HomeMy WebLinkAboutCONOCO SERVICE STATION - EXPANSION OF A NON-CONFORMING USE - 57-88 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWs
•
•
CITY OF FORT COLLINS
OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT
May 25, 1988
Bob Gallenstein
c/o Brady Oil Company
333 W. Drake Rd.
Fort Collins, CO 80526
Dear Mr. Gallenstein,
For your information, attached is a copy of the Staff's comments concerning
Expansion of Conoco Gas Station, which was presented before the Conceptual
Review Team on May 25, 1988.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,,
T �
Ted Shepard J
City Planner
Attachment
TS/bh
xc: Tom Peterson, Director of Planning
Mike Herzig, Development Coordinator
Jim Faulhaber, Civil Engineer I
Project Planner,/
File
11
SERVICES, PLANNING
r
CONCEPTUAL
MEETING DATE: May 23, 1988
REVIEW STAFF COMMENTS
ITEM: Expansion of the Conoco at the southwest corner of Taft Hill Road
and West Mulberry
APPLICANT: Mr. Bob Gallenstein, c/o Brady Oil Company, 333 W. Drake Rd.,
Fort Collins, CO 80526
LAND USE DATA: Request for one additional service bay and one automatic
carwash bay on the south side of the existing Conoco gas station at the
southwest corner of Taft and Mulberry.
COMMENTS:
1. Because of the B-L (Limited Business) zone, the request will be treated as a
non -conforming use and will be heard by the Planning and Zoning Board
after a seven week review process.
2. If the carwash uses a blower or dryer, then the electrical load may be
increased and a new transformer may be needed. If more power is
needed, then a Commercial One form must be filled out for Light and
Power to make an assessment of power needs.
3. The applicant must assess whether the current water service will be
adequate for the proposed carwash. If the service is not adequate, then a
larger tap may be necessary. Please consult with Water and Sewer for
current tap size and available pressure.
4. The carwash will need a mud trap. Also, the sanitary sewer line must be
equipped with a sand and oil trap located outside the building but within
a distance of 30 feet.
5. Since there will be no increase in impervious surface, storm detention will
not be required. Be sure that the carwash does not drain into the storm -
water system.
6. At the Conceptual Review stage, it is customary for Staff to raise all
possible issues that may affect the proposed addition. This "quick and
dirty" approach is a result of the limited time period. While this "shotgun"
approach is used for all development within the City, it does not, however,
a � a
Conceptual Reviewomments •
Page 2
distinguish between individual sites that have peculiar situations. With this
introduction, the following comments related to public improvements are
offered:
A. A Traffic Impact Analysis ma}
define the level of service at tl
and the operating efficiency and
is the long range policy of the
curb cuts that are found to have
of arterial - arterial intersections.
be required.
Such a
study would
intersection of Taft
and
Mulberry
safety of the
existing
curb
cuts. It
Transportation
Department
to close
negative effect
on the
safe
operation
B. The issue of dedication of land for right-of-way was raised. Since
both Taft and Mulberry are classified as arterial streets, a 50 half
width road section, as measured from the centerline, would be
required. In addition, a typical 15 foot easement is usually required
adjacent to the right-of-way for a standard utility easement. As
mentioned at the review meeting, this dedication may cause a severe
hardship due to the limited availability of land for the business.
Staff respects this hardship and the issue of right-of-way and easement
dedication is unresolved. It is recommended that the applicant and
staff meet in the future to discuss this issue in greater detail.
C. The Street Oversizing Fee would be assessed against the property. The
exact amount is based on a formula that considers how much the
property has already paid and what the extent of the improvements
are. It may be that if the property has already paid into the Street
Oversizing Fund, then the fee would be pro rated based on the expan-
sion area only. Mr. Matt Baker of the Engineering Department would
assess the fee. It is recommended that Mr. Baker be contacted as soon
as possible. The current rate for commercial property is $14,000 per
acre.
7. There are two options for pursuing the expansion through the City review
process. First, you may apply as an expansion of a non -conforming use in
which the strict requirements of the Zoning Code must be followed. If the
strict requirements of the Zoning Code cannot be met, then a variance
must be filed with the Zoning Board of Appeals. Second, you may apply
as Planned Unit Development in which the Zoning Code may be treated as
a flexible document provided that the site plan is prepared to the level of
detail required in the P.U.D. Ordinance. Staff will be available to advise
on which process would work best for you.