HomeMy WebLinkAboutPARK SOUTH PUD - MASTER PLAN - 46-88 - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETINGNEIGHBORHOOD MEETING SUMMARY
On Wednesday, August 10, 1988 at 7:00 P.M. in the Forum Room of the Square
Shopping -Center, a neighborhood meeting was held on the Park South PUD
Master Plan and Preliminary Phase Plan. In attendance at this meeting were
Frank Vaught and Tony Hughes of Vaught -Frye Architects (representing the
developer), Sherry Albertson -Clark, Project Planner for the City Planning
Department and approximately 40 residents.
The meeting began with an introduction by Sherry Albertson -Clark to the pur-
pose of the meeting. Frank Vaught then provided an overview of the proposed
Park South PUD Master Plan, after which, questions on the proposed project
were addressed.
The following summarizes the questions asked and responses given by Mr.
Vaught at the neighborhood meeting:
Question : What type of roofs are anticipated in the office and commercial
areas?
Response: Roofs would be of materials common to residential uses.
uestion: Where would trash be handled?
Response: Trash receptacles would be located in parking areas.
uestion: How close would the existing fence be to the proposed buildings?
Response: Distance varies (20' - approx. 40').
uestion: What commitment can be made for the installation of berms and
landscaping along the west property line?
Response: This could be tied -into the Master Plan a number of ways
y (an
example could be when a specific number of building permits are issued).
uesti n: What is the traffic impact on Horsetooth and Manhattan from this
project? What happens with Manhattan extended south to Trout-
man?
Response: Mr. Vaught explained the proposed improvements on Horsetooth and
Manhattan (left turn across median in Horsetooth, deccl lane on Horsetooth and
widening of Manhattan).
uestion: What is Master Plan process? Does the Master Plan have to b:.
fulfilled or can changes be made?
Response: Staff provided an overview of the PUD process, explaining the
differences -between a Master Plan and Phase Plan.
uestion: If Manhattan is widened, where does the land come from to widen
it?
Response: The additional width would come from this site.
uestion: How is storm drainage handled along the south part of the site?
What happens to the green belt on the original approved plan?
Would the duplexes be rental?
Response: The storm drainage would be handled in an underground pipe. The
location of the green belt would be the backs of the proposed single family
lots. It is unknown i� the units would be rentals.
uestion: What is the status of the storm drainage agreement?
Response: Unknown. Staff will verify status.
Question :
How many cars are on Horsetooth now?
Response:
Approximately 4500, depending on direction and time of
travel,
according
to traffic study.
uestion:
How would left -turn across median occur? Would this
project
increase the number of left turns over present situation?
Response:
Median would be cut. Turns would increase, since there
is no
median cut
presently.
Question :
What is the level of detail required on the Master Plan?
Would
specifics be committed to then?
Response:
Mr. Vaught discussed a more:detailed plan representing a potential
layout for
the site, stating that this detail was not typically on a Master
Plan.
Question :
Why this proposal and not residential?
Response:
Market situation. Question viability of residential uses
along
Horsetooth
and Manhattan.
uestion:
Can developer guarantee the hours of operation for the uses?
Response:
If reasonable requests are made.
-2- -
uestion: Is developer aware of the drainage problem along the Villages due
to grade difference? Basements arc flooding?
Response: Unaware of this.
uestion: 'Is this a neighborhood center?
Response: No. There is no food store (supermarket) and square footage is
different.
Question : What is the maximum number of businesses that could fit on the
site?
Response: Don't know at this stage.
Question Can you restrict the hours of operation for the users? What is the
drawing point for this center?
Response: Can be addressed. The anchor would be a home furnishings store
and related uses.
Question : Why is a used car lot on the list of uses? Clarify which plan is
the Master Plan.
Response: Use car lot could be temporary use. City is reviewing only original
Master Plan.
Question : Could you flip this site with the HB-zoned site and 'put these uses
there?
Response: Staff discussed the HB zone and uses, as well as the Land Use
Policies Plan and policies for residential and commercial uses.
Question : Shopping centers in Fort Collins are at two arterials. Do you know
where there are any like this situation?,
Response: One at Drake Crossing is at two arterials and a collector.
Question : What can we do if there is trash and debris on the site?
Response: Staff discussed city weed and dust control measures and added that
developer or property manager could be contacted.
uestion: What about left -turn on Horsetooth?
Response: Must be reviewed and approved by City.
uestion: Has there been any request for Icft-turns across Horsetooth before?
Response: Not aware of any.
-3-
C
c
LJ
0
uestion: Concern for empty office spaces, retail space. How does developer
determine need for space?
Response: Marketing study. This project plans small buildings that could be
sold to individuals.
uestion: What is maximum height on Master Plan? Is developer committing
to lower buildings south of the Villages?
Response: Forty feet is height over City. Have put height restrictions for
areas along the Villages. Height becomes a function of architecture.
uestion: Why isn't there more detail on the plan? Don't 90 degree turns on
Dennison cause problems?
Response: Master Plan and phase plan detail is different. Alternatives for
Dennison are curvelinear vs this design, which helps cut speed.
ucstion: What is process for preliminary and final plans?
Response: Staff reviewed process.
Question: Neal Jaspers, of 636 Wabash. Didn't want to sign petition against
project. Map being circulated shows there was no contact made.
Response: Staff noted.
ucstion: Concern for low water pressure in area. Will this plan create more
problems?
Response: Staff followed -up on this matter after last meeting. Gave overview
of Water and Sewer information, that with completion of new water main (60"),
pressure would stabilize to about 50 psi (or average pressure that each home
has during winter time). This project would not have affect on pressure situa-
tion with this new lime, to be completed by September 1, 1988.
nest; n: Are there any documents available to address land use and location?
4
Response: Staff gave overview of Land Use Policies Plan and LDGS.
Question : Is the area for duplexes or single family? How many duplexes?
Response: Fourteen duplex or single-family attached units.
Question : Does the detailed Master Plan shown become part of the record for
the Planning and Zoning Board?
Response: Staff replied that it would not.
uestion: What role does this detailed plan play then?
-4-
Response: Won't play a role in staff or P & Z review.
uestion: Where are copies of the plan available? Can specifics of the
detailed plan be incorporated into the Master Plan? through narra-
tive?
Response: Plan is available at Planning Department. Some of details are
incorporated into the Master Plan (ic. height, setbacks, etc.).
Question: Why is detailed plan not being reviewed by City?
Response: The detailed plan was done to illustrate potential development of
the site.
At the close of the question and answer period, staff clarified the next step of
the process, that the plan was scheduled for the August 22, 1988 Planning and
Zoning Board hearing. The meeting adjourned at 9:15 P.M
m
-5-
c
e n u j L: l: _ J LS E' l -AL4 i L t-r
TYPE OF MEETING:
DATE:
NAME ADDRESS
WRITTEN
NOTIFICATION
YES/NO
OWNER
RENTER
7�L 1 22.6 �iLvt o
�� � L.C.-•� r � d .� - �,. �
�
-
r
• C,
v
(�
/`c,7 Lis.
f
zaol V6 �� -f /-r
o ,f-
�
/" `7%e Learni'a,f
p Ile bey Vo& 6,
/-1oN ! r /9"
C� ��/ems o<-sa rat ��G�-/L�✓or� 7
Ao
v
2-
�j ��
PROJECT: i K
TYPE OF MEETING:
DATE: b
OV
NAME
ADDRESS
WRITTEN
NOTIFICATION
YES/NO
OWNER
RENTER
LIZ
Cal