HomeMy WebLinkAboutPLANETSCALE LIVING - FDP220004 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSREVISIONS:
Drawn By:
Sheet
Sheet Name:
No.Date:Description:FILENAME: U:\HCI Engineering Projects\2021\21_23 906 E. Stuart St\CAD\Plans\21-23 - CD - COVER.dwg PLOTDATE: 2021-11-11 Checked By:
Date Issued:
Project No:
CALL 811 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG,
GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND
MEMBER UTILITIES.
Know what's below,
Call before you dig.
UTILITY PLANS
PLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT
A PART OF TRACT 7, EAST ACRES LYING IN THE NORTHEAST 1/4 OF THE NORTHEAST 1/4 OF SECTION 24, TOWNSHIP 7
NORTH, RANGE 69 WEST OF THE 6TH P.M., COUNTY OF LARIMER, STATE OF COLORADO
906 E. STUART ST., FORT COLLINS
COLORADO
UTILITY PLANSPLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT906 E. STUART ST., FORT COLLINS, CONumber:
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
HCI 21_23
1 07.30.21 1ST SUB
11/11/2021
KZH
TGG
2 09.17.21 2ND SUB
3 11.17.21 3RD SUB
I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE
PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE
WITH ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF
COLORADO STANDARDS AND STATUTES, RESPECTIVELY; AND THAT
I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN,
REVISIONS, AND RECORD CONDITIONS THAT I HAVE NOTED ON
THESE PLANS.
_____________________________________________________________
T. GARRETT GOODLIN, P.E. DATE
STATE OF COLORADO NO. 56865
THESE PLANS HAVE BEEN REVIEWED BY THE CITY OF FORT COLLINS FOR CONCEPT
ONLY. THE REVIEW DOES IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT,
THE CITY OF FORT COLLINS ENGINEER, OR THE CITY OF FORT COLLINS FOR ACCURACY
AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT
IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES
REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE
OF FINANCIAL RESPONSIBILITY BY THE CITY OF FORT COLLINS FOR ADDITIONAL
QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION
PHASE.
I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE
PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE
WITH ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF
COLORADO STANDARDS AND STATUTES, RESPECTIVELY; AND THAT
I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN,
REVISIONS, AND RECORD CONDITIONS THAT I HAVE NOTED ON
THESE PLANS.
_____________________________________________________________
T. GARRETT GOODLIN, P.E. DATE
STATE OF COLORADO NO. 56865
THESE PLANS HAVE BEEN REVIEWED BY THE CITY OF FORT COLLINS FOR CONCEPT
ONLY. THE REVIEW DOES IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT,
THE CITY OF FORT COLLINS ENGINEER, OR THE CITY OF FORT COLLINS FOR ACCURACY
AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT
IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES
REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE
OF FINANCIAL RESPONSIBILITY BY THE CITY OF FORT COLLINS FOR ADDITIONAL
QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION
PHASE.
XXXX
GAS GAS
SAN
WAT WAT
ELEC ELEC
OHE OHE
5421
5420
XXX
CURB AND GUTTER (SPILL)
CURB AND GUTTER (CATCH)
STORM SEWER
SANITARY SEWER
WATER LINE
GAS LINE
ELECTRICAL
OVERHEAD POWER LINES
ELECTRICAL BOX
SITE LIGHT
SIGN
MANHOLES
INLET
METER PIT
GATE VALVE
THRUST BLOCK
CLEAN OUT
TREE
SLOPE
MAJOR CONTOUR
MINOR CONTOUR
SPOT ELEVATION
PROPOSED
UTILITY POLE
GAS METER
FIRE HYDRANT
FO FOFIBER OPTIC LINE
SSST ST SAN
CO
WAT
WAT
HY DHY D
BACK OF CURB
FLOWLINE
LIP (SPILL)
BACK OF CURB
FLOWLINE
LIP (CATCH)
MASTER LEGEND
GENERAL NOTES - CITY OF FORT COLLINS:
1. ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC
IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND
SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA
STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS.
WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE
SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST
RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED
AND APPROVED BY THE LOCAL ENTITY.
2. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE
LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED
OTHERWISE.
3. THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID
FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY THE
LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER THE EXPIRATION
DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE
LOCAL ENTITY PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE
PLANS.
4. THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION
AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO THE
LOCAL ENTITY, AS BENEFICIARY OF SAID ENGINEER’S WORK, FOR ANY
ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF
THESE PLANS BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE
ENGINEER WHO HAS PREPARED THESE PLANS OF ALL SUCH
RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE
ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE
LOCAL ENTITY, AND ITS OFFICERS AND EMPLOYEES, FROM AND AGAINST
ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY
ERRORS AND OMISSIONS CONTAINED IN THESE PLANS.
5. ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION,
AS WELL AS POWER AND OTHER “DRY” UTILITY INSTALLATIONS, SHALL
CONFORM TO THE LOCAL ENTITY STANDARDS AND SPECIFICATIONS
CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY
ENGINEER.
6. THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND
UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL
BE THE RESPONSIBILITY OF THE DEVELOPER TO VERIFY THE EXISTENCE
AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF
THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER
SHALL BE RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES.
7. THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER
OF COLORADO (UNCC) AT 1-800-922-1987, AT LEAST 2 WORKING DAYS
PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVE ALL
REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY
ENTITIES (I.E. DITCH / IRRIGATION COMPANY) ARE TO BE LOCATED BY
CONTACTING THE RESPECTIVE REPRESENTATIVE. UTILITY SERVICE
LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION
OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO
RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THESE PLANS.
8. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL
UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE
APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED.
9. IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES
AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER SHALL
COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN
MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR TO
BEGINNING CONSTRUCTION.
10. THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE
LOCAL ENTITY, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE THAT
THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM
DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR
CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF
ANY UTILITY SERVICE AS WELL AS THE UTILITY COMPANIES.
11. NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER,
SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER
NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A MINIMUM OF 2
WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE
DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION
MEETING MAY BE REQUIRED PRIOR TO COMMENCEMENT OF ANY WORK.
12. THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH
A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL,
STORM SEWER AND SANITARY SEWER SHOULD BE CONSTRUCTED PRIOR
TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES.
14. A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE
PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO INSTALL
UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER, CHANNEL,
IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES.
15. THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF
THE COLORADO PERMIT FOR STORM WATER DISCHARGE (CONTACT
COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION,
(303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION
CONTROL PLAN.
16. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE
MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE
PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE
RESPONSIBILITY OF THE PROPERTY OWNER(S).
17. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE LOCAL ENTITY,
CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED
ENGINEER, MUST BE SUBMITTED TO AND APPROVED BY THE STORMWATER
UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE
STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE
RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SINGLE FAMILY UNITS.
FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BE SUBMITTED TO
THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO
THE RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED
PRIOR TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT.
18. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR
INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF
GROUNDWATER SEEPAGE, WHETHER RESULTING FROM GROUNDWATER
FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH
DAMAGE OR INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY
FAILURE TO PROPERLY MAINTAIN ITS WATER, WASTEWATER, AND/OR
STORM DRAINAGE FACILITIES IN THE DEVELOPMENT.
19. ALL RECOMMENDATIONS OF THE "DRAINAGE CONFORMANCE LETTER
FOR ZIGGI'S COFFEE - FORT COLLINS" AND THE "EROSION CONTROL
REPORT FOR ZIGGI'S COFFEE - FORT COLLINS" DATED AUGUST, 2 2017 BY
HCI ENGINEERING. SHALL BE FOLLOWED AND IMPLEMENTED.
20. TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE
PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION
CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE
DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS
STABILIZED WITH HARD SURFACE OR LANDSCAPING.
21. THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD
OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET
SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS BY AN
APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT
DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY
STREET INSPECTOR.
22. NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED
PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR DEVELOPMENT
CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE.
23. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL
NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO
COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY THE
LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND
THE LOCAL ENTITY EROSION CONTROL INSPECTOR (FORT COLLINS –
221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THE START OF ANY EARTH
DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC
IMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER
PROPER NOTICE OF CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE
DEVELOPER MAY COMMENCE WORK IN THE ENGINEER ABSENCE.
HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO ACCEPT THE
IMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER
INSTALLATION.
24. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS
WITHIN THE PUBLIC RIGHT-OF-WAY AFTER RIGHT OF WAY GRADING AND
ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO THE PLACEMENT
OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL
SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE
RESULTS OF THE ORIGINAL GEOTECHNICAL REPORT, THE DEVELOPER
SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT
SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY’S DEFAULT
PAVEMENT THICKNESS SECTION(S). REGARDLESS OF THE OPTION USED,
ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY A
LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE
SUBMITTED TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR
TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER,
SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE LOCAL
ENTITY ENGINEER APPROVES THE FINAL REPORT.
25. THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND
SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET
SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS, INLETS,
AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR.
THE ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL
ENTITY THAT THESE ELEVATIONS CONFORM TO THE APPROVED PLANS AND
SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND
THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION OF BASE
COURSE OR ASPHALT WILL BE ALLOWED ON THE STREETS.
26. ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW
RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL STAGES
OF ROAD CONSTRUCTION. FOR THE PURPOSES OF THESE STANDARDS,
ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL
STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY
LINES AND MARKED SO AS TO REDUCE THE EXCAVATION NECESSARY FOR
BUILDING CONNECTIONS.
27. PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE
LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO
FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE DISTRICTS.
28. ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE
HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE
CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD
AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT
APPROVAL.
29. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE
CONTRACTOR SHALL CONTACT THE LOCAL ENTITY FORESTER TO
SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING A
PERMIT.
30. THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY
INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING,
TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA PUBLICATION 2226,
EXCAVATING AND TRENCHING.
31. THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL
PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY
AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE), FOR APPROVAL, PRIOR
TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE
RIGHT-OF-WAY. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING
ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE
CONSTRUCTION ACTIVITIES.
32. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL
AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL CONTACT
LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT, WHO WILL
TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE
CONTRACTOR; HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN
THEN THE CONTRACTOR WILL BE CHARGED FOR THE LABOR, MATERIALS
AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED.
33. THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL
INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE DEVELOPMENT
RELATED TO THE DEVELOPMENT’S LOCAL STREET OPERATIONS. IN
ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC
SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND
FROM THE DEVELOPMENT.
34. THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS,
UNLESS SPECIFICALLY APPROVED BY THE LOCAL ENTITY ENGINEER, AND
NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR HOLIDAYS, UNLESS
THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY.
35. THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND
MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED
IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE
PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED
OTHERWISE.
36. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED
FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN,
CONTACT THE DESIGNER FOR CLARIFICATION, AND ANNOTATE THE
DIMENSION ON THE AS-BUILT RECORD DRAWINGS.
37. THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED
COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE
STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND
EXTENSION AGREEMENTS NEEDED FOR THE JOB.
38. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE
ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT
IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE DEVELOPER SHALL
CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY.
39. THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT
INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE
CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY’S INSPECTOR
AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S)
SHALL SUBMIT RECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER.
40. THE DESIGNER SHALL PROVIDE, IN THIS LOCATION ON THE PLAN, THE
LOCATION AND DESCRIPTION OF THE NEAREST SURVEY BENCHMARKS (2)
FOR THE PROJECT AS WELL AS THE BASIS OF BEARINGS. THE
INFORMATION SHALL BE AS FOLLOWS:
BENCHMARKS—LOCAL ENTITY SURVEY.
B.M.NUMBER A 409 ELEV.= 5039.43,
DESCRIPTION NATIONAL GEODETIC SURVEY BRASS CAP STRAMPED "A 409"
LOCATED ON THE EAST RIGHT OF WAY LINE OF SOUTH COLLEGE AVENUE
APPROXIMATELY 1000 FEET SOUTH OF THE INTERSECTION OF WEST
TRILBY NAVD 1988 DATUM.
41. ALL STATIONING IS BASED ON CENTERLINE OF ROADWAYS UNLESS
OTHERWISE NOTED.
42. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO
CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS,
SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND
IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO
CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN
LIKE KIND AT THE DEVELOPER’S EXPENSE, UNLESS OTHERWISE INDICATED
ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED
IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST
CERTIFICATE OF OCCUPANCY.
43. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST
BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL
CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY
THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE
MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL
ENTITY STREET REPAIR STANDARDS. THE FINISHED PATCH SHALL BLEND IN
SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE
PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE
THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH,
INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION
OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL
ENTITY ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE
CUTS ARE MADE. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL
BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER
THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES
AND CONDITION AS REQUIRED BY THESE PLANS.
45. STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB
RETURNS AND AT ALL “T” INTERSECTIONS.
46. AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS
DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM
MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO
YEARS FROM THE DATE OF ACCEPTANCE.
47. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE
MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS,
INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THE
FOLLOWING PRIVATE STREETS: (LIST).
CONTACTS:
OWNER:
PLANETSCALE LIMITED
ATTN: SERDAR BADEM
12933 REGAN LN
SARATOGA, CA 95070
SERDAR.BADEM@GMAIL.COM
CIVIL ENGINEER:
HCI ENGINEERING
A DIVISION OF HABERER CARPENTRY INC.
ATTN: GARRETT GOODLIN, PE
621 SOUTHPARK DR., SUITE 1600
LITTLETON, CO 80210
PH: 303-979-3900
LANDSCAPE ARCHITECT:
GMR | LANDSCAPE ARCHITECTURE
ATTN: GREG M. ROSLER, ASLA
383 CORONA ST., SUITE 407
DENVER, CO 80128
PH: 720.209.7244
ARCHITECT:
WAYNE D. ANDERSON, AIA, LLC
ATTN: WAYNE ANDERSON
7825 W. ONTARIO PLACE
LITTLETON, CO 80128
PH: 303.550.5678
N
HATCHING LEGEND
EXISTING
CONCRETE
LANDSCAPE
PROPOSED
ASPHALT
LEGAL DESCRIPTION:
(FROM QUIT CLAIM DEED, REC. # 20200011699, LARIMER COUNTY RECORDS)
A TRACT OF LAND SITUATED IN THE NE 1/4 OF THE NE 1/4 OF SECTION24, TOWNSHIP 7 SOUTH, RANGE 69 WEST
OF THE 6TH P.M., AND BEING A PART OF TRACT 7, OF THE EAST ACRES SUBDIVISION, A SUBDIVISION OF RECORD
IN THE COUNTY OF LARIMER, STATE OF COLORADO, AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
CONSIDERING THE SOUTH LINE OF SAID TRACT 7 AS BEARING S89°56'00"W AND WITH ALL BEARING CONTAINED
HEREIN RELATIVE THERETO:
COMMENCING AT THE SE CORNER OF SAID TRACT 7; THENCE S89°56'00"W ALONG THE SAID SOUTH LINE A
DISTANCE OF 846.15 FEET TO THE POINT OF BEGINNING; THENCE ALONG THE EAST LINE OF THE
SPRINGMEADOWS ON THE SPRING CREEK SUBDIVISION N00°42'E, A DISTANCE OF 140.77 FEET;
THENCE ALONG A SOUTH LINE OF SAID SUBDIVISION S89°50'W A DISTANCE OF 99.97 FEET; THENCE S00°03'39"W
A DISTANCE OF 141.16 FEET, MORE OR LESS, TO THE SOUTH LINE OF SAID TRACT 7; THENCE N89°56'00"E, A
DISTANCE OF 98.40 FEET TO THE TRUE POINT OF BEGINNING. SUBJECT TO RIGHT OF WAY FOR EAST STUART
STREET.
BASIS OF BEARING:
THE SOUTH LINE OF THE NE 1/4 OF THE NE 1/4 OF SECTION 24 TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH
P.M., BEING MONUMENTED AS SHOWN HEREON, BEARS S89°56'00"W PER QUIT CLAIM DEED RECORDED AT REC.
# 20200011699, LARIMER COUNTY RECORDS.
BENCHMARK:
PROJECT DATUM: NAVD88
FORT COLLINS SURVEY MONUMENT, BENCHMARK #15-97 -ELEVATION: 4995.75' NAVD 88 DATUM, PER FORT
COLLINS DATASHET
TEMPORARY BENCHMARK (T.B.M.): THE TOP OF THE SET 5/8" REBAR AND CAP, PLS 6973, AT THE SOUTHEAST
CORNER OF THE ABOVE DESCRIBED PARCEL. ELEVATION: 4981.59'
COVER
C1.0
VICINITY MAP
N.T.S
Sheet List Table
Sheet Number Sheet Title
C1.0 COVER
C1.1 FORT COLLIN - EC-NOTES
C1.2 HCI NOTES
C1.3 DEMO PLAN
C2.0 SITE PLAN
C2.1 GRADING PLAN
C3.0 UTILITY PLAN
C4.0 DETAILS - WATER & WW
C4.1 DETAILS - SW & TRAN
C5.0 EROSION CONTROL PLAN
C5.1 EC - DETAILS (1)
C5.2 EC - DETAILS (2)
INDIAN
HILLS PARK
CHEROKEE DR.
E STUART ST.BROOKHAVEN CIR E.SEMINOLE DR.SEMINOLE DR.S LEMAY AVE.SPRING CREEK
MALLARD,S NEST
NATURAL AREA
BROOKHAVEN
NATURAL AREA
CHEYENNE DR.SPRING
C
R
E
E
K
T
R
L
E STUART ST.S LEMAY AVE.SITE
AREA
906 E STUART ST, FORT
COLLINS CO,80525
REVISIONS:
Drawn By:
Sheet
Sheet Name:
No.Date:Description:FILENAME: U:\HCI Engineering Projects\2021\21_23 906 E. Stuart St\CAD\Plans\21-23 - CD - COVER.dwg PLOTDATE: 2021-11-11 Checked By:
Date Issued:
Project No:
CALL 811 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG,
GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND
MEMBER UTILITIES.
Know what's below,
Call before you dig.
UTILITY PLANS
PLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT
A PART OF TRACT 7, EAST ACRES LYING IN THE NORTHEAST 1/4 OF THE NORTHEAST 1/4 OF SECTION 24, TOWNSHIP 7
NORTH, RANGE 69 WEST OF THE 6TH P.M., COUNTY OF LARIMER, STATE OF COLORADO
906 E. STUART ST., FORT COLLINS
COLORADO
UTILITY PLANSPLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT906 E. STUART ST., FORT COLLINS, CONumber:
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
HCI 21_23
1 07.30.21 1ST SUB
11/11/2021
KZH
TGG
2 09.17.21 2ND SUB
3 11.17.21 3RD SUB
STANDARD EROSION CONTROL NOTES
GENERAL EROSION CONTROL REQUIREMENTS
THESE NOTES ARE A SUMMARY FOR THE LEGAL REQUIREMENTS, THAT ARE SET FORTH IN THE FORT COLLINS STORMWATER
CRITERIA MANUAL (FCSCM), AND THAT ANY CONFLICT IS RESOLVED BY THE MORE STRINGENT REQUIREMENT CONTROLLING.
1) THE PROPERTY OWNER, OWNER’S REPRESENTATIVE, DEVELOPER, DESIGN ENGINEER, GENERAL CONTRACTOR,
SUB-CONTRACTORS, OR SIMILAR TITLE FOR THE DEVELOPING ENTITY (HERE AFTER REFERRED TO AS THE DEVELOPER) HAS
PROVIDED THESE EROSION CONTROL MATERIALS IN ACCORDANCE WITH EROSION CONTROL CRITERIA SET FORTH IN THE
MANUAL AS AN ATTEMPT TO IDENTIFY EROSION, SEDIMENT, AND OTHER POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH
THESE CONSTRUCTION ACTIVITIES AND PREVENTING THOSE POLLUTANTS FROM LEAVING THE PROJECT SITE AS AN ILLICIT
DISCHARGE. FULL CITY REQUIREMENTS AND ARE OUTLINED AND CLARIFIED IN THE MANUAL UNDER CHAPTER 4:
CONSTRUCTION CONTROL MEASURES AND SHOULD BE USED TO IDENTIFY AND DEFINE WHAT IS NEEDED ON A PROJECT.
2) THE DEVELOPER SHALL MAKE THEMSELVES THOROUGHLY FAMILIAR WITH THE PROVISIONS AND THE CONTENT OF THE
SPECIFICATIONS LAID OUT IN THE MANUAL, THE DEVELOPMENT AGREEMENT, THE EROSION CONTROL MATERIALS COMPILED
FOR THIS PROJECT, AND THE FOLLOWING NOTES AS ALL THESE MATERIALS ARE APPLICABLE TO THIS PROJECT.
3) THE DEVELOPER SHALL IMPLEMENT AND MAINTAIN CONTROL MEASURES FOR ALL POTENTIAL POLLUTANTS FROM THE START
OF LAND DISTURBING ACTIVITIES UNTIL FINAL STABILIZATION OF THE CONSTRUCTION SITE.
4) THE CITY EROSION CONTROL INSPECTOR SHALL BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO THE DESIRED
START OF ANY CONSTRUCTION ACTIVITIES ON THIS SITE TO ALLOW ADEQUATE TIME FOR ON-SITE CONFIRMATION (INITIAL
INSPECTION WHICH CAN TAKE UP TO TWO BUSINESS DAYS AFTER RECEIVING THE REQUEST) THAT THE SITE IS IN FACT
PROTECTED FROM SEDIMENT AND POLLUTANTS DISCHARGES OFF SITE. PLEASE CONTACT EROSION@FCGOV.COM EARLY TO
SCHEDULE THOSE INITIAL EROSION CONTROL INSPECTIONS WELL IN ADVANCE SO THAT DEMOLITION, CLEARING, GRUBBING,
TREE REMOVAL, AND SCRAPING MAY BEGIN WITHOUT DELAY. FAILURE TO RECEIVE AN ON-SITE CONFIRMATION BEFORE
CONSTRUCTION ACTIVITIES COMMENCE IS AN AUTOMATIC “NOTICE OF VIOLATION” AND CAN RESULT IN FURTHER
ENFORCEMENT ACTIONS.
5) THE DEVELOPER SHALL PROACTIVELY PROVIDE ALL APPROPRIATE CONTROL MEASURES TO PREVENT DAMAGE TO
ADJACENT DOWNSTREAM AND LEEWARD PROPERTIES. THIS INCLUDES BUT IS NOT LIMITED TO: TREES, SHRUBS, LAWNS,
WALKS, PAVEMENTS, ROADWAYS, STRUCTURES, CREEKS, WETLANDS, STREAMS, RIVERS, AND UTILITIES THAT ARE NOT
DESIGNED FOR REMOVAL, RELOCATION, OR REPLACEMENT IN THE COURSE OF CONSTRUCTION.
6) AT ALL TIMES THE DEVELOPER SHALL BE RESPONSIBLE TO ENSURE ADEQUATE CONTROL MEASURES ARE DESIGNED,
SELECTED, INSTALLED, MAINTAIN, REPAIRED, REPLACED, AND ULTIMATELY REMOVED IN ORDERTO PREVENT AND CONTROL
EROSION SUSPENSION, SEDIMENT TRANSPORTATION, AND POLLUTANT DISCHARGE AS A RESULT OF CONSTRUCTION
ACTIVITIES ASSOCIATED WITH THIS PROJECT.
7) ALL APPLICABLE CONTROL MEASURES BASED UPON THE SEQUENCING AND/OR PHASING OF THE PROJECT SHALL BE
INSTALLED PRIOR TO THOSE CONSTRUCTION ACTIVITIES COMMENCING.
8) AS DYNAMIC CONDITIONS (DUE TO THE NATURE, TIMING, SEQUENCE, AND PHASING OF CONSTRUCTION) IN THE FIELD MAY
WARRANT CONTROL MEASURES IN ADDITION, OR DIFFERENT, TO WHAT IS SHOWN ON THESE PLANS, THE DEVELOPER SHALL AT
ALL TIMES BE RESPONSIBLE TO IMPLEMENT THE CONTROL MEASURES THAT ARE MOST EFFECTIVE WITH THE CURRENT STATE
AND PROGRESS OF CONSTRUCTION. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED
NECESSARY, AND/OR AS DIRECTED BY THE CITY EROSION CONTROL INSPECTOR. THE DEVELOPER SHALL INSURE THAT ALL
EROSION CONTROL PLANS (MAPS) OR SWMP DOCUMENTS ARE UPDATED TO REFLECT THE CURRENT SITE CONDITIONS, WITH
UPDATES BEING INITIALED AND DATED. THESE SITE INSPECTIONS AND SITE CONDITION UPDATES SHALL BE MADE AVAILABLE
UPON REQUEST BY THE CITY.
9) ALL LISTINGS, PROVISIONS, MATERIALS, PROCEDURES, ACTIVITIES, SITE WORK AND THE LIKE ARTICULATED IN THIS OR
OTHER WRITTEN SITE-SPECIFIC DOCUMENTS (INCLUDING BUT NOT LIMITED TO THE EROSION CONTROL REPORTS,
DEVELOPMENT AGREEMENTS, LANDSCAPE, AND DRAINAGE MATERIALS) SHALL MEET OR EXCEED THE MOST RESTRICTIVE
LANGUAGE FOR CITY, COUNTY, STATE, AND FEDERAL REGULATIONS WITH REGARDS TO EROSION, SEDIMENT, POLLUTANT, AND
OTHER POLLUTION SOURCE CONTROL MEASURES. THE DEVELOPER SHALL BE RESPONSIBLE TO COMPLY WITH ALL OF THESE
AFOREMENTIONED LAWS AND REGULATIONS.
10) THE DEVELOPER SHALL ENSURE THAT ALL APPROPRIATE PERMITS (CDPS GENERAL PERMIT STORMWATER DISCHARGES
ASSOCIATED WITH CONSTRUCTION ACTIVITY, DEWATERING, CLEAN WATER ACT, ARMY CORPS OF ENGINEERS’ 404 WETLANDS
MITIGATION PERMIT, ETC.) HAVE BEEN ATTAINED PRIOR TO THE RELEVANT ACTIVITY HAS BEGUN. THESE PERMITS OR COPIES
SHALL BE MADE AVAILABLE UPON REQUEST BY THE CITY.
11) THE DEVELOPER SHALL FURNISH ALL CONVENIENCES AND ASSISTANCES TO AID THE EROSION CONTROL INSPECTORS OF
MATERIALS, WORKMANSHIP, RECORDS, AND SELF-INSPECTIONS, ETC. OF THE CONTROL MEASURES INVOLVED IN THE
CONSTRUCTION ACTIVITIES.
12) THE DEVELOPER SHALL REQUEST CLARIFICATION OF ALL APPARENT SITE CONSTRUCTION ISSUES THAT MAY ARISE DUE TO
INCONSISTENCIES IN CONSTRUCTION PLANS FOR THE SITE OR SITE CONDITIONS AROUND THE SELECTED CONTROL MEASURES
BY CONTACTING THE EROSION CONTROL INSPECTOR. THE EROSION CONTROL INSPECTOR WILL NOT BE RESPONSIBLE FOR
ANY EXPLANATIONS, INTERPRETATIONS, OR SUPPLEMENTARY DATA PROVIDED BY OTHERS.
13) ALL CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUAL.
14) THE CITY RESERVES THE RIGHT TO REQUIRE ADDITIONAL CONTROL MEASURES AS SITE CONDITIONS WARRANT, TO THE
EXTENT AUTHORIZED BY RELEVANT LEGAL AUTHORITY.
15) AS WITH ANY CONSTRUCTION STANDARDS, OCCASIONS MAY ARISE WHERE THE MINIMUM EROSION CONTROL STANDARDS
ARE EITHER INAPPROPRIATE OR CANNOT BE JUSTIFIED. IN THESE CASES, A VARIANCE TO THESESTANDARDS MAY BE APPLIED
FOR PURSUANT TO THE TERMS, CONDITIONS, AND PROCEDURES OF THE MANUAL.
16) INSPECTION. THE CONTRACTOR SHALL INSPECT SITE POLLUTANT SOURCES AND IMPLEMENT CONTROL MEASURES AT A
MINIMUM OF ONCE EVERY TWO WEEKS DURING CONSTRUCTION AND WITHIN 24 HOURS FOLLOWING A PRECIPITATION EVENT.
DOCUMENTATION OF EACH INSPECTION SHALL BE RECORDED AND RETAINED BY THE CONTRACTOR.
17) ALL TEMPORARY CONTROL MEASURES SHALL BE CLEANED, REPAIRED, OR RECONSTRUCTED AS NECESSARY IN ORDER TO
ASSURE CONTINUAL PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON
PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR
RELEASE INTO ANY DRAINAGE WAY.
18) ANY CONTROL MEASURE MAY BE SUBSTITUTED FOR ANOTHER STANDARD CONTROL MEASURE SO LONG AS THAT CONTROL
MEASURE IS EQUAL TO, OR OF GREATER PROTECTION THAN THE ORIGINAL CONTROL MEASURE THAT WAS TO BE USED IN THAT
LOCATION. (EX. SILT FENCE, FOR WATTLES, OR FOR COMPACT BERMS) WATTLE ALONE ON COMMERCIAL CONSTRUCTION SITES
HAVE SHOWN TO BE AN INEFFECTIVE SUBSTITUTE FOR SILT FENCE OR COMPACT BERMS UNLESS IT IS ACCOMPANIED BY A
CONSTRUCTION FENCE TO PREVENT VEHICLE TRAFFIC.
19) ANY IMPLEMENTATION OR REPLACEMENT OF EXISTING CONTROL MEASURES FOR A NON-STANDARD CONTROL, OR
ALTERNATIVE CONTROL MEASURE, SHALL REQUIRE THE REVIEW AND ACCEPTANCE BY THE CITY EROSION CONTROL STAFF
BEFORE THE MEASURE WILL BE ALLOWED TO BE USED ON THIS PROJECT. THESE CONTROL MEASURES’ DETAILS SHALL BE
SUBMITTED, REVIEWED AND ACCEPTED TO BE IN ACCORDANCE WITH THE EROSION CONTROL CRITERIA BASED UPON THE
FUNCTIONALITY AND EFFECTIVENESS IN ACCORDANCE WITH SOUND ENGINEERING AND HYDROLOGICAL PRACTICES
LAND DISTURBANCE, STOCKPILES, AND STORAGE OF SOILS
20) THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS. OFF ROAD
STAGING AREAS OR STOCKPILES MUST BE PREAPPROVED BY THE CITY. DISTURBANCES BEYOND THESE LIMITS WILL BE
RESTORED TO ORIGINAL CONDITION.
21) PRE-DISTURBANCE VEGETATION SHALL BE IDENTIFIED, PROTECTED, AND RETAINED WHEREVER POSSIBLE. REMOVAL OR
DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION
OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. THIS SHOULD INCLUDE SEQUENCING AND PHASING
CONSTRUCTION ACTIVITIES IN A WAY SO THAT THE SOIL IS NOT EXPOSED FOR LONG PERIODS OF TIME BY SCHEDULE OR LIMIT
GRADING TO SMALL AREAS. THIS SHOULD ALSO INCLUDE WHEN PRACTICAL ADVANCING THE SCHEDULE ON STABILIZATION
ACTIVITIES SUCH THAT LANDSCAPING TAKES PLACE SHORTLY IF NOT IMMEDIATELY AFTER GRADING HAS OCCURRED.
VEGETATION EFFORTS SHALL START AS SOON AS POSSIBLE TO RETURN THE SITE TO A STABILIZED CONDITION. SENSITIVE
AREAS SHOULD AVOID CLEARING AND GRADING ACTIVITIES AS MUCH POSSIBLE.
22) ALL EXPOSED SOILS OR DISTURBED AREAS ARE CONSIDERED A POTENTIAL POLLUTANT AND SHALL HAVE CONTROL
MEASURES IMPLEMENTED ON THE SITE TO PREVENT MATERIALS FROM LEAVING THE SITE.
23) ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING,
FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION AT ALL TIMES BY EQUIPMENT TRACKING, SCARIFYING OR DISKING
THE SURFACE ON A CONTOUR WITH A 2 TO 4 INCH MINIMUM VARIATION IN SOIL SURFACE UNTIL MULCH, VEGETATION, AND/OR
OTHER PERMANENT EROSION CONTROL IS INSTALLED.
24) NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT
TRANSPORT THROUGH THE USE OF SURFACE ROUGHENING, WATERING, AND DOWN GRADIENT PERIMETER CONTROLS. ALL
SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY WIND IN ACCORDANCE WITH MUNICIPAL CODE
§12-150. ALL STOCKPILES SHALL BE FLATTENED TO MEET GRADE OR REMOVED FROM SITE AS SOON AS PRACTICAL, AND NO
LATER THAN THE COMPLETION OF CONSTRUCTION ACTIVITIES OR ABANDONMENT OF THE PROJECT. ALL OFF-SITE STOCKPILE
STORAGE LOCATIONS IN CITY LIMITS SHALL HAVE A STOCKPILE PERMIT FROM THE CITY ENGINEERING DEPARTMENT PRIOR TO
USING THE AREA TO STORE MATERIAL. IF FREQUENT ACCESS FROM HARDSCAPE TO THE STOCKPILE IS NEEDED A STRUCTURAL
TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED.
25) ALL REQUIRED CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING,
STRIPPING, GRADING, ETC.). ALL OF THE REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE
TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND
EROSION CONTROL REPORT.
26) ALL INLETS, CURB-CUTS, CULVERTS, AND OTHER STORM SEWER INFRASTRUCTURE WHICH COULD BE POTENTIALLY
IMPACTED BY CONSTRUCTION ACTIVITIES SHALL BE PROTECTED WITH CONTROL MEASURES. MATERIAL ACCUMULATED FROM
THIS CONTROL MEASURE SHALL BE PROMPTLY REMOVED AND IN CASES WHERE THE PROTECTION HAS FAILED, THE PIPES
SHALL BE THOROUGHLY CLEANED OUT.
27) ALL STREAMS, STREAM CORRIDORS, BUFFERS, WOODLANDS, WETLANDS, OR OTHER SENSITIVE AREAS SHALL BE
PROTECTED FROM IMPACT BY ANY CONSTRUCTION ACTIVITY THROUGH THE USE OF CONTROL MEASURES.
28) ALL EXPOSED DIRT SHALL HAVE PERIMETER CONTROL. ANY PERIMETER CONTROLS THAT DRAIN OFF OR HAS THE ABILITY
TO BE TRACKED ONTO THE NEARBY HARDSCAPE SHALL HAVE SOME FORM OF EFFECTIVE SEDIMENT CONTROL AS THE, OR AS
PART OF THE, PERIMETER CONTROL.
29) ALL EXPOSED SLOPES SHOULD BE PROTECTED. ALL EXPOSED STEEP SLOPES (STEEPER THAN 3:1 H:V) SHALL BE
PROTECTED FROM EROSION AND SEDIMENT TRANSPORT THROUGH USE OF CONTROL MEASURES.
30) NO SOILS SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS AFTER ACTIVITY HAS
CEASED BEFORE REQUIRED TEMPORARY SEEDING OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING,
ETC.) IS INSTALLED. THIS IS NOT JUST LIMITED TO PROJECTS THAT ARE ABANDONED; THIS INCLUDES ANY PROJECT THAT IS
TEMPORARILY HALTED AND NO IMMEDIATE ACTIVITY IS TO RESUME WITHIN THE NEXT THIRTY (30) DAYS, UNLESS OTHERWISE
APPROVED BY THE CITY EROSION CONTROL INSPECTOR. DURING A SEASON WHEN SEEDING DOES NOT PRODUCE VEGETATIVE
COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE IMPLEMENTED WITH OR UNTIL TEMPORARY SEEDING OR
PERMANENT EROSION CONTROL CAN BE PERFORMED.
31) ALL INDIVIDUAL LOTS SHALL HAVE EFFECTIVE SEDIMENT CONTROLS LOCATED ON THE STREET SIDE AND ANY DOWN
GRADIENT SIDE. TYPICALLY MOST LOTS DRAIN TO THE FRONT YET ON THOSE CASES WHERE HOUSES ARE ALONG A POND OR
DRAINAGE SWALE HAVE THE LOT DRAIN IN A DIFFERENT DIRECTION THAN THE STREET, THOSE INDIVIDUAL LOTS WILL NEED
PROTECTION ON THAT DOWN GRADIENT SIDE TO PREVENT SEDIMENT FROM LEAVING THE LOT. SEE THE INDIVIDUAL LOT
DETAILS FOR FURTHER CLARIFICATION.
VEHICLE TRACKING
32) AT ALL POINTS WHERE VEHICLES EXIT OR LEAVE THE EXPOSED DIRT AREA ON TO A HARDSCAPE OR SEMI HARDSCAPE
(CONCRETE, ASPHALT, ROAD BASE, ETC.) SHALL HAVE INSTALLED AT LEAST ONE STRUCTURAL TRACKING CONTROL MEASURE
TO PREVENT VEHICLE TRACKING. ALL AREAS NOT PROTECTED BY AN ADEQUATE PERIMETER CONTROL SHALL BE CONSIDERED
A POINT WHERE VEHICLES EXIT THE SITE. ACCESS POINTS SHOULD BE LIMITED TO AS FEW ENTRANCES AS POSSIBLE (ALL
PERIMETER AREAS SHALL BE PROTECTED FROM TRACKING ACTIVITIES).
33) IN ALL AREAS THAT THE STRUCTURAL TRACKING CONTROL MEASURES FAIL TO PREVENT VEHICLE TRACKING, COLLECTION
AND PROPER DISPOSAL OF THAT MATERIAL IS REQUIRED. ALL INLETS LOCATED NEAR ACCESS POINTS AND AFFECTED BY
TRACKING ACTIVITIES SHALL BE PREVENTED FROM THE INTRODUCTION OF SEDIMENT INTO THE DRAINAGE SYSTEM.
34) CITY MUNICIPAL CODE §20-62, AMONG OTHER THINGS, PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR
ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY SOURCE. CITY MUNICIPAL CODE, §26-498, AMONG OTHER THINGS,
PROHIBITS THE DISCHARGE OF POLLUTANTS ON PUBLIC OR PRIVATE PROPERTY IF THERE IS A SIGNIFICANT POTENTIAL FOR
MIGRATION OF SUCH POLLUTANT. THEREFORE, ALL TRACKED OR DEPOSITED MATERIALS (INTENTIONAL OR INADVERTENT) ARE
NOT PERMITTED TO REMAIN ON THE STREET OR GUTTER AND SHALL BE REMOVED AND LEGALLY DISPOSED OF BY THE
DEVELOPER IN A TIMELY AND IMMEDIATE MANNER. DIRT RAMPS INSTALLED IN THE CURB-LINES ARE NOT EXEMPT TO THESE
SECTIONS OF CODE AND SHALL NOT BE PERMITTED IN THE STREET RIGHT OF WAY (PUBLIC OR PRIVATE).
35) IF REPEATED DEPOSIT OF MATERIAL OCCURS ON A SITE, ADDITIONAL STRUCTURAL TRACKING CONTROLS MAY BE
REQUIRED OF THE DEVELOPER BY THE CITY EROSION CONTROL INSPECTOR.
LOADING AND UNLOADING OPERATIONS
36) THE DEVELOPER SHALL APPLY CONTROL MEASURE TO LIMIT TRAFFIC (SITE WORKER OR PUBLIC) IMPACTS AND
PROACTIVELY LOCATE MATERIAL DELIVERED TO THE SITE IN CLOSE PROXIMITY TO THE WORK AREA OR IMMEDIATELY
INCORPORATED IN THE CONSTRUCTION TO LIMIT OPERATIONAL IMPACTS TO DISTURBED AREAS, VEHICLE TRACKING, AND
SEDIMENT DEPOSITION THAT COULD IMPACT WATER QUALITY.
OUTDOOR STORAGE OR CONSTRUCTION SITE MATERIALS, BUILDING MATERIALS, FERTILIZERS, AND CHEMICALS
37) ANY MATERIALS OF A NON-POLLUTING NATURE (STEEL, ROCK, BRICK, LUMBER, ETC.) SHALL BE INSPECTED FOR ANY
RESIDUE COMING OFF THE MATERIAL DURING ROUTINE INSPECTION AND WILL GENERALLY BE LOCATED WHERE PRACTICAL AT
LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM DRAINAGE WAYS.
38) ANY HIGH ENVIRONMENTAL IMPACT POLLUTANT MATERIALS THAT HAVE A HIGH LIKELIHOOD TO RESULT IN DISCHARGE
WHEN IN CONTACT WITH STORMWATER (LUBRICANTS, FUELS, PAINTS, SOLVENTS, DETERGENTS, FERTILIZERS, CHEMICAL
SPRAYS, BAGS OF CEMENT MIX, ETC.) SHOULD NOT BE KEPT ON SITE WHERE PRACTICAL. WHEN NOT PRACTICAL, THEY SHOULD
BE STORED INSIDE (VEHICLE, TRAILER, CONNEX, BUILDING, ETC.) AND OUT OF CONTACT WITH STORMWATER OR STORMWATER
RUNOFF. WHERE NOT AVAILABLE, THEY SHALL BE STORED OUTSIDE IN A RAISED (HIGH SPOTS OR ON PALLETS), COVERED
(PLASTIC OR TARPED), AND SEALED (LEAK PROOF CONTAINER) IN SECONDARY CONTAINMENT LOCATION. THE SECONDARY
CONTAINMENT OR OTHER CONTROL MEASURE SHALL BE ADEQUATELY SIZED, LOCATED, WHERE PRACTICAL, AT LEAST FIFTY
(50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS
PART OF THE ROUTINE INSPECTIONS.
VEHICLE AND EQUIPMENT MAINTENANCE AND FUELING
39) PARKING, REFUELING, AND MAINTENANCE OF VEHICLES AND EQUIPMENT SHOULD BE LIMITED IN ONE AREA OF THE SITE TO
MINIMIZE POSSIBLE SPILLS AND FUEL STORAGE AREAS. THIS AREA SHALL BE LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50)
FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS
PART OF THE ROUTINE INSPECTIONS. ALL AREAS SHALL KEEP SPILL KITS AND SUPPLIES CLOSE.
SIGNIFICANT DUST OR PARTICULATE GENERATING PROCESS
40) THE PROPERTY MUST BE ACTIVELY PREVENTING THE EMISSION OF FUGITIVE DUST AT ALL TIMES DURING CONSTRUCTION
AND VEGETATION ACTIVITIES. ALL LAND DISTURBING ACTIVITIES THAT RESULT IN FUGITIVE DUST SHALL BE IN ACCORDANCE
WITH MUNICIPAL CODE §12-150 TO REDUCE THE IMPACTS TO ADJACENT PROPERTIES AND COMMUNITY HEALTH. ALL REQUIRED
PRACTICES SHALL BE IMPLEMENTED AND ADDITIONAL ONES SHALL BE FOLLOWED. THESE PRACTICES INCLUDE WATERING THE
SITES AND DISCONTINUING CONSTRUCTION ACTIVITIES UNTIL THE WIND SUBSIDES AS DETERMINED BY ANY CITY INSPECTORS.
CONCRETE TRUCK / EQUIPMENT WASHING, INCLUDING THE CONCRETE TRUCK CHUTE AND ASSOCIATED FIXTURES AND
EQUIPMENT
41) ALL CONCRETE AND EQUIPMENT WASHING SHALL USE STRUCTURAL CONTROL MEASURES APPROPRIATE TO THE VOLUME
OF WASH AND FREQUENCY OF USE. THESE CONTROL MEASURES SHALL BE LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50)
FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS
PART OF THE ROUTINE INSPECTIONS. THESE AREAS SHALL BE CLEARLY IDENTIFIED AND PROTECTED FROM ANY WASH FROM
LEAVING THE CONTROL MEASURE. IF FREQUENT ACCESS FROM HARDSCAPE TO THE CONTROL MEASURE IS TO OCCUR, A
STRUCTURAL TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED. THESE CONTROL MEASURES SHALL BE FREQUENTLY
CLEANED OUT.
42) THE DEVELOPER IS RESPONSIBLE FOR ENSURING WASHING ACTIVITY IS TAKING PLACE AT THE APPROPRIATE CONTROL
MEASURE AND SITE WORKERS ARE NOT WASHING OR DUMPING WASH WATER ON TO THE DIRT O OTHER UNCONTROLLED
LOCATIONS.
DEDICATED ASPHALT AND CONCRETE BATCH PLANTS
43) DEDICATED ASPHALT AND CONCRETE BATCH PLANTS ARE NOT ACCEPTABLE ON CONSTRUCTION SITES WITHIN THE CITY OF
FORT COLLINS WITHOUT AN EXPRESSED WRITTEN REQUEST AND PLAN TO REDUCE POLLUTANTS ASSOCIATED WITH THAT TYPE
OF ACTIVITY AND APPROVAL BY THE CITY OF FORT COLLINS SPECIFICALLY THE EROSION CONTROL INSPECTOR. THE
DEVELOPER SHALL INFORM THE EROSION CONTROL INSPECTION STAFF OF ANY DEDICATED ASPHALT, OR CONCRETE BATCH
PLANTS THAT IS TO BE USED ON SITE.
CONCRETE SAW CUTTING MATERIALS
44) SAW CUTTING MATERIAL SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 FOR AIR EMISSIONS AND ALL WATER
APPLICATIONS TO THE SAW CUTTING SHALL PREVENT MATERIAL FROM LEAVING THEIMMEDIATE SITE AND COLLECTED. THESE
CUTTING LOCATIONS, ONCE DRIED, SHALL BE SWEPT AND SCRAPED OF ALL MATERIAL AND SHALL HAVE PROPER AND LEGAL
DISPOSAL.
WASTE MATERIALS STORAGE AND SANITARY FACILITIES
45) TRASH, DEBRIS, MATERIAL SALVAGE, AND/OR RECYCLING AREAS SHALL BE, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET
FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF
THE ROUTINE INSPECTIONS. THESE FACILITIES SHOULD BE LOCATED OUT OF THE WIND AND COVERED AS ABLE. WHERE NOT
ABLE TO COVER, LOCATING SAID AREAS ON THE SIDE OF OTHER STRUCTURES TO REDUCE EXPOSURE TO WINDS, AND FOLLOW
MAXIMUM LOADING GUIDELINES AS MARKED ON THE CONTAINER. THE DEVELOPER IS REQUIRED TO PRACTICE GOOD
HOUSEKEEPING TO KEEP THE CONSTRUCTION SITE FREE OF LITTER, CONSTRUCTION DEBRIS, AND LEAKING CONTAINERS.
46) SANITARY FACILITIES SHALL BE PREVENTED FROM TIPPING THROUGH THE USE OF ANCHORING TO THE GROUND OR
LASHING TO A STABILIZED STRUCTURE. THESE FACILITIES SHALL ALSO BE LOCATED AS FAR AS PRACTICAL FROM AN INLET,
CURB CUT, DRAINAGE SWALE OR OTHER DRAINAGE CONVEYANCES TO PREVENT MATERIAL TRANSPORT FROM LEAVING THE
LOCAL AREA. THIS CONSISTS OF THE FACILITY BEING LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY
PERMANENT OR INTERIM DRAINAGE WAYS.
OTHER SITE OPERATIONS AND POTENTIAL SPILL AREAS
47) SPILLS: FOR THOSE MINOR SPILLS THAT; ARE LESS THAN THE STATE’S REPORTABLE QUANTITY FOR SPILLS, STAY WITHIN
THE PERMITTED AREA, AND IN NO WAY THREATEN ANY STORMWATER CONVEYANCE, NOTIFY THE CITY OF FORT COLLINS
UTILITIES BY EMAIL AT EROSION@FCGOV.COM OR PHONE (970) 817-4770. FOR ANY SIGNIFICANT, MAJOR, OR HAZARDOUS
SPILLS, NOTIFY THE CITY OF FORT COLLINS UTILITIES BY PHONE ONLY AFTER EMERGENCY RESPONSE (911) HAS BEEN
NOTIFIED AND IS ON ROUTE, COUNTY HEALTH DEPARTMENT (LCDHE) HAS BEEN NOTIFIED THROUGH LARIMER COUNTY SHERIFF
DISPATCH (970) 416-1985, AND THE STATE SPILL HOTLINE INCIDENT REPORTING HAVE BEEN CONTACTED 1-877-518-5608.
WRITTEN DOCUMENTATION SHALL BE PROVIDED TO THE CITY WITHIN 5 DAYS OF THE EVENT. ALL SPILLS SHALL BE CLEANED UP
IMMEDIATELY.
48) SELECTION OF “PLASTIC WELDED” EROSION CONTROL BLANKETS SHALL NOT BE USED IN AREAS THAT WILDLIFE, SUCH AS
SNAKES, ARE LIKELY TO BE LOCATED AS THESE HAVE PROVEN TO CAUSE ENTRAPMENT ISSUES.
FINAL STABILIZATION AND PROJECT COMPLETION
49) ANY STORMWATER FACILITIES USED AS A TEMPORARY CONTROL MEASURE WILL BE RESTORED AND STORM SEWER LINES
WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE OVER TO THE OWNER,
HOMEOWNERS ASSOCIATION (HOA), OR OTHER PARTY RESPONSIBLE FOR LONG TERM MAINTENANCE OF THOSE FACILITY.
50) ALL FINAL STABILIZATION SPECIFICATIONS SHALL BE DONE IN ACCORDANCE WITH THE MANUAL, CHAPTER 4:
CONSTRUCTION CONTROL MEASURES.
51) ALL DISTURBED AREAS DESIGNED TO BE VEGETATED SHALL BE AMENDED, SEEDED & MULCHED, OR LANDSCAPED AS
SPECIFIED IN THE LANDSCAPE PLANS WITHIN 14 WORKING DAYS OF FINAL GRADING.
52) SOIL IN ALL VEGETATED (LANDSCAPED OR SEEDED) AREAS, INCLUDING PARKWAYS AND MEDIANS SHALL COMPLY WITH ALL
REQUIREMENTS SET FORTH IN SECTIONS 12-130 THROUGH 12-132 OF THE CITY MUNICIPAL CODE, AS WELL AS SECTION 3.8.21
FOR THE CITY LAND USE CODE.
53) ALL SEEDING SHALL REFER TO LANDSCAPING PLANS FOR SPECIES MIXTURE AND APPLICATION RATES AND DEPTHS
REQUIREMENTS.
54) ALL SEED SHALL BE DRILLED WHERE PRACTICAL TO A DEPTH BASED UPON THE SEED TYPE. BROADCAST SEEDING SHALL BE
APPLIED AT DOUBLE THE RATE AS PRESCRIBED FOR DRILL SEEDING AND SHALL BE LIGHTLY HAND RAKED AFTER APPLICATION.
HYDROSEEDING MAY BE SUBSTITUTED FOR DRILL SEEDING ON SLOPES STEEPER THAN 3(H):1(V) OR ON OTHER AREAS NOT
PRACTICAL TO DRILL SEED AND CRIMP AND MULCH. ALL HYDROSEEDING MUST BE CONDUCTED AS TWO SEPARATE PROCESSES
OF SEEDING AND TACKIFICATION.
55) ALL SEEDED AREAS MUST BE MULCHED WITHIN TWENTY-FOUR (24) AFTER PLANTING. ALL MULCH SHALL BE MECHANICALLY
CRIMPED AND OR ADEQUATELY APPLIED TACKIFIER. THE USE OF CRIMPED MULCH OR TACKIFIER MAY REQUIRE MULTIPLE
RE-APPLICATIONS IF NOT PROPERLY INSTALLED OR HAVE WEATHERED OR DEGRADED BEFORE VEGETATION HAS BEEN
ESTABLISHED. AREAS OF EMBANKMENTS HAVING SLOPES GREATER THAN OR EQUAL TO 3H:1V SHALL BE STABILIZED WITH AN
EROSION MAT OR APPROVED EQUAL TO ENSURE SEED WILL BE ABLE TO GERMINATE ON THE STEEP SLOPES. DURING A
SEASON WHEN SEEDING DOES NOT PRODUCE VEGETATIVE COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE
IMPLEMENTED ALONG WITH, OR UNTIL, TEMPORARY SEEDING OR PERMANENT EROSION CONTROL CAN BE PERFORMED.
56) THE DEVELOPER SHALL WARRANTY AND MAINTAIN ALL VEGETATIVE MEASURES FOR TWO GROWING SEASONS AFTER
INSTALLATION OR UNTIL SEVENTY PERCENT (70%) VEGETATIVE COVER HAS BEEN ESTABLISHED, WHICHEVER IS LONGER AND
MEETS ALL THE CRITERIA OUTLINED IN THE FORT COLLINS STORMWATER CRITERIA MANUAL CHAPTER 4: CONSTRUCTION
CONTROL MEASURES.
57) THE DEVELOPER SHALL MAINTAIN, MONITOR, REPAIR, AND REPLACE ANY AND ALL APPLICABLE CONTROL MEASURES UNTIL
FINAL STABILIZATION HAS BEEN OBTAINED. ALL CONTROL MEASURES MUST REMAIN UNTIL SUCH TIME AS ALL UPSTREAM
CONTRIBUTING POLLUTANT SOURCES HAVE BEEN VEGETATED OR REMOVED FROM THE SITE. WHEN ANY CONTROL MEASURE
IS REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEANUP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM
THAT CONTROL MEASURE. AT THE POINT AT WHICH THE SITE HAS BEEN DEEMED STABILIZED AND VERIFIED BY CITY EROSION
CONTROL INSPECTOR, ALL TEMPORARY CONTROL MEASURES CAN THEN BE FULLY REMOVED. ALL MEASURES SHALL BE
REMOVED WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED.
58) THE RESPONSIBLE PARTY SHALL MAINTAIN AND KEEP CURRENT ALL PAYMENTS OR RELATED FORMS OF SECURITY FOR THE
EROSION CONTROL ESCROW UNTIL 1) STABILIZATION HAS BEEN REACHED AND 2) ALL CONTROL MEASURES AND/OR BMPS
HAVE SEDIMENT MATERIALS COLLECTED AND THE CONTROL MEASURE REMOVED FROM THE SITE. AT THAT TIME THE SITE WILL
BE CONSIDERED COMPLETED AND ANY REMAINING EROSION CONTROL ESCROW SHALL BE RETURNED TO THE APPROPRIATE
PARTIES.
FORT COLLIN -
EC-NOTES
C1.1
REVISIONS:
Drawn By:
Sheet
Sheet Name:
No.Date:Description:FILENAME: U:\HCI Engineering Projects\2021\21_23 906 E. Stuart St\CAD\Plans\21-23 - CD - COVER.dwg PLOTDATE: 2021-11-11 Checked By:
Date Issued:
Project No:
CALL 811 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG,
GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND
MEMBER UTILITIES.
Know what's below,
Call before you dig.
UTILITY PLANS
PLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT
A PART OF TRACT 7, EAST ACRES LYING IN THE NORTHEAST 1/4 OF THE NORTHEAST 1/4 OF SECTION 24, TOWNSHIP 7
NORTH, RANGE 69 WEST OF THE 6TH P.M., COUNTY OF LARIMER, STATE OF COLORADO
906 E. STUART ST., FORT COLLINS
COLORADO
UTILITY PLANSPLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT906 E. STUART ST., FORT COLLINS, CONumber:
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
HCI 21_23
1 07.30.21 1ST SUB
11/11/2021
KZH
TGG
2 09.17.21 2ND SUB
3 11.17.21 3RD SUB
HCI GENERAL UTILITY NOTES:
1.ALL WATER, SANITARY SEWER AND STORM SEWER WORK SHALL
COMPLY WITH THE APPROPRIATE GOVERNING AGENCIES'
STANDARDS AND SPECIFICATIONS, CURRENT EDITION, PERTINENT
TO EACH UTILITY.
2.THE CONTRACTOR AND SURVEY CREW SHALL VERIFY ELEVATIONS
OF EXISTING SANITARY SEWER, STORM SEWER, WATER LINES AND
MANHOLES TO BE TIED TO PRIOR TO CONSTRUCTION OR STAKING
OF PIPE. THE CONTRACTOR SHALL NOTIFY ENGINEER OF ANY
DISCREPANCY.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING
AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS.
4.THE CONTRACTOR SHALL CONTACT ALL APPROPRIATE UTILITY
COMPANIES AND THE APPROPRIATE GOVERNING AGENCY PRIOR
TO THE BEGINNING OF ANY CONSTRUCTION. CONTRACTOR SHALL
BE RESPONSIBLE FOR LOCATING ANY EXISTING UTILITY
(INCLUDING DEPTHS) WHICH MAY CONFLICT WITH THE PROPOSED
CONSTRUCTION. ALL EXISTING UTILITIES SHALL BE PROTECTED
FROM DAMAGE BY THE CONTRACTOR. DAMAGED UTILITIES SHALL
BE REPAIRED BY THE CONTRACTOR AT HIS OWN EXPENSE.
5.THE LOCATIONS OF EXISTING UTILITIES ARE BASED UPON THE
BEST AVAILABLE INFORMATION, ARE SHOWN IN AN APPROXIMATE
WAY ONLY, AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY
THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL
DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES
BEFORE COMMENCING WORK, AND AGREES TO BE FULLY
RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE
OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY
LOCATE AND PRESERVE ANY AND ALL UTILITIES.
6.LOCATION OF ALL EXISTING UTILITIES (PRIVATE OR PUBLIC) SHALL
BE IDENTIFIED AND VERIFIED BY CONTRACTOR PRIOR TO
MOBILIZATION, CONSTRUCTION, OR ORDERING OF MATERIALS.
THE CONTRACTOR SHALL BEAR THE FULL COST OF REMOVAL,
REPLACEMENT AND DELAY RELATED TO UNVERIFIED EXISTING
CONDITIONS. WHERE THE CONTRACTOR FINDS CONFLICTS OR
DISCREPANCIES THEY SHALL BE REPORTED IMMEDIATELY TO THE
ENGINEER.
7.THE CONTRACTOR SHALL OBTAIN, AT HIS EXPENSE, ALL PERMITS
THAT ARE NECESSARY TO PERFORM THE PROPOSED WORK.
8.PIPE BACKFILLING SHALL NOT OCCUR UNTIL PIPE HAS BEEN
INSPECTED.
9.BEGIN LAYING PIPE AT THE LOWEST POINT, WITH THE BELLS
POINTING UPHILL. LAY THE PIPE IN ACCORDANCE WITH THE
MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS. LAY
PIPE TRUE TO LINE AND GRADE AS SHOWN ON THE DRAWINGS.
10.ALL STORM SEWER AND SANITARY SEWER PIPE LENGTHS AND
SLOPES ARE FIGURED FROM CENTER OF MANHOLE, BEND, WYE
AND THE INSIDE WALL OF INLETS. PIPE LENGTHS ARE GIVEN AS A
HORIZONTAL LENGTH AND ARE APPROXIMATE. PIPE LENGTHS
INCLUDE THE FLARED END SECTION.
11.ALL STORM SEWER AND SANITARY SEWER PIPE BEDDING TO BE
CLASS B BEDDING ALTERNATE, UNLESS OTHERWISE NOTED.
12.RCP STORM SEWER PIPE SHALL BE CLASS III, UNLESS OTHERWISE
NOTED.
13.ALL RCP SECTIONS SHALL BE JOINED IN SUCH A MANNER THAT THE
ENDS ARE FULLY ENTERED AND THE INNER SURFACES ARE
REASONABLY FLUSH. RUBBER GASKETS SHALL BE USED ON ALL
PIPE JOINTS CONFORMING TO ASTM C-433. AVERAGE JOINT GAP
THAT EXCEEDS ½ INCH SHALL BE FILLED WITH AN APPROVED
FLEXIBLE PLASTIC SEALANT.
14.PVC STORM SEWER PIPES AND SANITARY MAIN / SERVICES SHALL
CONFORM TO ASTM D3034 SDR 35 FOR SIZES 4-INCHES TO
15-INCHES IN DIAMETER (SOLID WALL), UNLESS OTHERWISE
NOTED. GASKETS SHALL COMPLY WITH ASTM F477, CONSISTING OF
A PROPERLY VULCANIZED HIGH GRADE ELASTOMERIC COMPOUND.
LUBRICANTS SHALL BE IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS. JOINTS SHALL BE IN
CONFORMANCE WITH ASTM D3212. C900 PIPE USED FOR STORM
SEWER CONSTRUCTION SHALL BE DR18.
15.CONSTRUCTION AND MATERIALS USED IN ALL STORM SEWER
CONSTRUCTION SHALL BE PER THE APPROPRIATE GOVERNING
AGENCIES STANDARDS. ALL MANHOLES SHALL HAVE SHAPED
INVERTS.
16.CONSTRUCTION AND MATERIALS USED IN ALL SANITARY SEWER
OR WATER MAIN CONSTRUCTION SHALL BE PER THE APPROPRIATE
GOVERNING AGENCIES STANDARDS AND SPECIFICATIONS. ALL
MANHOLES SHALL HAVE SHAPED INVERTS.
17.MANHOLE RIM ELEVATIONS SHOWN ARE APPROXIMATE ONLY AND
ARE NOT TO BE TAKEN AS FINAL ELEVATIONS. RING AND COVER
SHALL BE SET IN CENTERED CONCRETE RINGS WITH RAM-NECK
FOR ADJUSTMENT TO MATCH FINAL PAVEMENT ELEVATIONS.
18.SANITARY AND STORM SEWER PIPE SHALL BE CONSTRUCTED A
MINIMUM OF TEN-FEET FROM THE CENTER OF WATER LINES.
EXCEPT WHERE THEY CROSS.
19.ALL WATER AND SANITARY SEWER SERVICES MUST BE INSPECTED
BY THE APPROPRIATE GOVERNING AGENCIES INSPECTOR.
20.SANITARY SEWER CLEAN OUTS SHALL BE THE SAME SIZE AS THE
HOST PIPE. CLEAN OUTS TO HAVE THREADED CAPS. COVERS TO
BE TRAFFIC RATED AND FLUSH WITH FINISHED GRADE.
21.WATER SERVICE PIPING SHALL BE TYPE K COPPER, SOFT, UNLESS
OTHERWISE NOTED. ALL WATER SERVICE PIPE SHALL BE
INSTALLED WITH 5.0-FT COVER TYPICAL (4.5-FT MINIMUM) BELOW
FINISHED GRADE. THE MAXIMUM COVER IS 5.5 FEET UNLESS
OTHERWISE NOTED IN THE PLANS AND APPROVED BY
APPROPRIATE GOVERNING AGENCY.
22.REFER TO LIGHTING PLAN FOR LOCATIONS OF LIGHT POLES.
23.WHERE APPROPRIATE, NEATLY SAW CUT ALL EXISTING CONCRETE
AND ASPHALT, THE PLACEMENT OF ADDITIONAL PAVING SHALL BE
DONE TO A NEAT WORK LINE, SAW CUTTING A MINIMUM OF ONE (1)
FOOT. SAW CUTTING WILL NOT BE PAID FOR SEPARATELY BUT
WILL BE CONSIDERED INCIDENTAL TO THE WORK. REPAIR/REPLACE
ALL DISTURBED EXISTING ITEMS WITH LIKE MATERIALS AND
THICKNESSES. ANY ASPHALT REMOVED IS TO BE REPLACED TO
MEET THE SPECIFICATIONS OF THE COLORADO DEPT OF
TRANSPORTATION. EXISTING CONCRETE PAVEMENT SHALL BE
SCORED THEN BROKEN AT JOINT TO CREATE A ROUGH SURFACE
FOR THE CONSTRUCTION JOINT.
24.ALL ASPHALT WORK REQUIRING PATCHING WILL BE PERFORMED
TO A NEAT WORK LINE. THE EXISTING ASPHALT SHALL BE SAW
CUT. ALL ASPHALT PATCH WORK SHALL BE AT LEAST 2' WIDE
AFTER THE COMPLETION OF WORK. NEW CURB CAN BE PLACED
FLUSH WITH THE EXISTING ASPHALT IF IT IS TO A NEAT WORK LINE.
25.ALL UTILITIES ARE BASED UPON SURFACE LOCATES AND OR
RECORD MAPS. ENGINEER IS NOT RESPONSIBLE FOR
INCONSISTENCIES DUE TO INACCURATE LOCATES OR RECORDS.
ENGINEER RECOMMENDS ALL UTILITIES BE POTHOLED AND FIELD
SURVEYED TO VERIFY THIS INFORMATION.
26.CONTRACTOR SHALL COORDINATE ALL DRY UTILITIES SERVICE
AND RELOCATIONS WITH THE PROVIDERS.
27.CONTRACTOR SHALL COORDINATE RIMS OF ALL MANHOLES AND
SURFACE STRUCTURES WITH ANY CHANGE IN GRADE.
CONTRACTOR SHALL INCLUDE COST TO LOWER OR RAISE ALL RIMS
AS NEEDED FOR NEW GRADES.
28.ALL SANITARY SEWER CLEAN OUTS (C.O.) TO BE 2-WAY AND HAVE
HS-25 RATED COVERS.
29.ALL WATER INSTALLATION SHALL COMPLY WITH APPROVED PLANS.
30.ALL SANITARY SEWER FITTINGS SHALL BE AS MANUFACTURED AND
FURNISHED BY THE PIPE SUPPLIER OR APPROVED EQUAL AND
HAVE BELL AND / OR SPIGOT CONFIGURATIONS COMPATIBLE WITH
THE PIPE.
31.4" SANITARY SEWER SERVICE SHALL HAVE A MINIMUM SLOPE OF
2.0% (1/2" PER FOOT). 6" SANITARY SEWER SERVICES SHALL HAVE
A MINIMUM SLOPE OF 1.0% (1/4" PER FOOT).
32.CONTRACTOR TO VERIFY EXISTING SEWER SERVICE DEPTH AND
SIZE BEFORE STARTING ANY WORK. NOTIFY ENGINEER IF ANY
MODIFICATIONS NEED TO BE MADE. ALL CONNECTIONS TO
EXISTING SEWER LINES SHALL BE CONFIRMED.
33.WATER LINES, METERS, TAPS AND FIRE HYDRANTS MUST BE IN
CONFORMANCE WITH THE APPROPRIATE GOVERNING AGENCIES
STANDARDS AND SPECIFICATIONS OR SUPPLEMENTARY
STANDARDS AND SPECIFICATIONS.
34.ALL SANITARY SEWER IMPROVEMENTS MUST BE IN CONFORMANCE
WITH THE APPROPRIATE GOVERNING AGENCIES STANDARDS AND
SPECIFICATIONS OR SUPPLEMENTARY STANDARDS AND
SPECIFICATIONS.
35.DRY UTILITY IMPROVEMENTS SHALL BE COORDINATED WITH THE
PROVIDER PRIOR TO CONSTRUCTION.
36.CONTRACTOR IS RESPONSIBLE FOR COORDINATION, COMPLETION
AND SUBMITTAL OF ALL DRY UTILITY (GAS, ELECTRIC, PHONE,
CABLE, AND OTHER) APPLICATIONS.
37.UTILITY STUBS ARE SHOWN TO BEST AVAILABLE INFORMATION,
AND MAY NOT BE SHOWN AT EXACT LOCATION, LENGTH OR DEPTH.
CONTRACTOR SHALL VERIFY UTILITY STUBS PRIOR TO
CONSTRUCTION AND NOTIFY ENGINEER IMMEDIATELY OF AN
DISCREPANCIES. FOR BIDDING PURPOSES, CONTRACTOR SHALL
ASSUME THAT ALL UTILITY STUBS SHOWN ON THE PLANS HAVE
NOT BEEN INSTALLED, AND THAT NEW CONNECTIONS TO THE
EXISTING INFRASTRUCTURE SHALL BE MADE, UNLESS NOTED
OTHERWISE.
GRADING NOTES:
1.ALL EARTHWORK REQUIRED OF THIS CONSTRUCTION SHALL BE
COMPLETED IN ACCORDANCE WITH ALL APPLICABLE SECTIONS OF
THE PROJECT SPECIFICATIONS, GEOTECHNICAL INVESTIGATION
FOR THE SITE AND THE APPROPRIATE GOVERNING AGENCIES
STANDARDS AND SPECIFICATIONS.
2.A PRE CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THE
DEVELOPER, ENGINEER, CONTRACTOR AND THE APPROPRIATE
GOVERNING AGENCY PRIOR TO ANY CONSTRUCTION.
3.REFER TO THE GEOTECHNICAL REPORT AND STRUCTURAL
DRAWINGS FOR COMPACTION AND EARTHWORK REQUIREMENTS
FOR THE BUILDING PADS AND ADJACENT AREAS. THE
CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT FOR
ADDITIONAL REQUIREMENTS.
4.IF THE SUBGRADE SHOULD BECOME FROZEN, DESICCATED,
SATURATED, OR DISTURBED, THE AFFECTED MATERIAL SHOULD BE
REMOVED OR THESE MATERIALS SHOULD BE SCARIFIED,
MOISTURE CONDITIONED, AND RECOMPACTED PRIOR TO
FOUNDATION, FLOOR SLAB AND PAVEMENT CONSTRUCTION.
5.FILL SHOULD BE PLACED AND COMPACTED IN HORIZONTAL (8")
LIFTS, USING EQUIPMENT AND PROCEDURES THAT WILL PRODUCE
RECOMMENDED MOISTURE CONTENTS AND DENSITIES
THROUGHOUT THE LIFT. REFER TO GEOTECHNICAL REPORT FOR
COMPACTION REQUIREMENTS.
6.THE PLACEMENT AND COMPACTION OF FILL AND BACKFILL SHOULD
BE OBSERVED BY A REPRESENTATIVE OF THE GEOTECHNICAL
ENGINEER. REFER TO THE COMPACTION REQUIREMENTS IN THE
GEOTECHNICAL REPORT FOR ADDITIONAL REQUIREMENTS.
7.ALL SOILS USED FOR FILL AND BACKFILL MUST BE APPROVED BY
THE GEOTECHNICAL ENGINEER PRIOR TO INSTALLATION. THE
GEOTECHNICAL ENGINEER SHALL OBSERVE AND TEST THE FILL
COMPACTION, APPROVE THE FILL MATERIALS AND COMMENT, AS
NEEDED, ON THE METHOD OF PLACING AND COMPACTION, IN
WRITING, TO THE OWNER'S REPRESENTATIVE. THE CONTRACTOR
SHALL BE RESPONSIBLE TO NOTIFY THE GEOTECHNICAL ENGINEER
WHEN TESTS ARE TO BE MADE. THE GEOTECHNICAL ENGINEER
SHALL APPROVE ALL FOUNDATION EXCAVATIONS AND GIVE
WRITTEN APPROVAL OF THE COMPLETED FOUNDATIONS TO THE
ARCHITECT. QUALITY CONTROL BY AN INDEPENDENT TESTING
AGENCY AND GEOTECHNICAL ENGINEER SHALL IN NO WAY
RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FOR
PERFORMING ALL WORK IN ACCORDANCE WITH THE CONTRACT
REQUIREMENTS.
8.NO RUBBLE OR DEBRIS INCLUDING TIMBER, CONCRETE RUBBLE,
TREES, BRUSH, AND ASPHALT SHALL BE PLACED IN THE BACKFILL
UNDER ANY OF THE PROPOSED BUILDINGS, STREETS, CURB &
GUTTER, SIDEWALK, DRAINAGE STRUCTURES, WITHIN FIVE (5) FEET
OF A BUILDING FOOTPRINT OR BE IN THE PLACEMENT OF ANY
UNCLASSIFIED FILL. PROPERLY GRADED RUBBLE MAY BE USED IN
SOME LOCATIONS AS SPECIFIED AND VERIFIED BY THE ENGINEER.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL
AND HAULING OF SUCH MATERIALS TO A SUITABLE SPOIL AREA.
COSTS ASSOCIATED WITH THE REMOVAL OF SUCH MATERIALS
SHALL BE PAID FOR AS DOCUMENTED IN THE PROJECT
SPECIFICATIONS.
9.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE DESIGN,
MAINTENANCE AND OPERATION OF ANY REQUIRED DEWATERING
SYSTEM. THE CONTRACTOR SHALL PERFORM SUCH INDEPENDENT
INVESTIGATION AS DEEMED NECESSARY TO DETERMINE THE
SUBSURFACE GROUNDWATER CONDITIONS AND UNSTABLE SOIL
CONDITIONS TO BE ENCOUNTERED THROUGHOUT THE
CONSTRUCTION.
10.IMMEDIATELY PUMP OR BAIL OUT WATER FOUND IN EXCAVATIONS,
WHETHER RAIN OR SEEPAGE. EXCAVATIONS MUST BE KEPT FREE
FROM WATER AT ALL TIMES. TAKE ALL MEASURES AND FURNISH
ALL EQUIPMENT AND LABOR NECESSARY TO CONTROL THE FLOW,
DRAINAGE AND ACCUMULATION OF WATER AS REQUIRED TO
PERMIT COMPLETION OF THE WORK AND TO AVOID DAMAGE TO
THE WORK. CONTRACTOR SHALL COMPLY WITH ALL CDPHE AND
OSHA RULES AND REGULATIONS AT ALL TIMES.
11.WHEN FREEZING TEMPERATURES MAY BE EXPECTED, DO NOT
EXCAVATE TO THE FULL DEPTH INDICATED UNLESS THE FOOTING
OR SLABS ARE TO BE POURED IMMEDIATELY AFTER THE
EXCAVATION HAS BEEN COMPLETED. IF PLACING OF CONCRETE IS
DELAYED, PROTECT THE BOTTOMS OF EXCAVATIONS FROM FROST
UNTIL CONCRETE IS PLACED.
12.NO FILL MATERIAL SHALL BE PLACED, SPREAD OR ROLLED WHILE IT
IS FROZEN OR THAWING OR DURING UNFAVORABLE WEATHER
CONDITIONS. WHEN THE WORK IN PROGRESS IS INTERRUPTED BY
HEAVY RAIN, FILL OPERATIONS SHALL NOT BE RESUMED UNTIL THE
GEOTECHNICAL ENGINEER INDICATES THAT THE MOISTURE
CONTENT AND DENSITY OF THE PREVIOUSLY PLACED FILL ARE AS
SPECIFIED.
13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROVISION
OF ADEQUATE SHORING AND/OR BRACING NECESSARY TO
FACILITATE THE EXCAVATION ASSOCIATED WITH THE
CONSTRUCTION OF THE WALLS, PIPELINES AND FOUNDATIONS.
THE BRACING AND/OR SHORING OF EXCAVATED WALLS OR
TRENCHES SHALL BE IN COMPLIANCE WITH OSHA REGULATIONS
AND SHALL BE DESIGNED BY A REGISTERED PROFESSIONAL
ENGINEER. THE COST OF SHORING AND/OR BRACING SHALL BE
INCLUDED IN THE COST OF THE SPECIFIC CONSTRUCTION ITEM
REQUIRING THE SHORING AND/OR BRACING.
14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL
AND HAULING OF UNSUITABLE FILL MATERIALS TO A SUITABLE
SPOIL AREA. EXCESS EXCAVATION SHALL BECOME THE PROPERTY
OF THE CONTRACTOR AND SHALL BE DISPOSED OF AT THE
CONTRACTOR'S EXPENSE. THE COST OF HAULAGE AND SPOILING
OF EXCESS EXCAVATED MATERIALS SHALL BE PAID FOR AS
DOCUMENTED IN THE PROJECT SPECIFICATIONS.
15.THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE SITE
PRIOR TO BIDDING TO VERIFY SITE CONDITIONS.
16.PROPOSED GRADING CONTOURS SHOWN ON THE PLAN ARE TO
FINAL GRADE.
17.ALL VERTICAL SPOT ELEVATIONS SHOWN ON THE GRADING PLAN
ARE FLOWLINE OF CURB (FL), UNLESS OTHERWISE NOTED.
18.ALL SLOPES EQUAL TO OR GREATER THAN 4:1 SHALL REQUIRE
EROSION CONTROL BLANKET, NORTH AMERICAN GREEN SC150BN
DOUBLE NETTED OR EQUAL AS A TEMPORARY STABILIZATION
MEASURE.
19.ALL SURFACES NOT RECEIVING PAVEMENT OR OTHER TREATMENT
SHALL BE SEEDED AND MULCHED.
20.BUILDING CONTRACTOR(S) WILL BE RESPONSIBLE FOR
CONSTRUCTING POSITIVE DRAINAGE AWAY FROM ALL
STRUCTURES.
21.SIDEWALK SLOPES SHALL NOT EXCEED 2.0% MAXIMUM CROSS
SLOPES AND 5.0% MAXIMUM LONGITUDINAL SLOPES, UNLESS
OTHERWISE NOTED. THE SLOPE IN THE HANDICAP PARKING
SPACES AND ASSOCIATED STRIPED ISLAND SHALL NOT EXCEED
2.0%.
22.APPROXIMATE AREA TO BE DISTURBED = 0.28 ACRES
23.THESE PLANS HAVE BEEN PREPARED BY HCI ENGINEERING IN
ACCORDANCE WITH AND IN RELIANCE UPON THE GEOTECHNICAL
STUDY AND RECOMMENDATIONS. THE CONTRACTOR SHALL
REVIEW THE GEOTECHNICAL REPORT FOR PAVEMENT DESIGN AND
RECOMMENDATIONS REGARDING EXCAVATION, COMPACTION,
MATERIALS, EMBANKMENT, PAVEMENT SUBEXCAVATION,
MOISTURE CONTROL, AND TOPSOIL REMOVAL AND REPLACEMENT.
THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF
DISCREPANCIES BETWEEN THE GEOTECHNICAL REPORT
RECOMMENDATIONS AND REQUIREMENTS OF THESE
CONSTRUCTION DRAWINGS.
24.CONTRACTOR SHALL PROVIDE A 2-FOOT MINIMUM ASPHALT PATCH
AT ALL NEW FLATWORK (SIDEWALK, CURB AND GUTTER, CROSS
PANS, ETC..) TO EXISTING PAVEMENT LOCATIONS. THE PATCH
SHALL MATCH EXISTING PAVEMENT THICKNESS,
RECOMMENDATIONS PER GEOTECHNICAL REPORT OR
JURISDICTIONAL STANDARDS WHICHEVER IS MOST
CONSERVATIVE. IF REQUIRED, THE PATCH SHALL BE UP-SIZED AS
NEED TO ENSURE GRADE SLOPES BETWEEN FLATWORK AND
EXISTING PAVEMENT ARE NOT GREATER THAN 5% AND LESS THAN
2.0%. CONTRACTOR SHALL COMPLETE A FIELD INSPECTION TO
DETERMINE IS ADDED PAVEMENT PATCH WORK IS NEEDED.
25.GRADING AND FORM CHECK SHALL BE PROVIDED TO ENGINEER
PRIOR TO INSTALLATION AND POURING OF ADA RAMPS AND
PARKING STALLS.
26.CONTRACTOR SHALL PROVIDE ENGINEER WITH TOPOGRAPHIC
AS-BUILT SURVEY OF ALL CRITICAL PEDESTRIAN PATHS, RAMPS
AND STRUCTURE THRESHOLDS TO ENSURE CONFORMANCE WITH
ADA CRITERIA.
SIGNAGE AND STRIPING NOTES:
1.ALL TRAFFIC CONTROL, TRAFFIC SIGNS AND PAVEMENT MARKINGS
SHALL BE IN CONFORMANCE WITH THE MANUAL ON UNIFORM
TRAFFIC CONTROL DEVISES (MUTCD), THE CURRENT COLORADO
SUPPLEMENT AND THE APPROVED PLANS.
2.THE PAVEMENT MARKING PAINT SHALL BE ALKYD-RESIN TYPE,
READY MIXED COMPLYING WITH AASHTO M248, TYPE I, COLOR AS
NOTED ON PLANS OR CHLORINATED-RUBBER BASE TRAFFIC LANE
MARKING PAINT, FACTORY-MIXED, QUICK-DRYING AND
NON-BLEEDING.
3.INSTALL THE PAVEMENT MARKING PAINT PER THE
MANUFACTURER'S RECOMMENDATIONS.
4.APPLY PAINT WITH MECHANICAL EQUIPMENT TO PRODUCE
UNIFORM STRAIGHT EDGES. APPLY IN TWO COATS AT
MANUFACTURER'S RECOMMENDED RESULTS. SWEEP AND CLEAN
SURFACE PRIOR TO PAINTING TO ELIMINATE LOOSE MATERIAL AND
DUST.
5.STRIPING SHALL BE DONE WHEN THE AIR AND PAVEMENT
TEMPERATURES ARE AT LEAST 50F OR AS RECOMMENDED BY THE
MANUFACTURER. THE PAVEMENT SURFACE AND WEATHER
CONDITIONS SHALL BE CONDUCIVE TO SATISFACTORY RESULTS.
6.STOP SIGN PLACEMENT LOCATIONS SHALL BE PER SECTION 2B-9
OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, LATEST
EDITION AND CDoT S-614-1.
7.EXISTING PAVEMENT MARKINGS CONFLICTING WITH PROPOSED
DESIGN SHALL BE REMOVED BY A WATER OR SAND BLAST METHOD
THAT WILL NOT DETERIORATE THE PAVEMENT, AS APPROVED BY
THE ENGINEER.
8.HANDICAP PARKING SIGNS SHALL BE LOCATED AT EACH HANDICAP
PARKING SPACE.
9.ALL PAVEMENT MARKINGS FOR PARKING SPACES AND PAINTED
ISLANDS SHALL BE 4-INCH WIDE WHITE STRIPES, UNLESS
OTHERWISE NOTED.
10.STRIPED ISLANDS: 4” WIDE WHITE PAINTED STRIPES @ 36” O.C.
TYPICAL, PAINTED AT A 45 DEGREE ANGLE TO PARKING SPACE
LINE.
11.CONTRACTOR TO VERIFY FIRE LANE PAINT AND SIGN LOCATIONS
WITH FIRE DEPARTMENT PRIOR TO INSTALLATION.
DEMOLITION NOTES:
1.TREE REMOVAL/RELOCATION SHALL BE COORDINATED WITH
LANDSCAPE PLANS AND OWNER'S REPRESENTATIVE.
1.IT IS THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE AND
VERIFY THE EXTENTS OF REQUIRED DEMOLITION PRIOR TO
CONSTRUCTION. ADDITIONAL SCOPE MAY BE REQUIRED THAN
SHOWN HEREON. THE CONTRACTOR SHALL COORDINATE ALL
DEMOLITION WITH STRUCTURAL MECHANICAL, ELECTRICAL,
PLUMBING, LANDSCAPING AND ARCHITECTURAL DRAWINGS.
2.THE ENGINEER ASSUMES NO RESPONSIBILITY FOR BURIED
UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING
AND PROTECTING ALL UTILITIES PRIOR TO CONSTRUCTION.
3.HCI ENGINEERING HAS NOT CONDUCTED ANY ON SITE
INVESTIGATION FOR EXISTING UTILITIES. ADDITIONAL UTILITIES, IN
USE OR ABANDONED, MIGHT EXIST ON, NEAR OR CROSSING THE
SUBJECT PROPERTY. IT IS THE CONTRACTOR'S RESPONSIBILITY
TO CONDUCT ON SITE INVESTIGATION FOR UNKNOWN UTILITIES
AND CONFIRM UTILITY LOCATIONS SHOWN HEREON. THE
CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCY.
4.CONTRACTOR SHALL PRESERVE EXISTING VEGETATION OUTSIDE
OF THE PROJECT LIMITS. ANY DAMAGE TO VEGETATION OR SITE
IMPROVEMENTS OUTSIDE OF THE PROJECT LIMITS DUE TO
CONSTRUCTION ACTIVITIES SHALL BE REPLACED IN KIND AT THE
CONTRACTOR'S EXPENSE.
5.BARRIERS/FENCING SHALL BE PROVIDED PRIOR TO SITE
DEMOLITION TO PROVIDE FOR SAFETY OF WORKERS AND
PASSERSBY. THE CONTRACTOR SHALL MAINTAIN PEDESTRIAN
ROUTES DURING CONSTRUCTION.
6.THE CONTRACTOR SHALL SUBMIT A DETAIL DEMOLITION PLAN
OUTLINING REMOVAL.
7.THE CONTRACTOR SHALL PROVIDE FOR DUST CONTROL DURING
DEMOLITION TO INCLUDE COVERING TRUCKS HAULING DEBRIS
OFFSITE, PERIODICALLY CLEANING AND SWEEPING ADJACENT
STREETS AND DRIVES AND/OR USING DUST PALLIATIVE AS
NEEDED.
8.THE CONTRACTOR SHALL SAW CUT EXISTING ASPHALT
PAVEMENT AT DEMOLITION LIMITS. APPLY SS-1 TACKCOAT AT
EDGE PRIOR TO PLACING NEW ASPHALT.
9.EXISTING CONCRETE AT DEMOLITION LIMITS SHALL BE SCORED
THEN BROKEN AT THE JOINT TO CREATE A ROUGH SURFACE TO
ACCEPT NEW CONCRETE.
10.THE CONTRACTOR SHALL REFER TO PROJECT SPECIFICATIONS
FOR THE DISPOSAL OF ALL DEMOLISHED ITEMS.
11.THOROUGHLY CLEAN ALL AREAS, SURFACES, BUILDINGS AND
STRUCTURES IMPACTED BY DEMOLITION ACTIVITIES PRIOR TO
START OF NEW CONSTRUCTION.
12.DEMOLITION SHALL INCLUDE (AT A MINIMUM):
·REMOVAL OF IRRIGATION SYSTEM LINE AND APPURTENANCES
·REMOVAL AND/OR ABANDONING STORM LINE (VIA FLOW FILL
AND CAPPING).
·REMOVAL AND/OR ABANDONING WATER LINE (VIA FLOW FILL
AND CAPPING).
·REMOVAL/RELOCATION OF ELECTRIC, GAS AND
TELECOMMUNICATION LINES IN COORDINATION WITH THE
UTILITY OWNER.
·REMOVAL OF ASPHALT, CONCRETE, AND OR GRAVEL
SURFACES.
·REMOVAL OF LANDSCAPING FEATURES (E.G. SITE WALLS,
FENCES, BOULDERS, PAVERS, GARDEN BEDS)
·REMOVAL OR TREES, BUSHES AND FOLIAGE, AS DIRECTED BY
LANDSCAPE. TREE REMOVAL OR TRANSPLANTING SHALL BE
COORDINATED WITH THE OWNER'S REPRESENTATIVE AND
LANDSCAPE.
·REMOVAL OF ANY UNSATISFACTORY SOIL, AS IDENTIFIED BY
THE GEOTECHNICAL ENGINEER.
HCI NOTES
C1.2
SS
REVISIONS:
Drawn By:
Sheet
Sheet Name:
No.Date:Description:FILENAME: U:\HCI Engineering Projects\2021\21_23 906 E. Stuart St\CAD\Plans\21-23 - CD -DEMO PLAN.dwg PLOTDATE: 2021-11-11 Checked By:
Date Issued:
Project No:
CALL 811 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG,
GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND
MEMBER UTILITIES.
Know what's below,
Call before you dig.
UTILITY PLANS
PLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT
A PART OF TRACT 7, EAST ACRES LYING IN THE NORTHEAST 1/4 OF THE NORTHEAST 1/4 OF SECTION 24, TOWNSHIP 7
NORTH, RANGE 69 WEST OF THE 6TH P.M., COUNTY OF LARIMER, STATE OF COLORADO
906 E. STUART ST., FORT COLLINS
COLORADO
UTILITY PLANSPLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT906 E. STUART ST., FORT COLLINS, CONumber:
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
HCI 21_23
1 07.30.21 1ST SUB
11/11/2021
KZH
TGG
2 09.17.21 2ND SUB
3 11.17.21 3RD SUB
N
30'20'10'0'
SCALE: 1" = 10'
DEMO PLAN
C1.3
SS
M
CO
CO
PRO.16.00'
PAVER DRIVE WAY
PRO.4.00'
SIDEWALK RAMP
W/ HANDRAILS
PRO.5.00'
SIDEWALK
PRO.16.00'
ACCESS
PRO.SIDEWALK
TIE TO EXIST
PRO.4.00'
SIDEWALK
8.50'
8.50'
18.00'
5.00'
18.00'
PARKING STALLS WEST TO ACCOMMODATE
ACCESS DRIVE
PRO.LANDSCAPE PLANTING/MULCH AREAS
PRO.GREEN SPACE PROVIDED
TO RETAIN CANOPY TREES
PRO.(4) STALL ENCLOSED BIKE RACK ON PAD
RE: ARCH
PRO.STREET/TREE LAWN AREA
(2) STALL FIXED BIKE RACK,
DIRECT BURIAL
RE: ARCH
3.00'3.00'
PRO. 26 F.L.CURB FLOWLINE
PRO.38.00' STUART STREET RIGHT
OF WAY BY
SEPARATE DOCUMENT
PRO.9.00' UTILITY EASEMENT
BY SEPARATE DOCUMENT
R10.00'R10.00'
PRO. 3644 SF.
PERMEABLE PAVERS
20.00'
3.0'
16.00'3.0'
PRO. SSWER CLEANOUT
PRO. CLEANOUT MH
PRO. CLEANOUT MH
7.00'
17.52'
PRO. TRANSFORMER
PRO. 6" STEP
REVISIONS:
Drawn By:
Sheet
Sheet Name:
No.Date:Description:FILENAME: U:\HCI Engineering Projects\2021\21_23 906 E. Stuart St\CAD\Plans\21-23 - CD - SITE PLAN.dwg PLOTDATE: 2021-11-11 Checked By:
Date Issued:
Project No:
CALL 811 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG,
GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND
MEMBER UTILITIES.
Know what's below,
Call before you dig.
UTILITY PLANS
PLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT
A PART OF TRACT 7, EAST ACRES LYING IN THE NORTHEAST 1/4 OF THE NORTHEAST 1/4 OF SECTION 24, TOWNSHIP 7
NORTH, RANGE 69 WEST OF THE 6TH P.M., COUNTY OF LARIMER, STATE OF COLORADO
906 E. STUART ST., FORT COLLINS
COLORADO
UTILITY PLANSPLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT906 E. STUART ST., FORT COLLINS, CONumber:
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
HCI 21_23
1 07.30.21 1ST SUB
11/11/2021
KZH
TGG
2 09.17.21 2ND SUB
3 11.17.21 3RD SUB
N
30'20'10'0'
SCALE: 1" = 10'
SITE PLAN
C2.0
PRO.1.5" DOMESTIC
METER
SS
M
CO
CO
80.75
80.75
80.51
80.75
MATCH EX.
4980.27
80.37
MATCH EX.
4980.50
80.70
81.68
80.63
81.737.4%5.9%5.8%5.2%
1.1%
0
.
2%
0
.
2%
0
.
2%0.5%1.6%1.6%1.5%FFE = 4980.75
80.70
80.75
80.66
81.68
81.57
MATCH EX.
4981.62
MATCH EX.
4981.55 1.5%80.71
81.65 81.58
81.65
MATCH EX.
4981.7081.68
MATCH EX.
4981.64
MATCH EX.
4981.65
MATCH EX.
4981.09
80.43MATCH EX.
4980.02
MATCH EX.
4980.04
80.70 80.69
80.75
80.75
80.75
80.70
80.70
80.69
80.69
80.7280.71 80.69 80.59
80.75
81.72
80.70
80.75
80.7480.74
80.7480.7480.74
80.74
80.70
1.5%1.4%0.9%1.4%1.2%8.0%0.5%0.5%0.9%0.1%0.1%0.1%0.2%0.3%15.5%PRO. SWALE W/
UNDERDRAIN
PRO. SWALE W/
UNDERDRAIN
80.70
81.67 81.67
80.6880.68 80.63
80.66 80.66
81.16 81.16
81.19 81.19
81.69 81.69
80.75
80.75MATCH EX.
4980.19
80.63
80.55
80.58
80.32
1.2%
N
REVISIONS:
Drawn By:
Sheet
Sheet Name:
No.Date:Description:FILENAME: U:\HCI Engineering Projects\2021\21_23 906 E. Stuart St\CAD\Plans\21-23 - CD - GRADING PLAN.dwg PLOTDATE: 2021-11-11 Checked By:
Date Issued:
Project No:
CALL 811 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG,
GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND
MEMBER UTILITIES.
Know what's below,
Call before you dig.
UTILITY PLANS
PLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT
A PART OF TRACT 7, EAST ACRES LYING IN THE NORTHEAST 1/4 OF THE NORTHEAST 1/4 OF SECTION 24, TOWNSHIP 7
NORTH, RANGE 69 WEST OF THE 6TH P.M., COUNTY OF LARIMER, STATE OF COLORADO
906 E. STUART ST., FORT COLLINS
COLORADO
UTILITY PLANSPLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT906 E. STUART ST., FORT COLLINS, CONumber:
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
HCI 21_23
1 07.30.21 1ST SUB
11/11/2021
KZH
TGG
2 09.17.21 2ND SUB
3 11.17.21 3RD SUB
N
30'20'10'0'
SCALE: 1" = 10'
GRADING PLAN
C2.1
DRAINAGE LEGEND
DRAINAGE BASIN
FLOW ARROW
BASIN ID
C100AREA (AC)
C10
MAJOR BASIN BOUNDARY
B3-6
2.8 0.47
0.76
PRO.
0.32 0.40
0.52
XXXX
5421
5420
XXXSLOPE
MAJOR CONTOUR
MINOR CONTOUR
SPOT ELEVATION
SSWATWATWATWATWATWATMWFWFWFCO
CO
PRO. 1.5" WATER METER
W/74 L.F. TYPE "K"
COOPER SERVICE LINE
PRO. SSWER CLEANOUT
PRO. CLEANOUT MH
PRO. CLEANOUT MH
PRO. 27 L.F. 6" DIP FIRE LINE
PRO. 28 L.F. 4" PERFORATED PVC
UNDERDRAIN @ 0.50% MIN.
PRO. 45 L.F. 4"
PERFORATED
PVC UNDERDRAIN
@ 0.50% MIN.
PRO. TRANSFORMER
PRO.38.00' STUART STREET RIGHT
OF WAY BY
SEPARATE DOCUMENT
PRO.9.00' UTILITY EASEMENT
BY SEPARATE DOCUMENT
PRO. 8 L.F. 4" PVC
UNDER BIKE PAD
@ 0.50% MIN.
PRO. 4 L.F. 4" PVC
UNDER SIDEWALK
@ 0.50% MIN.
N
30'20'10'0'
SCALE: 1" = 10'
REVISIONS:
Drawn By:
Sheet
Sheet Name:
No.Date:Description:FILENAME: U:\HCI Engineering Projects\2021\21_23 906 E. Stuart St\CAD\Plans\21-23 - CD - UTILITY PLAN.dwg PLOTDATE: 2021-11-11 Checked By:
Date Issued:
Project No:
CALL 811 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG,
GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND
MEMBER UTILITIES.
Know what's below,
Call before you dig.
UTILITY PLANS
PLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT
A PART OF TRACT 7, EAST ACRES LYING IN THE NORTHEAST 1/4 OF THE NORTHEAST 1/4 OF SECTION 24, TOWNSHIP 7
NORTH, RANGE 69 WEST OF THE 6TH P.M., COUNTY OF LARIMER, STATE OF COLORADO
906 E. STUART ST., FORT COLLINS
COLORADO
UTILITY PLANSPLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT906 E. STUART ST., FORT COLLINS, CONumber:
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
HCI 21_23
1 07.30.21 1ST SUB
11/11/2021
KZH
TGG
2 09.17.21 2ND SUB
3 11.17.21 3RD SUB
GAS
SAN
W W W
ELEC
STORM SEWER
SANITARY SEWER
WATER LINE
GAS LINE
ELECTRICAL
ELECTRICAL BOX
SITE LIGHT
MANHOLES
GATE VALVE
CLEAN OUT
PROPOSED
FIRE HYDRANT
WATER METER
ST SS
HY DUGTFIBER OPTIC LINE
UTILITY LEGEND
BASIS OF BEARING:
THE SOUTH LINE OF THE NE 1/4 OF THE NE 1/4 OF SECTION 24 TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M.,
BEING MONUMENTED AS SHOWN HEREON, BEARS S89°56'00"W PER QUIT CLAIM DEED RECORDED AT REC. #
20200011699, LARIMER COUNTY RECORDS.
BENCHMARK:
PROJECT DATUM: NAVD88
FORT COLLINS SURVEY MONUMENT, BENCHMARK #15-97 -ELEVATION: 4995.75' NAVD 88 DATUM, PER FORT COLLINS
DATASHET
TEMPORARY BENCHMARK (T.B.M.): THE TOP OF THE SET 5/8" REBAR AND CAP, PLS 6973, AT THE SOUTHEAST CORNER
OF THE ABOVE DESCRIBED PARCEL. ELEVATION: 4981.59'
UTILITY PLAN
C3.0
REVISIONS:
Drawn By:
Sheet
Sheet Name:
No.Date:Description:FILENAME: U:\HCI Engineering Projects\2021\21_23 906 E. Stuart St\CAD\Plans\21 - 23 - CD - DETAILS.dwg PLOTDATE: 2021-11-11 Checked By:
Date Issued:
Project No:
CALL 811 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG,
GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND
MEMBER UTILITIES.
Know what's below,
Call before you dig.UTILITY PLANSPLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT906 E. STUART ST., FORT COLLINS, CONumber:
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
HCI 21_23
1 07.30.21 1ST SUB
11/11/2021
KZH
TGG
2 09.17.21 2ND SUB
3 11.17.21 3RD SUB
DETAILS - WATER & WW
C4.0
REVISIONS:
Drawn By:
Sheet
Sheet Name:
No.Date:Description:FILENAME: U:\HCI Engineering Projects\2021\21_23 906 E. Stuart St\CAD\Plans\21 - 23 - CD - DETAILS.dwg PLOTDATE: 2021-11-11 Checked By:
Date Issued:
Project No:
CALL 811 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG,
GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND
MEMBER UTILITIES.
Know what's below,
Call before you dig.UTILITY PLANSPLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT906 E. STUART ST., FORT COLLINS, CONumber:
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
HCI 21_23
1 07.30.21 1ST SUB
11/11/2021
KZH
TGG
2 09.17.21 2ND SUB
3 11.17.21 3RD SUB
DETAILS - SW & TRAN
C4.1
VARIES
8"
EX. GRA
D
E
PROVIDE 1/2" - 3/4"
WASHED CRUSHED GRAVEL
4" ADS PERFORATED PIPE,
SLOPE TO FOLLOW SWALE LINE
NOTES:
1.COMPACT SUB-GRADE PER GEOTECH REPORT.
2.LINE TRENCH WITH PERMEABLE GEOTEXTILE.
Scale: N.T.S.
4" SWALE UNDERDRAINA
SSWATWATWATWATWATWATMWFWFWFCO
CO
LOC
DTC
CWA
FC
VTC
SSA
SCL
CS
CS
N
REVISIONS:
Drawn By:
Sheet
Sheet Name:
No.Date:Description:FILENAME: U:\HCI Engineering Projects\2021\21_23 906 E. Stuart St\CAD\Plans\21-23 - CD - EROSION CONTROL PLAN.dwg PLOTDATE: 2021-11-11 Checked By:
Date Issued:
Project No:
CALL 811 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG,
GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND
MEMBER UTILITIES.
Know what's below,
Call before you dig.
UTILITY PLANS
PLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT
A PART OF TRACT 7, EAST ACRES LYING IN THE NORTHEAST 1/4 OF THE NORTHEAST 1/4 OF SECTION 24, TOWNSHIP 7
NORTH, RANGE 69 WEST OF THE 6TH P.M., COUNTY OF LARIMER, STATE OF COLORADO
906 E. STUART ST., FORT COLLINS
COLORADO
UTILITY PLANSPLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT906 E. STUART ST., FORT COLLINS, CONumber:
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
HCI 21_23
1 07.30.21 1ST SUB
11/11/2021
KZH
TGG
2 09.17.21 2ND SUB
3 11.17.21 3RD SUB
N
30'20'10'0'
SCALE: 1" = 10'
EROSION CONTROL PLAN
C5.0
BMP LEGEND
CONCRETE WASHOUT AREA
CONSTRUCTION FENCE
CURB SOCK-INLET PROTECTION
INLET PROTECTION
SEDIMENT CONTROL LOG
STABILIZED STAGING AREA
VEHICLE TRACING CONTROL
LIMITS OF CONSTRUCTION
CWA
CF
CS
IP
SCL
SSA
VTC
LOC
DESCRIPTIONLABELSYMBOL
DEBRIS/TRASH CONTROLDTC
BMP
CUT/ FILL VOLUMES
CUT (C.Y.)FILL (C.Y.)NET (C.Y.)
34 28 6
TOTAL AREA OF DISTURBANCE = 0.28 AC
CUT/FILL VOLUMES FOR REFERENCE ONLY,
CONTRACTOR TO PERFORM OWN EARTH
WORK CALCULATIONS.
BMP'S TAKEOFF
BMP QUANTITY
CF 490 LF
VTC 1 EA.
SSA 293 SF
CWA 1 EA.
CS 4 EA.
SCL 284 LF
LOC 0.28 AC / 12,197 SF
PROPOSED CONTOURS MAJOR
PROPOSED CONTOURS MINOR
GRADING LEGEND
5280
5279
BMP INSTALLATION SCHEDULE
ORDER INSTALLATION ORDER/ TIME LINE
1
INSTALLATION OF CONSTRUCTION FENCE (CF),
PERIMETER CURB SOCKS (CS), SEDIMENT CONTROL
LOGS (HEAVY WATTLES) (SCL) AND INLET PROTECTION
(IP)
2 INSTALLATION OF THE SITE VEHICLE TRACKING
CONTROL (VTC)
3
INSTALLATION OF THE SITE STABILIZED STAGING
AREA (SSA) ONCE THE AREA FOR THE SSA HAS BEEN
CLEARED AND GRUBBED, SURFACE ROUGHENING ALL
SOILS
4
INSTALLATION OF THE SITE CONCRETE WASHOUT
AREA (CWA), THE CWA SHALL BE ACCESSIBLE FROM
THE VTC
5
INSTALLATION OF THE SEDIMENT CONTROL LOGS
(SCL) AROUND ANY STOCKPILING AND CURB SOCKS
(CS) AROUND ANY SOILS ON PAVED SURFACES
6 INSTALLATION OF DIVERSION DIKES (DD), AND
EROSION CONTROL BLANKETS (ECB)*
7
REMOVE THE SSA, VTC, SCL AND IP TO ALLOW FOR
PAVING. PAVING SHOULD COMMENCE IMMEDIATELY
ALLOWING NO LAG TIME FOR EROSION
CONTAMINATION DUE TO THE REMOVAL OF THESE
BMP'S.
8
ONCE PAVING IS COMPLETED RE-INSTALL CS (CURB
SOCKS ON PAVED SURFACE AROUND ANY STOCK PILE
AND INLET PROTECTION)
9
REMOVE CF, SCL, IP AND CS ONCE THE FINAL
STABILIZATION IS COMPLETE AND NO DISTURBED
SOILS ARE EXPOSED
BASIS OF BEARING:
THE SOUTH LINE OF THE NE 1/4 OF THE NE 1/4 OF SECTION 24 TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M.,
BEING MONUMENTED AS SHOWN HEREON, BEARS S89°56'00"W PER QUIT CLAIM DEED RECORDED AT REC. # 20200011699,
LARIMER COUNTY RECORDS.
BENCHMARK:
PROJECT DATUM: NAVD88
FORT COLLINS SURVEY MONUMENT, BENCHMARK #15-97 -ELEVATION: 4995.75' NAVD 88 DATUM, PER FORT COLLINS
DATASHET
TEMPORARY BENCHMARK (T.B.M.): THE TOP OF THE SET 5/8" REBAR AND CAP, PLS 6973, AT THE SOUTHEAST CORNER OF
THE ABOVE DESCRIBED PARCEL. ELEVATION: 4981.59'
REVISIONS:
Drawn By:
Sheet
Sheet Name:
No.Date:Description:FILENAME: U:\HCI Engineering Projects\2021\21_23 906 E. Stuart St\CAD\Plans\21 - 23 - CD - EC DETIALS.dwg PLOTDATE: 2021-11-11 Checked By:
Date Issued:
Project No:
CALL 811 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG,
GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND
MEMBER UTILITIES.
Know what's below,
Call before you dig.
Number:
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
HCI 21_23
1 07.30.21 1ST SUB
11/11/2021
KZH
TGG
2 09.17.21 2ND SUB
3 11.17.21 3RD SUBUTILITY PLANSPLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT906 E. STUART ST., FORT COLLINS, COEC - DETAILS
(1)
C5.1
REVISIONS:
Drawn By:
Sheet
Sheet Name:
No.Date:Description:FILENAME: U:\HCI Engineering Projects\2021\21_23 906 E. Stuart St\CAD\Plans\21 - 23 - CD - EC DETIALS.dwg PLOTDATE: 2021-11-11 Checked By:
Date Issued:
Project No:
CALL 811 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG,
GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND
MEMBER UTILITIES.
Know what's below,
Call before you dig.
Number:
A DIVISION OF
HABERER CARPENTRY INC.
621 SOUTHPARK DR., SUITE 1600
LITTLETON CO, 80120
PHONE: (303) 979-3900
INFO@HABERERGROUP.COM
HCI 21_23
1 07.30.21 1ST SUB
11/11/2021
KZH
TGG
2 09.17.21 2ND SUB
3 11.17.21 3RD SUBUTILITY PLANSPLANETSCALE LIVING - AFFORDABLE HOUSING PROJECT906 E. STUART ST., FORT COLLINS, COEC - DETAILS
(2)
C5.2