Dear Mr. Ambrose:
For your information, attached is a copy of the Staffs comments concerning Hewlett-Packard
Office Buildings presented before the Conceptual Review Team on December 18. 1995.
The comments are offered informally by Staff to assist you in preparing the detailed components of
the project application. Modifications and additions to these comments may be made at the time of
formal review of this project.
If you should have any questions regarding these comments or the next steps in the review process,
please feel free to call me at 221-6750.
Sincerely,
Ted Shepard
Senior Planner
TS/gjd
Attachments
cc: Transportation Department
Stormwater Department
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750
FAX (970) 221-6378 • TDD (9770) 224-6002
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE: December 18, 1995
ITEM: Hewlett-Packard Office Buildings
APPLICANT: Hewlett-Packard c/o Mr. Jeff Ambrose, H+L Architecture, 1621 18th
Street, Suite 110. Denver. CO. 80202.
LAND USE DATA: Request for 200.000 square feet of office space, divided between two
buildings, two and three stories in height, located north of Building Six, at the northeast corner of
Harmony Road and County Road #9.
COMMENTS:
Since additional electrical power will need to be brought to the site, the City's Light and
Power Utility will need to meet with H-P representatives to determine the proper amount
of power and entrance capacity. A Commercial One ("C-1 ") Form will need to be
completed by the electrical contractor. For further information, please contact Kevin
Westhuis, Light and Power Utility, 221-6700.
2. There is a 12 inch diameter water line stub under C.R. 99 that is available to serve the
site. It may be possible to tie new buildings' sanitary sewer directly onto internal mains.
If so, then there is no need to connect to the City mains. For further information, please
contact Roger Buffington, Water and Waster Water Utility, 221-6681.
The request may be processed as an I-L Site Plan Review. This is an Administrative
Review by the Director of Current Planning.
4. The Zoning Administrator has determined that a roof projection that houses rooftop air
intake mechanical equipment may exceed 40 feet in height.
5. The Poudre Fire Authority will require that the emergency fire access between Buildings
3 and 6 must be retained. Also, access will be needed through.the new expanded
courtyard. The new buildings must be equipped with automatic fire sprinklers and fire
alarms. Be sure that the fire hydrants are capable of delivering the proper amount of
water pressure for the two new buildings. For further information, please contact Roger
Frasco, Poudre Fire Authority, 221-6570.
COMMUNITY PLANNING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
r • •
6. The Building Inspection Division cautions that the first four buildings were classified by
the Uniform Building Code as having "unlimited" floor space based on a minimum of 60
feet of yard setback. Be sure the new buildings do not jeopardize this classification by
encroaching into this setback area.
7. Handicap exits must have sidewalks meeting A.D.A. requirements that lead to the
parking lot in an unobstructed manner. For further information regarding handicap
accessibility and compliance with the Uniform Building Code, as amended and adopted
by the City of Fort Collins, please contact Sharon Getz, Plans Examiner, 221-6760.
8. The site is located in the Fox Meadows Drainage Basin. The Storm Drainage Fee in this
basin is $6,468 per acre, subject to the amount of stormwater detention and the runoff
coefficient.
9. The standard Drainage Report, Drainage and Grading Plan, and Erosion Control Plan are
required. The Drainage Report must verify compliance with the Overall Drainage Plan
done by Nolte and Associates. Some additional detail is needed concerning the location
of the downspouts and the routing of flows to the outfall. Also, additional detail is
needed regarding grading and erosion control design.
10. The drainage channel along the north property line needs to be constructed at least along
the proposed Building 5 and the new parking area.
11. The easement for the channel, in its final location, will be required with this project. This
easement should continue through the ponds and to the outfall offsite. For further
information regarding drainage issues, please contact Glen Schlueter, Stormwater
Engineer, 221-6589.
12. The Street Oversizing Fee will apply to the two new buildings and assessed at the
"office" rate. This fee will be assessed on pro -rated basis for the acreage of the new
structures. For an estimate, please contact Matt Baker, 221-6605.
13. Since the site is already platted, any new easement dedications must be by separate legal
instrument that specifically names the City as the beneficiary of the dedication. The City
has sample language available for such dedications. For further information, please
contact Kerrie Ashbeck, 221-6750.
14. Please be cautioned that since the I-L Site Plan Review will precede the review of the
civil engineering documents, a building permit cannot be issued until the Utility Plans
are signed off by the appropriate City Departments.