March 04, 2022
Mike Mcbride
MMLA Landscape + Planning
2339 Spruce Creek Drive
Fort Collins, CO
RE: SweetWater Brewing - Beer Garden, FDP220003, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of SweetWater Brewing - Beer Garden. If you have questions
about any comments, you may contact the individual commenter or direct your questions
through your Development Review Coordinator, Brandy Bethurem Harras via phone at
970-416-2744 or via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 1
02/14/2022: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone conversations. Thank you!
Comment Number: 2
02/14/2022: INFORMATION:
As part of your resubmittal, you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable, avoiding responses like noted or acknowledged.
2
Comment Number: 3
02/14/2022: INFORMATION:
Please follow the Electronic Submittal Requirements and File Naming
Standards found at https://www.fcgov.com/developmentreview/files/electronic
submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888.
File names should begin with the file type, followed by the project information, and round number.
Example: UTILITY PLANS_PROJECT NAME_PDP_Rd2.pdf
File type acronyms maybe appropriate to avoid extremely long file names.
Example: TIS for Traffic Impact Study, ECS for Ecological Characterization Study.
*Please disregard any references to paper copies, flash drives, or CDs.
Comment Number: 4
02/14/2022: INFORMATION:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set,
and these must be removed prior to submittal as they can cause issues with the
PDF file. The default setting is "1" ("on") in AutoCAD. To change the setting
and remove this feature, type "EPDFSHX" in the command line and enter "0".
Read this article at Autodesk.com for more tips on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-Aut oCAD.html
Comment Number: 5
02/14/2022: INFORMATION:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are ready to resubmit your
plans, please notify me with as much advanced notice as possible.
Comment Number: 6
02/14/2022: INFORMATION:
Temporary Service Changes - City of Fort Collins Development Review
In order to continue providing thorough reviews and giving every project the
attention it deserves, the City of Fort Collins is implementing temporary
changes in how we serve our development customers. As you may be aware,
we are experiencing staff shortages in a number of key departments, which has
begun to impact the timeliness of our reviews. We recognize that development
and construction play a critical role in our community’s vibrancy and economic
recovery, and we have been exploring options for mitigating impacts to our
customers. As a result, we will be making some temporary service changes.
Beginning Monday May 10, 2021, one additional week of review time will be
added to all 1st and 2nd round submittals (increase from 3 weeks to 4 weeks).
Comment Number: 7
02/14/2022: INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the
expiration of your project. (LUC 2.211 Lapse, Rounds of Review).
Comment Number: 8
02/14/2022: FOR FINAL APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this
project. I will provide a recording checklist and process information when we are closer to this step.
3
Department: Planning Services
Contact: Will Lindsey, , wlindsey@fcgov.com
Topic: General
Comment Number:
03/01/2022: FOR APPROVAL:
Please include scale bar and north arrow on final copies of the site, lighting, and landscape plans.
Response: Scales and North Arrows have been provided.
Department: Engineering Development Review
Contact: Sophie Buckingham, , sbuckingham@fcgov.com
Topic: General
Comment Number: 1
02/28/2022: FOR APPROVAL - REVISED:
On the plat, please show distances from eastern utility easements to Platte
River Power Authority (PRPA) easement. See Technical Services redlines.
Please also add a note to the plat explaining that the drainage easement in the
southeast corner will be preserved as dedicated by the plat of Fort Collins
Brewery and as partially vacated by the resolution recorded at Larimer County
Reception Number 20170077793.
Response Number: 1
Response: Distances from eastern utility easements to PRPA easement have been added. Please see
note 12 under surveyor notes regarding the southeast drainage easement.
02/28/2022: FOR APPROVAL - REVISED:
On Sheet C3.00 of the utility plans, an existing 8-inch public sewer line is
depicted darker than the existing sanitary sewer main in Lincoln Avenue.
Please clarify on the plans that no construction will be involved in the transfer to
private maintenance.
Response Number: 2
Response: The public sewer that is being converted into a private sewer service has been hatched on the
plan and clarified that no construction will be involved in the transfer to private.
Comment Number: 4
03/02/2022: INFORMATION - NEW COMMENT:
An excavation permit will be required so that an inspector can approve the
water and sewer service abandonments. You can find information about the
excavation permit at https://www.fcgov.com/engineering/excavation
4
Department: Traffic Operation
Contact: Spencer Smith, 970-221-6820, smsmith@fcgov.com
Topic: General
Comment Number: 1
03/01/2022: INFORMATION:
The previously submitted (during MJA process) Traffic Memo was reviewed and
conclusions accepted. Traffic Operations has no comments on the proposed
FDP. Work with Engineering on any required frontage improvements,
easement dedications, etc.
Response: Noted
Department: Erosion Control
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1
02/25/2022: FOR FINAL APPROVAL:
Please address redlined comments provided on the Erosion Control Plan.
Response Number: 1
Response: The erosion control redlines have been completed.
Department: Stormwater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
Topic: General
Comment Number: 2
03/01/2022: INFORMATION:
There will be an amended development agreement needed for the stormwater
features. The City is currently working on this draft.
Response: Noted
Comment Number: 3
03/01/2022: FOR INFORMATION ONLY:
Regarding the “future structure with columns in the rain garden.” Thank you for
the explanation. Please note that structures are typically not permitted within
rain gardens and doing so may require a variance as well as partial easement
vacation since rain garden areas are dedicated in drainage easements.
Response: Reference to columns in the rain garden has been removed.
Comment Number: 4
03/01/2022: FOR APPROVAL:
Please show the detention ponding areas on the Site Plan in the Planning Set
and on the Grading Pan in the utility plan set.
Response Number: 4
Response: Detention area and the water surface elevation has been added to the site plan, grading plan
and drainage exhibit. A reference to the previously approved Red Truck Brewing plans has been added for
the existing pond’s detention area.
Comment Number: 5
5
03/01/2022: FOR APPROVAL:
See redlines for minor comments.
Response Number: 5
Response: The stormwater redlines have been completed.
Comment Number: 6
03/01/2022: FOR APPROVAL:
PLAT COMMENTS:
a. Please check for consistency in easement callouts between the plat and the utility plans.
b. The existing drainage easement in the southeast corner of the site needs to
be adequately incorporated into the current plat. This is a complicated
easement that was dedicated by Fort Collins Brewery and then partially vacated
by Red Truck. I have included this vacation document with the redlines.
Please review and think though how to fully incorporate into this plat.
Specific concerns I have are:
- The square shapes need explanation and potentially meets and bounds or other geometric description.
- The previous drainage easement vacation included a top elevation in the description, allowing the
deck to overhang above the pond. this needs to be carried forwards with this plat.
In the comment meeting you mentioned that you would prefer not to vacate and
replat this drainage easement. This may be a good approach; however, I think
it would be best for you to meet with City Engineering and City Survey to
discuss how to best incorporate the drainage easement into the Plat.
Response Number: 6
Response: Easement callouts have been corrected on the utility plans to match the callouts on the plat.
Note 12 under surveyor notes has been added regarding the existing drainage easement at the southeast
corner of the site.
Comment Number: 7
3/4/2022: FOR INFORMATION:
A stormwater site certification will be required upon completion of the project.
This will need to include recertification of the final detention pond volume.
Response: Noted.
Comment Number: 8
03/04/2022: FOR RECORDING:
Since this project will not have a "certificate of occupancy" at the end, we will
need to determine another mechanism to ensure the drainage certification is
performed, submitted, and accepted at the end of the project. The City does
have an escrow option for the drainage certification, in lieu of holding a CO.
This would be refunded to you upon completion of the drainage certification
(minus a $200 administrative fee). Please let me know if this is an acceptable
option and we can proceed with this. The escrow would need to be calculated
and paid with approval of the FDP. Please contact me if you would like to discuss.
Department: Water-Wastewater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
6
Topic: General
Comment Number: 1
03/01/2022: INFORMATION:
Please note that all City of Fort Collins Utility Customers are subject to City
Code requirements for wastewater. These requirements include Section
26-306 Wastewater Discharge Permit Requirements and Section 26-332
Prohibitive Discharge Standards. A permit may be required depending on
activities on the site; however, discharge standards apply to every customer,
both large and small, regardless of what activities take place on the site.
Please contact Industrial Pretreatment, Industrial_Pretreatment@fcgov.com or
(970)221-6900, to discuss these requirements and how they apply to this development.
Response: Noted. Coordination with Industrial Pretreatment has been ongoing.
Comment Number: 2
03/01/2022: FOR APPROVAL:
The hydrozone table needs to be updated to match 2022 City Hydrozone values
of 3, 8, 14, and 18 gallons/square foot/year for very low, low, medium, and high zones, respectively.
Response: Hydrozone table has been revised.
Comment Number: 3
03/01/2022: FOR APPROVAL:
See redlines for minor comments.
Response Number: 3
Response: The water/wastewater redlines have been completed.
Department: Building Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
02/07/2022: BUILDING PERMIT:
Contact Russ at Building Services at 416-2341 to verify if the scope-or-work will
require a building permit.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 5
03/01/2022: FOR FINAL APPROVAL:
Please revise the sub-title as marked. See redlines.
Response Number: 5
Response: The sub-title on the cover page has been revised.
Comment Number: 6
03/01/2022: FOR FINAL APPROVAL:
There are sheet numbering issues. See redlines.
Response Number: 6
Response: The sheet numbering has been corrected.
7
Topic: Landscape Plans
Comment Number: 4
03/01/2022: FOR FINAL APPROVAL:
Please add a north arrow, scale & scale bar.
Response: Scales and North Arrows have been provided.
Topic: Plat
Comment Number: 1
03/01/2022: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter. If you have any specific questions about the redlines, please contact John
Von Nieda at 970-221-6565 or jvonnieda@fcgov.com
Response Number: 1
Response: Corrections have been made. See attached answers to redlines.
Topic: Site Plan
Comment Number: 2
03/01/2022: FOR FINAL APPROVAL:
Please revise the sub-title as marked. See redlines.
Response: Sub-title has been revised.
Comment Number: 3
03/01/2022: FOR FINAL APPROVAL:
Please add a north arrow, scale & scale bar.
Response: Scales and North Arrows have been provided.