HomeMy WebLinkAboutHEWLETT-PACKARD MODULAR OFFICE BUILDING #2 - 54-88E - CORRESPONDENCE - STAFF'S PROJECT COMMENTSComTr. ty Planning and Environment.
Current Planning
Citv of Fort Collins
October 25, 1995
Ms. Amy Dykstal
Hewlett-Packard Facilities Department
3404 East Harmony Road
Fort Collins, CO 80525
Dear Amy:
ices
Staff has reviewed the request for the Modular Office Building Number Two, I-L Site Plan
Review, and offers the following comments:
1. Water and Wastewater Utility is assuming that water and sewer service lines serving the
new modular building will connect to existing lines on H-P private property. If so, then there are
no cc=ents. If new service lines are being tapped from the main in the public right-of-way, then
water and sewer tap fees will apply. Please add a note stating the intention of providing water
and sewer services.
2. Please provide building dimensions for the new modular structure.
3. A building permit and compliance with adopted building codes are required for both the
modular and the pedestrian walkway. The walkway must conform to the provisions of Section
509 of the Uniform Building Code with minimum one -hour fire resistive type construction
throughout.
4. The modular must be made accessible to a person in a wheelchair. Toilet rooms, if
provided, must also be handicap accessible.
5. The Building Inspection Division will need a foundation design and anchoring system
bearing the original seal and signature of a Colorado registered professional engineer or architect.
6. Please indicate, in note form, the distance from the structure to the nearest property line.
7. In the title section in the lower right corner, please note, in large bold type, that this is an
I-L Site Plan Review for Hewlett-Packard Temporary Modular Office Building Number Two.
8. The plan should contain a vicinity map showing the location of the Hewlett-Packard
property in the context of a two mile radius. The City's Zoning Map could be used.
281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (970) 221-6750
FAX (970) 2221-6378 TDD (970) '"4-6002
9. Please expand note number six stating that although the new building will take up existing
parking spaces, a sufficient number of parking spaces remain onsite to accommodate the
employees using the new building and that no new parking spaces will be constructed.
10. The ownership signature should also contain a notarial block for whoever notarizes the
owner's signature.
This concludes Staff comments.
The Planning Department has scheduled the Administrative Hearing for the I-L Site Plan Review
for TUESDAY, NOVEMBER 7, 1995. The meeting will be held at 1:30 p.m. in the second floor
conference room of the Planning Department, 281 North College Avenue. It is suggested that
you bring a signed mylar, with notary, to this meeting to expedite recording.
Sincerely:
Ted Shepard
Senior Planner