Loading...
HomeMy WebLinkAboutHEWLETT-PACKARD MODULAR OFFICE BUILDING - I-L SITE PLAN REVIEW - 54-88D - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWComroity Planning and EnvironmentServices Current Planning City of Fort Collins May 22, 1995 Ms. Amy Dykstal/ Facilities Project Manager Hewlett Packard 3404 E. Harmony Road Fort Collins, CO 80525 Dear Ms. Dykstall: For your information, attached is a copy of the Staff's comments concerning Hewlett Packard - Modular Office Space presented before the Conceptual Review Team on May 15, 1995. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the • next steps in the review process, please feel free to call me at 221-6750. • Sincerely, Ted Shepard, A CP Senior Planner TS/gj d Attachments cc: Transportation Department Stormwater Department Project Planner File 281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6750 FAX (303) 221-6378 • TDD (303) 224-6002 • • • CONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins MEETING DATE: May 15, 1995 ITEM: Hewlett Packard - Modular Office Space APPLICANT: Ms. Amy Dykstall, Facilities Project Manager, Hewlett Packard, 3404 East Harmony Road, Fort Collins, CO. 80525. LAND USE DATA: Request for a 33,320 square foot temporary modular structure for office space located within the existing parking lot north of Building One and west of Building Two. COMMENTS: 1. Electrical power will come from Building One. Therefore, there are no comments from the City's Light and Power Department. 2. Water and Sewer services will be extended from Building One. Therefore, there are no comments from the Water and Wastewater Department. 3. The Building Inspection Department will require an engineered tie down system connecting the modular to the foundation. Please contact Sharon Getz, Plans Examiner, 221-6760, for further details. 4. The structure must be equipped with an automatic fire extinguishing system. Plans for this system must be submitted and reviewed by the Poudre Fire Authority - Fire Prevention Bureau. For further information, please contact Mike Pretz, 221-6570. 5. The Building Permit Application should include a letter verifying that the structure will be placed over existing impervious surface. 6. The Street Oversizing Fee may or may not be applicable. Please contact Matt Baker, Engineering Department, 221-6605, for further details. 7. The project will be reviewed as an I-L, Limited Industrial, Site Plan Review. The application should include a mailing list of all property owners within 500 feet of the entire H-P campus, excluding public rights -of -way. The mailing list must be printed on self-adhesive mailing labels. The process take about three to five weeks for completion. COMMUNITY PLANNING & ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT