November 17, 2021
Robert Kirkpatrick
619 Skysail Lane
Fort Collins, CO 80525
RE: 504 S Whitcomb Street ‑ Carriage House, FDP210006, Round Number 3
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of 504 S Whitcomb Street ‑ Carriage House. If you have
questions about any comments, you may contact the individual commenter or direct your
questions through your Development Review Coordinator, Brandy Bethurem Harras via
phone at 970‑416‑2744 or via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970‑416‑2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 1
04/07/2021: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Comment Number: 2
04/07/2021: INFORMATION:
As part of your resubmittal you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable, avoiding responses like noted or acknowledged.
Comment Number: 3
04/07/2021: INFORMATION:
Please follow the Electronic Submittal Requirements and File Naming
Standards found at https://www.fcgov.com/developmentreview/files/electronic
submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888.
File names should begin with the file type, followed by the project information,
and round number. Example: UTILITY PLANS_504 S Whitcomb_Rd2.pdf
Comment Number: 4
04/07/2021: INFORMATION:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut‑off for routing the same week. When you are ready to resubmit your
plans, please notify me advanced notice as possible.
Comment Number: 5
04/07/2021: INFORMATION:
Temporary Service Changes ‑ City of Fort Collins Development Review
In order to continue providing thorough reviews and giving every project the
attention it deserves, the City of Fort Collins is implementing temporary
changes in how we serve our development customers. As you may be aware,
we are experiencing staff shortages in a number of key departments, which has
begun to impact the timeliness of our reviews. We recognize that development
and construction play a critical role in our community’s vibrancy and economic
recovery, and we have been exploring options for mitigating impacts to our
customers. As a result, we will be making some temporary service changes.
Beginning Monday May 10th one additional week of review time will be added
to all 1st and 2nd round submittals (increase from 3 weeks to 4 weeks).
Comment Number: 6
05/17/2021: INFORMATION:
LUC 2.211 Lapse, Rounds of Review: Applicants, within one hundred eighty
(180) days of receipt of written comments and notice to respond from the City
on any submittal (or subsequent revision to a submittal) of an application for
approval of a development plan, shall file such additional or revised submittal
documents as are necessary to address such comments from the City. If the
additional submittal information or revised submittal is not filed within said
period of time, the development application shall automatically lapse and
become null and void.
Comment Number: 7
04/07/2021: FOR HEARING:
The proposed development project is subject to a Type 1 Review. The decision
maker for your project will be an Administrative Hearing Officer at a public
hearing. For the hearing, we will formally notify surrounding property owners
within 800 feet (excluding public right‑of‑way and publicly owned open space).
As your Development
Review Coordinator, I will assist with preparing the mailing and coordinating the
hearing date with your team.
Comment Number: 8
04/07/2021: FOR HEARING:
All "For Hearing" comments need to be addressed and resolved prior to
moving forward with scheduling the Hearing. Staff would need to be in
agreement the project is ready for Hearing approximately 3 5 weeks prior to the
hearing.
Comment Number: 9
04/07/2021: FOR HEARING:
I am letting you know that your quasi-judicial item will be heard remotely and that
there is the option to hold off until an in-person hearing can be conducted.
Any person or applicant seeking a quasi-judicial decision from City Council, a
City board or commission or an administrative hearing officer under the City
Code or the City's Land Use Code, shall be notified in writing or by email of the
intention to conduct a Quasi-Judicial Hearing using Remote Technology. Such
person or applicant shall be entitled to request that the Quasi-Judicial Hearing
be delayed until such time as the Hearing can be conducted in person.
Department: Planning Services
Contact: Pete Wray, 970‑221‑6754, pwray@fcgov.com
Topic: General
Comment Number: 4
11/15/2021: FOR HEARING:
Comments resolved and ready for hearing.
Department: Light And Power
Contact: Cody Snowdon, 970‑416‑2306, csnowdon@fcgov.com
Topic: General
Comment Number: 12
11/15/2021: FOR DCP:
Due to the additional service, system modifications will need to occur. Off‑line
discussion can be had to understand the upgrades required.
Department: Stormwater Engineering
Contact: Matt Simpson, (970)416‑2754, masimpson@fcgov.com
Topic: General
Comment Number: 8
11/16/2021: FOR APPROVAL:
Please make minor updates to the drainage report and plan set for
documentation and clarification purposes. See redlines for more information.
Department: Engineering Development Review
Contact: Sophie Buckingham, , sbuckingham@fcgov.com
Topic: General
Comment Number: 1
11/11/2021: FOR HEARING ‑ UPDATED:
Thank you for adding the easement to the site plan and providing the deed of
dedication. You will also need to provide a legal description. Please see
comments from Technical Services.
09/15/2021: FOR HEARING ‑ UNRESOLVED, REVISED:
The easement has not been shown on the site plan. Please add the 8 foot
easement to the site plan in the next round, and provide a legal description,
deed of dedication, and fees to record the easement. Documents regarding the
easement dedication are included with this comment letter.
04/19/2021: FOR HEARING:
The applicant would be required to dedicate an 8 foot utility easement behind
the alley right‑of‑way (and depict on the plans prior to hearing) as part of this
application in conformance with alley cross section requirements. A legal
description and deed of dedication, along with $250 deed of dedication and
recording fees as outlined under the "Process" area of the "Easement and
Right Of Way Dedication" of the following link would be required prior to plan
approval: https://www.fcgov.com/engineering/devrev.php
Department: Technical Services
Contact: Jeff County, 970‑221‑6588, jcounty@fcgov.com
Topic: Easements
Comment Number: 6
11/16/2021: FOR FINAL APPROVAL:
The Easement needs a legal description, and should include a simple
exhibit(drawing) showing the Easement & it's location on the Lot. The drawing
provided is showing too much information.
Department: Building Services
Contact: Katy Hand, khand@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 2
09/20/2021: BUILDING PERMIT:
1. Drawings show that the house will be electrically heated. Houses require
additional insulation: R21 between wall studs PLUS R5 continuous insulation on
the face of studs (coordinate with structural engineer on best placement (exterior or interior side of walls.
2. New house must also be PV ready (conduit in place).
3. Gutters should extend 5ft away from foundation.
Contact: Russell Hovland, 970‑416‑2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
04/19/2021: BUILDING PERMIT:
A permit is required for this project and construction shall comply with adopted
codes as amended. Current adopted codes are:
2018 International Residential Code (IRC) with local amendments
2018 International Plumbing Code (IPC) as amended by the State of Colorado
2020 National Electrical Code (NEC) as amended by the State of Colorado
Copies of current City of Fort Collins code amendments can be found at fcgov.com/building.
Please read the residential permit application submittal checklist for complete requirements.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures):
· 140mph (Ultimate) exposure B or
· Front Range Gust Map published by The Structural Engineer's Association of
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code: 2018 IRC chapter 11.
INFORMATIONAL ITEMS:
· 5ft setback required from property line or provide fire rated walls & openings
for non‑fire sprinkled houses per chap 3 of the IRC. 3ft setback is required for fire sprinkled houses.
· Bedroom egress windows (emergency escape openings) required in all bedrooms.
· Prescriptive energy compliance with increased insulation values is required for
buildings using electric heat.
· A passing building air tightness (blower door) test is required for certificate of occupancy.
Department: Water Conservation
Contact: Eric Olson, 970‑221‑6704, eolson@fcgov.com
Topic: General
Comment Number: 1
04/21/2021: BUILDING PERMIT:
Irrigation plans are required no later than at the time of building permit. The
irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code.