Loading...
HomeMy WebLinkAboutHEWLETT-PACKARD, BUILDING FOUR - PDP - 54-88G - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW (2)A* C1CSICYI1 LANDSCAPE ARCHITECTURE January 9, 1998 URBAN DESIGN PLANNING Ted Shepard City of Fort Collins Planning 281 N. College Ave. Fort Collins, CO. 80522 RE: Hewlett Packard Genesis IV Fabrication Facility BHA DESIGN, INC. 4B03 INNOVATION DRIVE Dear Ted, FT. COLLINS, CO 80525 T E L 970 223.7577 Attached is Hewlett Packard's application for the new Genesis IV fabrication FAX 970 223-1827 facility for the Fort Collins campus. Attached you will find the required application materials. Outlined below I have responded to each of the comments raised in the original Conceptual Review meeting on September 29,1997. The numbers of our responses match the items in your letter. 1. The proposed new facility will be less than 25 % of the total floor area of the entire HP property and therefore would meet the requirements for a Minor Amendment. We also have included with this application the information required for a special height review. 2. We recognize that FCLP will be serving this property and have met with Allen Boushee to discuss specific requirements. HP and FCLP have agreed on a plan for power. IDC/HP are working w/ FCLP on actual routing on site. 3. There have been separate meetings with Water and Wastewater by the project civil consultant. An overall site plan is included with this submittal to indicate the service to the site. 4. The building does not encroach into the mandatory 60 foot yard area required by the 1991 UBC. 5. We acknowledge the transition from 1991 to the 1997 UBC. IDC will be meeting with the Building Department on a regular basis to ensure conformance with the building code. 6. Same comment as item 5. 7. We have met with the Poudre Fire Authority to review fire protection requirements and have included their recommendations in our proposal. design 8. Halon will not be used as a fire extinguishing agent. 9. Dust control will be managed within the State guidelines. A Fugitive Dust Permit is currently being pursued with the State Health Department by the general contractor (Mortenson). 10. A Drainage Report has been prepared and is included with this submittal. 11. This comment is acknowledged. Sear Brown Engineers has been in contact with Kevin McBride regarding this issue. 12. This comment is acknowledged. 13. Utility plans are included with this submittal. 14. A Traffic Impact Study is included with this submittal. 15. The Genesis IV building will include lockers for employees. Employee showers exist currently in adjacent buildings. HP already provides preferential parking for vanpools and carpools. This project will incorporate the same strategies. Sincerely, bhajpsign mc. b NruceA. Hendee, ASLA Principal