregard any references to paper copies, flash drives, or CDs.
NAMING CONVENTION USED
Comment Number: 4
02/14/2022: NFORMATION:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be
removed from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set,
and these must be removed prior to submittal as they can cause issues with the
PDF file. The default setting is "1" ("on") in AutoCAD. To change the setting
and remove this feature, type "EPDFSHX" in the command line and enter "0".
Read this article at Autodesk.com for more tips on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
cles/sfdcarticles/Drawing‑text‑appears‑as‑Comments‑in‑a‑PDF‑created‑by‑Aut oCAD.html
UPDATED DEFAULT IN CAD
Comment Number: 5
02/14/2022: INFORMATION:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut‑off for routing the same week. When you are ready to resubmit your
plans, please notify me with as much advanced notice as possible.
NOTED, NO RESPONSE.
Comment Number: 6
02/14/2022: INFORMATION:
Temporary Service Changes ‑ City of Fort Collins Development Review
In order to continue providing thorough reviews and giving every project the
attention it deserves, the City of Fort Collins is implementing temporary
changes in how we serve our development customers. As you may be aware,
we are experiencing staff shortages in a number of key departments, which has
begun to impact the timeliness of our reviews. We recognize that development
and construction play a critical role in our community’s vibrancy and economic
recovery, and we have been exploring options for mitigating impacts to our
customers. As a result, we will be making some temporary service changes.
Beginning Monday May 10, 2021, one additional week of review time will be
added to all 1st and 2nd round submittals (increase from 3 weeks to 4 weeks).
NOTED, NO RESPONSE.
Comment Number: 7
02/14/2022: INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the
expiration of your project. (LUC 2.211 Lapse, Rounds of Review).
NOTED, NO RESPONSE.
Comment Number: 8
02/14/2022: FOR FINAL APPROVAL:
The Director shall issue a written decision to approve, approve with conditions,
or deny the development application based on compliance with the standards
referenced in Step 8 of the Common Development Review Procedures
(Section 2.2.8).
The written decision shall be mailed to the applicant, to any person who
provided comments during the comment period and to the abutting property
owners and shall also be posted on the City's website at HYPERLINK "http://www.fcgov.com" www.fcgov.com.
NOTED, NO RESPONSE.
Comment Number: 9
02/14/2022: FOR FINAL APPROVAL:
If the project is approved by the Director, there is a two‑week appeal period
from the date of the decision. The project is not able to be recorded until it is
confirmed there are no appeals.
NOTED, NO RESPONSE.
Comment Number: 10
02/14/2022: FOR FINAL APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this
project. I will provide a recording checklist and process information when we are closer to this step.
NOTED, NO RESPONSE.
Department: Planning Services
Contact: Will Lindsey, , wlindsey@fcgov.com
Topic: General
Comment Number:
03/07/2022: FOR APPROVAL:
As discussed at the time of the Conceptual Review the Eastborough
subdivision has more stringent setbacks than what is required by City code and
must demonstrate a 30' front yard setback, 7 foot side‑yard, and 15 rear‑yard
setback (see Covenants recorded here:
https://records.fcgov.com/WebLink/DocView.aspx?
id=11523813&dbid=0&repo=FortCollins). If you're unable to adjust the rear lot
line to meet the minimum setback than a formal variance must be requested.
The Director may review a setback encroachment of up to 10%, but anything
larger would need to be reviewed by the Zoning Board of Appeals.
LOT LINE HAS BEEN ADJUSTED TO BE WITHIN 10% OF REQUIREMENT.
A MODIFICATION TO THE STANDARD IS REQUESTED OF THE REAR SETBACK FOUND IN LAND USE CODE SECTION 4.4(D)(2)(C). THE MODIFIED PLAN WILL NOT DIVERGE FROM THE STANDARDS OF THE LAND USE CODE
EXCEPT IN A NOMINAL, INCONSEQUENTIAL WAY. A 10% REDUCTION IN THE REQUIRED REAR SETBACK IS REQUESTED, FROM 15 FT TO 13.5 FT." 13.5’ BACK YARD SETBACK IS REQUESTED TO BE USED ON LOT
60A OF CARNAHAN SUBDIVISION.
Department: Building Services
Contact: Russell Hovland, 970‑416‑2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
02/11/2022: FOR APPROVAL:
The new or relocated property lines must not be closer than 5ft to existing structures.
NEW/RELOCATED LINES MEET THIS CRITERIA.
Department: Technical Services
Contact: Jeff County, 970‑221‑6588, jcounty@fcgov.com
Topic: Plat
Comment Number: 1
03/04/2022: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter. If you have any specific questions about the redlines, please contact John
Von Nieda at 970‑221‑6565 or HYPERLINK "mailto:jvonnieda@fcgov.com" jvonnieda@fcgov.com
REDLINES ARE ADDRESSED.
Comment Number: 2
03/04/2022: FOR FINAL APPROVAL:
Please provide a closure report for the outer boundary of this Plat.
CLOSURE REPORT PROVIDED.
Department: Outside Agencies
Contact: Megan Harrity Larimer County Office of the Assessor mharrity@larimer.org, ,
Topic: General
Comment Number: 1
02/23/2022: FOR APPROVAL:
The dedication of the subdivision needs to be updated. It is currently shown as:
to be known as (the development).
ADDRESSED WITH PLAT REDLINES
Department: Traffic Operation
Contact: Spencer Smith, 970‑221‑6820, smsmith@fcgov.com
Topic: General
Comment Number: 1
03/08/2022: The proposed lot line adjustments will not impact traffic. Traffic
Impact Study is waived. No comments
NOTED, NO RESPONSE.
Department: PFA
Contact: Marcus Glasgow, 970‑416‑2869, marcus.glasgow@poudre‑fire.org
Topic: General
Comment Number: 1
03/02/2022: INFORMATION:
PFA has no comments on the replat of the property.
NOTED, NO RESPONSE.
Department: Stormwater Engineering
Contact: Basil Hamdan, 970‑222‑1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 2
03/07/2022: INFORMATION:
No Comment from Erosion Control.
Based upon the submitted Planning Materials it has been determined that this
project; will disturb less than 10,000 sq. ft., is not proposed to be in a sensitive
area, has no steep slopes (greater than 3H:1V) within or adjacent to the project,
and is not part of a larger common development that will or is under
construction. Therefore, no Erosion Control Material submittal is needed.
If this project substantially changes in size or design where the above criteria
now apply, erosion control materials should be submitted. Though the project at
this time requires no erosion control material submittal, the project still must be
swept and maintained to prevent dirt, saw cuttings, concrete wash, trash debris,
landscape materials and other pollutants from the potential of leaving the site
and entering the storm sewer at all times during the project in accordance with
City Code 26 498. If complaint driven or site observation of the project seem not
to prevent the pollutant discharge the City may require the project to install
erosion and sediment control measures. Nearby inlets that may be impacted by
the pollutants, in particular dirt, should be protected as a good preventative
practice and individual lots should be protected from material escaping onto the
sidewalk. If at building permit issuance any issues arise please email
erosion@fcgov.com to help facilitate getting these permits signed off.
NOTED, NO RESPONSE.
Department: Light And Power
Contact: Tyler Siegmund, 970‑416‑2772, tsiegmund@fcgov.com
Topic: General
Comment Number: 1
03/08/2022: INFORMATION:
Light and Power serves all 3 properties electric service from the frontage of the lots.
NOTED, NO RESPONSE.
Comment Number: 2
03/08/2022: INFORMATION:
Any changes to the electric capacity to the homes or meter locations will initiate
electric development and system modification charges. Please coordinate
power requirements with Light and Power Engineering if changes are proposed
with this project.
NOTED, NO RESPONSE.
Comment Number: 3
03/08/2022: INFORMATION:
Please contact Tyler Siegmund with Light & Power Engineering if you have any
questions at 970.416.2772 Please reference our policies, construction
practices, development charge processes, electric service standards, and use
our fee estimator at:
http://www.fcgov.com/utilities/business/builders and developers
NOTED, NO RESPONSE.