Loading...
HomeMy WebLinkAboutBUCKING HORSE PARK - BDR210011 - DOCUMENT MARKUPS - ROUND 3 - DRAINAGE REPORT January 26, 2022 DRAINAGE AND EROSION CONTROL REPORT FOR Bucking Horse Park Fort Collins, Colorado Prepared for: City of Fort Collins Attn: Matt Schaefer PO Box 580 Fort Collins, Colorado 80522 Prepared by: 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 1748-002  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is necessary, we recommend double-sided printing. January 26, 2022 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Drainage and Erosion Control Report for Bucking Horse Park Dear Staff: Northern Engineering is pleased to submit this Drainage and Erosion Control Report for your review. This report accompanies the Basic Development Review (BDR) submittal for the proposed Bucking Horse Park development. This report was prepared in accordance with Fort Collins Stormwater Criteria Manual (FCSCM) and serves to document the stormwater impacts associated with the proposed project. We understand that review by the city is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, Northern Engineering Services, Inc. Carlos Ortiz García Shane Ritchie, PE Project Engineer Project Manager Bucking Horse Park Final Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ............................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 2 C. Floodplain.......................................................................................................................................... 3 II. DRAINAGE BASIN AND SUB-BASIN ........................................................................ 5 A. Major Basin Description .................................................................................................................... 5 B. Sub-Basin Description ....................................................................................................................... 5 III. DRAINAGE DESIGN CRITERIA ................................................................................. 5 A. Regulations........................................................................................................................................ 5 B. Hydrological Criteria ......................................................................................................................... 5 C. Hydraulic Criteria .............................................................................................................................. 5 D. Modifications of Criteria ................................................................................................................... 6 IV. DRAINAGE FACILITY DESIGN ................................................................................. 6 A. General Concept ............................................................................................................................... 6 B. Specific Details .................................................................................................................................. 7 C. LID Summary ..................................................................................................................................... 8 V. CONCLUSIONS ....................................................................................................... 8 A. Compliance with Standards .............................................................................................................. 8 VI. REFERENCES .......................................................................................................... 9 VII. EROSION CONTROL REPORT ................................................................................ 15 APPENDICES APPENDIX A – Hydrologic Computations APPENDIX B– Updated SWMM Model for Bucking Horse Second Filing APPENDIX C– Hydraulic Computations APPENDIX D– LID Sizing APPENDIX E– Erosion Control Report and USDA Soils Report LIST OF FIGURES Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2 – Proposed Site Plan ............................................................................................... 3 Figure 3 – Area Floodplain Mapping ...................................................................................... 4 MAP POCKET Proposed Drainage Exhibit Bucking Horse Park Bucking Horse Park Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION Vicinity Map A. LOCATION 1. Bucking Horse Park is located in the Southeast ¼ of Section 20, Township 7 North, Range 68 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. It is generally bound to the northwest by single family homes, the east\northeast by the Great Western Railroad, the southwest by Miles Horse Avenue, and the southeast by a daycare facility and Detention Pond 215. 2. An existing channel runs along the east boundary of the site parallel to the railroad right- of-way, conveying stormwater from the surrounding area to Detention Pond 215. 3. Aside from the large channel that borders the site, offsite flows through the project area are minimal. Refer to the Drainage Exhibit for offsite basin locations. Bucking Horse Park Bucking Horse Park Drainage Report 2 B. DESCRIPTION OF PROPERTY 1. The project area is roughly 7.54± acres. Figure 1 – Aerial Photograph 2. The subject property is an undeveloped parcel with native ground cover. The existing ground generally slopes at moderate grades (1%–3%) from the southwest to the northeast, towards the channel that borders the east side of the site. There is a soil stockpile located on the southeast corner of the site. 3. A soils report (Project No. FC09343-125) was completed by CTL Thompson, Inc. on May 8, 2020. The report contains the results of a complete geotechnical subsurface exploration as well as pertinent geotechnical recommendations. 4. The proposed project site plan is composed of one small restroom building, numerous park amenities, and open spaces. Please see Figure 2, on the following page, showing the proposed site plan. Bucking Horse Park Bucking Horse Park Drainage Report 3 Figure 2 – Proposed Site Plan C. FLOODPLAIN 1. The Bucking Horse Park is currently located within a FEMA Moderate Risk Flood Hazard Area for the Cache la Poudre River. This area is designated as Zone X on Firm Panel 0992G, Revised May 2, 2012. Therefore, it falls outside of the regulated 100-year floodway and floodplain fringe. (Figure 3 – Area Floodplain Mapping) Bucking Horse Park Bucking Horse Park Drainage Report 4 Figure 3 – Existing Floodplain Mapping It should be noted an updated floodplain map is being prepared by consultants for the Colorado Water Conservation Board (CWCB) in coordination with the Federal Emergency Management Agency (FEMA). This remapping is called RiskMAP. The updated mapping will entirely remove the project site from any floodplain designations. Therefore, the project site is not required to conform with the provisions of Chapter 10. Figure 4 – Updated RiskMAP Floodplain Mapping Bucking Horse Park Bucking Horse Park Drainage Report 5 II. DRAINAGE BASIN AND SUB-BASIN A. MAJOR BASIN DESCRIPTION The Bucking Hose – Park is in Basin 57 of the Foothills Drainage Basin. According to the updated Foothills Master Drainage Plan by Anderson Consulting Engineers (ACE) dated July 15, 1999, the project site was limited to a 100-year developed discharge of 85 CFS, which equated to the 2-year historical rate. B. SUB-BASIN DESCRIPTION The subject property is located within the Bucking Horse Filing Two development and has historically drained overland from southwest to northeast. All of Bucking Horse Filing Two drains to Detention Pond 215. This pond currently provides approximately 32.4 ac-ft of storage volume. The pond also provides water quality as a 40- hour dry extended detention basin (EDB). The project area was modeled as part of the SWMM model for Bucking Horse Filing Two. This model has been updated to reflect the constructed conditions within the study area and to document the final required detention volume for Pond 215 and the peak flow for the channel running along the east boundary of the site. (See Appendix B) A description of the project drainage patterns follows in Section IV.A. below. III. DRAINAGE DESIGN CRITERIA A. REGULATIONS There are no optional provisions outside of the FCSCM with the proposed project. B. HYDROLOGICAL CRITERIA 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the proposed development. Tabulated data contained in Table RA-7 was utilized for Rational Method runoff calculations. 2. The Rational Method was employed to compute localized stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The previously approved SWMM model that was approved with Bucking Horse Filing Two and updated as part of Bucking Horse Filing Four (Bucking Horse Apartments) has been updated using current City criteria. 4. Two separate design storms were utilized to address distinct drainage scenarios. The first event analyzed is the “Minor” or “Initial” Storm, which has a two-year recurrence interval. The second event considered is the “Major” Storm, which has a 100-year recurrence interval. 5. No other assumptions or calculation methods were used with this development that are not referenced by the current City of Fort Collins criteria. C. HYDRAULIC CRITERIA 1. As previously noted, the subject property maintains historical drainage patterns. 2. All drainage facilities proposed with the project are designed in accordance with the criteria outlined in the FCSCM and/or Mile High Flood District (UDFCD) Urban Storm Drainage Criteria Manual. Bucking Horse Park Bucking Horse Park Drainage Report 6 3. As previously mentioned, this project is not subject to any floodplain regulations. D. MODIFICATIONS OF CRITERIA No modifications are requested at this time. IV. DRAINAGE FACILITY DESIGN A. GENERAL CONCEPT 1. The main objectives of the project drainage design are to maintain existing drainage patterns and ensure no adverse impacts to any adjacent properties. 2. There is no onsite detention and water quality treatment for this site since this has been provided in Detention Pond 215. 3. The site was broken into seventeen (17) onsite basins and two (2) offsite basins for design purposes. Anticipated drainage patterns for proposed drainage basins are described below. Basin 1 Basin 1 consists of sidewalks, gravel, and open areas. This basin will generally drain via overland flow to a culvert pipe, routing flow to the existing swale running along the east boundary of the site parallel to the Railroad, directing water out to Detention Pond 215. Basins 6, 8, and 9 Basins 6, 8, and 9 consist of landscape areas. These basins will generally drain via inlets and storm drains, routing flow to the existing swale running along the east boundary of the site parallel to the Railroad, directing water out to Detention Pond 215. Basins 5 Basins 5 consist primarily of open space. This basin will generally drain via overland to inlets and storm drains, routing flow to the existing swale running along the east boundary of the site parallel to the Railroad, directing water out to Detention Pond 215. Basins 7, 10, and 11 Basins 7, 10, and 11 consist of sidewalks, gravel, landscape, and open areas. These basins will generally drain via overland to inlets and storm drains, routing flow to the existing swale running along the east boundary of the site parallel to the Railroad, directing water out to Detention Pond 215. Basin 12 Basin 12 consists of sidewalk, gravel, landscape, concrete, building, and open space areas. This basin will generally drain via overland flow, routing flow to the existing swale running along the east boundary of the site parallel to the Railroad, directing water out to Detention Pond 215. Basins 13, 14, and 15 Basins 13, 14, and 15 consist of sidewalk and open space areas. These basins will generally drain via overland flow to Miles House Avenue routing flow along curb and gutter to existing inlets. Basin 16 Basins 16 consists of sidewalk and open space areas. These basins will drain via overland flow along the southeast property boundary to Pond 215. Bucking Horse Park Bucking Horse Park Drainage Report 7 Basin OS1 Basin OS1 consists of open space from Bucking Horse Filing two residential lots. This basin will generally drain via overland flow to Basin 1. Basins OS2 Basin OS2, as shown on the Drainage Exhibit, consists of open space and sidewalk along the northeast side of the existing swale running parallel to the Railroad. B. SPECIFIC DETAILS 1. Large portions of the Bucking Horse neighborhood, including portions of Sidehill Filings 1 & 2 as well as Bucking Horse Filings 1, 2, 3 and 5 drain to Pond 215. Some drainage from the west side of Timberline is also passed through the overall project area. Due to the size of the drainage basin, a SWMM model was developed with the original filings to document the overall drainage patterns in the study area. 2. The SWMM model was originally developed by JR Engineering as part of the Sidehill development. It was subsequently updated with minor changes through the development of the various filings that followed. 3. The most recent update was provided as part of Bucking Horse Filing 4 (aka – Bucking Horse Apartments). In that iteration, all areas south of Nancy Gray were included in Basin 107. While this delineation was appropriate for that project, it did not adequately model the anticipated flows in the channel south of Nancy Gray. 4. In order to accurately model the channel flows adjacent to the Bucking Horse Park, Basin 107 has been divided into 2 basins – Basin 107a and Basin 107b. This division now provides accurate stormwater flows in the channel. 5. In addition to the updates to Basin 107, the impervious areas of the other SWMM basins were updated to reflect the actual values, as opposed to using assumptions for unknown projects. This was particularly true of Basin 105, where the percent impervious was reduced from the originally assumed 75% to the actual 56% documented as part of Bucking Horse Filing 4. The imperviousness of the park site has also been updated to reflect the actual layout. 6. These updates to the SWMM model produce a required total Storage Volume of 870,255 c.f. (19.98 ac-ft), which is significantly less than what was originally called for and far below the volume provided in Pond 215. 7. These updates to the SWMM model produce a calculated 100-yr flow in the channel of 341.1 cfs. 8. As a part of the planned City trail project that will be adjacent to Bucking Horse Park, the trail is proposed to be relocated to the far side of the ditch, closer to the railroad tracks. In order to accomplish this relocation, the ditch will be reconfigured from the current symmetrical section to an asymmetrical section. This new channel configuration has been modeled using the updated design flow x 1.33 to account for freeboard. The results of this modeling are included in the appendices. Bucking Horse Park Bucking Horse Park Drainage Report 8 C. LID SUMMARY 1. The formal grass buffers located throughout the site will treat storm runoff for a minimum of 50% of the modified or added impervious area on the site for water quality prior to discharge into the public storm infrastructure, satisfying the City of Fort Collins LID requirements. These features will facilitate sedimentation and filtration while limiting erosion, providing both treatment and slowed release of the water quality capture volume. The proposed redevelopment of this site will serve to limit water quality and quantity impacts to natural drainageways by decreasing the frequency, rate, duration, and volume of runoff. 2. An LID Exhibit highlighting where the formal grass buffers and contributing impervious areas can be found in Appendix D. 3. The formal grass buffers were sized using Mile High Flood Control District criteria and sizing spreadsheets. These calculations can also be found in Appendix D. V. CONCLUSIONS A. COMPLIANCE WITH STANDARDS 1. The drainage design proposed with the proposed project complies with the City of Fort Collins’ Stormwater Criteria Manual, as well as previous drainage studies from which downstream stormwater infrastructure was constructed 2. The drainage design proposed with this project complies with requirements for the Foothills Basin. 3. The drainage plan and stormwater management measures proposed with the proposed development are compliant with all applicable State and Federal regulations governing stormwater discharge. Bucking Horse Park Bucking Horse Park Drainage Report 9 VI. REFERENCES 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Mile High Flood Control District, Denver, Colorado, Updated January 2016. 6. Geotechnical Investigation Proposed Improvements Bucking Horse Park, Fort Collins, Colorado, May 8, 2020, CLT Thompson. (Project No. FC09343-125) 7. Final Drainage Report Bucking Horse Filing One, Dated September 19, 2012, by Northern Engineering. 8. Final Drainage Report Bucking Horse Filing Two, Dated December 17, 2012, by Northern Engineering APPENDIX A Hydrologic Computations Where: Length (ft) Elev Up Elev Down Slope (%) Ti 2-Yr (min) Ti 10-Yr (min) Ti 100-Yr (min) Length (ft) Elev Up Elev Down Slope (%)Surface n Flow Area3 (sq.ft.) WP3 (ft)R (ft)V (ft/s) Tt (min) Tc 2-Yr (min) Tc 100-Yr (min) 1 (lid) 1 (LID)155 94.04 91.72 1.50%16.02 16.02 14.42 210 91.72 88.57 1.50% Swale (8:1)0.04 8.00 16.12 0.50 3.27 1.07 12.0 12.0 5 (lid) 5 (LID)56 94.12 92.83 2.29%9.16 9.16 8.52 48 92.83 91.96 1.81% Swale (8:1)0.04 8.00 16.12 0.50 3.59 0.22 9.4 8.7 6 6 18 93.96 93.60 2.00%5.67 5.67 5.35 31 93.60 92.97 2.01% Swale (8:1)0.04 8.00 16.12 0.50 3.79 0.14 5.8 5.5 7 7 131 96.42 92.79 2.77%10.52 10.52 8.96 185 92.79 90.11 1.45% Swale (8:1)0.04 8.00 16.12 0.50 3.21 0.96 11.5 9.9 8 8 18 93.96 93.60 2.03%5.59 5.59 5.28 21 93.60 93.18 1.99% Swale (8:1)0.04 8.00 16.12 0.50 3.77 0.09 5.7 5.4 9 9 18 93.97 93.60 2.01%5.72 5.72 5.40 32 93.60 92.96 2.00% Swale (8:1)0.04 8.00 16.12 0.50 3.78 0.14 5.9 5.5 10 10 86 98.90 92.40 7.56%7.53 7.53 6.98 146 92.40 90.11 1.57% Swale (8:1)0.04 8.00 16.12 0.50 3.34 0.73 8.3 7.7 11 11 92 98.92 92.33 7.15%7.66 7.66 7.02 134 92.33 90.11 1.66% Swale (8:1)0.04 8.00 16.12 0.50 3.44 0.65 8.3 7.7 12 (lid) 12 (LID)64 94.00 93.98 0.03%35.01 35.01 30.70 65 93.98 92.50 2.28% Swale (8:1)0.04 8.00 16.12 0.50 4.03 0.27 10.7 10.7 13 13 8 97.21 95.74 17.93%1.63 1.63 1.48 14 95.74 94.26 10.91% Swale (8:1)0.04 8.00 16.12 0.50 8.82 0.03 5.0 5.0 14 14 19 99.58 97.00 13.95%2.97 2.97 2.79 34 97.00 93.80 9.46% Swale (8:1)0.04 8.00 16.12 0.50 8.21 0.07 5.0 5.0 15 15 146 99.41 92.82 4.52%10.59 10.59 9.48 183 92.82 90.60 1.21% Swale (8:1)0.04 8.00 16.12 0.50 2.94 1.04 11.6 10.5 16 (lid) 16 (LID)79 94.29 92.60 2.14%10.86 10.86 10.04 111 92.60 88.85 3.39% Swale (8:1)0.04 8.00 16.12 0.50 4.91 0.38 11.1 10.4 os1 OS1 86 97.52 93.31 4.88%9.22 9.22 8.71 66 93.31 92.17 1.74% Swale (8:1)0.04 8.00 16.12 0.50 3.52 0.31 9.5 9.0 os2 OS2 25 90.77 86.75 15.98%3.02 3.02 2.75 599 86.75 84.18 0.43% Swale (8:1)0.04 8.00 16.12 0.50 1.75 5.71 8.7 8.5 1 to 12 + OS1 + OS2 155 94.04 91.72 1.50%17.32 17.32 16.06 210 91.72 88.57 1.50% Swale (8:1)0.04 8.00 16.12 0.50 3.27 1.07 12.0 12.0 1 + OS1 155 94.04 91.72 1.50%15.78 15.78 14.13 210 91.72 88.57 1.50% Swale (8:1)1.04 8.00 16.12 0.50 0.11 31.82 12.0 12.0 7, 10, & 11 (LID)86 98.90 92.40 7.56%6.85 6.85 6.13 146 92.40 90.11 1.57% Swale (8:1)0.04 8.00 16.12 0.50 2.93 0.83 7.7 7.0 Combined Basins Design Point Basin ID Overland Flow Channelized Flow Time of Developed Basins: DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Maximum Tc:Overland Flow, Time of Concentration: Channelized Flow, Velocity:Channelized Flow, Time of Concentration: Bucking Horse Park Fort Collins C. Ortiz January 24, 2022 Notes S = Longitudinal Slope, feet/feet R = Hydraulic Radius (feet) n = Roughness Coefficient V = Velocity (ft/sec)WP = Wetted Perimeter (ft) (Equation 3.3-2 per Fort Collins Stormwater Manual)=1.87 1.1 − ∗ =1.49 ∗ /∗(Equation 5-4 per Fort Collins Stormwater Manual) =180 + 10 (Equation 3.3-5 per Fort Collins Stormwater Manual) =∗ 60 (Equation 5-5 per Fort Collins 1) Add 4900 to all elevations. 2) Per Fort Collins Stormwater Manual, minimum Tc = 5 min. 3) Assume a water depth of 6" and a typical curb and gutter per Larimer County Urban Street Standard Detail 701 for curb and gutter channelized flow. Assume a water depth of 1', fixed side Page 2 of 3 APPENDIX B Updated SWMM Model for Bucking Horse Second Filing Computation WDDXXXXDXDE DEDDD DDDDDD D D DLPDDDD R.T.U.R.T.U.R.T.U.UP MILES HOUSE AVENUENANCY GRAY AVENUE PA L O M I N O D R I V E P A L O M I N O C O U R TWALKALOOSA WAYPALOMINO DRIVEWALKALOOSA WAYMILES HOUSE AVENUEDRAKE ROADGREAT WESTERN RAILROADTRACT BFUTURE CITY PARKTRACT EHORSEAREANANCY GRAYWETLANDTRACT ICOMMUNITYSUPPORTEDAGRICULTUREXXXXX420 SF CLASSRO O M9 HALL11 1149 SFBARN12 6" 114 SFOFFICE15 115 SFOFFICE16 WOMENS17 MENS18 371 SF TRACTOR / EQUIP.STORAGE19 COW MILKING20 MILKING PREP21 JAN.22MECH.23OFFICEBUILDING 1OFFICEBLDG 2OFFICEBLDG 3TRACT ATRACT FT R A C T G TRACT HTRACT DOUTLOT AOUTLOT DOUTLOT FOUTLOT EOUTLOT GOUTLOT HOFFICECOMPLEXNATIVE UPLANDHABITAT AREA/DETENTION PONDTRACT CWORKINGFARM101102103105108109100107a107b104DRAWN BY: ATCSCALE: 1" = 500'ISSUED: 10/19/2021SWMM BASIN UPDATESHEET NO:1BUCKING HORSE SECOND FILING Elapsed Time (hours) 6543210Volume (ft3)900000.0 800000.0 700000.0 600000.0 500000.0 400000.0 300000.0 200000.0 100000.0 0.0 Node 215 Volume (ft3) SWMM 5 Page 1 Elapsed Time (hours) 6543210Flow (CFS)90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 Link out215 Flow (CFS) SWMM 5 Page 1 Elapsed Time (hours) 6543210Flow (CFS)350.0 300.0 250.0 200.0 150.0 100.0 50.0 0.0 Link IN_215a Flow (CFS) SWMM 5 Page 1 EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.014) -------------------------------------------------------------- WARNING 02: maximum depth increased for Node 302 WARNING 02: maximum depth increased for Node 303 WARNING 02: maximum depth increased for Node 304 WARNING 02: maximum depth increased for Node 305 WARNING 02: maximum depth increased for Node 306 WARNING 02: maximum depth increased for Node 307 ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ 11/21/2012 00:00:00 Ending Date .............. 11/21/2012 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:01:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 30.00 sec ************************** Volume Depth SWMM 5 Page 1 Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 62.620 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 18.769 1.100 Surface Runoff ........... 43.386 2.542 Final Storage ............ 0.753 0.044 Continuity Error (%) ..... -0.458 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 43.385 14.138 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 34.675 11.299 Flooding Loss ............ 1.442 0.470 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 7.247 2.361 Continuity Error (%) ..... 0.050 ******************************** Highest Flow Instability Indexes ******************************** Link out002 (36) Link 202 (27) Link 5 (23) Link 204 (3) Link 203 (2) ************************* Routing Time Step Summary ************************* Minimum Time Step : 30.00 sec SWMM 5 Page 2 Average Time Step : 30.00 sec Maximum Time Step : 30.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 1.27 Percent Not Converging : 0.00 *************************** Subcatchment Runoff Summary *************************** ------------------------------------------------------------------------------------------------------------------------------ Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS ------------------------------------------------------------------------------------------------------------------------------ 109 3.67 0.00 0.00 0.68 1.98 0.97 2.95 1.15 101.36 0.805 108 3.67 0.00 0.00 0.68 1.98 0.97 2.95 1.74 153.81 0.805 100 3.67 0.00 0.00 0.42 2.52 0.69 3.20 1.04 105.75 0.873 102 3.67 0.00 0.00 0.68 1.94 1.03 2.96 2.61 245.74 0.808 101 3.67 0.00 0.00 1.33 1.76 0.51 2.28 0.97 39.41 0.621 104 3.67 0.00 0.00 0.65 1.99 1.00 2.99 0.78 75.55 0.816 105 3.67 0.00 0.00 0.64 2.01 0.98 2.99 1.71 161.94 0.816 106 3.67 0.00 0.00 2.68 0.04 0.95 0.99 0.00 0.04 0.270 107a 3.67 0.00 0.00 1.76 0.62 1.28 1.90 1.63 73.64 0.519 107b 3.67 0.00 0.00 1.66 0.83 1.16 1.99 2.52 127.09 0.542 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- 302 JUNCTION 1.84 4.00 101.90 0 00:56 4.00 mh002 JUNCTION 0.51 2.29 102.59 0 00:49 2.29 mh001 JUNCTION 2.78 10.00 109.00 0 00:52 10.00 303 JUNCTION 1.05 1.84 97.74 0 00:40 1.83 SWMM 5 Page 3 304 JUNCTION 1.14 2.79 96.69 0 00:40 2.77 305 JUNCTION 1.23 3.03 95.93 0 00:41 3.03 306 JUNCTION 1.23 3.03 95.53 0 00:41 3.03 307 JUNCTION 0.59 1.49 93.49 0 00:41 1.49 OUTFALL OUTFALL 0.00 0.00 90.00 0 00:00 0.00 001 STORAGE 2.36 6.15 106.15 0 01:14 6.15 002 STORAGE 0.84 7.43 109.43 0 00:49 7.43 4 STORAGE 2.77 3.64 105.64 0 02:07 3.64 18 STORAGE 0.74 2.84 104.84 0 00:55 2.84 215 STORAGE 3.08 4.17 95.17 0 02:25 4.17 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- 302 JUNCTION 0.00 98.62 0 01:42 0 6.3 0.000 mh002 JUNCTION 0.00 109.39 0 00:49 0 2.61 0.000 mh001 JUNCTION 0.00 122.79 0 01:14 0 6.77 -0.000 303 JUNCTION 75.55 120.51 0 00:40 0.78 7.07 -0.000 304 JUNCTION 161.94 274.44 0 00:40 1.71 8.77 0.000 305 JUNCTION 0.04 270.30 0 00:41 0.00269 8.76 0.000 306 JUNCTION 73.64 340.99 0 00:41 1.63 10.4 0.000 307 JUNCTION 127.09 464.21 0 00:41 2.52 12.9 -0.000 OUTFALL OUTFALL 0.00 82.00 0 01:55 0 11.3 0.000 001 STORAGE 39.41 183.67 0 00:47 0.965 6.79 0.031 002 STORAGE 245.74 245.74 0 00:40 2.61 2.61 0.033 4 STORAGE 255.17 255.17 0 00:40 2.89 2.89 0.016 18 STORAGE 105.75 105.75 0 00:40 1.04 1.04 0.043 215 STORAGE 0.00 464.29 0 00:41 0 12.9 -0.000 ********************* Node Flooding Summary ********************* SWMM 5 Page 4 Flooding refers to all water that overflows a node, whether it ponds or not. -------------------------------------------------------------------------- Total Maximum Maximum Time of Max Flood Ponded Hours Rate Occurrence Volume Volume Node Flooded CFS days hr:min 10^6 gal 1000 ft3 -------------------------------------------------------------------------- mh001 0.93 30.42 0 01:14 0.470 0.000 ********************** Storage Volume Summary ********************** -------------------------------------------------------------------------------------------------- Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------------- 001 49.352 12 0 0 184.148 46 0 01:13 122.79 002 6.389 5 0 0 78.352 60 0 00:49 109.39 4 184.780 8 0 0 289.040 13 0 02:07 16.00 18 11.650 2 0 0 60.646 8 0 00:54 23.90 215 536.149 11 0 0 870.255 17 0 02:25 82.00 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- OUTFALL 97.08 72.08 82.00 11.298 ----------------------------------------------------------- System 97.08 72.08 82.00 11.298 SWMM 5 Page 5 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- 202 CONDUIT 109.39 0 00:49 9.98 0.23 0.33 201 CONDUIT 98.62 0 01:42 8.55 1.07 1.00 203 CONDUIT 97.93 0 00:56 7.71 0.01 0.08 204 CONDUIT 117.67 0 00:41 8.27 0.02 0.09 205 CONDUIT 270.26 0 00:41 10.26 0.04 0.14 206 CONDUIT 269.50 0 00:41 11.02 0.10 0.22 IN_215a CONDUIT 341.10 0 00:41 32.19 0.01 0.07 IN_215b CONDUIT 464.29 0 00:41 45.01 0.01 0.07 out002 DUMMY 109.39 0 00:49 out001 DUMMY 122.79 0 01:14 out4 DUMMY 16.00 0 00:50 5 DUMMY 23.90 0 00:55 out215 DUMMY 82.00 0 01:55 ************************* Conduit Surcharge Summary ************************* ---------------------------------------------------------------------------- Hours Hours --------- Hours Full -------- Above Full Capacity Conduit Both Ends Upstream Dnstream Normal Flow Limited ---------------------------------------------------------------------------- 201 0.92 0.92 0.92 0.93 0.92 Analysis begun on: Wed Oct 20 08:52:10 2021 Analysis ended on: Wed Oct 20 08:52:10 2021 Total elapsed time: < 1 sec SWMM 5 Page 6 This unofficial copy was downloaded on Oct-11-2021 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA [TITLE] ;;Project Title/Notes [OPTIONS] ;;Option Value FLOW_UNITS CFS INFILTRATION HORTON FLOW_ROUTING KINWAVE LINK_OFFSETS DEPTH MIN_SLOPE 0 ALLOW_PONDING NO SKIP_STEADY_STATE NO START_DATE 11/21/2012 START_TIME 00:00:00 REPORT_START_DATE 11/21/2012 REPORT_START_TIME 00:00:00 END_DATE 11/21/2012 END_TIME 06:00:00 SWEEP_START 01/01 SWEEP_END 12/31 DRY_DAYS 0 REPORT_STEP 00:01:00 WET_STEP 00:05:00 DRY_STEP 01:00:00 ROUTING_STEP 0:00:30 RULE_STEP 00:00:00 INERTIAL_DAMPING PARTIAL NORMAL_FLOW_LIMITED BOTH FORCE_MAIN_EQUATION H-W VARIABLE_STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 12.566 MAX_TRIALS 8 HEAD_TOLERANCE 0.005 SYS_FLOW_TOL 5 LAT_FLOW_TOL 5 MINIMUM_STEP 0.5 THREADS 1 [EVAPORATION] ;;Data Source Parameters ;;-------------- ---------------- CONSTANT 0.0 DRY_ONLY NO [RAINGAGES] ;;Name Format Interval SCF Source ;;-------------- --------- ------ ------ ---------- FtCollins-100yr INTENSITY 0:05 1.0 TIMESERIES 100yr [SUBCATCHMENTS] ;;Name Rain Gage Outlet Area %Imperv Width %Slope CurbLen SnowPack ;;-------------- ---------------- ---------------- -------- -------- -------- -------- -------- ---------------- 109 FtCollins-100yr 4 14.3 55 2076 1 0 108 FtCollins-100yr 4 21.7 55 3150 1 0 100 FtCollins-100yr 18 12.0 70 1742 2.6 0 102 FtCollins-100yr 002 32.4 53.9 4705 2.2 0 101 FtCollins-100yr 001 15.6 49.8 2265 .004 0 104 FtCollins-100yr 303 9.6 55.4 1343 3 0 105 FtCollins-100yr 304 21.0 56 3049 2.1 0 106 FtCollins-100yr 305 .1 1 1 2.6 0 107a FtCollins-100yr 306 31.5 17.2 1087 1.5 0 107b FtCollins-100yr 307 46.6 23.0 1373 1.5 0 [SUBAREAS] ;;Subcatchment N-Imperv N-Perv S-Imperv S-Perv PctZero RouteTo PctRouted ;;-------------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- 109 .016 .25 .1 .3 0 OUTLET 108 .016 .25 .1 .3 0 OUTLET 100 .016 .25 .1 .3 0 OUTLET 102 .016 .25 .1 .3 0 OUTLET 101 .016 .25 .1 .3 0 OUTLET 104 .016 .25 .1 .3 0 OUTLET 105 .016 .25 .1 .3 0 OUTLET 106 .016 .25 .1 .3 0 OUTLET 107a .016 .25 .1 .3 0 OUTLET 107b .016 .25 .1 .3 0 OUTLET [INFILTRATION] ;;Subcatchment MaxRate MinRate Decay DryTime MaxInfil ;;-------------- ---------- ---------- ---------- ---------- ---------- 109 .51 0.5 6.48 7 0 108 .51 0.5 6.48 7 0 100 .51 0.5 6.48 7 0 102 .51 0.5 6.48 7 0 101 .51 0.5 6.48 7 0 104 .51 0.5 6.48 7 0 105 .51 0.5 6.48 7 0 106 .51 0.5 6.48 7 0 107a .51 0.5 6.48 7 0 107b .51 0.5 6.48 7 0 [JUNCTIONS] ;;Name Elevation MaxDepth InitDepth SurDepth Aponded ;;-------------- ---------- ---------- ---------- ---------- ---------- 302 97.9 10 0 0 0 mh002 100.3 10 0 0 0 mh001 99 10 0 0 0 303 95.9 10 0 0 0 304 93.9 10 0 0 0 305 92.9 10 0 0 0 306 92.5 10 0 0 0 307 92.0 10 0 0 0 [OUTFALLS] ;;Name Elevation Type Stage Data Gated Route To ;;-------------- ---------- ---------- ---------------- -------- ---------------- OUTFALL 90 FREE NO [STORAGE] ;;Name Elev. MaxDepth InitDepth Shape Curve Name/Params N/A Fevap Psi Ksat IMD ;;-------------- -------- ---------- ----------- ---------- ---------------------------- -------- -------- -------- -------- 001 100 10 0 TABULAR P1 0 0 002 102 10 0 TABULAR P2 0 0 4 102 10 0 TABULAR P4 0 0 18 102 10 0 TABULAR t 0 0 215 91 10 0 TABULAR P215 0 0 [CONDUITS] ;;Name From Node To Node Length Roughness InOffset OutOffset InitFlow MaxFlow ;;-------------- ---------------- ---------------- ---------- ---------- ---------- ---------- ---------- ---------- 202 mh002 001 55 .013 0 0 0 0 201 mh001 302 266 .013 0 0 0 0 203 302 303 505 .013 0 0 0 0 204 303 304 482 .013 0 0 0 0 205 304 305 260 .013 0 0 0 0 206 305 306 95 .013 0 0 0 0 IN_215a 306 307 10 0.01 0 0 0 0 IN_215b 307 215 10 0.01 0 0 0 0 [OUTLETS] ;;Name From Node To Node Offset Type QTable/Qcoeff Qexpon Gated ;;-------------- ---------------- ---------------- ---------- --------------- ---------------- ---------- -------- out002 002 mh002 0 TABULAR/DEPTH O2 NO out001 001 mh001 0 TABULAR/DEPTH O1 NO out4 4 001 0 TABULAR/DEPTH O4 NO 5 18 001 0 TABULAR/DEPTH T_O NO out215 215 OUTFALL 0 TABULAR/DEPTH O215 NO [XSECTIONS] ;;Link Shape Geom1 Geom2 Geom3 Geom4 Barrels Culvert ;;-------------- ------------ ---------------- ---------- ---------- ---------- ---------- ---------- 202 CIRCULAR 7 0 0 0 1 201 CIRCULAR 4 0 0 0 1 203 CIRCULAR 20 0 0 0 1 204 CIRCULAR 20 0 0 0 1 205 CIRCULAR 20 0 0 0 1 206 CIRCULAR 14 0 0 0 1 IN_215a CIRCULAR 20 0 0 0 1 IN_215b CIRCULAR 20 0 0 0 1 [CURVES] ;;Name Type X-Value Y-Value ;;-------------- ---------- ---------- ---------- det1 Rating 102 0 det1 104 30 det1 106 60 ; pond2 Rating 0 0 pond2 4 7 pond2 8 14 ; det2 Rating 0 0 det2 4 7 det2 8 14 ; p1out Rating 0 0.0 p1out 1 0.3 p1out 2 0.5 p1out 3 0.6 p1out 4 0.7 p1out 5 0.8 p1out 6 0.8 p1out 7.2 0.9 ; p2out Rating 0.00 0.00 p2out 0.20 4.00 p2out 1.20 8.34 p2out 2.20 8.59 p2out 3.20 8.83 p2out 4.20 9.06 p2out 5.20 9.29 p2out 6.00 9.47 ; out3 Rating 0.00 0.00 out3 1.10 6.00 out3 2.10 12.94 out3 3.10 18.90 out3 4.10 23.38 out3 5.10 27.14 out3 6.10 30.43 out3 6.70 33.40 ; outlet4 Rating 0 0 outlet4 2 1 outlet4 4 1.5 ; outle5 Rating 0 0 outle5 2 1 outle5 4 1.5 ; O4 Rating 0 0 O4 1 4 O4 2 10 O4 3 16 ; O3 Rating 0 0 O3 2.6 20 O3 4.6 40 O3 5.6 60 ; O1 Rating 0 0 O1 1.8 30 O1 3.8 60 O1 6.8 140 ; O2 Rating 0 0 O2 1.6 46.6 O2 3.6 72.10 O2 4.6 82.8 O2 5.6 92.3 O2 6.6 101.2 O2 7.6 111.1 ; T_O Rating 0 0 T_O 2 18 T_O 4 32 ; O215 Rating 0 0 O215 2 65 O215 4 82 ; pond1 Storage 0.00 186.71 pond1 1.00 11610.97 pond1 2.00 18910.48 pond1 3.00 27597.47 pond1 4.00 37457.72 pond1 5.00 42732.82 pond1 6.00 47703.39 pond1 7.20 53728.51 ; detpond2 Storage 0.00 422.47 detpond2 0.20 1667.16 detpond2 1.00 6743.86 detpond2 2.00 16049.38 detpond2 3.00 22104.10 detpond2 4.00 26630.53 detpond2 5.00 30414.38 detpond2 6.00 34190.32 ; pond3 Storage 0.00 0.00 pond3 1.10 7902.02 pond3 2.10 29813.22 pond3 3.10 64874.66 pond3 4.10 103295.75 pond3 5.10 112676.39 pond3 6.10 122158.92 pond3 6.70 127897.52 ; detpond4 Storage 0 0 detpond4 2 25000 detpond4 4 50000 ; detpond5 Storage 0 0 detpond5 2 20000 detpond5 4 50000 ; P4 Storage 0 0 P4 1 43560 P4 2 87120 P4 3 130680 ; P3 Storage 0 0 P3 2.6 12637 P3 4.6 16646 P3 5.6 18800 ; P1 Storage 0 0 P1 1.8 24042 P1 3.8 37538 P1 6.8 51067 ; P2 Storage 0 0 P2 1.6 7629 P2 3.6 10697 P2 4.6 12381 P2 5.6 14165 P2 6.6 16049 P2 7.6 18034 ; t Storage 0 0 t 2 30000 t 4 60000 ; P215 Storage 0 0 P215 2 200000 P215 4 400000 [TIMESERIES] ;;Name Date Time Value ;;-------------- ---------- ---------- ---------- 100yr 0:05 1 100yr 0:10 1.14 100yr 0:15 1.33 100yr 0:20 2.23 100yr 0:25 2.84 100yr 0:30 5.49 100yr 0:35 9.95 100yr 0:40 4.12 100yr 0:45 2.48 100yr 0:50 1.46 100yr 0:55 1.22 100yr 1:00 1.06 100yr 1:05 1 100yr 1:10 0.95 100yr 1:15 0.91 100yr 1:20 0.87 100yr 1:25 0.84 100yr 1:30 0.81 100yr 1:35 0.78 100yr 1:40 0.75 100yr 1:45 0.73 100yr 1:50 0.71 100yr 1:55 0.69 100yr 2:00 0.67 [REPORT] ;;Reporting Options SUBCATCHMENTS ALL NODES ALL LINKS ALL [TAGS] [MAP] DIMENSIONS 0.000 0.000 10000.000 10000.000 Units None [COORDINATES] ;;Node X-Coord Y-Coord ;;-------------- ------------------ ------------------ 302 4359.410 7244.898 mh002 3520.408 7494.331 mh001 4359.410 7925.170 303 4393.733 6403.270 304 4475.477 5422.343 305 4543.597 4441.417 306 4598.093 3487.738 307 5242.215 3483.276 OUTFALL 6432.403 2650.215 001 4359.410 8492.063 002 2658.730 7494.331 4 3554.422 9387.755 18 3506.006 8483.483 215 6121.245 3487.124 [VERTICES] ;;Link X-Coord Y-Coord ;;-------------- ------------------ ------------------ [Polygons] ;;Subcatchment X-Coord Y-Coord ;;-------------- ------------------ ------------------ 109 2783.447 9078.798 109 2783.447 9101.474 109 2772.109 9101.474 109 2794.785 9090.136 108 2866.591 9527.589 108 2741.875 9527.589 108 2775.888 9686.319 100 2859.033 8473.167 100 2722.978 8473.167 100 2802.343 8597.884 102 1986.017 7475.435 102 1838.624 7588.813 102 1838.624 7452.759 101 5273.998 8450.491 101 5160.620 8439.153 101 5160.620 8552.532 104 3428.771 6298.883 104 3400.838 6452.514 105 3417.382 5364.807 105 3353.004 5354.077 105 3363.734 5482.833 106 3385.193 4366.953 106 3310.086 4345.494 106 3310.086 4484.979 107a 3893.093 3008.413 107a 3828.715 2997.684 107a 3817.985 3094.250 107b 4638.601 2964.245 107b 4684.737 3033.449 107b 4534.794 3033.449 [SYMBOLS] ;;Gage X-Coord Y-Coord ;;-------------- ------------------ ------------------ FtCollins-100yr -582.579 8495.475 APPENDIX C Hydraulic Computations Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Oct 20 2021 Main Channel (341 cfs 100-yr flow x 1.33) User-defined Invert Elev (ft) = 4885.82 Slope (%) = 0.30 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 454.00 (Sta, El, n)-(Sta, El, n)... ( 0.00, 4890.43)-(15.00, 4889.87, 0.035)-(31.00, 4885.82, 0.035)-(44.00, 4886.08, 0.035)-(60.00, 4890.02, 0.035) Highlighted Depth (ft) = 3.95 Q (cfs) = 454.00 Area (sqft) = 108.13 Velocity (ft/s) = 4.20 Wetted Perim (ft) = 44.53 Crit Depth, Yc (ft) = 2.71 Top Width (ft) = 43.59 EGL (ft) = 4.22 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Elev (ft) Depth (ft)Section 4884.00 -1.82 4885.00 -0.82 4886.00 0.18 4887.00 1.18 4888.00 2.18 4889.00 3.18 4890.00 4.18 4891.00 5.18 Sta (ft) Project Name:Bucking Horse Park Project Number :1748-002 Location :Fort Collins, CO.Computation By :COG Design Point:Storm Drain Ap (FES-A1)Check By :SR Given:Based on Urban Storm Drainage Criteria Manual 1.50 D Conduit Diameter (ft.) 18 (in)Volume 1, Major Drainage, June 2001 8.35 Q Discharge (cf/s)Reference for all Figures and Tables noted 5.90 V Velocity (f/s) 0.60 Yt Tail Water Depth (ft.) (For unknown Yt, Yt=D*0.4) 3.03 Q / D2.5 Froude Number Determine Type of Riprap Protection (See Figure MD-21) 0.40 Yt / D 4.55 Q / D1.5 L Type of Riprap (Select Type VL, L, M, H, VH) 9 d50 (in.)Table MD-7 Percent smaller than Intermediate Rock given size by weight dimension (in.) 70-100 15 50-70 12 35-50 9 2-10 3 Determine Expansion Factor (See Figure MD-22) 0.40 Yt / D 3.03 Q / D2.5 4.25 1/(2tan ) Determine Length of Riprap Protection 1.52 Q / V At = required area of flow at required velocity (ft.) (Required Velocity = 5.5 f/s, erosive soils) 4.38 Eq. MD-22 Lp = Required length of riprap (ft.)L = ( 1/(2tan ) )( At/Yt - D) ) 4.50 L < 3D Check Minimum length 15.00 L < 10D Check Maximum length 4.50 Proposed Length (ft.) Determine Width of Riprap Protection 4.50 Minimum Width (3*D) 2.25 SY Required Determine Minimum Riprap Depth 2d50 =1.50 ft. Determine Bedding Thickness L Type of Riprap 6 Type II Bedding (in.)Table MD-12 RIPRAP EROSION PROTECTION AT CIRCULAR CONDUIT OUTLET FIGURE MD-22 EXPANSION FACTOR FOR CIRCULAR CONDUITS RIPRAP EROSION PROTECTION Single Circular Conduit Outlet Protection FIGURE MD-21 1748-002_RIPRAP_ Circular Conduit.xls, Storm Drain AP-100 Project Name:Bucking Horse Park Project Number :1748-002 Location :Fort Collins, CO.Computation By :COG Design Point:Park Culvert (FES-P1)Check By :SR Given:Based on Urban Storm Drainage Criteria Manual 1.00 D Conduit Diameter (ft.) 12 (in)Volume 1, Major Drainage, June 2001 1.38 Q Discharge (cf/s)Reference for all Figures and Tables noted 2.22 V Velocity (f/s) 0.40 Yt Tail Water Depth (ft.) (For unknown Yt, Yt=D*0.4) 1.38 Q / D2.5 Froude Number Determine Type of Riprap Protection (See Figure MD-21) 0.40 Yt / D 1.38 Q / D1.5 L Type of Riprap (Select Type VL, L, M, H, VH) 9 d50 (in.)Table MD-7 Percent smaller than Intermediate Rock given size by weight dimension (in.) 70-100 15 50-70 12 35-50 9 2-10 3 Determine Expansion Factor (See Figure MD-22) 0.40 Yt / D 1.38 Q / D2.5 6.50 1/(2tan ) Determine Length of Riprap Protection 0.25 Q / V At = required area of flow at required velocity (ft.) (Required Velocity = 5.5 f/s, erosive soils) -2.42 Eq. MD-22 Lp = Required length of riprap (ft.)L = ( 1/(2tan ) )( At/Yt - D) ) 3.00 L < 3D Check Minimum length 10.00 L < 10D Check Maximum length 3.00 Proposed Length (ft.) Determine Width of Riprap Protection 3.00 Minimum Width (3*D) 1.00 SY Required Determine Minimum Riprap Depth 2d50 =1.50 ft. Determine Bedding Thickness L Type of Riprap 6 Type II Bedding (in.)Table MD-12 FIGURE MD-21 RIPRAP EROSION PROTECTION AT CIRCULAR CONDUIT OUTLET FIGURE MD-22 EXPANSION FACTOR FOR CIRCULAR CONDUITS RIPRAP EROSION PROTECTION Single Circular Conduit Outlet Protection 1748-002_RIPRAP_ Circular Conduit.xls, Park Culvert APPENDIX D LID SIZING Sheet 1 of 1 Designer: Company: Date: Project: Location: 1. Design Discharge A) 2-Year Peak Flow Rate of the Area Draining to the Grass Buffer Q2 =0.3 cfs 2.Minimum Width of Grass Buffer WG =6 ft 3.Length of Grass Buffer (14' or greater recommended)LG =341 ft 4.Buffer Slope (in the direction of flow, not to exceed 0.1 ft / ft)SG =0.080 ft / ft 5. Flow Characteristics (sheet or concentrated) A) Does runoff flow into the grass buffer across the entire width of the buffer? B) Watershed Flow Length FL=45 ft C) Interface Slope (normal to flow)SI=0.013 ft / ft D) Type of Flow SHEET FLOW Sheet Flow: FL * SI < 1 Concentrated Flow: FL * SI > 1 6. Flow Distribution for Concentrated Flows 7 Soil Preparation (Describe soil amendment) 8 Vegetation (Check the type used or describe "Other") 9. Irrigation (*Select None if existing buffer area has 80% vegetation AND will not be disturbed during construction.) 10. Outflow Collection (Check the type used or describe "Other") Notes: Design Procedure Form: Grass Buffer (GB) LID Basin 1 Northern Engineering Bucking Horse Park January 18, 2022 UD-BMP (Version 3.07, March 2018) Fort Collins, CO SEE SOIL AMENDMENT NOTES ON DRAINAGE PLAN Existing Xeric Turf Grass Irrigated Turf Grass Other (Explain): Choose One Choose One Grass Swale Street Gutter Storm Sewer Inlet Other (Explain): None (sheet flow) Slotted Curbing Level Spreader Choose One Other (Explain): Choose One Yes No Choose One Permanent None* Temporary 1 Basin ID LID Treatment Impervious Area (sq. ft.) Impervious Area Treated By LID (sq. ft.) Percent of Impervious Treated by LID 1 Grass Buffer 3,511 3,511 100% 5 Grass Buffer 1,913 1,913 100% 7, 10, & 11 Grass Buffer 17,521 17,521 100% 12 Grass Buffer 16,563 3,096 19% 16 Grass Buffer 3,155 3,155 100% Total Site 45,450 29,195 64% LID SUMMARY X 6' GRASS BUFFER (MIN.) 4' GRASS BUFFER (MIN.) 32' GRASS BUFFER (MIN.) 19' GRASS BUFFER (MIN.) 11' GRASS BUFFER (MIN.)MILES HOUSE AVE . STORM DRAIN (TYP.) SWALE (TYP.) LID EXHIBIT GRASS BUFFER SUMMARY FORT COLLINS, CO BUCKING HORSE PARK E N G I N E E R N GI EHTRON R N 01.18.2022 P:\1748-002\DWG\DRNG\PARK\1748-002_PARK_LID.DWG NORTH FORMAL GRASS BUFFER AREA PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER BASIN 5 PROPOSED INLET LEGEND: PROPERTY BOUNDARY BASIN 1 BASIN 7, 10, & 11 BASIN 12 BASIN 16 IMPERVIOUS AREA'S BEING TREATED BY GRASS BUFFER BASIN 5 BASIN 1 BASIN 7, 10, & 11 BASIN 12 BASIN 16 Basin ID LID Treatment Impervious Area (sq. ft.) Impervious Area Treated By LID (sq. ft.) Percent of Impervious Treated by LID 1 Grass Buffer 3511 3511 100% 5 Grass Buffer 1913 1913 100% 7, 10, & 11 Grass Buffer 17521 17521 100% 12 Grass Buffer 16563 3096 19% 16 Grass Buffer 3155 3155 100% Total Site 45450 29195 64% NOTES 1.FOR LID AND GRASS BUFFER CALCULATIONS PLEASE REFER TO THE DRAINAGE AND EROSION CONTROL REPORT FOR BUCKING HORSE PARK DATED JAN. 26 2022. 2.REFER TO UTILITY PLANS FOR BUCKING HORSE PARK FOR ADDITIONAL GRADING AND UTILITY INFORMATION. 3.REFER TO LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON HARDSCAPES. 4.REFER TO DRAINAGE EXHIBIT SHEET DR1 OF UTILITY PLANS FOR SOIL AMENDMENT NOTES ( IN FEET ) 0 1 INCH = 100 FEET 100 100 TFEXISTING DETENTION POND 215 1 OS1 5 6 7 8 9 10 11 12 14 15 16 13 S S S S S S S S S SWWWWW CMWWSSSSSSSSSSSSSSSSS S SSS S SS S SEWWWWWXXXX X X X X XX X XXXXX100' ROW GREAT WESTERN RAIL ROAD CO CO CO CO CO S S S S SSSSSSSSSSSSSCO CO CO CO COS S S S S S S SSSSSSSHYD EMILES HOUSE AVENUEPALOMINO COURT 15 0.38 ac 1 0.49 ac 6 0.06 ac 7 0.82 ac 8 0.03 ac 9 0.05 ac 10 0.40 ac 11 0.84 ac 12 1.20 ac 13 0.16 ac 14 0.39 ac 16 0.96 ac OS1 0.65 ac OS2 1.39 ac OS2 5 0.35 ac PROPERTY BOUNDARY POUDRE RIVER 500-YR FLOODPLAIN (PER RiskMAP) PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY PROPOSED AREA DRAIN PROPOSED AREA DRAIN PROPOSED AREA DRAIN PROPOSED AREA DRAIN PROPOSED AREA DRAIN PROPOSED AREA DRAIN RE-ALIGN EXISTING SWALE DR1 DRAINAGE EXHIBIT14 NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 SOIL AMENDMENT NOTES: 1.REFER TO THE DRAINAGE AND EROSION CONTROL REPORT FOR BUCKING HORSE PARK DATED JAN. 26 2022 FOR ADDITIONAL INFORMATION. 2.THIS PROPERTY IS CURRENTLY LOCATED IN THE FEMA MODERATE RISK FLOOD HAZARD AREA FOR THE CACHE LA POUDRE RIVER. BUT THE PROPOSED REMAPPING FROM RISKMAP WILL REMOVE ALL FLOODPLAIN DESIGNATIONS FROM THE PROJECT AREA. 3.REFER TO THE LANDSCAPE PLANS BY CITY OF FORT COLLINS FOR ADDITIONAL LANDSCAPING INFORMATION. LEGEND: PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET ADESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 11 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R SheetBUCKING HORSE PARKThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 14 10 0.37 ac BASIN DESIGNATION BASIN AREA (AC) NOTES: 1.LOOSEN THE TOP 8 INCHES 2.TILL OR MIX 3 CUBIC YARDS OF AMENDMENT PER 1,000 SQUARE FEET INTO THE TOP 6 INCHES OF SOIL OR 3.ADD 4 INCHES OF TOPSOIL THAT MEETS THE FOLLOWING REQUIREMENTS TOPSOIL MUST BE FREE FROM NOXIOUS WEEDS, ROOTS, SALTS, CLAY LUMPS AND ANY NON-SOIL MATERIALS (ROCKS, CONCRETE, BRICK CHIPS, BUILDING MATERIALS, FOREIGN MATTER AND ANY CHEMICAL, BIOLOGICAL OR RADIOLOGICAL CONTAMINANTS). TOPSOIL REQUIREMENTS SAND 20% - 75% SILT 5% - 60% CLAY 5% - 30% ORGANIC MATERIAL 5% OR MORE Ph 6.0 - 8.0 C2 C100 Q2 (cfs) Q100 (cfs)