Loading...
HomeMy WebLinkAbout2900 S COLLEGE AVE AT&T - FDP220002 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTS 1 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 - fax fcgov.com/developmentreview February 09, 2022 Jaclyn Levine AT&T, Nexius Solutions 7025 S Fulton Street Suite 100 Centennial, CO 80112 RE: 2900 S College Ave AT&T, FDP220002, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of 2900 S College Ave AT&T. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or via email at bbethuremharras@fcgov.com. Comment Summary: Department: Development Review Coordinator Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com Topic: General Comment Number: 1 02/09/2022: INFORMATION: I will be your primary point of contact throughout the development review and permitting process. If you have any questions, need additional meetings with the project reviewers, or need assistance throughout the process, please let me know and I can assist you and your team. Please include me in all email correspondence with other reviewers and keep me informed of any phone conversations. Thank you! Comment Number: 2 02/09/2022: INFORMATION: As part of your resubmittal, you will respond to the comments provided in this letter. This letter is provided to you in Microsoft Word format. Please use this document to insert responses to each comment for your submittal, using a different font color. When replying to the comment letter please be detailed in your responses, as all comments should be thoroughly addressed. Provide reference to specific project plans or explanations of why comments have not been addressed, when applicable, avoiding responses like noted or acknowledged. 2 Comment Number: 3 02/09/2022: INFORMATION: Please follow the Electronic Submittal Requirements and File Naming Standards found at https://www.fcgov.com/developmentreview/files/electronic submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888. File names should begin with the file type, followed by the project information, and round number. Example: UTILITY PLANS_PROJECT NAME_PDP_Rd2.pdf File type acronyms maybe appropriate to avoid extremely long file names. Example: TIS for Traffic Impact Study, ECS for Ecological Characterization Study. *Please disregard any references to paper copies, flash drives, or CDs. Comment Number: 4 02/09/2022: INFORMATION: All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers. Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the PDF’s. AutoCAD turns drawing text into comments that appear in the PDF plan set, and these must be removed prior to submittal as they can cause issues with the PDF file. The default setting is "1" ("on") in AutoCAD. To change the setting and remove this feature, type "EPDFSHX" in the command line and enter "0". Read this article at Autodesk.com for more tips on this topic: https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-AutoCAD.html Comment Number: 5 02/09/2022: INFORMATION: Resubmittals are accepted any day of the week, with Wednesday at noon being the cut-off for routing the same week. When you are ready to resubmit your plans, please notify me with as much advanced notice as possible. Comment Number: 6 02/09/2022: INFORMATION: Temporary Service Changes - City of Fort Collins Development Review In order to continue providing thorough reviews and giving every project the attention it deserves, the City of Fort Collins is implementing temporary changes in how we serve our development customers. As you may be aware, we are experiencing staff shortages in a number of key departments, which has begun to impact the timeliness of our reviews. We recognize that development and construction play a critical role in our community’s vibrancy and economic recovery, and we have been exploring options for mitigating impacts to our customers. As a result, we will be making some temporary service changes. Beginning Monday May 10, 2021, one additional week of review time will be added to all 1st and 2nd round submittals (increase from 3 weeks to 4 weeks). Comment Number: 7 02/09/2022: INFORMATION: Please resubmit within 180 days, approximately 6 months, to avoid the expiration of your project. (LUC 2.211 Lapse, Rounds of Review). Comment Number: 8 FOR FINAL APPROVAL: All "For Final Approval / For Approval" comments need to be addressed and resolved prior to moving forward with the final documents and recording of this project. 3 Department: Planning Services Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com Topic: General Comment Number: 1 02/09/2022: FOR APPROVAL: Please format photo-rendering sheets as 24x36 for recording purposes. Renderings can be condensed onto 1 or 2 pages - whatever maintains a legible size of the photo/text. Add sheet numbers and reflect in title page index. Response:Updated Comment Number: 2 02/09/2022: FOR APPROVAL: Please update any note that calls out the RF-Transparent screen to be, "painted as faux brick to match existing building" to "painted AND TEXTURED to match existing brick". Response:Updated Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: General Comment Number: 1 02/07/2022: FOR FINAL APPROVAL: Please add sheet numbering to the Photosims sheets. See redlines. Response:Updated Comment Number: 2 02/07/2022: FOR FINAL APPROVAL: Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets. See redlines. Response:Updated Comment Number: 3 02/07/2022: FOR FINAL APPROVAL: There are spelling issues. See redlines. Response:Updated Comment Number: 4 02/07/2022: FOR FINAL APPROVAL: Please revise the Benchmark Statement as marked. See redlines. Response:Updated Comment Number: 5 02/07/2022: FOR FINAL APPROVAL: There is text that needs to be masked. Mask all text in hatched areas. See redlines. Response:Updated Department: Forestry Contact: Molly Roche, 224-616-1992, mroche@fcgov.com Topic: General Comment Number: 1 4 1/19/2022: FOR FINAL APPROVAL: Please include the existing tree inventory and mitigation table as well as associated trees labeled on the site plans (previously submitted and shown on sheets L1.0 and L.20 of FDP190015). In addition, please add a note that states EXISTING TREES TO REMAIN AND BE PROTECTED. Response:Updated Department: Erosion Control Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control Comment Number: 2 01/25/2022: INFORMATION: No Comment from Erosion Control. Based upon the submitted Planning Materials it has been determined that this project; will disturb less than 10,000 sq. ft., is not proposed to be in a sensitive area, has no steep slopes (greater than 3H:1V) within or adjacent to the project, and is not part of a larger common development that will or is under construction. Therefore, no Erosion Control Material submittal is needed. If this project substantially changes in size or design where the above criteria now apply, erosion control materials should be submitted. Though the project at this time requires no erosion control material submittal, the project still must be swept and maintained to prevent dirt, saw cuttings, concrete wash, trash debris, landscape materials and other pollutants from the potential of leaving the site and entering the storm sewer at all times during the project in accordance with City Code 26-498. If complaint driven or site observation of the project seem not to prevent the pollutant discharge the City may require the project to install erosion and sediment control measures. Nearby inlets that may be impacted by the pollutants, in particular dirt, should be protected as a good preventative practice and individual lots should be protected from material escaping onto the sidewalk. If at building permit issuance any issues arise please email erosion@fcgov.com to help facilitate getting these permits signed off. Department: Water-Wastewater Engineering Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com Topic: General Comment Number: 1 01/21/2022: INFORMATION: The existing building at 2900 S College Ave is currently served by a 2-inch water service / meter. This water service does not currently have an allotment associated with it. To bring this service up to City Code, an annual water use allotment will be added upon approval of the project. Please contact our Utility Fee and Rate Specialists at (970) 416-4252 or UtilityFees@fcgov.com for more information or questions. Department: Internal Services Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com Topic: Building Insp Plan Review 5 Comment Number: 1 01/24/2022: BUILDING PERMIT: Antenna install requires a building permit and plans must be submitted showing the engineered connection details meet the City wind load.