Loading...
HomeMy WebLinkAboutFOOTHILLS UNITARIAN CHURCH EXPANSION - FDP210027 - SUBMITTAL DOCUMENTS - ROUND 3 - RESPONSE TO STAFF REVIEW COMMENTSFOOTHILLS UNITARIAN CHURCH EXPANSION RESPONSES TO FDP210027, ROUND TWO COMMENT LETTER DATED FEBRUARY 9, 2022 Department: Development Review Coordinator Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com Topic: General 1 12/14/2021: INFORMATION: I will be your primary point of contact throughout the development review and permitting process. If you have any questions, need additional meetings with the project reviewers, or need assistance throughout the process, please let me know and I can assist you and your team. Please include me in all email correspondence with other reviewers and keep me informed of any phone conversations. Thank you! Response: Understood 2 12/14/2021: INFORMATION: As part of your resubmittal, you will respond to the comments provided in this letter. This letter is provided to you in Microsoft Word format. Please use this document to insert responses to each comment for your submittal, using a different font color. When replying to the comment letter please be detailed in your responses, as all comments should be thoroughly addressed. Provide reference to specific project plans or explanations of why comments have not been addressed, when applicable, avoiding responses like noted or acknowledged. Response: Understood 3 12/14/2021: INFORMATION: Please follow the Electronic Submittal Requirements and File Naming Standards found at https://www.fcgov.com/developmentreview/files/electronic submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888. File Foothills Unitarian Church Response to Conceptual Review Comments names should begin with the file type, followed by the project information, and round number. Example: UTILITY PLANS_PROJECT NAME_PDP_Rd2.pdf File type acronyms maybe appropriate to avoid extremely long file names. Example: TIS for Traffic Impact Study, ECS for Ecological Characterization Study. *Please disregard any references to paper copies, flash drives, or CDs. Response: Understood 4 12/14/2021: INFORMATION: All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers. Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the PDF’s. AutoCAD turns drawing text into comments that appear in the PDF plan set, and these must be removed prior to submittal as they can cause issues with the PDF file. The default setting is "1" ("on") in AutoCAD. To change the setting and remove this feature, type "EPDFSHX" in the command line and enter "0". Read this article at Autodesk.com for more tips on this topic: https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdca rticles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by -AutoCAD.html Response: Understood 6 12/14/2021: INFORMATION: Please resubmit within 180 days, approximately 6 months, to avoid the expiration of your project. (LUC 2.211 Lapse, Rounds of Review). Response: Understood 7 12/14/2021: FOR FINAL APPROVAL: All "For Final Approval / For Approval" comments need to be addressed and resolved prior to moving forward with the final documents and recording of this project. Response: Understood 8 12/14/2021: INFORMATION: Resubmittals are accepted any day of the week, with Wednesday at noon being the cut-off for routing the same week. When you are ready to resubmit your plans, please notify me with as much advanced notice as possible. Foothills Unitarian Church Response to Conceptual Review Comments Response: Understood Department: Stormwater Engineering Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com 3 02/07/2022: FOR APPROVAL – UPDATED: On the forebay, please reduce the outlet “notch” or “curb cut” to 1.5-inches. RESPONSE: Forebay detail has been updated per comment. 12/14/2021: FOR FINAL APPROVAL: The rain garden forebay should be made of concrete to provide for easy maintenance and sediment removal. Feel free to contact me for examples from other projects. 10 02/07/2022: FOR APPROVAL -UPDATED: Fill out the design information table on the standard detail for the outlet structure. Please also cross out any items not needed – such as the extended detention orifice plate (if not being used). RESPONSE: Outlet structure detail has been updated to match design intent. 12/14/2021: FOR FINAL APPROVAL: Please use City of Fort Collins standard outlet structure detail. D-46 https://citydocs.fcgov.com/index.php?scope=doctype&dn=Utilities&dt=DETAIL+D RAWINGS&vid=189&q=stormwater&cmd=search 11 02/07/2022: FOR FINAL APPROVAL: Please see updated redlines of the Utility Plans. Response: Comment acknowledged. Refer to redline responses. 12 02/07/2022: INFORMATION: Upon completion of construction, the project will need to submit a Lot Grading Certification and a Site Stormwater Certification before the CO can be issued. This will need to be filled out by a Colorado Professional Engineer. I have Foothills Unitarian Church Response to Conceptual Review Comments included the standard forms with the redlines for reference. Response: These certificates have been passed along to the contractor. Department: Water-Wastewater Engineering Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com Topic: General 3 02/07/2022: FOR FINAL APPROVAL - UPDATED: I am not seeing a hydrozone map or table on the plans. Please point out if I have missed it. If not, please add a hydrozone map and annual water use table to the plans. See the included example. 12/14/2021: FOR FINAL APPROVAL: Irrigation Water Service and Irrigation Plan Requirements - The next FDP submittal will need to include: - Preliminary Irrigation Plan (PIP) – plan requirements can be found at: www.fcgov.com/WCS. Please contact Eric Olson (eolson@fcgov.com or 970-221-6704) with questions regarding the required PIP. *The PIP only needs to be prepared for the areas that are being revised. -Water budget (annual usage) and irrigation peak flow (gallons per minute). This information should be included on the PIP and Landscape Plans. *The water budget and irrigation peak flow need to be updated for the entire site. -Landscape Plan including hydrozone table updated with 2022 values – 3, 8, 14, and 18 gallons/square foot/year for very low, low, medium, and high zones, respectively. These requirements were mentioned during the Major Amendment Review with more clarification to come at FDP review. These are the result of recent changes to Fort Collins Utilities Water Supply Requirements (WSR) and Plant Investment Fees (PIF) codes which were adopted on Oct. 5, 2021 by City Council. These changes are to be implemented 1/1/2022; more information can be found at: www.fcgov.com/wsr-update Response: We apologize for the omission of the Hyrdozone plan, it is included with the Landscape drawings (L.6) 4 12/14/2021: INFORMATION: Foothills Unitarian Church Response to Conceptual Review Comments The existing 1.5 inch commercial water and 1.5 inch irrigation services currently do not have an annual water allotment associated with them. To bring these services up to current City Code, an annual water use allotment will be added to each service upon approval of the development project. Please contact our Utility Fee and Rate Specialists at (970) 416 4252 or UtilityFees@fcgov.com for more information or questions. We can discuss this further during FDP. Response: Understood. Department: Erosion Control Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com Topic: Erosion Control 1 01/25/2022: FOR FINAL APPROVAL - UPDATED: Please address all redlined comments provided on the Grading and Erosion Control Plan. RESPONSE: Comment acknowledged. See redline responses 12/09/2021: How much area is going to be disturbed with your project? Area of Disturbance: Total area at the site where any Construction Activity is expected to result in disturbance of the ground surface. This includes any activity that could increase the rate of erosion, including but not limited to, clearing, grading, excavation, and demolition activities, installation of new or improved haul roads and access roads, staging areas, heavy vehicle traffic areas, stockpiling of fill materials, and borrow areas. That will help us better estimate the Inspection fees. Please add a note to the plans indicating the area of disturbance. Note: if the disturbed area is less than an acre but over 10,000 square feet no Erosion Control report would be required and only erosion and Sediment Control Plans would be needed. If the disturbed area exceeds one acre an erosion and Sediment Control report would also be required. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Building Elevations 7 02/08/2022: FOR FINAL APPROVAL: Foothills Unitarian Church Response to Conceptual Review Comments There are line over text issues. See redlines. Response: The line over texted noted on the elevation redline has been resolved. Topic: Construction Drawings 9 02/08/2022: FOR FINAL APPROVAL- UNRESOLVED: Please provide the following information for the Benchmark Statement in the EXACT format shown below. PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION ELEVATION: BENCHMARK # w/ DESCRIPTION ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 DATUM - X.XX’. RESPONSE: Benchmark statement has been updated per comment. 12/14/2021: FOR FINAL APPROVAL: Please provide the following information for the Benchmark Statement in the EXACT format shown below. Foothills Unitarian Church Response to Conceptual Review Comments 11 02/08/2022: FOR FINAL APPROVAL: There are line over text issues. See redlines. RESPONSE: Only the cover page of the utility plans had redlines on it and have been addressed. Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson@fcgov.com Topic: General 1 12/13/2021: FOR FINAL APPROVAL: Landscape amendments for commercial properties will require an irrigation review. Please describe in detail, how the existing irrigation system will be adjusted to accommodate the landscape renovations or additions. Create an irrigation legend identifying specific zones and methods of converting from turf watering to drip applications. Please refer to the provisions outlined in Section 3.2.1(J) of the Land Use Code for details. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com Response: We have been updated that this comment was addressed and resolved with our Round 2 submittal.