Loading...
HomeMy WebLinkAboutTHE SAVOY - PDP210019 - SUBMITTAL DOCUMENTS - ROUND 2 - VARIANCE REQUEST FORT COLLINS: 301 North Howes Street, Suite 100, 80521 | 970.221.4158 GREELEY: 820 8th Street, 80631 | 970.395.9880 | WEB: www.northernengineering.com ADDRESS: 200 S. College Ave. Suite 10 Fort Collins, CO 80524 PHONE: 970.221.4158 FAX: 970.221.4159 WEBSITE: www.northernengineering.com Administrative Engineering Variance Request Letter Date: February 23, 2022 Project: The Savoy Project No. 514-003 Fort Collins, Colorado Attn: Mr. Marc Virata and Mr. Spencer Smith Engineering Development Review City of Fort Collins 281 North College Avenue Fort Collins, Colorado 80524 RE: Intersection Spacing – High-Volume Drive Dear Staff: Public safety and convenience, maintaining public use, and optimizing the use of limited physical capacity of right-of-way are among the objectives of the Larimer County Urban Area Street Standards (LCUASS) – Repealed and Reenacted August 1, 2021. It is with those considerations in mind that this variance request letter has been prepared. This letter is provided pursuant to Section 1.9.4 of LCUASS to document the site condition proposed to deviate from the current standards. The criteria in question is the distance between high-volume driveways and intersections for a Minor Collector, as prescribed in Section 7.4 of LCUASS. The proposed high-volume driveway off Cinquefoil Lane does not meet the required 175’ intersection spacing from Le Fever Drive. The proposed high-volume driveway is measured at 157’, per LCUASS Figure 9.1, which is 18’ short of meeting the required spacing. The Savoy is pursuing a variance request because the project property (Brookfield First Replat – Parcel M) has lost developable space due to dedicating additional right-of-way for all four surrounding streets (Le Fever Drive, Cinquefoil Lane, Brookfield Drive, and Precision Drive) to accommodate the new LCUASS standards and cross sections. Additionally, there is an existing 42” RCP pipe at the southwest corner of the site that is requiring additional easement be dedicated to it to bring it up to the current FCSCM Section 9.4.2. During The Savoy’s first round PDP (PDP210019) staff review meeting city staff indicated that an additional entrance off Cinquefoil Lane would help improve circulation. Prior to proposing this third high-volume drive entrance off of Cinquefoil Lane The Savoy was meeting LUC Section 3.2.2 requirements with its two entrances - one off of Le Fever Drive and one off of Brookfield Drive. However, The Savoy project team and ownership agree with city staff that an additional entrance off Cinquefoil Lane would be desirable and ultimately improve the site’s vehicular circulation. Lastly, per the Traffic Impact Study – The Savoy it shows… The Savoy | Variance Request | 02.23.22 P:\514-003\Admin\Variance Requests\VarianceRequest - Intersection Spacing - High Volume Drive.docx Page 2 of 2 ADDRESS: 200 S. College Ave. Suite 10 Fort Collins, CO 80524 PHONE: 970.221.4158 FAX: 970.221.4159 WEBSITE: www.northernengineering.com From the long-range analyses [worse case] in the transportation impact study, the 95th percentile queues (northbound approaching Le Fever and southbound approaching the West Site Access) will be less than one vehicle in the peak hours. Therefore, there will not be any conflicting left-turning vehicles in the substandard segment of Cinquefoil Lane between Le Fever Drive and the West Site Access. The variance requested in this letter will not be detrimental to public health, safety, or welfare. The requested variance will not have an adverse impact on the City’s capital and maintenance costs, nor are they expected to reduce the design life of the respective improvements. Please feel free to contact me if you have any questions. Sincerely, Northern Engineering Blaine Mathisen, PE Project Engineer Attachment: None