GEOTECHNICAL INVESTIGATION
PROPOSED HANSEN FARM APARTMENTS
NW OF TIMBERLINE ROAD & ZEPHYR ROAD
FORT COLLINS, COLORADO
HANSEN MF, LLC
3665 John F. Kennedy Parkway
Building 2, Suite 202
Fort Collins, Colorado 80525
Attention: Brecken Schaefer
Project No. FC10225-120
March 8, 2022
Revised March 10, 2022
TABLE OF CONTENTS
SCOPE 1
SUMMARY OF CONCLUSIONS 1
SITE CONDITIONS 2
PROPOSED CONSTRUCTION 2
INVESTIGATION 2
SUBSURFACE CONDITIONS 3
Groundwater 3
GEOLOGIC HAZARDS 3
Expansive Soils 4
Seismicity 4
SITE DEVELOPMENT 4
Fill Placement 4
Excavations 5
FOUNDATIONS 5
Footings 6
BELOW GRADE AREAS 7
FLOOR SYSTEMS 7
Exterior Flatwork 9
OVER-EXCAVATION 9
SWIMMING POOL AND POOL FLATWORK 10
PAVEMENTS 11
Pavement Selection 12
Subgrade and Pavement Materials and Construction 12
Pavement Maintenance 13
WATER-SOLUBLE SULFATES 13
SURFACE DRAINAGE 14
CONSTRUCTION OBSERVATIONS 14
GEOTECHNICAL RISK 14
LIMITATIONS 15
FIGURE 1 – LOCATIONS OF EXPLORATORY BORINGS
FIGURES 2 THROUGH 4 – SUMMARY LOGS OF EXPLORATORY BORINGS
APPENDIX A – RESULTS OF LABORATORY TESTING
APPENDIX B – SAMPLE SITE GRADING SPECIFICATIONS
APPENDIX C – PAVEMENT CONSTRUCTION RECOMMENDATIONS
APPENDIX D – PAVEMENT MAINTENANCE PROGRAM
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
1
SCOPE
This report presents the results of our Geotechnical Investigation for the proposed
apartment complex in Fort Collins, Colorado. The purpose of the investigation was to
evaluate the subsurface conditions and provide foundation recommendations and
geotechnical design criteria for the project. The scope was described in our Service
Agreement (Proposal No. FC-21-0639) dated December 2, 2021.
The report was prepared from data developed during field exploration, laboratory
testing, engineering analysis, and experience with similar conditions. The report includes a
description of subsurface conditions found in our exploratory borings and discussions of site
development as influenced by geotechnical considerations. Our opinions and
recommendations regarding design criteria and construction details for site development,
foundations, floor systems, slabs-on-grade, pavements, and drainage are provided. The
report was prepared for the exclusive use of Hansen MF, LLC in design and construction of
the proposed improvements. If the proposed construction differs from descriptions herein,
we should be requested to review our recommendations. Our conclusions are summarized
in the following paragraphs.
SUMMARY OF CONCLUSIONS
1. Soils encountered in our borings generally consisted of sandy clay to the
depths explored. Interlayers of silt, silty sands and/or silty clays were
encountered in several of the borings at depths of 14 to 19 feet. No bedrock
was encountered during this investigation.
2. Groundwater was measured at depths ranging from 16 to 20 feet in 14 of the
borings during drilling. When measured several days later, groundwater was
encountered at depths of 14 to 18 feet across all borings. Existing groundwater
levels are not expected to significantly affect site development.
3. The presence of expansive soils constitutes a geologic hazard. There is risk
that slabs-on-grade and foundations will heave or settle and be damaged. We
judge the risk is moderate. We believe the recommendations presented in this
report will help to control risk of damage; they will not eliminate that risk. Slabs-
on-grade and, in some instances, foundations may be damaged.
4. Footing foundations designed to maintain a minimum dead load placed on
properly over-excavated and re-compacted fill are recommended for the
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
2
proposed construction. Design and construction criteria for foundations are
presented in the report.
5. We believe a slab-on-grade floor is appropriate for this site if constructed on 4
feet of over-excavated and properly placed fill. Some movement of slab-on-
grade floors should be anticipated. We expect movements will be minor, on
the order of 1-inch or less following over-excavation. If movement cannot be
tolerated, structural floors should be used.
6. Surface drainage should be designed, constructed, and maintained to provide
rapid removal of surface runoff away from the proposed improvements.
Conservative irrigation practices should be followed to avoid excessive wetting.
7. Samples of the subgrade soils generally classified as AASHTO A-6 and A-7-6
soils. For the parking lot, we recommend 4 inches of asphaltic concrete over
6 inches of aggregate base course. Thicker sections are recommended for
areas with heavier traffic.
SITE CONDITIONS
The site is located in Fort Collins, Colorado (Figure 1). The vacant 10½-acre tract
slopes gradually north. An irrigation ditch is located the south of the site, Mail Creek Ditch is
located north of the site. At the time of our investigation, overlot grading was complete and
utilities had been installed.
PROPOSED CONSTRUCTION
We understand the proposed complex will consist of three-story wood and/or steel-
framed residential structures, a clubhouse structure, pool, and associated parking and
accesses. No below grade construction is planned.
INVESTIGATION
The field investigation included drilling 15 exploratory borings at the locations
presented on Figure 1. The borings were drilled to depths of approximately 20 to 30 feet
using 4-inch diameter, continuous-flight augers, and a truck-mounted drill. Drilling was
observed by our field representative who logged the soils. Summary logs of the borings,
including results of field penetration resistance tests, are presented on Figures 2 through 4.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
3
Soil samples obtained during drilling were returned to our laboratory and visually
examined by our geotechnical engineer. Laboratory testing was assigned and included
moisture content, dry density, swell-consolidation, particle-size analysis, Atterberg limits, and
water-soluble sulfate tests. Swell-consolidation test samples were wetted at a confining
pressure which approximated the pressure exerted by the overburden soils (overburden
pressures). Results of the laboratory tests are presented in Appendix A.
SUBSURFACE CONDITIONS
Soils encountered in our borings consisted of sandy clay to the depths explored. No
bedrock was encountered during this investigation. Samples of the clay soils tested indicated
0.1 percent compression to 4.7 percent swell. Further descriptions of the subsurface
conditions are presented on our boring logs and in our laboratory test results.
Groundwater
Groundwater was measured at depths ranging from 16 to 20 feet in 14 borings during
drilling. When measured several days later, groundwater was encountered at depths of 14
to 18 feet across all borings. Groundwater may develop when a source of water not presently
contributing becomes available. Groundwater levels are expected to fluctuate seasonally and
with water levels in the nearby ditches. Groundwater is not expected to affect construction at
the site. We recommend a minimum separation of 3 feet from groundwater to foundations
and floor systems.
GEOLOGIC HAZARDS
Our investigation addressed potential geologic hazards, including expansive soils, and
seismicity that should be considered during planning and construction. None of these
hazards considered will preclude proposed construction. The following sections discuss each
of these geologic hazards and associated development concerns.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
4
Expansive Soils
Expansive soils and bedrock are present at the site. The presence of expansive soils
and bedrock, collectively referred to as expansive or swelling soils, constitutes a geologic
hazard. There is a risk that ground heave will damage slabs-on-grade and foundations. The
risks associated with swelling soils can be mitigated, but not eliminated, by careful design,
construction, and maintenance procedures. We believe the recommendations in this report
will help control risk of foundations and/or slab damage; they will not eliminate that risk.
Seismicity
This area, like most of central Colorado, is subject to a low degree of seismic risk. As
in most areas of recognized low seismicity, the record of the past earthquake activity in
Colorado is incomplete.
According to the 2018 International Building Code and the subsurface conditions
encountered in our borings, this site probably classifies as a Site Class D. Only minor damage
to relatively new, properly designed and built buildings would be expected. Wind loads, not
seismic considerations, typically govern dynamic structural design for the structures planned
in this area.
SITE DEVELOPMENT
Fill Placement
The existing onsite soils are suitable for re-use as fill material provided debris or
deleterious organic materials are removed. If import material is used, it should be tested and
approved as acceptable fill by CTL Thompson. In general, import fill should meet or exceed
the engineering qualities of the onsite soils. Areas to receive fill should be scarified, moisture-
conditioned and compacted to at least 95 percent of standard Proctor maximum dry density
(ASTM D698, AASHTO T99). Sand soils used as fill should be moistened to within 2 percent
of optimum moisture content. Clay soils should be moistened between optimum and 3
percent above optimum moisture content. The fill should be moisture-conditioned, placed in
thin, loose lifts (8 inches or less) and compacted as described above. We should observe
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
5
placement and compaction of fill during construction. Fill placement and compaction should
not be conducted when the fill material is frozen.
Site grading in areas of landscaping where no future improvements are planned can
be placed at a dry density of at least 90 percent of standard Proctor maximum dry density
(ASTM D 698, AASHTO T 99). Example site grading specifications are presented in
Appendix B.
Water and sewer lines are often constructed beneath areas where improvements are
planned. Compaction of trench backfill can have a significant effect on the life and
serviceability overlying structures. We recommend trench backfill be moisture conditioned
and compacted as described above. Placement and compaction of backfill should be
observed and tested by a representative of our firm during construction.
Excavations
We believe the materials found in our borings can be excavated using conventional
heavy-duty excavation equipment. Excavations should be sloped or shored to meet local,
State and Federal safety regulations. Based on our investigation and OSHA standards, we
believe the clay soils classify as Type A soils. Type A soils require a maximum slope
inclination of ¾:1 in dry conditions. Excavation slopes specified by OSHA are dependent
upon types of soil and groundwater conditions encountered. The contractor’s “competent
person” should identify the soils and/or rock encountered in the excavation and refer to OSHA
standards to determine appropriate slopes. Stockpiles of soils, rock, equipment, or other
items should not be placed within a horizontal distance equal to one-half the excavation
depth, from the edge of excavation. Excavations deeper than 20 feet should be braced or a
professional engineer should design the slopes.
FOUNDATIONS
Our investigation indicates moderately swelling soils are present at the anticipated
foundation levels. Footing foundations designed to maintain a minimum dead load are
recommended for the proposed construction. We recommend over-excavation to a depth of
4 feet from existing grades.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
6
Design criteria for footing foundations developed from analysis of field and laboratory
data and our experience are presented below.
Footings
1. Footings should be constructed on properly over-excavated and recompacted
fill (see the Fill Placement section of this report). All existing, uncontrolled fill
should be removed from under footings and within one footing width around
footings and replaced with properly compacted fill. Where soil is loosened
during excavation, it should be removed and replaced with compacted fill.
2. Footings should be designed for a net allowable soil pressure of 3,000 psf and
a minimum dead load pressure of 1,000 psf. The soil pressure can be
increased 33 percent for transient loads such as wind or seismic loads. We
recommend a minimum 3-foot separation between foundation elements and
groundwater.
3. We anticipate footings designed using the soil pressure recommended above
could experience 1-inch of movement. Differential movement of ½- inch should
be considered in the design.
4. Footings should have a minimum width of at least 18 inches. Foundations for
isolated columns should have minimum dimensions of 24 inches by 24 inches.
Larger sizes may be required depending on loads and the structural system
used.
5. The soils beneath footing pads can be assigned an ultimate coefficient of
friction of 0.4 to resist lateral loads. The ability of grade beam or footing backfill
to resist lateral loads can be calculated using a passive equivalent fluid
pressure of 250 pcf. This assumes the backfill is densely compacted and will
not be removed. Deflection of grade beams is necessary to mobilize passive
earth pressure; we recommend a factor of safety of 2 for this condition. Backfill
should be placed and compacted to the criteria in the Fill Placement section of
this report.
6. To meet the minimum deadload criteria, a continuous void with minimum 4-
inch thickness should be placed below grade beams, between pads to
concentrate the load of the structures on the footing pads.
7. Exterior footings should be protected from frost action. We believe 30 inches
of frost cover is appropriate for this site.
8. Foundation walls and grade beams should be well reinforced both top and
bottom. We recommend reinforcement sufficient to simply span 10 feet. The
reinforcement should be designed by a structural engineer.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
7
9. We should observe completed footing excavations to confirm whether the
subsurface conditions are similar to those found in our borings.
BELOW GRADE AREAS
No below grade areas are planned for the buildings. For this condition, perimeter
drains are not usually necessary. Lateral earth pressure on foundation walls can be
calculated using an equivalent fluid density of 50 pcf. This value is for horizontal backfill
conditions and does not include pressure due to surcharge or hydrostatic pressure. We
should be contacted to provide foundation drain recommendations if plans change to include
basement areas.
FLOOR SYSTEMS
In our opinion, it is reasonable to use slab-on-grade floors for the proposed
construction if over-excavation is performed. We estimate up to 4 inches of potential heave
at existing grades prior to over-excavation. Any fill placed for the floor subgrade should be
built with densely compacted, engineered fill as discussed in the Fill Placement section of this
report.
It is impossible to construct slab-on-grade floors with no risk of movement. We believe
movements due to swell will be less than 1-inch at this site following over-excavation. If
movement cannot be tolerated, structural floors should be used. Structural floors can be
considered for specific areas that are particularly sensitive to movement or where equipment
on the floor is sensitive to movement.
Where structurally supported floors are selected, we recommend a minimum void
between the ground surface and the underside of the floor system of 8 inches. The minimum
void should be constructed below beams and utilities that penetrate the floor. The floor may
be cast over void form. Void form should be chosen to break down quickly after the slab is
placed. We recommend against the use of wax or plastic-coated void boxes.
Slabs may be subject to heavy point loads. The structural engineer should design
floor slab reinforcement. For design of slabs-on-grade, we recommend a modulus of
subgrade reaction of 150 pci for on-site soils.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
8
If the owner elects to use slab-on-grade construction and accepts the risk of movement
and associated damage, we recommend the following precautions for slab-on-grade
construction at this site. These precautions can help reduce, but not eliminate, damage or
distress due to slab movement.
1. Slabs should be separated from exterior walls and interior bearing members
with a slip joint that allows free vertical movement of the slabs. This can reduce
cracking if some movement of the slab occurs.
2. Slabs should be placed directly on exposed soils or properly moisture
conditioned, compacted fill. The 2021 International Building Code (IBC)
requires a vapor retarder be placed between the base course or subgrade soils
and the concrete slab-on-grade floor. The merits of installation of a vapor
retarder below floor slabs depend on the sensitivity of floor coverings and
building use to moisture. A properly installed vapor retarder (minimum 6-mil;
10-mil recommended) is more beneficial below concrete slab-on-grade floors
where floor coverings, painted floor surfaces or products stored on the floor will
be sensitive to moisture. The vapor retarder is most effective when concrete
is placed directly on top of it, rather than placing a sand or gravel leveling
course between the vapor retarder and the floor slab. The placement of
concrete on the vapor retarder may increase the risk of shrinkage cracking and
curling. Use of concrete with reduced shrinkage characteristics including
minimized water content, maximized coarse aggregate content, and
reasonably low slump will reduce the risk of shrinkage cracking and curling.
Considerations and recommendations for the installation of vapor retarders
below concrete slabs are outlined in Section 3.2.3 of the 2006 report of
American Concrete Institute (ACI) Committee 302, “Guide for Concrete Floor
and Slab Construction (ACI 302.R1-04)”.
3. If slab-bearing partitions are used, they should be designed and constructed to
allow for slab movement. At least a 2-inch void should be maintained below or
above the partitions. If the “float” is provided at the top of partitions, the
connection between interior, slab-supported partitions and exterior, foundation
supported walls should be detailed to allow differential movement.
4. Underslab plumbing should be eliminated where feasible. Where such
plumbing is unavoidable it should be thoroughly pressure tested for leaks prior
to slab construction and be provided with flexible couplings. Pressurized water
supply lines should be brought above the floors as quickly as possible.
5. Plumbing and utilities that pass through the slabs should be isolated from the
slabs and constructed with flexible couplings. Where water and gas lines are
connected to furnaces or heaters, the lines should be constructed with
sufficient flexibility to allow for movement.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
9
6. HVAC equipment supported on the slab should be provided with a collapsible
connection between the furnace and the ductwork, with allowance for at least
2 inches of vertical movement.
7. The American Concrete Institute (ACI) recommends frequent control joints be
provided in slabs to reduce problems associated with shrinkage cracking and
curling. To reduce curling, the concrete mix should have a high aggregate
content and a low slump. If desired, a shrinkage compensating admixture
could be added to the concrete to reduce the risk of shrinkage cracking. We
can perform a mix design or assist the design team in selecting a pre-existing
mix.
Exterior Flatwork
We recommend exterior flatwork and sidewalks be isolated from foundations to reduce
the risk of transferring heave, settlement or freeze-thaw movement to the structure. One
alternative would be to construct the inner edges of the flatwork on haunches or steel angles
bolted to the foundation walls and detailing the connections such that movement will cause
less distress to the building, rather than tying the slabs directly into the building foundation.
Construction on haunches or steel angles and reinforcing the sidewalks and other exterior
flatwork will reduce the potential for differential settlement and better allow them to span
across wall backfill. Frequent control joints should be provided to reduce problems associated
with shrinkage. Panels that are approximately square perform better than rectangular areas.
OVER-EXCAVATION
If you are willing to accept risk of potential movements, a slab-on-grade floor and
spread footing foundations can be used if constructed on an over-excavation. The over-
excavation should extend at least 4 feet below the slab and foundation subgrade and at least
2 feet beyond the perimeter of the footprint of the structure. The existing on-site soils are
suitable for re-use as fill material provided debris or deleterious organic materials are
removed. The fill should be placed as described in the Fill Placement section of this report.
For the pool area, we recommend that over-excavation extend at least 2 feet below the
flatwork surrounding the pool. Shallow pools may also benefit from over-excavation. Detailed
pool plans were not available for our review at the time of this investigation.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
10
SWIMMING POOL AND POOL FLATWORK
Our investigation indicates that the bottom of the swimming pool, as well as flatwork
around the pool, will bear on natural sandy clays. The soils encountered in our borings
exhibited low to moderate swell in the upper 5+ feet. The swelling soils pose high risk of
damaging the pools and/or decks in the event they swell due to increases in moisture content.
Reinforced concrete or “gunite/shot-crete” type pools tend to be brittle and may be more
susceptible to cracking due to shrinkage and/or movement of the subgrade soils. Alternatives
to reduce the risk of damage due to these types of movements include the use of flexible
plastic or fiberglass pool structures; and/or over-excavating and replacing the native materials
with non-expansive fill, or moisture conditioning and recompacting the existing materials as
engineered fill to provide more uniform support as described above in OVER-EXCAVATION.
Fill should be constructed according to the guidelines presented below in the Fill Placement
section of this report.
Pool walls should be designed for lateral earth pressures where backfill is not present
to about the same extent on both sides of the wall. Many factors affect the value of the design
lateral earth pressure. These factors include, but are not limited to, the type, compaction,
slope and drainage of the backfill, and the rigidity of the wall against rotation and deflection.
For a very rigid wall where negligible or very little deflection will occur, an "at-rest" lateral earth
pressure should be used in design. This is appropriate for pool design.
If on-site soils are used as backfill and the backfill is not saturated, we recommend
design of pool walls at this site using an equivalent fluid density of at least 55 pounds per
cubic foot (pcf). This value assumes deflection; some minor cracking of walls may occur. If
very little wall deflection is desired, higher design density may be appropriate. Recent
experience indicates for similar subsurface conditions, most walls designed with 50 pcf to 65
pcf equivalent fluid density have performed satisfactorily.
We recommend that a gravel blanket be provided beneath the pool for drainage
purposes. The gravel blanket material should consist of 3/8" to 3/4" washed or crushed rock
with a maximum of 5 percent passing a #200 sieve. Drains which are to discharge downslope
by means of gravity (daylighted) should either be connected to a sump pit or have a cleanout
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
11
installed to facilitate monitoring and maintenance. The discharge area should be protected
from damage due to animal activity, vegetation, and traffic. The discharge area should be
placed so that it does not interfere with adjacent properties.
We believe the pool flatwork should be constructed as slabs-on-grade bearing on a 2-
foot mat of over-excavated soil. Minor cracking of the flatwork from shrinkage is likely and
will require maintenance. Cracks and joints in the flatwork should be sealed regularly. The
flatwork and surrounding areas should be sloped to drain away from the pool and any
adjacent structures, slabs, or pavements.
PAVEMENTS
The project will include a paved parking lot and access drives. The performance of
pavements is dependent upon the characteristics of the subgrade soil, traffic loading and
frequency, climatic conditions, drainage and pavement materials. We drilled 15 exploratory
borings and conducted laboratory tests to characterize the subgrade soils, which consisted
of slightly moist to moist, stiff to very stiff sandy clay with low to moderate expansion potential.
The subgrade soils classified as A-6 and A-7-6 soils in accordance with AASHTO procedures.
The subgrade soil will likely provide poor support for new pavement. If fill is needed, we have
assumed it will be soils with similar or better characteristics.
Traffic loading of a parking lot can be estimated based on type of usage and number
of parking spaces. We understand there will be approximately 442 parking spaces, and traffic
will primarily consist of lightly-loaded passenger vehicles. Delivery and garbage truck traffic
is anticipated to be minor and possibly isolated to certain areas of the parking lot. We envision
that a member of the design team that ultimately configures the parking and access drives
will select the locations for which the different pavement sections will be used.
Flexible hot mix asphalt (HMA) over aggregate base course (ABC) is likely planned
for pavement areas. Rigid Portland cement concrete (PCC) pavement should be used for
trash enclosure areas and where the pavement will be subjected to frequent turning of heavy
vehicles. Our designs are based on the AASHTO design method and our experience. Using
the criteria discussed above we recommend the minimum pavement sections provided in
Table A.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
12
TABLE A
RECOMMENDED PAVEMENT SECTIONS
Classification
Hot Mix Asphalt
(HMA) + Aggregate
Base Course (ABC)
+ Moisture Treated
Subgrade (MTS)
Portland Cement
Concrete (PCC) +
Moisture Treated
Subgrade (MTS)
Parking Area
4" HMA +
6" ABC +
12” MTS
5" PCC +
12” MTS
Access Drives
/ Heavy Traffic
Areas
5" HMA +
6" ABC +
12” MTS
6" PCC +
12” MTS
Trash
Enclosures - 6" PCC +
12” MTS
Pavement Selection
Composite HMA/ABC pavement over a stable subgrade is expected to perform well
at this site based on the recommendations provided. HMA provides a stiff, stable pavement
to withstand heavy loading and will provide a good fatigue resistant pavement. However,
HMA does not perform well when subjected to point loads in areas where heavy trucks turn
and maneuver at slow speeds. PCC pavement is expected to perform well in this area; PCC
pavement has better performance in freeze-thaw conditions and should require less long-
term maintenance than HMA pavement. The PCC pavement for trash enclosures should
extend out to areas where trash trucks park to lift and empty dumpsters.
Subgrade and Pavement Materials and Construction
The design of a pavement system is as much a function of the quality of the paving
materials and construction as the support characteristics of the subgrade. The construction
materials are assumed to possess sufficient quality as reflected by the strength factors used
in our design calculations. Moisture treatment criteria and additional criteria for materials and
construction requirements are presented in Appendix C of this report.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
13
Pavement Maintenance
Routine maintenance, such as sealing and repair of cracks, is necessary to achieve
the long-term life of a pavement system. We recommend a preventive maintenance program
be developed and followed for all pavement systems to assure the design life can be realized.
Choosing to defer maintenance usually results in accelerated deterioration leading to higher
future maintenance costs, and/or repair. A recommended maintenance program is outlined
in Appendix D.
Excavation of completed pavement for utility construction or repair can destroy the
integrity of the pavement and result in a severe decrease in serviceability. To restore the
pavement top original serviceability, careful backfill compaction before repaving is necessary.
WATER-SOLUBLE SULFATES
Concrete that comes into contact with soils can be subject to sulfate attack. We
measured water-soluble sulfate concentrations in three samples from this site.
Concentrations were below measurable limits (<0.01 percent) across all tests conducted.
Sulfate concentrations less than 0.1 percent indicate Class 0 exposure to sulfate attack for
concrete that comes into contact with the subsoils, according to the American Concrete
Institute (ACI). For this level of sulfate concentration, ACI indicates there are no special
requirements for sulfate resistance.
Superficial damage may occur to the exposed surfaces of highly permeable concrete,
even though sulfate levels are relatively low. To control this risk and to resist freeze-thaw
deterioration, the water-to-cementitious materials ratio should not exceed 0.50 for concrete
in contact with soils that are likely to stay moist due to surface drainage or high water tables.
Concrete should have a total air content of 6 percent ± 1.5 percent. We advocate all
foundation walls and grade beams in contact with the soil (including the inside and outside
faces of garage and crawl space grade beams) be damp-proofed.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
14
SURFACE DRAINAGE
Performance of foundations, flatwork and pavements are influenced by changes in
subgrade moisture conditions. Carefully planned and maintained surface grading can reduce
the risk of wetting of the foundation soils and pavement subgrade. We recommend a
minimum slope of 5 percent in the first ten feet outside foundations in landscaped areas.
Backfill around foundations should be moisture treated and compacted as described in Fill
Placement. Roof drains should be directed away from buildings. Downspout extensions and
splash blocks should be provided at discharge points, or roof drains should be connected to
solid pipe discharge systems. We do not recommend directing roof drains under buildings.
CONSTRUCTION OBSERVATIONS
We recommend that CTL Thompson, Inc. provide construction observation services
to allow us the opportunity to verify whether soil conditions are consistent with those found
during this investigation. Other observations are recommended to review general
conformance with design plans. If others perform these observations, they must accept
responsibility to judge whether the recommendations in this report remain appropriate.
GEOTECHNICAL RISK
The concept of risk is an important aspect with any geotechnical evaluation primarily
because the methods used to develop geotechnical recommendations do not comprise an
exact science. We never have complete knowledge of subsurface conditions. Our analysis
must be tempered with engineering judgment and experience. Therefore, the
recommendations presented in any geotechnical evaluation should not be considered risk-
free. Our recommendations represent our judgment of those measures that are necessary to
increase the chances that the structures will perform satisfactorily. It is critical that all
recommendations in this report are followed during construction. Owners must assume
responsibility for maintaining the structures and use appropriate practices regarding drainage
and landscaping. Improvements performed by owners after construction, such as
construction of additions, retaining walls, landscaping and exterior flatwork, should be
completed in accordance with recommendations in this report.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120 Rev 1
15
LIMITATIONS
This report has been prepared for the exclusive use of Hansen MF, LLC for the
purpose of providing geotechnical design and construction criteria for the proposed project.
The information, conclusions, and recommendations presented herein are based upon
consideration of many factors including, but not limited to, the type of construction proposed,
the geologic setting, and the subsurface conditions encountered. The conclusions and
recommendations contained in the report are not valid for use by others. Standards of practice
evolve in the area of geotechnical engineering. The recommendations provided are
appropriate for about three years. If the proposed construction is not constructed within about
three years, we should be contacted to determine if we should update this report.
Fifteen borings were drilled during this investigation to obtain a reasonably accurate
picture of the subsurface conditions. Variations in the subsurface conditions not indicated by
our borings are possible. A representative of our firm should observe foundation excavations
to confirm the exposed materials are as anticipated from our borings. We should also test
compaction of fill if over-excavation is used.
We believe this investigation was conducted with that level of skill and care ordinarily
used by geotechnical engineers practicing under similar conditions. No warranty, express or
implied, is made. If we can be of further service in discussing the contents of this report or in
the analysis of the influence of subsurface conditions on design of the structures, please call.
CTLTHOMPSON, INC.
Taylor H. Ray, PE R.B. “Chip” Leadbetter, III, PE
Geotechnical Project Engineer Senior Geotechnical Engineer
Via e-mail: breckens@affinitycre.com
TH-1
TH-2
TH-3
TH-5
TH-6 TH-7
TH-8
TH-9
TH-14
TH-10
TH-11
TH-13
TH-12
TH-15
TH-4
TRILBY RD.
ZEPHYR RD.LEMAY AVE.TIMBERLINE RD.SITE
LEGEND:
INDICATES APPROXIMATE
LOCATION OF EXPLORATORY
BORING
TH-1
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL I T PROJECT NO. FC10225-120
FIGURE 1
Locations of
Exploratory
Borings
VICINITY MAP
(FORT COLLINS, COLORADO)
NOT TO SCALE
150'75'
APPROXIMATE
SCALE: 1" = 150'
0'
0
5
10
15
20
25
30
35
40
0
5
10
15
20
25
30
35
40
20/12
10/12
2/12
19/12
TH-1
17/12
19/12
3/12
24/12
WC=17.8LL=46 PI=28-200=72
WC=18.7DD=110SW=0.4
WC=17.8LL=46 PI=28-200=72
WC=18.7DD=110SW=0.4
TH-2
18/12
13/12
9/12
20/12
19/12
WC=17.9DD=112SW=1.4
WC=22.1DD=105SW=0.5
WC=17.9DD=112SW=1.4
WC=22.1DD=105SW=0.5
TH-3
14/12
16/12
7/12
14/12
22/12
22/12
WC=18.0DD=105SW=1.6SS=<0.01
WC=18.0DD=105SW=1.6SS=<0.01
TH-4
24/12
11/12
5/12
20/12
24/12
12/12
WC=18.7DD=109SW=1.6
WC=19.2DD=108SW=0.3
WC=18.7DD=109SW=1.6
WC=19.2DD=108SW=0.3
TH-5
Summary Logs of
Exploratory Borings
FIGURE 2 DEPTH - FEETDEPTH - FEETHANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-115
0
5
10
15
20
25
30
35
40
0
5
10
15
20
25
30
35
40
15/12
8/12
1/12
9/12
12/12
WC=12.1DD=112SW=4.3
WC=12.1DD=112SW=4.3
TH-6
12/12
7/12
5/12
7/12
WC=18.9DD=108SW=-0.1
WC=18.9DD=108SW=-0.1
TH-7
14/12
7/12
4/12
7/12
14/12
7/12
WC=17.7DD=114SW=2.5
WC=19.8DD=106SW=0.1
WC=17.7DD=114SW=2.5
WC=19.8DD=106SW=0.1
TH-8
23/12
12/12
8/12
18/12
12/12
WC=12.0DD=121SW=4.0SS=<0.01
WC=12.0DD=121SW=4.0SS=<0.01
TH-9
15/12
12/12
12/12
17/12
WC=11.8DD=121SW=4.7
WC=11.8DD=121SW=4.7
TH-10
Summary Logs of
Exploratory Borings
FIGURE 3 DEPTH - FEETDEPTH - FEETHANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-115
0
5
10
15
20
25
30
35
40
0
5
10
15
20
25
30
35
40
21/12
9/12
3/12
4/12
12/12
9/12
WC=11.4DD=120SW=4.7SS=<0.01
WC=11.4DD=120SW=4.7SS=<0.01
TH-11
16/12
10/12
3/12
14/12
WC=14.0LL=39 PI=19-200=73
WC=14.0LL=39 PI=19-200=73
TH-12
17/12
11/12
7/12
7/12
13/12
WC=11.2DD=116SW=3.3
WC=11.2DD=116SW=3.3
TH-13
9/12
8/12
2/12
33/12
WC=20.0DD=105SW=0.4
WC=20.0DD=105SW=0.4
TH-14
33/12
14/12
9/12
24/12
WC=15.7DD=114SW=1.7
WC=15.7DD=114SW=1.7
TH-15
DEPTH - FEETDRIVE SAMPLE. THE SYMBOL 21/12 INDICATES 21 BLOWS OF A 140-POUND HAMMER FALLING
30 INCHES WERE REQUIRED TO DRIVE A 2.5-INCH O.D. SAMPLER 12 INCHES.
CLAY, SANDY WITH OCCASIONAL SILT, SANDY AND/OR CLAYEY INTERLAYERS, SLIGHTLY
MOIST TO WET, VERY SOFT TO VERY STIFF, BROWN (CL, ML)
1.
NOTES:
THESE LOGS ARE SUBJECT TO THE EXPLANATIONS, LIMITATIONS AND CONCLUSIONS IN THIS
REPORT.
WATER LEVEL MEASURED SEVERAL DAYS AFTER DRILLING.
3.
LEGEND:DEPTH - FEETWATER LEVEL MEASURED AT TIME OF DRILLING.
Summary Logs of
Exploratory Borings
THE BORINGS WERE DRILLED ON FEBRUARY 4 AND 7, 2022 USING 4-INCH DIAMETER
CONTINUOUS-FLIGHT AUGERS AND A TRUCK-MOUNTED DRILL RIG.
FIGURE 4
WC
DD
SW
-200
LL
PI
UC
SS
-
-
-
-
-
-
-
-
INDICATES MOISTURE CONTENT (%).
INDICATES DRY DENSITY (PCF).
INDICATES SWELL WHEN WETTED UNDER OVERBURDEN PRESSURE (%).
INDICATES PASSING NO. 200 SIEVE (%).
INDICATES LIQUID LIMIT.
INDICATES PLASTICITY INDEX.
INDICATES UNCONFINED COMPRESSIVE STRENGTH (PSF).
INDICATES SOLUBLE SULFATE CONTENT (%).
2.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-115
APPENDIX A
RESULTS OF LABORATORY TESTING
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=112 PCF
From TH - 1 AT 4 FEET MOISTURE CONTENT=18.5 %
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=110 PCF
From TH - 2 AT 9 FEET MOISTURE CONTENT=18.7 %
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-120
APPLIED PRESSURE -KSF
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
FIGURE A-1COMPRESSION % EXPANSION-4
-3
-2
-1
0
1
2
3
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
-4
-3
-2
-1
0
1
2
3
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
0.1 1.0 10 100
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=112 PCF
From TH - 3 AT 4 FEET MOISTURE CONTENT=17.9 %
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=105 PCF
From TH - 3 AT 9 FEET MOISTURE CONTENT=22.1 %
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-120
APPLIED PRESSURE -KSF
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
FIGURE A-2COMPRESSION % EXPANSION-4
-3
-2
-1
0
1
2
3
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
-4
-3
-2
-1
0
1
2
3
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
0.1 1.0 10 100
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=105 PCF
From TH - 4 AT 2 FEET MOISTURE CONTENT=18.0 %
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=109 PCF
From TH - 5 AT 2 FEET MOISTURE CONTENT=18.7 %
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-120
APPLIED PRESSURE -KSF
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
FIGURE A-3COMPRESSION % EXPANSION-4
-3
-2
-1
0
1
2
3
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
-4
-3
-2
-1
0
1
2
3
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
0.1 1.0 10 100
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=108 PCF
From TH - 5 AT 9 FEET MOISTURE CONTENT=19.2 %
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-120
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
Test Results FIGURE A-4
-8
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
6
7
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=112 PCF
From TH - 6 AT 4 FEET MOISTURE CONTENT=12.1 %
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-120
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
Test Results FIGURE A-5
-8
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
6
7
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=108 PCF
From TH - 7 AT 9 FEET MOISTURE CONTENT=18.9 %
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=114 PCF
From TH - 8 AT 2 FEET MOISTURE CONTENT=17.7 %
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-120
APPLIED PRESSURE -KSF
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
FIGURE A-6COMPRESSION % EXPANSION-4
-3
-2
-1
0
1
2
3
ADDITIONAL COMPRESSION UNDER
CONSTANT PRESSURE DUE TO
WETTING
-3
-2
-1
0
1
2
3
4
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
0.1 1.0 10 100
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=106 PCF
From TH - 8 AT 9 FEET MOISTURE CONTENT=19.8 %
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-120
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
Test Results FIGURE A-7
-8
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
6
7
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=121 PCF
From TH - 9 AT 4 FEET MOISTURE CONTENT=12.0 %
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-120
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
Test Results FIGURE A-8
-8
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
6
7
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=121 PCF
From TH - 10 AT 4 FEET MOISTURE CONTENT=11.8 %
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-120
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
Test Results FIGURE A-9
-8
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
6
7
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=120 PCF
From TH - 11 AT 2 FEET MOISTURE CONTENT=11.4 %
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-120
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
Test Results FIGURE A-10
-8
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
6
7
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=116 PCF
From TH - 13 AT 4 FEET MOISTURE CONTENT=11.2 %
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-120
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
Test Results FIGURE A-11
-8
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
6
7
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
0.1 1.0 10 100
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=105 PCF
From TH - 14 AT 4 FEET MOISTURE CONTENT=20.0 %
Sample of CLAY, SANDY (CL) DRY UNIT WEIGHT=114 PCF
From TH - 15 AT 4 FEET MOISTURE CONTENT=15.7 %
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL | T PROJECT NO. FC10225-120
APPLIED PRESSURE -KSF
APPLIED PRESSURE -KSFCOMPRESSION % EXPANSIONSwell Consolidation
FIGURE A-12COMPRESSION % EXPANSION-4
-3
-2
-1
0
1
2
3
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
-4
-3
-2
-1
0
1
2
3
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
0.1 1.0 10 100
0.1 1.0 10 100
PASSING WATER-
MOISTURE DRY LIQUID PLASTICITY APPLIED NO. 200 SOLUBLE
DEPTH CONTENT DENSITY LIMIT INDEX SWELL*PRESSURE SIEVE SULFATES
BORING (FEET)(%)(PCF)(%)(PSF)(%)(%)DESCRIPTION
TH-1 4 18.5 112 1.3 500 CLAY, SANDY (CL)
TH-2 2 17.8 46 28 72 CLAY, SANDY (CL)
TH-2 9 18.7 110 0.4 1,100 CLAY, SANDY (CL)
TH-3 4 17.9 112 1.4 500 CLAY, SANDY (CL)
TH-3 9 22.1 105 0.5 1,100 CLAY, SANDY (CL)
TH-4 2 18.0 105 1.6 150 <0.01 CLAY, SANDY (CL)
TH-5 2 18.7 109 1.6 150 CLAY, SANDY (CL)
TH-5 9 19.2 108 0.3 1,100 CLAY, SANDY (CL)
TH-6 4 12.1 112 4.3 500 CLAY, SANDY (CL)
TH-7 9 18.9 108 -0.1 1,100 CLAY, SANDY (CL)
TH-8 2 17.7 114 2.5 150 CLAY, SANDY (CL)
TH-8 9 19.8 106 0.1 1,100 CLAY, SANDY (CL)
TH-9 4 12.0 121 4.0 500 <0.01 CLAY, SANDY (CL)
TH-10 4 11.8 121 4.7 500 CLAY, SANDY (CL)
TH-11 2 11.4 120 4.7 150 <0.01 CLAY, SANDY (CL)
TH-12 2 14.0 39 19 73 CLAY, SANDY (CL)
TH-13 4 11.2 116 3.3 500 CLAY, SANDY (CL)
TH-14 4 20.0 105 0.4 500 CLAY, SANDY (CL)
TH-15 4 15.7 114 1.7 500 CLAY, SANDY (CL)
SWELL TEST RESULTS*
TABLE A-I
SUMMARY OF LABORATORY TESTING
ATTERBERG LIMITS
Page 1 of 1
* NEGATIVE VALUE INDICATES COMPRESSION.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTL|T PROJECT NO. FC10225-120
APPENDIX B
SAMPLE SITE GRADING SPECIFICATIONS
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120
B-1
SAMPLE SITE GRADING SPECIFICATIONS
1. DESCRIPTION
This item shall consist of the excavation, transportation, placement and
compaction of materials from locations indicated on the plans, or staked by the
Engineer, as necessary to achieve building site elevations.
2. GENERAL
The Geotechnical Engineer shall be the Owner's representative. The
Geotechnical Engineer shall approve fill materials, method of placement, moisture
contents and percent compaction, and shall give written approval of the completed
fill.
3. CLEARING JOB SITE
The Contractor shall remove all trees, brush and rubbish before excavation or fill
placement is begun. The Contractor shall dispose of the cleared material to
provide the Owner with a clean, neat appearing job site. Cleared material shall not
be placed in areas to receive fill or where the material will support structures of any
kind.
4. SCARIFYING AREA TO BE FILLED
All topsoil and vegetable matter shall be removed from the ground surface upon
which fill is to be placed. The surface shall then be plowed or scarified to a depth
of 8 inches until the surface is free from ruts, hummocks or other uneven features,
which would prevent uniform compaction by the equipment to be used.
5. COMPACTING AREA TO BE FILLED
After the foundation for the fill has been cleared and scarified, it shall be disked or
bladed until it is free from large clods, brought to the proper moisture content and
compacted to not less than 95 percent of maximum dry density as determined in
accordance with ASTM D 698 or AASHTO T 99.
6. FILL MATERIALS
On-site materials classifying as CL, SC, SM, SW, SP, GP, GC, and GM are
acceptable. Fill soils shall be free from organic matter, debris, or other deleterious
substances, and shall not contain rocks or lumps having a diameter greater than
three (3) inches. Fill materials shall be obtained from the existing fill and other
approved sources.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120
B-2
7. MOISTURE CONTENT
Fill materials shall be moisture treated. Clay soils placed below the building
envelope should be moisture-treated to between optimum and 3 percent above
optimum moisture content as determined from Standard Proctor compaction tests.
Clay soil placed exterior to the building should be moisture treated between
optimum and 3 percent above optimum moisture content. Sand soils can be
moistened to within 2 percent of optimum moisture content. Sufficient laboratory
compaction tests shall be performed to determine the optimum moisture content
for the various soils encountered in borrow areas.
The Contractor may be required to add moisture to the excavation materials in the
borrow area if, in the opinion of the Geotechnical Engineer, it is not possible to
obtain uniform moisture content by adding water on the fill surface. The Contractor
may be required to rake or disk the fill soils to provide uniform moisture content
through the soils.
The application of water to embankment materials shall be made with any type of
watering equipment approved by the Geotechnical Engineer, which will give the
desired results. Water jets from the spreader shall not be directed at the
embankment with such force that fill materials are washed out.
Should too much water be added to any part of the fill, such that the material is too
wet to permit the desired compaction from being obtained, rolling and all work on
that section of the fill shall be delayed until the material has been allowed to dry to
the required moisture content. The Contractor will be permitted to rework wet
material in an approved manner to hasten its drying.
8. COMPACTION OF FILL AREAS
Selected fill material shall be placed and mixed in evenly spread layers. After each
fill layer has been placed, it shall be uniformly compacted to not less than the
specified percentage of maximum dry density. Fill materials shall be placed such
that the thickness of loose material does not exceed 8 inches and the compacted
lift thickness does not exceed 6 inches. Fill placed under foundations, exterior
flatwork and pavements should be compacted to a minimum of 95 percent of
maximum standard Proctor dry density (ASTM D698).
Compaction, as specified above, shall be obtained by the use of sheepsfoot rollers,
multiple-wheel pneumatic-tired rollers, or other equipment approved by the
Engineer. Compaction shall be accomplished while the fill material is at the
specified moisture content. Compaction of each layer shall be continuous over the
entire area. Compaction equipment shall make sufficient trips to ensure that the
required dry density is obtained.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120
B-3
9. COMPACTION OF SLOPES
Fill slopes shall be compacted by means of sheepsfoot rollers or other suitable
equipment. Compaction operations shall be continued until slopes are stable, but
not too dense for planting, and there is no appreciable amount of loose soil on the
slopes. Compaction of slopes may be done progressively in increments of three
to five feet (3' to 5') in height or after the fill is brought to its total height. Permanent
fill slopes shall not exceed 3:1 (horizontal to vertical).
10. DENSITY TESTS
Field density tests shall be made by the Geotechnical Engineer at locations and
depths of his choosing. Where sheepsfoot rollers are used, the soil may be
disturbed to a depth of several inches. Density tests shall be taken in compacted
material below the disturbed surface. When density tests indicate that the dry
density or moisture content of any layer of fill or portion thereof is below that
required, the particular layer or portion shall be reworked until the required dry
density or moisture content has been achieved.
11. SEASONAL LIMITS
No fill material shall be placed, spread or rolled while it is frozen, thawing, or during
unfavorable weather conditions. When work is interrupted by heavy precipitation,
fill operations shall not be resumed until the Geotechnical Engineer indicates that
the moisture content and dry density of previously placed materials are as
specified.
12. NOTICE REGARDING START OF GRADING
The contractor shall submit notification to the Geotechnical Engineer and Owner
advising them of the start of grading operations at least three (3) days in advance
of the starting date. Notification shall also be submitted at least 3 days in advance
of any resumption dates when grading operations have been stopped for any
reason other than adverse weather conditions.
13. REPORTING OF FIELD DENSITY TESTS
Density tests performed by the Geotechnical Engineer, as specified under "Density
Tests" above, shall be submitted progressively to the Owner. Dry density, moisture
content and percent compaction shall be reported for each test taken.
APPENDIX C
PAVEMENT CONSTRUCTION RECOMMENDATIONS
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120
C-1
SUBGRADE PREPARATION
Moisture Treated Subgrade (MTS)
1. The subgrade should be stripped of organic matter, scarified,
moisture treated and compacted to the specifications stated below in
Item 2. The compacted subgrade should extend at least 3 feet
beyond the edge of the pavement where no edge support, such as
curb and gutter, are to be constructed.
2. Sandy and gravelly soils (A-1-a, A-1-b, A-3, A-2-4, A-2-5, A-2-6, A-
2-7) should be moisture conditioned near optimum moisture content
and compacted to at least 95 percent of standard Proctor maximum
dry density (ASTM D 698, AASHTO T 99). Clayey soils (A-6, A-7-5,
A-7-6) should be moisture conditioned between optimum and 3
percent above optimum moisture content and compacted to at least
95 percent of standard Proctor maximum dry density (ASTM D 698,
AASHTO T 99).
3. Utility trenches and all subsequently placed fill should be properly
compacted and tested prior to paving. As a minimum, fill should be
compacted to 95 percent of standard Proctor maximum dry density.
4. Final grading of the subgrade should be carefully controlled so the
design cross-slope is maintained and low spots in the subgrade that
could trap water are eliminated.
5. Once final subgrade elevation has been compacted and tested to
compliance and shaped to the required cross-section, the area
should be proof-rolled using a minimum axle load of 18 kips per axle.
The proof-roll should be performed while moisture contents of the
subgrade are still within the recommended limits. Drying of the
subgrade prior to proof-roll or paving should be avoided.
6. Areas that are observed by the Engineer that have soft spots in the
subgrade, or where deflection is not uniform of soft or wet subgrade
shall be ripped, scarified, dried or wetted as necessary and
recompacted to the requirements for the density and moisture. As
an alternative, those areas may be sub-excavated and replaced with
properly compacted structural backfill. Where extensively soft,
yielding subgrade is encountered; we recommend a representative
of our office observe the excavation.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120
C-2
PAVEMENT MATERIALS AND CONSTRUCTION
Aggregate Base Course (ABC)
1. A Class 5 or 6 Colorado Department of Transportation (CDOT)
specified ABC should be used. A reclaimed concrete pavement
(RCP) alternative which meets the Class 5 or 6 designation and
design R-value/strength coefficient is also acceptable. Blending of
recycled products with ABC may be considered.
2. Bases should have a minimum Hveem stabilometer value of 72, or
greater. ABC, RAP, RCP, or blended materials must be moisture
stable. The change in R-value from 300-psi to 100-psi exudation
pressure should be 12 points or less.
3. ABC or RCP bases should be placed in thin lifts not to exceed 6
inches and moisture treated to near optimum moisture content.
Bases should be moisture treated to near optimum moisture content,
and compacted to at least 95 percent of standard Proctor maximum
dry density (ASTM D 698, AASHTO T 99).
4. Placement and compaction of ABC or RCP should be observed and
tested by a representative of our firm. Placement should not
commence until the underlying subgrade is properly prepared and
tested.
Hot Mix Asphalt (HMA)
1. HMA should be composed of a mixture of aggregate, filler, hydrated
lime, and asphalt cement. Some mixes may require polymer
modified asphalt cement, or make use of up to 20 percent reclaimed
asphalt pavement (RAP). A job mix design is recommended and
periodic checks on the job site should be made to verify compliance
with specifications.
2. HMA should be relatively impermeable to moisture and should be
designed with crushed aggregates that have a minimum of 80
percent of the aggregate retained on the No. 4 sieve with two
mechanically fractured faces.
3. Gradations that approach the maximum density line (within 5 percent
between the No. 4 and 50 sieves) should be avoided. A gradation
with a nominal maximum size of 1 or 2 inches developed on the fine
side of the maximum density line should be used.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120
C-3
4. Total void content, voids in the mineral aggregate (VMA) and voids
filled should be considered in the selection of the optimum asphalt
cement content. The optimum asphalt content should be selected at
a total air void content of approximately 4 percent. The mixture
should have a minimum VMA of 14 percent and between 65 percent
and 80 percent of voids filled.
5. Asphalt cement should meet the requirements of the Superpave
Performance Graded (PG) Binders. The minimum performing
asphalt cement should conform to the requirements of the governing
agency.
6. Hydrated lime should be added at the rate of 1 percent by dry weight
of the aggregate and should be included in the amount passing the
No. 200 sieve. Hydrated lime for aggregate pretreatment should
conform to the requirements of ASTM C 207, Type N.
7. Paving should be performed on properly prepared, unfrozen
surfaces that are free of water, snow and ice. Paving should only be
performed when both air and surface temperatures equal, or exceed,
the temperatures specified in Table 401-3 of the 2006 Colorado
Department of Transportation Standard Specifications for Road and
Bridge Construction.
8. HMA should not be placed at a temperature lower than 245oF for
mixes containing PG 64-22 asphalt, and 290oF for mixes containing
polymer-modified asphalt. The breakdown compaction should be
completed before the HMA temperature drops 20oF.
9. Wearing surface course shall be Grading S or SX for residential
roadway classifications and Grading S for collector, arterial,
industrial, and commercial roadway classifications.
10. The minimum/maximum lift thicknesses for Grade SX shall be 1½
inches/2½ inches. The minimum/maximum lift thicknesses for Grade
S shall be 2 inches/3½ inches. The minimum/maximum lift
thicknesses for Grade SG shall be 3 inches/5 inches.
11. Joints should be staggered. No joints should be placed within wheel
paths.
12. HMA should be compacted to between 92 and 96 percent of
Maximum Theoretical Density. The surface shall be sealed with a
finish roller prior to the mix cooling to 185oF.
13. Placement and compaction of HMA should be observed and tested
by a representative of our firm. Placement should not commence
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120
C-4
until approval of the proof rolling as discussed in the Subgrade
Preparation section of this report. Sub-base, base course or initial
pavement course shall be placed within 48 hours of approval of the
proof rolling. If the Contractor fails to place the sub-base, base
course or initial pavement course within 48 hours or the condition of
the subgrade changes due to weather or other conditions, proof-
rolling and correction shall be performed again.
Portland Cement Concrete (PCC)
1. Portland cement concrete should consist of Class P of the 2011
CDOT - Standard Specifications for Road and Bridge Construction
specifications for normal placement or Class E for fast-track projects.
PCC should have a minimum compressive strength of 4,200 psi at
28 days and a minimum modulus of rupture (flexural strength) of 650
psi. Job mix designs are recommended and periodic checks on the
job site should be made to verify compliance with specifications.
2. Portland cement should be Type II “low alkali” and should conform
to ASTM C 150.
3. Portland cement concrete should not be placed when the subgrade
or air temperature is below 40°F.
4. Concrete should not be placed during warm weather if the mixed
concrete has a temperature of 90°F, or higher.
5. Mixed concrete temperature placed during cold weather should have
a temperature between 50°F and 90°F.
6. Free water should not be finished into the concrete surface.
Atomizing nozzle pressure sprayers for applying finishing
compounds are recommended whenever the concrete surface
becomes difficult to finish.
7. Curing of the Portland cement concrete should be accomplished by
the use of a curing compound. The curing compound should be
applied in accordance with manufacturer recommendations.
8. Curing procedures should be implemented, as necessary, to protect
the pavement against moisture loss, rapid temperature change,
freezing, and mechanical injury.
9. Construction joints, including longitudinal joints and transverse joints,
should be formed during construction or sawed after the concrete
has begun to set, but prior to uncontrolled cracking.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120
C-5
10. All joints should be properly sealed using a rod back-up and
approved epoxy sealant.
11. Traffic should not be allowed on the pavement until it has properly
cured and achieved at least 80 percent of the design strength, with
saw joints already cut.
12. Placement of Portland cement concrete should be observed and
tested by a representative of our firm. Placement should not
commence until the subgrade is properly prepared and tested.
APPENDIX D
PAVEMENT MAINTENANCE PROGRAM
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120
D-1
MAINTENANCE RECOMMENDATIONS FOR FLEXIBLE PAVEMENTS
A primary cause for deterioration of pavements is oxidative aging resulting
in brittle pavements. Tire loads from traffic are necessary to "work" or knead the
asphalt concrete to keep it flexible and rejuvenated. Preventive maintenance
treatments will typically preserve the original or existing pavement by providing a
protective seal or rejuvenating the asphalt binder to extend pavement life.
1. Annual Preventive Maintenance
a. Visual pavement evaluations should be performed each spring or
fall.
b. Reports documenting the progress of distress should be kept
current to provide information on effective times to apply
preventive maintenance treatments.
c. Crack sealing should be performed annually as new cracks
appear.
2. 3 to 5 Year Preventive Maintenance
a. The owner should budget for a preventive treatment at
approximate intervals of 3 to 5 years to reduce oxidative
embrittlement problems.
b. Typical preventive maintenance treatments include chip seals,
fog seals, slurry seals and crack sealing.
3. 5 to 10 Year Corrective Maintenance
a. Corrective maintenance may be necessary, as dictated by the
pavement condition, to correct rutting, cracking and structurally
failed areas.
b. Corrective maintenance may include full depth patching, milling
and overlays.
c. In order for the pavement to provide a 20-year service life, at least
one major corrective overlay should be expected.
HANSEN MF, LLC
HANSEN FARM APARTMENTS
CTLT PROJECT NO. FC10225-120
D-2
MAINTENANCE RECOMMENDATIONS FOR RIGID PAVEMENTS
High traffic volumes create pavement rutting and smooth polished surfaces.
Preventive maintenance treatments will typically preserve the original or existing
pavement by providing a protective seal and improving skid resistance through a
new wearing course.
1. Annual Preventive Maintenance
a. Visual pavement evaluations should be performed each spring or
fall.
b. Reports documenting the progress of distress should be kept
current to provide information of effective times to apply
preventive maintenance.
c. Crack sealing should be performed annually as new cracks
appear.
2. 4 to 8 Year Preventive Maintenance
a. The owner should budget for a preventive treatment at
approximate intervals of 4 to 8 years to reduce joint deterioration.
b. Typical preventive maintenance for rigid pavements includes
patching, crack sealing and joint cleaning and sealing.
c. Where joint sealants are missing or distressed, resealing is
mandatory.
3. 15 to 20 Year Corrective Maintenance
a. Corrective maintenance for rigid pavements includes patching
and slab replacement to correct subgrade failures, edge damage,
and material failure.
b. Asphalt concrete overlays may be required at 15 to 20 year
intervals to improve the structural capacity of the pavement.