HomeMy WebLinkAboutFOOTHILLS UNITARIAN CHURCH EXPANSION - FDP210027 - SUBMITTAL DOCUMENTS - ROUND 3 - ELEVATIONSMAIN FLOOR
100'-0"
METAL FASCIA & SOFFIT,
MEDIUM BRONZE
METAL CAP FLASHING TO
MATCH CMU COLOR @ CMU
WALLS
STUCCO
SPLIT FACE CMU
STUCCO CONTROL JOINTS,
TYP
ANGLED WALL PROJECTS IN
FRONT OF CLERESTORY WALL
BEHIND BY 5' TO 12'-6"
EXISTING CURVED, SPLIT
FACE CMU WALL
EXISTING SPLIT FACE CMU WALLEXISTING STUCCO
EXISTING ASPHALT
SHINGLE ROOF
3'-0"
RECESSED ENTRANCE
PARAPET WALL STEPS BACK FROM
CLERESTORY WALL 2'
207'-3 1/8"NEW SANCTUARY
104'-9 1/8"
EXISTING SANCTUARY BUILDING
102'-6"
METAL CAP, MEDIUM BRONZE
ALUMINUM CLAD RESIDENTIAL
STYLE WINDOWS
PARAPET HEIGHT CHANGES AT
MATERIAL CHANGE
WALL MOUNTED LIGHT
FIXTURE
MAIN FLOOR
100'-0"
EXST LOWER FLOOR
91'-0"
NEW LOWER FLOOR
89'-0"
ROOF TOP UNIT, SEE 3D VIEW
FOR ACTUAL VISIBILITY1'-0 1/4"
1'-2 1/2"METAL WINDOW SHADING FINS, MEDIUM BRONZE
ROOF OVERHANG
ENTIRE BUILDING
172'-6 3/8"
NEW SANCTUARY
73'-2 5/8"25'-1"RESIDENTIAL ALUMINUM CLAD
WINDOW (SIM TO EXISTING)
SPLIT FACE CMU FINS
STUCCO
GABION WALL
METAL DOWNSPOUT,
MED BRONZE
WALL MOUNTED LIGHT
FIXTURE15'-4 3/4"17'-7 3/4"CONNECTOR ADDITION BEYOND
METAL FASCIA, SOFFIT & GUTTER, MEDIUM BRONZE
STUCCO JOINT, TYP.
ELECTRICAL GEAR
ELECTRIC METER
SCALE
PROJECT NUMBER
DRAWN BY
DATE
REVISIONS
CHECKED BY
COPYRIGHT 2021 EWERS ARCHITECTURE PCstructural engineercivil engineerKL&A, INC.BASELINE ENGINEERINGmechanical + electrical engineerGIVEN & ASSOCIATES, INClandscape architectSAARINEN ASSOCIATES1/8" = 1'-0"Autodesk Docs://1700-Foothills Unitarian/1700-CD4.rvt2/10/2022 11:17:08 AMEXTERIOR ELEVATIONSAND 3D VIEWS1815 YORKTOWN AVENUE FORT COLLINS COLORADO1700
AEO
02.16.22
PJE
A.2
FINAL DEVELOPMENT PLAN
1/8" = 1'-0"
1 NORTHWEST ELEVATION
1/8" = 1'-0"
2 SOUTHWEST ELEVATION
3 VIEW FROM DRAKE ROAD4VIEW FROM YORKTOWN AVE5AERIAL VIEW FROM NORTHWEST
RTU SCREENING RTU SCREENING
MAIN FLOOR
100'-0"
8" TALL ADDRESS NUMBERS ADDED, VISIBLE
FROM YORKTOWN AVENUE.
NEW CONSTRUCTION CONNECTIONG
EXISTING BUILDINGS BEYOND
COURTYARD
EXISTING EDUCATION BUILDING
EXISTING SANCTUARY BUILDING18'-1 3/4"EXISTING TREE IN COURTYARD TO
REMAIN
MECHANICAL EQUIPMENT, SEE 3D VIEWS
FOR ACTUAL SCREENING
NEW SANCTUARY BEYOND
STUCCO
METAL CAP, MED BRONZE 24'-4 1/8"ENTIRE BUILDING (EXISTING)
169'-2 3/8"
EXISTING EDUCATION BUILDING
31'-0"
EXISTING SANCTUARY BUILDING
98'-8 3/8"
MAIN FLOOR
100'-0"
EXST LOWER FLOOR
91'-0"
NEW LOWER FLOOR
89'-0"
EXISTING EDUCATION BUILDING
EXISTING SANCTUARY BEYOND
STANDING SEAM METAL ROOF, MED BRONZE
METAL FASCIA & GUTTER, MED BRONZE
STUCCO
SPLIT FACE CMU
METAL CAP, MED BRONZE
FLASHING/CAP TO MATCH CMU
ROOF MOUNTED PV PANELS
STUCCO JOINTS, TYP
25'-1"15'-4 3/4"ANGLED WALLCMU AND UPPER WALL STEPPED
BACK FROM ANGLED WALL
EXISTING EDUCATION BUILDING
143'-5 5/8"
SANCTUARY ADDITION
80'-0"
RESIDENTIAL ALUMIMUM CLAD
WINDOWS (SIM TO EXISTING)
207'-1 5/8"
SCALE
PROJECT NUMBER
DRAWN BY
DATE
REVISIONS
CHECKED BY
COPYRIGHT 2021 EWERS ARCHITECTURE PCstructural engineercivil engineerKL&A, INC.BASELINE ENGINEERINGmechanical + electrical engineerGIVEN & ASSOCIATES, INClandscape architectSAARINEN ASSOCIATES1/8" = 1'-0"Autodesk Docs://1700-Foothills Unitarian/1700-CD4.rvt2/10/2022 11:17:18 AMEXTERIOR ELEVATIONSAND 3D VIEWS1815 YORKTOWN AVENUE FORT COLLINS COLORADO1700
AEO
02.16.22
PJE
A.3
FINAL DEVELOPMENT PLAN
1/8" = 1'-0"
1 NORTHEAST ELEVATION
1/8" = 1'-0"
2 SOUTHEAST ELEVATION
3 VIEW FROM EAST PARKING ENTRANCE4AERIAL VIEW FROM EAST 5 AERIAL VIEW FROM SOUTH
RTU SCREENING