PROJECT: Hewlett-Packard, Building Four, Fab. Plant
DATE: January 14, 1998
APPLICANT: Hewlett-Packard
CONSULTANTS: Bruce Hendee, B.H.A. and Associates
Tom Morton, Callison Architecture, Inc.
Tim Walsh, Mortenson Construction
PLANNER: Ted Shepard, City of Fort Collins
The meeting began with a description of the proposed project. The building is referred to as "H-
P, Building Four, Fabrication Plant." The building is a multi -level structure with a footprint of
161,000 square feet with total floor area of 315,000 square feet. The maximum height will be 63
feet. The building is divided between the manufacturing area and the central utility plant.
Access will be from the existing gate along C.R. #9. A total of 462 new parking spaces will be
provided. Construction is expected to begin in April of 1998 with completion in expected in July
of 1999.
QUESTIONS, CONCERNS, COMMENTS
1. Will there be landscape berms along C.R. #9 to help screen the building?
RESPONSE: Yes, where possible, there will be landscape berms. The area along C.R. #9 is
somewhat constrained by the fact that there is a drainage swale which precludes the use of berms
in this area.
2. What about the number of employees? Will there be new employees brought to the site
or will existing employees just be transferred over?
RESPONSE: We estimate that the plant will employ a total of 400 people divided between two
shifts. (Each shift is a 12-hour shift.) Most of these employees are already on the campus and
will be transferred over. There will be some new employees. The exact number is not known at
this time.
3. What about construction employees? How many will there be and what time will they
start?
•
RESPONSE: We estimate that there will z
of the trades will start at 7:00 a.m. but there
during the summer.
4. When do you expect completion?
RESPONSE: We are estimating completic
NEIGHBORHOOD IL
'`�ORIVIATION MEETIL
41 SAAl, 67
Did You Rcccive 'Correct
Written Notification
of this meeting'
Address.
Name Address Zip
Yes
No
Yes
No
1 �
(I In n (lak, J7,
-j A-'.
/S
c Z:e
S �
KATTI)&L C. 0 i -T P P COAJ S U L- T JJ
h4g.e- VJAct-,5-e— 44P
JA i?-T4 0 0f- e,,
III
M)KNj�l I vr", T
x
% - 77 -r6 rJ !1 ?C H
LLI0
I
II
I
I
(
I
I