Loading...
HomeMy WebLinkAboutPLANETSCALE LIVING - FDP220004 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORT (2)BMP No.ID Unit Installation Unit Cost Initial/Interim Quantity Initial/Interim Cost 1 CD LF $24.00 $- 2 CB SF $0.50 $- 3 CFB LF $4.00 $- 4 CWA EA $1,000.00 1 $1000 5 Construction Fence CF LF $5.00 490 $2450 6 CM LF $0.30 $- 7 CS LF $20.00 4 $80 8 DW EA $600.00 $- 9 Diversion Ditch (2-yr flow less than 10 cfs)DD LF $1.75 $- DD LF $3.25 $- 10 Erosion Control Blanket ECB SY $5.00 $- 11 Inlet Protection IP EA $300.00 $- 12 Felxible Growth Medium FGM SY $-$ 13 Reinforced Check Dam RCD LF $36.00 $- 15 RRB for Culvert Protection RRC LF $10.00 $- 16 Sediment Basin SB AC $1,000.00 $- 17 Sediment Control Log SCL LF $3.00 284 $852 18 Sediment Trap ST EA $600.00 $- 19 SM AC $2,500.00 $- (Greater than 10 Acres)SM AC $1,500.00 $- 20 Silt Fence SF LF $2.00 $- 21 Stabalized Staging Area SSA SY $2.00 33 $66 22 Surface Roughening SR AC $600.00 $- 23 Temporary Slope Drain TSD LF $25.00 $- 24 Temporary Stream Crossing (2-yr flow less than 10 cfs)TSC EA $1,000.00 $- (2-yr flow greater than 10 cfs)TSC EA $2,000.00 $- 25 Terracing TER $-$ 26 Vehicle Tracking Control VTC EA $1,000.00 1 $1000 27 VTC with Wheel Wash WW EA $1,500.00 $- 28 Mobilization (required on all projects)MB LS $5,000.00 $- 29 Pond Maintenance/Sediment Removal PM AC $1,000.00 $- (Based on area tributary to the pond)- 30 Street Maintenance SM LM $500.00 $- (Based on lane miles of streets within project and frontage)- 31 Other $-$ Total Cost of Initial/Interim BMPs $5,448.00 Compost Blanket Engineer's Erosion Control Cost Estimate Spreadsheet for Final BMP's Note: Signature of Applicant/Developer, engineer, and case review engineer required Project Name: 906 E. Stuart Street Date: 02/07/22 BMP Check Dam Seeding & Mulching (Less than 10 Acres) Compost Filter Berm Concrete Washout Area Construction Markers Curb Sock Dewatering (2-yer flow greater than 10 cfs)