HomeMy WebLinkAboutSWEETWATER BREWING - BEER GARDEN - FDP220003 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTProject Number:100-033 Location:Fort Collins, CO
Date:January 24, 2022 Total Acres:0.60
EROSION CONTROL MEASURE Units
Estimated
Quantity
Unit
Price
Total
Price
each 8 $100.00 $800.00
L.F.356 $1.10 $391.60
each 2 $125.00 $250.00
each 1 $300.00 $300.00
each 2 $200.00 $400.00
acre 0.11 $1,000.00 $110.00
TOTAL =$2,251.60
TOTAL =$3,377.40
TOTAL =$900.00
REQUIRED AMOUNT OF SECURITY =$3,377.40
NOTE: 'Total Acres' represents total disturbed area.
Concrete Washout Area
Silt Fence
- OR -
COST TO VEGETATE: TOTAL ACRES x ($1000/acre) x 1.5
(WHICHEVER IS GREATER)
Sweetwater Brewing Beer Garden
Erosion Control Cost Estimate
Vehicle Tracking Control Pads
AMOUNT OF SECURITY = 1.5 x $2,251.60
Vegetate Landscaped Areas
Inlet Protection
Rock Socks
=
=
P:\100-033\Drainage\Erosion\100-033_Erosion Escrow