Loading...
HomeMy WebLinkAboutHEWLETT-PACKARD, BUILDING FOUR - PDP - 54-88G - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETINGNEIGHBORHOOD MEETING MINUTES PROJECT: Hewlett-Packard, Building Four, Fab. Plant DATE: January 14, 1998 APPLICANT: Hewlett-Packard CONSULTANTS: Bruce Hendee, B.H.A. and Associates Tom Morton, Callison Architecture, Inc. Tim Walsh, Mortenson Construction PLANNER: Ted Shepard, City of Fort Collins The meeting began with a description of the proposed project. The building is referred to as "H- P, Building Four, Fabrication Plant." The building is a multi -level structure with a footprint of 161,000 square feet with total floor area of 315,000 square feet. The maximum height will be 63 feet. The building is divided between the manufacturing area and the central utility plant. Access will be from the existing gate along C.R. #9. A total of 462 new parking spaces will be provided. Construction is expected to begin in April of 1998 with completion in expected in July of 1999. QUESTIONS, CONCERNS, COMMENTS 1. Will there be landscape berms along C.R. #9 to help screen the building? RESPONSE: Yes, where possible, there will be landscape berms. The area along C.R. #9 is somewhat constrained by the fact that there is a drainage swale which precludes the use of berms in this area. 2. What about the number of employees? Will there be new employees brought to the site or will existing employees just be transferred over? RESPONSE: We estimate that the plant will employ a total of 400 people divided between two shifts. (Each shift is a 12-hour shift.) Most of these employees are already on the campus and will be transferred over. There will be some new employees. The exact number is not known at this time. 3. What about construction employees? How many will there be and what time will they start? • RESPONSE: We estimate that there will z of the trades will start at 7:00 a.m. but there during the summer. 4. When do you expect completion? RESPONSE: We are estimating completic NEIGHBORHOOD IL '`�ORIVIATION MEETIL 41 SAAl, 67 Did You Rcccive 'Correct Written Notification of this meeting' Address. Name Address Zip Yes No Yes No 1 � (I In n (lak, J7, -j A-'. /S c Z:e S � KATTI)&L C. 0 i -T P P COAJ S U L- T JJ h4g.e- VJAct-,5-e— 44P JA i?-T4 0 0f- e,, III M)KNj�l I vr", T x % - 77 -r6 rJ !1 ?C H LLI0 I II I I ( I I