HomeMy WebLinkAboutFORT COLLINS NISSAN-KIA - PDP210017 - DOCUMENT MARKUPS - ROUND 2 - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT 19 OLD TOWN SQUARE #238 | FORT COLLINS, CO 80524 | 970-530-4044 | www.unitedcivil.com F ORT C OLLINS N ISSAN -K IA Fossil Creek Subdivision Fort Collins, CO Prepared for: Fort Collins Nissan-Kia 5811 S College Ave Fort Collins, CO 80526 Date: October 6, 2021 P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO i U21004_Drainage Report October 6, 2021 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Fort Collins Nissan-Kia Fort Collins, Colorado Project Number: U21004 Dear Staff: United Civil Design Group, LLC. is pleased to submit this Preliminary Drainage Report for the Fort Collins Nissan-Kia site in Fort Collins, Colorado. In general, this report serves to document the stormwater impacts associated with the proposed improvements related to the existing site. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria contained in the Fort Collins Stormwater Criteria Manual (FCSCM). This report was prepared in compliance with technical criteria set forth in both the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual and the Fort Collins Stormwater Criteria Manual. If you should have any questions or comments as you review this report, please feel free to contact us at your convenience. Sincerely, United Civil Design Group Colton Beck, PE Kevin Brazelton, PE Project Engineer Principal P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO ii U21004_Drainage Report TABLE OF CONTENTS I. General Location and Description ...................................................................................................................................... 1 A. General Location & Existing Site Information ............................................................................................. 1 B. Description of Property ............................................................................................................................... 2 C. Project Description ..................................................................................................................................... 2 D. Floodplains .................................................................................................................................................. 3 II. Drainage Basins and Sub-Basins ......................................................................................................................................... 3 A. Major Basin Description .............................................................................................................................. 3 B. Sub-Basin Description ................................................................................................................................. 3 III. Drainage Design Criteria ..................................................................................................................................................... 3 A. Regulations ................................................................................................................................................. 3 B. Directly Connected Impervious Area (DCIA) ............................................................................................... 4 C. Hydrological Criteria ................................................................................................................................... 4 D. Hydraulic Criteria ........................................................................................................................................ 4 E. Modifications of Criteria ............................................................................................................................. 5 IV. Drainage Facility Design ..................................................................................................................................................... 5 A. General Concept ......................................................................................................................................... 5 B. Specific Details ............................................................................................................................................ 5 V. Erosion Control ................................................................................................................................................................. 12 VI. Conclusions ...................................................................................................................................................................... 13 A. Compliance with Standards ...................................................................................................................... 13 B. Drainage Concept...................................................................................................................................... 13 C. Stormwater Quality................................................................................................................................... 13 VII. References .................................................................................................................................................................... 14 APPENDICES APPENDIX A – Hydrology Calculations APPENDIX B – Hydraulic Calculations B.1 – Low Impact Development Calculations B.2 – Water Quality Calculations B.3 – Detention Pond and Orifice Calculations B.4 – Inlet Sizing Calculations (Reserved for Final Submittal) B.5 – Storm Pipe Calculations (Reserved for Final Submittal) B.6 – Curb Channel Calculations (Reserved for Final Submittal) APPENDIX C – Referenced Materials APPENDIX D – Drainage Exhibits P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 1 U21004_Drainage Report I.GENERAL LOCATION AND DESCRIPTION A.GENERAL LOCATION &EXISTING SITE INFORMATION The Fort Collins Nissan-Kia site (referred herein as “the site”) is located within the Fossil Creek Subdivision, situated in the northeast quarter of Section 11, T6N, R69W of the 6th P.M., City of Fort Collins, Larimer County, Colorado. The property, consisting of approximately 17.0 acres, is located immediately west of S College Ave. The site is split into two separate areas divided by Crestridge St. South of Crestridge St. exists a car dealership to be redesigned and redeveloped. This portion of the property is bounded by Crestridge St to the north, S College Ave to the east, a school facility and residential land to the west, and a commercial property to the south. On-site stormwater drains off-site undetained to either S College Ave, Crestridge St, or off-site to the west. The northern, undeveloped portion of the site is bounded by Crestridge St to the south, S College Ave to the east, and undeveloped land to the north and west. Stormwater on this portion of the site largely drains the northwest via sheet flow to Fossil Creek. A portion of the site adjacently north of Crestridge St drains to the south via sheet flow. All on-site runoff drains downstream within the City of Fort Collins Fossil Creek master drainage basin. Storm sewer infrastructure exists on-site south of Crestridge St and drains to the off-site to the east. This storm pipe exists as an irrigation bypass system. A City of Fort Collins Floodway and an Erosion Buffer are established with Fossil Creek. Also, existing on-site is an underground irrigation pipe owned by North Louden Ditch Company. This irrigation pipe drains from south to north through the site, ultimately to infrastructure that drains across S College Ave to the east. The on-site portion of this ditch lateral is planned to be relocated; however, this relocation is unrelated to the drainage design of the site. An existing residential subdivision and small commercial property are constructed to drain runoff to Venus Ave, conveyed through an existing wetland area west of Venus Ave to Lang Gulch and ultimately to Fossil Creek. FIGURE 1:SITE VICINITY MAP Smokey St S College AveBueno Dr Venus AveCrestridge St P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 2 U21004_Drainage Report B.DESCRIPTION OF PROPERTY The northern portion of the project site currently exists largely as grass/weed landscape. The southern portion of the site includes concrete and asphalt pavement, a commercial building, and gravel landscaping. In its historic condition, the site primarily sheet flows in two general directions: north and south, all conveyed to Fossil Creek. Below are summaries of key components of the site in its existing conditions. Land Use - The site’s current land use is commercial. Ground Cover - The northern portion of the site exists as grass/weed landscape. The weed/grass cover is good (ie., heavy or dense cover with nearly all ground surfaces protected by vegetation). The southern portion of the site is fully developed as consists largely of impervious hardscaping. Existing Topography – The northern, undeveloped portion of the site is bounded by Crestridge St to the south, S College Ave to the east, and undeveloped land to the north and west. Stormwater on this portion of the site largely drains the northwest via sheet flow to Fossil Creek. A portion of the site adjacently north of Crestridge St drains to the south via sheet flow. All on-site runoff drains downstream within with the City of Fort Collins Fossil Creek master drainage basin. Grades – In general, the northern portion of the site slopes northwesterly at approximately 1.0% to 15.0%; the southern portion of the site is sloped in several directions at approximately 1.0% to 3.0% Soil Type – The USDA’s Web Soil Survey shows that the site consists of “Type B”, “Type C”, and “Type D” soils. The Web Soil Survey indicates the site is comprised of Kim Loam (5.0 to 9.0% slopes), Kim Thedalund Loams (3.0 to 15.0% slopes), Midway Clay Loam (5.0% to 25.0% slopes) and Thedalund Loam (3.0% to 9.0% slopes). The on-site soils provide moderate infiltration and are suitable for development. Utilities – The following utilities exist adjacent to the site in Crestridge St, College Avenue and Venus Drive: potable water, sanitary sewer, natural gas, electric and telecommunications. Irrigation Facilities – An existing on-site underground irrigation pipe owned by North Louden Ditch Company. This irrigation pipe drains from south to north through the site, ultimately to infrastructure that drains across S College Ave to the east. Drainage Features and Storm Sewer – Storm sewer infrastructure exists on-site south of Crestridge St. North of the site exists the Fossil Creek. For development purposes, a City of Fort Collins Floodway and an Erosion Buffer are established with Fossil Creek. The western side of the site drains via sheet flow to the Lang Gulch. This portion of the Lang Gulch exists immediately upstream of Fossil Creek and is accounted for within the City of Fort Collins Floodway boundary. C.PROJECT DESCRIPTION The proposed Fort Collins Nissan-Kia site improvements are limited to approximately 19.0 acres of disturbance. South of Crestridge St, the proposed site improvements consist of the demolition of the existing car dealership building and associated paving, and ultimately the construction of a new building with associated drive lanes and inventory parking lot. North of Crestridge St, site improvements include the extension of Venus Ave, and the addition of a car dealership building and associated drive lanes and inventory parking lot. Designed with the proposed commercial buildings and paving include underground utilities, underground water quality, and underground detention. On-site stormwater south of Crestridge Dr is designed to be conveyed via storm sewer to proposed drainage facilities west of Venus Ave. In addition to an existing school facility adjacent to the site at the intersection of the Venus Ave and Crestridge St, the existing Skyview Subdivision to the south is associated with the site in regard to stormwater runoff. In its existing state, this development along with the school facility drains approximately 3.7-acres to an existing on-site wetland area. With a proposed relocation of the mentioned wetlands, runoff is now designed to be conveyed to a proposed on-site detention facility. P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 3 U21004_Drainage Report D.FLOODPLAINS The proposed development is not in a FEMA designated floodplain. According to the FEMA Flood Insurance Rate Map Panel (08069C1000F), the site is zoned in an area of minimal flood hazard. The FEMA FIRM Map is included in the appendix. West and Northwest of the site exists a “High Risk – Floodway” boundary along Fossil Creek, established by the City of Fort Collins. This boundary is provided on the Drainage Plan (see Appendix D) and a City of Fort Collins floodplain map is included in Appendix C. FIGURE 2:FLOODPLAIN MAP II.DRAINAGE BASINS AND SUB-BASINS A.MAJOR BASIN DESCRIPTION The proposed development is located within the Fossil Creek Basin and will adhere to the Fossil Creek Basin Master Drainage Plan. In conformance with master plan, the site is designed to release on-site runoff at a rate not to exceed 0.2 cfs/acre. B.SUB-BASIN DESCRIPTION Historically the southern portion of the property has been utilized for commercial purposes. The site is designed to operate in a similar fashion (i.e., commercial), though with significant site improvements. Despite these significant improvements, the proposed site is largely designed to conform to existing drainage patterns – downstream within the Fossil Creek Basin. In its existing condition, stormwater on the northern portion of the site is largely conveyed the north to Fossil Creek. The southern portion of the property drains in a multitude of directions: west to a neighboring property, east to US 287, and north to Crestridge St. In its improved condition, on-site runoff is intended to drain to multiple downstream underground water quality and detention facilities by way of sheet flow, swales, pans, inlets, and storm sewer. III.DRAINAGE DESIGN CRITERIA A.REGULATIONS The design criteria for this study are directly from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards Manual and the Urban Storm Drainage Criteria Manuals Volumes 2, and 3 (referred to herein as USDCM). P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 4 U21004_Drainage Report B.DIRECTLY CONNECTED IMPERVIOUS AREA (DCIA) With the adoption of the USDCM, the City has also adopted the “Four Step Process” that is recommended in Volume 3 of the USDCM in selecting structural BMPs for the redeveloping urban areas. The following portions of this summary describe each step and how it has been utilized for this project: Step 1 – Employ Runoff Reduction Practices The objective of this step is to reduce runoff peaks and volumes and to employ the technique of “minimizing directly connected impervious areas” (MDCIA). This project accomplishes this by: Routing the roof and pavement flows through a bioretention facility, underground water quality treatment/infiltration facilities and vegetated swales to increase time of concentration, promote infiltration and provide water quality. Step 2 – Provide Water Quality Capture Volume (WQCV) The objective of providing WQCV is to reduce the sediment load and other pollutants that exit the site. For this project WQCV is provided within underground treatment facilities, a bioretention pond and an extended detention pond. Step 3 – Stabilize Drainageways The site exists adjacent to lang Gulch. A storm outfall is proposed immediately upstream of the Lang Gulch; stabilization is planned with this pipe connection. As a result of the pipe connection, additional stabilizing will be provided via the elimination of existing runoff from traveling down the sides of the channel. This project will pay stormwater development and stormwater utility fees which the City uses, in part, to maintain the stability of the City drainageway systems. Step 4 – Consider Need for Site Specific and Source Control BMPs Site specific and source control BMPs are generally considered for large industrial and commercial sites. The redevelopment of the existing site will include multiple site specific and source controls, including: Covered storage areas for vehicles and materials. Dedicated vehicle maintenance areas within each build with appropriate internal waste collection systems. Dedicated maintenance personnel providing landscape maintenance and snow and ice management. Bioretention water quality control ponds. C.HYDROLOGICAL CRITERIA City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, provided by Figure RA-16 of the Fort Collins Stormwater Criteria Manual, are utilized for all hydrologic computations related to the site in its existing/historic and proposed conditions. Since this site is relatively small and does not have complex drainage basins, the peak flow rates for design points have been calculated based on the Rational Method as described in the USDCM and the City of Fort Collins Stormwater Criteria Manual (FCSCM) with storm duration set equal to the time of concentration for each sub-basin. This method was used to analyze the developed runoff from the 10-year (minor) and the 100-year (major) storm events. The Rational Method is widely accepted for drainage design involving small drainage areas (less than 160 acres) and short time of concentrations. Runoff coefficients are assumed based on impervious area and are given in the Appendices. D.HYDRAULIC CRITERIA The developed site will convey runoff to the proposed pond or underground treatment facility via swales, concrete channels, and pipes. The City of Fort Collins Stormwater Criteria Manual (FCSCM) and USDCM are referenced for all hydraulic calculations. In addition, the following computer programs are utilized: Storm Sewer Extension for AutoCAD Civil3D Hydraflow Express Extension for AutoCAD Civil3D UD-Inlet by UDFCD Drainage conveyance facility capacities proposed with the development project, including storm sewer, swales, and inlet capacities, are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s Urban Storm Drainage Criteria Manual (UDFCD). P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 5 U21004_Drainage Report E.MODIFICATIONS OF CRITERIA The site improvements are proposed with the omission of variances to City of Fort Collins criteria. IV.DRAINAGE FACILITY DESIGN A.GENERAL CONCEPT Developed runoff is designed to be conveyed in a safe and effective manner via swales, concrete channels, and storm sewer systems/inlets. Stormwater is designed to be released within the Fossil Creek Basin. Runoff that drains off-site to the west (south of Crestridge St) is heavily reduced with the proposed site. Runoff from the site in its improved condition is primarily conveyed to underground water quality and detention facilities. Due to grading constraints, not all on-site runoff is fully detained - these areas are considered in the overall release rate from the site. B.SPECIFIC DETAILS Hydrology As previously stated, hydrology from the developed site is designed to comply with criteria set forth in the City of Fort Collins Stormwater Criteria Manual. Referenced tables, charts, formulas, etc. are included in the appendices. The area, time of concentration, and runoff of each proposed sub-basin is summarized in Appendix A. The following information outlines the basin characteristics and drainage patterns for each basin. Existing Basins The following basins provide proposed drainage delineations for the site in its existing condition. Refer to Appendix A for hydrology computations and Appendix D for visual representation of existing basins. Basin EX1 Basin EX1 (refer to attached Existing Drainage Map) represents runoff associated with CDOT Right-of-Way in College Ave. This basin consists of concrete paving, asphalt paving, gravel, and landscaping. Runoff within this basin is conveyed north along College Ave and ultimately to Fossil Creek. Basin EX2 Basin EX2 represents on-site runoff that drains to College Ave. This basin consists of concrete paving, asphalt paving, gravel, and landscaping. Runoff within this basin is conveyed College Ave (i.e., Basin EX1) via sheet flow and concrete curb. Basin EX3 Basin EX3 represents runoff associated with CDOT Right-of-Way in College Ave. This basin consists of concrete paving, asphalt paving, gravel, and landscaping. Runoff within this basin is conveyed south along College Ave within the Fossil Creek Basin. Basin EX4 Basin EX4 represents on-site runoff that drains to College Ave. This basin consists of concrete paving, asphalt paving, gravel, and landscaping. Runoff within this basin is conveyed to College Ave (i.e., Basin EX3) via sheet flow and concrete curb. Basin EX5 Basin EX5 represents on-site runoff that drains to Fossil Creek. This basin is to remain undeveloped, consisting of landscaped area. Runoff within this basin is conveyed to the northwest, designed to drain to off-site to a culvert system associated with Fossil Creek. Basin EX6 Basin EX6 represents on-site runoff that drains to the Lang Gulch, and ultimately Fossil Creek. A portion of this basin is developed and is designed to drain to existing wetlands located around the southwestern region of the site; other undeveloped areas drain directly to the Lang Gulch via sheet flow. This basin consists of concrete paving, asphalt paving, gravel, and landscaping. P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 6 U21004_Drainage Report Basin OS1 Basin OS1 is a drainage basin associated with and adjacent commercial property and the Skyview Subdivision, located immediately south of the site. This basin is fully developed and drains on-site via sheet flow along Venus Ave. This basin accounts for approximately 3.7-acres of off-site drainage. Basin OS2 Basin OS2 represents off-site runoff that drains to Fossil Creek. This basin is to remain undeveloped, consisting of landscaped area. Similar to Basin EX5, runoff within this basin is conveyed to the northwest to a culvert system associated with Fossil Creek. Proposed Basins The following basins provide proposed drainage delineations for the site in its improved condition. Refer to Appendix A for hydrology computations and Appendix B for calculations related to Detention, Water Quality, Low Impact Development, and other hydraulic features. Basin A Sub-basins A1-A16 (see Drainage Plans attached) are generally located around the southern region of the site. These basins consist of roofs, asphalt and concrete paving, and landscaping. Runoff within these Basins is conveyed to a Bioretention Pond (Pond A2) via sheet flow, curb, inlets, and storm sewer. Runoff conveyed to the Bioretention Pond is further discharged southwest to a detention facility (Pond A1). Runoff from Basin A is released to Lang Gulch and ultimately to Fossil Creek. Basin B Sub-basins B1-B6 represent on-site drainage basins generally located around the central region of the site. These basins consist of roofs, asphalt and concrete paving, and landscaping. Runoff within these basins is conveyed to Detention Pond B1 by way of multiple water quality treatment facilities, namely a bioretention pond (i.e., Pond B2) and a wetland channel. Runoff from Basin B is released to Lang Gulch via Pond A1 and ultimately to Fossil Creek. Basin C Sub-basins C1-C4 represent on-site drainage basins generally located around the northern region of the site. These basins consist of roofs, asphalt and concrete paving, and landscaping. Runoff within Basins C3 and C4 is conveyed to a proposed underground water quality and detention pond facility (Pond C) via inlets and storm sewer. Basin C1 and C2 (i.e., Venus Ave) is conveyed to storm sewer in Venus Ave, treated with Snouts within the inlets and released downstream to Fossil Creek. Basin D Basin D1 represents CDOT Right-of-Way in College Ave at the Southeast corner of the site. In accordance with established drainage patterns, this area of College Ave drains south along College Ave, ultimately to Fossil Creek. The basin consists of concrete pavement, asphalt pavement, and landscaping. Basin E Basin E1, similar to Basins D1, represents CDOT Right-of-Way in College Ave; however, this portion of College Ave drains to the north. In accordance with established drainage patterns, this area of College Ave drains north along College Ave, ultimately to Fossil Creek. The basin consists of concrete pavement, asphalt pavement, and landscaping. Basin OS1 Basin OS1 is a drainage basin associated with and adjacent commercial property and the Skyview Subdivision, located immediately south of the site. This basin is fully developed and drains on-site via sheet flow along Venus Ave. This basin accounts for approximately 3.7-acres of off-site drainage. In its improved condition, Venus Ave is designed to convey Basin OS1 to a proposed detention facility (i.e., Pond A1) via storm sewer infrastructure. P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 7 U21004_Drainage Report Basin OS2 Basin OS2 represents off-site runoff that drains to Fossil Creek. This basin is to remain similar to its existing condition; however, an additional 12” culvert system is provided at the downstream Fossil Creek Trail. Stormwater Quality I.Bioretention Bioretention is designed to remove sediment and pollution from stormwater runoff via infiltration through an engineered sand media. This slows the conveyance rate of storm water runoff, reduces runoff and provides a flow path across a vegetated surface. Bioretention ponds are proposed with the site improvements and are utilized to convey and treat stormwater prior to release to downstream proposed detention facilities and ultimately Fossil Creek. Bioretention Pond A2 is designed to provide approximately 8,020-sf of bioretention area. Provided 12-inches of depth, the bioretention pond provides an approximate volume of 6,195-cf – this volume exceeds the required WQCV for Basin A2 and Basins A4-16 (6,150-cf). Ponding above the initial 12-inches of pond depth is intended for head purposes to discharge the 100-year event through the outlet structure. Runoff is ultimately conveyed to the adjacent Detention Pond A1. Below is a summary of Bioretention Pond A2: Pond Bottom of Pond Elevation Bioretention WSEL Bioretention Volume Required (cf) Bioretention Volume Provided (cf) Pond A2 5009.00 5010.00 6,150 6,195 Bioretention Pond B2 is designed to provide about 780-sf of bioretention area. Provided 12-inches of depth, the bioretention pond provided an approximate volume of 1,430-cf – this volume exceeds the required WQCV for Basins A2-16 (427-cf). Ponding above the initial 12-inches of pond depth is intended for head purposes to discharge the 100-year event through the outlet structure. Below is a summary of the bioretention pond, recognized as Pond B2: Pond Bottom of Pond Elevation Bioretention WSEL Bioretention Volume Required (cf) Bioretention Volume Provided (cf) Pond B2 5011.80 5012.80 427 1,430 II.Underground Water Quality An underground water quality facility is designed to divert storm water runoff during the water quality event and treat the flows through infiltration prior to being collected within an underdrain system. This provides for the removal of sediment and other pollutants from the runoff while also promoting infiltration. Underground water quality chambers are designed to collect and treat storm water runoff from Basins C3-C4 prior to being released to downstream storm sewer associated with Basin C. The underground water quality system, designated as “Pond C” is designed with a volume of 3,730-cf which exceeds the minimum design requirements for the area (2,444-cf). Below is a summary table for water quality related to Basins C3 and C4. Refer to Appendix B for additional information. Pond WQCV Required (cf) WQCV Provided (cf) Pond C1 2,444 3,730 P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 8 U21004_Drainage Report III.Extended Detention - WQCV The proposed site improvements include water quality for off-site Basin OS1. This 3.70-acre area necessitates a WQCV approximately 2,985-cf. Pond A1 also considers water quality for Basin A3 (i.e., 571-cf). Pond A1 is sufficiently sized to provide this combined treatment volume of 3,557-cf. Below is a summary table for water quality related to Basins A3 and OS1. Refer to Appendix B for additional information. Pond WQCV Necessary (cf) WQCV Provided (cf) Pond A1 3,557 4,470 IV.Structural Water Quality Treatment Snouts are provided with inlets related to Basin C1 and C2; runoff from these basins are designed be released from the site undetained. These structures are designed to act as temporary water quality features. Proposed immediately downstream of the mentioned storm infrastructure including snouts (i.e, in series with the structural water quality treatment) is a grass swale and buffer area. This area is intended to provide additional water quality treatment until future development is pursued on the neighboring property to the north. With future development of this downstream, off-site area, the landowner of the neighboring property will be required to replace the temporary grass swale and buffer area with a permanent water quality feature adequate to treat Basins C1 and C2. Low Impact Development (LID) In December of 2015, Fort Collins City Council adopted the revised Low Impact Development (LID) policy and criteria which requires developments within City limits to meet certain enhanced stormwater treatment requirements in addition to more standard treatment techniques. The proposed development will be required to meet the newly adopted LID criteria which requires the following: -Treat no less than 75% of any newly added impervious area using one or a combination of LID techniques. -Treat no less than 50% of any newly added impervious area using one or a combination of LID techniques when at least 25% of any newly added pavement is provided with permeable pavement. The following measures are implemented with this proposed development: I.Underground Water Quality Basins C3-C4, combined for 124,235-sf of proposed impervious area, are designed to be routed through an underground water quality system located in the northern region of the site. The proposed impervious area treated through underground water quality includes proposed parking, driveway, and roof areas. The underground water quality system is designed with an overall capacity of 3,896-cf which exceeds the minimum design requirements for the area. Refer to Appendix B for additional information. II.Bioretention Basins A2-A16, accounting for 210,565-sf of proposed impervious area, are designed to be conveyed to Bioretention Pond A2. All new or modified impervious area related to Basins A2-A16 is to be treated by Pond A2. The entirety of Basin B4, accounting for 16,368-sf of newly proposed impervious area, is designed to be conveyed to and treated by Bioretention Pond B2. III.Wetland Channel Basins B1-B3 and B5-B6, accounting for approximately 69,000-sf of newly proposed impervious area, is designed to drain to and treated by a wetland channel. This channel is proposed within Detention Pond B1. P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 9 U21004_Drainage Report Provided that the application of proposed pervious pavers is below 25% of the total of newly added pavement, the site is required to treat no less than 75% of added impervious area. Provided the LID measures noted above, approximately 76.1% of the site is treated in its improved condition. Refer to Appendix B for calculations Detention I.Pond A1 The design of Pond A1 is intended for extended detention purposes for all ‘A” Basins and Basin OS1. This detention facility is designed to release captured runoff at a rate of 3.50-cfs in the 100-yr event, significantly reducing the existing undetained release of Basin OS1 to Lang Gulch and ultimately Fossil Creek. For emergency situations, the pond is designed to spill stormwater through the emergency overflow structure which is located at the western end of the detention pond. Water discharged from the emergency overflow will be conveyed directly to the Lang Gulch. Below is a summary of Pond A1 utilizing the FAA method: Pond Bottom of Pond Detention WSEL Top of Pond Elevation Detention Volume Required (ac-ft) Detention Volume Provided (ac-ft) 100-yr Release Rate (cfs) Pond A1 5002.60 5010.00 5011.00 1.99 2.12 3.50 II.Pond B1 The design of Pond B1 is intended for extended detention purposes for all ‘B” Basins. This detention facility is designed to release captured runoff at a rate of 2.00-cfs in the 100-yr event. For emergency situations, the pond is designed to spill stormwater through the emergency overflow structure which is located at the southwestern end of the detention pond. Water discharged from the emergency overflow will be conveyed directly to the Lang Gulch. Below is a summary of Pond B1 utilizing the FAA method: Pond Bottom of Pond WQCV WSEL Detention WSEL Top of Pond Elevation Detention Volume Required (ac-ft) Detention Volume Provided (ac-ft) 100-yr Release Rate (cfs) Pond B1 5002.70 5005.00 5009.00 5010.00 0.49 0.88 2.00 III.Pond C1 Runoff captured within Basins C3-C4 are routed to underground chambers, designed to collect and detain storm water runoff prior to being released to Fossil Creek. Stormwater events that exceed the water quality event (see section Stormwater Quality narrative above) are designed to exceed the capacity of the system’s isolator row and be further conveyed throughout the underground facility to other chambers for detention purposes. The minimum 100-yr release via underground detention is established by a release rate per chamber to an underdrain – this release rate is limited by flow through geotextile with accumulated sediment. Below is a summary of Pond C1 utilizing the FAA method: Pond Detention Volume Required (ac-ft) Detention Volume Provided (ac-ft) 100-yr Release Rate (cfs) Pond C1 0.55 0.56 2.40 P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 10 U21004_Drainage Report Drainage Summary A basin summary table is included below: Existing/Historic Basins Basin Area %I C2 C100 Q2 Q100 (acre) (cfs) (cfs) EX1 2.12 65.0% 0.70 0.87 3.40 14.85 EX2 1.70 60.6% 0.67 0.84 3.05 13.30 EX3 0.41 82.1% 0.82 1.00 0.96 4.12 EX4 0.38 88.9% 0.89 1.00 0.96 3.80 EX5 7.97 2.0% 0.25 0.31 3.21 13.95 EX6 6.44 24.7% 0.41 0.52 5.12 22.35 OS1 3.70 55.6% 0.64 0.80 6.33 27.60 OS2 5.75 2.0% 0.25 0.31 2.37 10.33 Proposed Basins Basin Area %I C2 C100 Q2 Q100 (acre) (cfs) (cfs) A1 0.95 2.0% 0.25 0.31 0.57 2.49 A2 0.41 2.0% 0.25 0.31 0.26 1.13 A3 0.45 72.9% 0.76 0.95 0.98 4.27 A4 0.45 86.7% 0.86 1.00 1.10 4.50 A5 0.48 100.0% 0.95 1.00 1.30 4.77 A6 0.14 95.5% 0.92 1.00 0.36 1.37 A7 0.38 62.3% 0.68 0.85 0.74 3.25 A8 0.09 100.0% 0.95 1.00 0.26 0.94 A9 0.18 100.0% 0.95 1.00 0.48 1.76 A10 0.50 75.6% 0.78 0.97 1.11 4.86 A11 0.05 100.0% 0.95 1.00 0.13 0.47 A12 0.81 77.7% 0.79 0.99 1.83 7.97 A13 0.48 90.0% 0.95 1.00 1.31 4.80 A14 0.57 94.2% 0.82 1.00 1.46 5.62 A15 0.74 93.3% 0.90 1.00 1.90 7.36 A16 0.60 90.0% 0.95 1.00 1.63 5.98 B1 0.95 2.0% 0.25 0.31 0.60 2.60 B2 0.99 78.4% 0.80 0.99 2.25 9.81 B3 0.42 100.0% 0.95 1.00 1.13 4.14 B4 0.59 63.3% 0.69 0.86 1.16 5.08 B5 0.22 61.8% 0.68 0.85 0.43 1.88 B6 0.30 77.2% 0.79 0.98 0.68 2.97 C1 0.61 84.9% 0.84 1.00 1.46 6.07 C2 0.83 58.8% 0.66 0.82 1.56 6.81 C3 2.73 91.9% 0.89 1.00 6.94 27.15 C4 0.38 90.0% 0.95 1.00 1.04 3.82 D1 0.49 67.9% 0.72 0.90 1.00 4.37 E1 2.12 77.4% 0.79 0.99 4.47 19.48 OS1 3.70 55.6% 0.64 0.80 6.33 27.60 OS2 5.84 2.0% 0.25 0.31 2.41 10.49 P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 11 U21004_Drainage Report 100-year Event: Proposed Runoff to College Ave Basin Designation Release Rate (cfs) Basin D1 4.37 Basin E1 19.48 Proposed Runoff 23.85 Refer to Appendix D for an Existing Drainage Map that provides a visual representation of Existing Basins EX1-EX6 and OS1- OS2. In the site’s existing condition, nearly 2.1-acres (i.e., Basin EX2 and EX4) of on-site runoff drains undetained to College Ave. In addition to on-site basins EX2 and EX4, Basins EX1 and EX2 (i.e., College Ave) also contribute runoff to the west half of College Ave – the entirety of Basins EX1-EX4 account for approximately 36.07-cfs in the 100-year event. In the site’s improved condition, this 2.1-acre area is captured and conveyed to on-site detention; runoff related to all “A” basins are detained. Moreover, the improved site is designed to convey 0.35-acres of College Ave runoff (see Basin A10). Despite the addition of a drive lane to College Ave (i.e., additional impervious area), there is a significant reduction in runoff conveyed by College Ave in the 100-year Event. The tables below summarize the impacts of the proposed improvements to College Ave relative to the site’s existing condition. 100-year Event: Existing Runoff to College Ave In the site’s its improved condition, the total runoff related to College Ave during the 100-year event is significantly reduced. In relation to the Fossil Creek Basin, the site is limited to a 0.2-cfs/acre release rate in its improved condition – this amounts to 3.10-cfs over 15.51 acres (i.e., sum of Basins A, B, and C). Provided the 3.7-acre conveyance and detention of off-site runoff (i.e., Basin OS1), the overall release to Fossil Creek considers the 27.60-cfs that Basin OS1 produces in the 100-year event. Thus, the total maximum on-site release to Fossil Creek is limited to 30.70-cfs. The proposed drainage design limits the overall release to Fossil Creek to 20.77-cfs. Although Basins C1 and C2 are released undetained to Fossil Creek, the improved site is designed to overdetain for Basin OS1 and limit the site’s overall release to Fossil Creek. The tables below summarize the impacts of the proposed improvements to Fossil Creek relative to the site’s limiting criteria. 100-year Event: Allowed Release to Fossil Creek Basin Designation Release Rate (cfs) Basin EX1 14.85 Basin EX2 13.30 Basin EX3 4.12 Basin EX4 3.80 Existing Runoff 36.07 Basin Designation Release Rate (cfs) Basin OS1 27.60 0.2 cfs/acre 3.10 Total Release 30.70 100-yr Event: Proposed On-Site Release to Fossil Creek Basin/Pond Designation Release Rate (cfs) Pond A1 3.50 Pond B1 2.00 Pond C1 2.40 Basin C1 6.07 Basin C2 6.81 Total Release 20.77 P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 12 U21004_Drainage Report Standard Operating Procedures (SOPs) In order for physical stormwater Best Management Practices (BMPs) to be effective, proper maintenance is essential. Maintenance includes both routinely scheduled activities, as well as non-routine repairs that may be required after large storms, or as a result of other unforeseen problems. Standard Operating Procedures should clearly identify BMP maintenance responsibility. BMP maintenance is typically the responsibility of the entity owning the BMP. Identifying who is responsible for maintenance of BMPs and ensuring that an adequate budget is allocated for maintenance is critical to the long-term success of BMPs. Maintenance responsibility may be assigned either publicly or privately. For this project, the privately owned BMPs including grass swales, underground water quality and detention, and the bioretention pond, are to be maintained by the property owner. Storm Sewers There are multiple storm sewer networks proposed with the site improvements. Several networks including roof drains, storm drains, and underground water quality and detention features are proposed ultimately with outfalls to Fossil Creek. Proposed storm sewer systems are both private and public, designed to accommodate the flows from the 100-year storm event. Hydraulic computations of these systems will be provided with the initial final compliance submittal. Inlets There are multiple inlets proposed with the site improvements, including Nyloplast drain basins and Type R inlets. Type R Inlets are designed throughout the site on-grade and in sump to capture developed runoff for detention. On-site drain basins are designed in a sump condition and are designed to convey runoff produced within smaller interior basins to on-site bioretention and detention facilities. All inlets on the site are sized to provide adequate capacity and convey the 100-year storm event. Hydraulic computations of these systems will be provided with the initial final compliance submittal. V.EROSION CONTROL A separate Erosion Control Report / Storm Water Management Plan (SWMP) will be prepared for the site in accordance with the Stormwater Discharge Permit for Colorado Department of Public Health and Environment as the site will disturb an area greater than 1-acre. The Erosion Control Report will be completed during the Final Compliance phase of the project and will include more detailed information on the sediment and erosion control items for this project. It is intended that the proposed improvements will comply with Erosion Control Criteria per the FCSCM, and all Erosion Control Materials will be provided with the Final Drainage Report. At a minimum, the following temporary BMP’s will be installed and maintained to control on-site erosion and prevent sediment from traveling off-site during construction: Silt Fence – a woven synthetic fabric that filters runoff. The silt fence is a temporary barrier that is placed at the base of a disturbed area. Vehicle Tracking Control – a stabilized stone pad located at points of ingress and egress on a construction site. The stone pad is designed to reduce the amount of mud transported onto public roads by construction traffic. Riprap – Riprap will be used downstream of all storm sewer outfalls to control erosion of the receiving channels. Inlet Protection – acts as a sediment filter. It is a temporary BMP and requires proper installation and maintenance to ensure their performance. Straw Wattles – wattles act as a sediment filter in swales around inlets. They are a temporary BMP and require proper installation and maintenance to ensure their performance. Slope Protection – Slopes should be terraced using a “tracked” vehicle, run perpendicular to slope to inhibit rill/gulley erosion. The contractor shall store all construction materials and equipment and shall provide maintenance and fueling of equipment in confined areas on-site from which runoff will be contained and filtered. Temporary Best Management Practices (BMP’s) will be inspected by the contractor at a minimum of once every two weeks and after each significant storm event. P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 13 U21004_Drainage Report VI.CONCLUSIONS A.COMPLIANCE WITH STANDARDS Storm drainage calculations have followed the guidelines provided by the Urban Storm Drainage Criteria Manuals Volumes 1, 2 and 3 and the City of Fort Collins Stormwater Criteria Manual. B.DRAINAGE CONCEPT The drainage system has been designed to convey the runoff to the designated design points and the existing public infrastructure in an effective, safe manner. No negative impacts are anticipated to the City of Fort Collins Master Drainage Plan or to downstream properties or infrastructure due to the proposed improvements. C.STORMWATER QUALITY Multiple long-term stormwater quality measures have been selected for the site that will provide treatment of stormwater prior it to being discharged from the site. For this site this includes grass swales, a bioretention pond, and underground water quality. P RELIMINARY D RAINAGE R EPORT F ORT C OLLINS N ISSAN -K IA F ORT C OLLINS ,CO 14 U21004_Drainage Report VII.REFERENCES 1.City of Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, November 2017. 2.Urban Storm Drainage Criteria Manual Volume 1 and 2, Urban Drainage and Flood Control District, Denver, Colorado, June 2001, Revised April 2008. 3.Natural Resources Conservation Service Web Soil Survey at: websoilsurvey.nrcs.usda.gov/app 4.Preliminary Flood Insurance Rate Map, FEMA, Panel 2079E, https://hazards.fema.gov/femaportal/ 5.Stormwater Discharges Associated with Construction Activity, Stormwater Management Plan Preparation Guides, State of Colorado, www.colorado.com A PPENDIX A D RAINAGE C ALCULATIONS RUNOFF COEFFICIENTS AND % IMPERVIOUS Nissan Dealership, Fort Collins, CO Basin Design Pt.Composite NRCS Soil Total Total Roof (1)Asphalt Concrete(1)Gravel(1)Lawns(1)Imperviousness Type C2 C100 acres %I = 90%%I = 100%%I = 100%%I =40%%I=2%(%I) C=0.95 C=0.95 C=0.95 C=0.50 C=0.25 sf sf sf sf sf sf EX1 EX1 2.12 92,255 54,030 3,425 4,665 30,135 65.0%C/D 0.70 0.87 EX2 EX2 1.70 74,165 4,185 5,225 32,995 6,200 25,560 60.6%C/D 0.67 0.84 EX3 EX3 0.41 18,045 10,235 2,435 5,375 -82.1%C/D 0.82 1.00 EX4 EX4 0.38 16,625 4,145 10,100 2,380 -88.9%C/D 0.89 1.00 EX5 EX5 7.97 347,140 347,140 2.0%C/D 0.25 0.31 EX6 EX6 6.44 280,470 7,095 15,390 42,290 2,450 213,245 24.7%C/D 0.41 0.52 OS1 OS1 3.70 161,165 18,000 52,870 19,150 71,145 55.6%C/D 0.64 0.80 OS2 OS2 5.75 250,410 250,410 2.0%C/D 0.25 0.31 Basin Design Pt.Composite NRCS Soil Total Total Roof (1)Asphalt Concrete(1)Pavers(1)Lawns(1)Imperviousness Type C2 C100 acres sf %I = 90%%I = 100%%I = 100%%I =40%%I=2%(%I) C=0.95 C=0.95 C=0.95 C=0.50 C=0.25 sf sf sf sf sf A1 A1 0.95 41,480 41,480 2.0%C/D 0.25 0.31 A2 A2 0.41 17,975 17,975 2.0%C/D 0.25 0.31 A3 A3 0.45 19,800 10,510 3,805 5,485 72.9%C/D 0.76 0.95 A4 A4 0.45 19,715 15,515 1,530 2,670 86.7%C/D 0.86 1.00 A5 A5 0.48 20,865 20,865 -100.0%C/D 0.95 1.00 A6 A6 0.20 8,745 5,145 575 3,025 66.1%C/D 0.71 0.88 A7 A7 0.38 16,710 9,235 1,045 6,430 62.3%C/D 0.68 0.85 A8 A8 0.09 4,110 4,110 -100.0%C/D 0.95 1.00 A9 A9 0.18 7,695 7,200 495 -100.0%C/D 0.95 1.00 A10 A10 0.50 21,945 14,915 1,565 5,465 75.6%C/D 0.78 0.97 A11 A11 0.05 2,065 2,065 -100.0%C/D 0.95 1.00 A12 A12 0.81 35,285 26,630 635 8,020 77.7%C/D 0.79 0.99 A13 A13 0.48 21,030 21,030 -90.0%C/D 0.95 1.00 A14 A14 0.57 24,620 23,160 1,460 94.2%C/D 0.91 1.00 A15 A15 0.74 32,215 30,000 2,215 93.3%C/D 0.90 1.00 A16 A16 0.60 26,200 26,200 -90.0%C/D 0.95 1.00 B1 B1 0.95 41,250 41,250 2.0%C/D 0.25 0.31 B2 B2 0.99 43,197 33,665 9,532 78.4%C/D 0.80 0.99 B3 B3 0.42 18,110 18,110 -100.0%C/D 0.95 1.00 B4 B4 0.59 25,857 14,374 1,800 9,683 63.3%C/D 0.69 0.86 B5 B5 0.22 9,748 4,705 1,240 3,803 61.8%C/D 0.68 0.85 B6 B6 0.30 13,195 8,885 1,240 3,070 77.2%C/D 0.79 0.98 -0.00 ---- C1 C1 0.61 26,565 16,845 5,625 4,095 84.9%C/D 0.84 1.00 C2 C2 0.83 36,362 15,795 5,275 15,292 58.8%C/D 0.66 0.82 C3 C3 2.73 118,860 100,000 9,000 9,860 91.9%C/D 0.89 1.00 C4 C4 0.38 16,710 16,710 -90.0%C/D 0.95 1.00 D1 D1 0.49 21,220 12,365 1,900 6,955 67.9%C/D 0.72 0.90 E1 E1 2.12 92,490 59,100 12,035 21,355 77.4%C/D 0.79 0.99 OS1 OS1 3.70 161,165 18,000 52,870 19,150 71,145 55.6%C/D 0.64 0.80 OS2 OS2 5.84 254,355 254,355 2.0%C/D 0.25 0.31 Notes: (1) Recommended % Imperviousness Values per USDCM Volume 1, Table 6-3. (2) Runoff C is based on %I and NRCS soil group per UDFCD Volume 1, Table 6-4. Areas Composite Runoff Coefficients (2) Composite Runoff Coefficients (2)Areas Existing Basins Proposed Basins Date: 10/5/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP TIME OF CONCENTRATION Nissan Dealership, Fort Collins, CO Basin Design Pt.Area C2(1)Length Slope ti(2)Length Slope Cv Velocity (3)tt(4)Check tc?Total Length tc(5) acres ft %min ft %fps min min Urban?ft min min EX1 EX1 2.12 0.70 50 2.2%4.0 1180 2.3%20 3.0 6.6 10.5 Yes 1230 17 10.5 EX2 EX2 1.70 0.67 160 2.8%7.0 155 1.0%20 2.0 1.3 8.3 Yes 315 12 8.3 EX3 EX3 0.41 0.82 40 2.0%2.6 730 2.5%20 3.2 3.8 6.4 Yes 770 14 6.4 EX4 EX4 0.38 0.89 45 2.0%2.1 165 3.5%20 3.7 0.7 2.8 Yes 210 11 5.0 EX5 EX5 7.97 0.25 500 10.0%16.1 320 2.0%7 1.0 5.4 21.4 No --21.4 EX6 EX6 6.44 0.41 265 1.8%16.6 376 2.6%20 3.2 1.9 18.6 Yes 641 14 13.6 OS1 OS1 3.70 0.64 65 2.0%5.3 475 2.0%20 2.8 2.8 8.1 Yes 540 13 8.1 OS2 OS2 5.75 0.25 380 10.0%14.0 360 2.0%7 1.0 6.1 20.1 No --20.1 Basin Design Pt.Area C2(1)Length Slope ti(2)Length Slope Cv Velocity (3)tt(4)Check tc?Total Length tc(5) acres ft %min ft %fps min min Urban?ft min min A1 A1 0.95 0.25 120 14.0%7.0 160 1.0%15 1.5 1.8 8.8 Yes 280 12 8.8 A2 A2 0.41 0.25 45 12.0%4.5 170 0.5%15 1.1 2.7 7.2 Yes 215 11 7.2 A3 A3 0.45 0.76 40 2.0%3.1 210 1.5%20 2.4 1.4 4.6 Yes 250 11 5.0 A4 A4 0.45 0.86 70 2.6%2.7 170 2.8%20 3.3 0.8 3.5 Yes 240 11 5.0 A5 A5 0.48 0.95 95 3.9%1.7 100 0.6%20 1.5 1.1 2.8 Yes 195 11 5.0 A6 A6 0.20 0.71 65 2.2%4.4 90 2.0%20 2.8 0.5 4.9 Yes 155 11 5.0 A7 A7 0.38 0.68 45 3.0%3.5 70 1.0%20 2.0 0.6 4.1 Yes 115 11 5.0 A8 A8 0.09 0.95 45 2.9%1.3 50 0.6%20 1.5 0.5 1.8 Yes 95 11 5.0 A9 A9 0.18 0.95 45 2.2%1.4 110 0.8%20 1.8 1.0 2.4 Yes 155 11 5.0 A10 A10 0.50 0.78 20 5.0%1.5 210 0.8%20 1.8 2.0 3.5 Yes 230 11 5.0 A11 A11 0.05 0.95 10 2.0%0.7 50 0.5%20 1.4 0.6 1.3 Yes 60 10 5.0 A12 A12 0.81 0.79 65 2.3%3.4 165 1.1%20 2.1 1.3 4.7 Yes 230 11 5.0 A13 A13 0.48 0.95 70 2.0%1.8 100 2.0%20 2.8 0.6 2.4 Yes 170 11 5.0 A14 A14 0.57 0.91 160 3.3%2.9 40 0.5%20 1.4 0.5 3.4 Yes 200 11 5.0 A15 A15 0.74 0.90 160 3.3%3.1 80 0.5%20 1.4 0.9 4.0 Yes 240 11 5.0 A16 A16 0.60 0.95 75 2.0%1.9 60 2.0%20 2.8 0.4 2.2 Yes 135 11 5.0 B1 B1 0.95 0.25 50 20.0%4.0 280 1.2%15 1.6 2.8 6.9 Yes 330 12 6.9 B2 B2 0.99 0.80 215 2.0%6.4 115 0.8%20 1.8 1.1 7.5 Yes 330 12 7.5 B3 B3 0.42 0.95 195 1.6%3.2 15 1.6%20 2.5 0.1 3.3 Yes 210 11 5.0 B4 B4 0.59 0.69 130 2.7%6.1 110 0.5%15 1.1 1.7 7.8 Yes 240 11 7.8 B5 B5 0.22 0.68 95 2.5%5.5 50 4.0%20 4.0 0.2 5.7 Yes 145 11 5.7 B6 B6 0.30 0.79 55 3.7%2.7 40 5.2%20 4.6 0.1 2.9 Yes 95 11 5.0 --------- C1 C1 0.61 0.84 55 2.5%2.6 380 5.0%20 4.5 1.4 4.0 Yes 435 12 5.0 C2 C2 0.83 0.66 60 2.5%4.6 300 5.0%20 4.5 1.1 5.7 Yes 360 12 5.7 C3 C3 2.73 0.89 180 3.5%3.3 300 2.5%20 3.2 1.6 4.9 Yes 480 13 5.0 C4 C4 0.38 0.95 65 2.0%1.7 75 2.0%20 2.8 0.4 2.2 Yes 140 11 5.0 D1 D1 0.49 0.72 40 2.0%3.4 210 2.5%20 3.2 1.1 4.6 Yes 250 11 5.0 E1 E1 2.12 0.79 40 2.0%2.8 945 2.5%20 3.2 5.0 7.8 Yes 985 15 7.8 OS1 OS1 3.70 0.64 65 2.0%5.3 475 2.0%20 2.8 2.8 8.1 Yes 540 13 8.1 OS2 OS2 5.84 0.25 380 10.0%14.0 360 2.0%7 1.0 6.1 20.1 No --20.1 Notes: (1) C=Cx*Cf (2)ti = [0.395(1.1-C5)L1/2]/S1/3, S= slope in %, L=length of overland flow (300' max urban, 500' max rural) (3)V=KS0.5, S=watercourse slope in ft/ft, UDFCD Equation 6-4 (4)tt=L/(V*60 sec/min) (5)tc check (for urban or developed areas only) = total length/180 + 10 (6)min tc = 5 min Existing Basins Proposed Basins Travel/Channelized Time of Flow (tt) ti+tt tc Check for Urbanized Basins Final tc (6) ti+tt Final tc (6) tc Check for Urbanized BasinsTravel/Channelized Time of Flow (tt) Date: 10/5/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP TIME OF CONCENTRATION Nissan Dealership, Fort Collins, CO Basin Design Pt.Area C100 (1)Length Slope ti (2)Length Slope Cv Velocity (3)tt (4)Check tc?Total Length tc (5) acres ft %min ft %fps min min Urban?ft min min EX1 EX1 2.12 0.87 50 2.2%2.2 1180 2.3%20 3.0 6.6 8.8 Yes 1230 17 8.8 EX2 EX2 1.70 0.84 160 2.8%4.2 155 1.0%20 2.0 1.3 5.5 Yes 315 12 5.5 EX3 EX3 0.41 1.00 40 2.0%0.9 730 2.5%20 3.2 3.8 4.8 Yes 770 14 5.0 EX4 EX4 0.38 1.00 45 2.0%1.0 165 3.5%20 3.7 0.7 1.7 Yes 210 11 5.0 EX5 EX5 7.97 0.31 500 10.0%14.9 320 2.0%7 1.0 5.4 20.3 No --20.3 EX6 EX6 6.44 0.52 265 1.8%14.1 376 2.6%20 3.2 1.9 16.0 Yes 641 14 13.6 OS1 OS1 3.70 0.80 65 2.0%3.5 475 2.0%20 2.8 2.8 6.3 Yes 540 13 6.3 OS2 OS2 5.75 0.31 380 10.0%13.0 360 2.0%7 1.0 6.1 19.0 No --19.0 Basin Design Pt.Area C100 (1)Length Slope ti (2)Length Slope Cv Velocity (3)tt (4)Check tc?Total Length tc (5) acres ft %min ft %fps min min Urban?ft min min A1 A1 0.95 0.31 120 14.0%6.5 160 1.0%15 1.5 1.8 8.3 Yes 280 12 8.3 A2 A2 0.41 0.31 45 12.0%4.2 170 0.5%15 1.1 2.7 6.9 Yes 215 11 6.9 A3 A3 0.45 0.95 40 2.0%1.4 210 1.5%20 2.4 1.4 2.8 Yes 250 11 5.0 A4 A4 0.45 1.00 70 2.6%1.1 170 2.8%20 3.3 0.8 1.9 Yes 240 11 5.0 A5 A5 0.48 1.00 95 3.9%1.1 100 0.6%20 1.5 1.1 2.2 Yes 195 11 5.0 A6 A6 0.20 0.88 65 2.2%2.4 90 2.0%20 2.8 0.5 2.9 Yes 155 11 5.0 A7 A7 0.38 0.85 45 3.0%2.1 70 1.0%20 2.0 0.6 2.7 Yes 115 11 5.0 A8 A8 0.09 1.00 45 2.9%0.9 50 0.6%20 1.5 0.5 1.4 Yes 95 11 5.0 A9 A9 0.18 1.00 45 2.2%0.9 110 0.8%20 1.8 1.0 2.0 Yes 155 11 5.0 A10 A10 0.50 0.97 20 5.0%0.6 210 0.8%20 1.8 2.0 2.6 Yes 230 11 5.0 A11 A11 0.05 1.00 10 2.0%0.5 50 0.5%20 1.4 0.6 1.0 Yes 60 10 5.0 A12 A12 0.81 0.99 65 2.3%1.2 165 1.1%20 2.1 1.3 2.5 Yes 230 11 5.0 A13 A13 0.48 1.00 70 2.0%1.2 100 2.0%20 2.8 0.6 1.8 Yes 170 11 5.0 A14 A14 0.57 1.00 160 3.3%1.5 40 0.5%20 1.4 0.5 2.0 Yes 200 11 5.0 A15 A15 0.74 1.00 160 3.3%1.5 80 0.5%20 1.4 0.9 2.5 Yes 240 11 5.0 A16 A16 0.60 1.00 75 2.0%1.2 60 2.0%20 2.8 0.4 1.6 Yes 135 11 5.0 0.00 B1 B1 0.95 0.31 50 20.0%3.7 280 1.2%15 1.6 2.8 6.6 Yes 330 12 6.6 B2 B2 0.99 0.99 215 2.0%2.2 115 0.8%20 1.8 1.1 3.3 Yes 330 12 5.0 B3 B3 0.42 1.00 195 1.6%2.2 15 1.6%20 2.5 0.1 2.3 Yes 210 11 5.0 B4 B4 0.59 0.86 130 2.7%3.6 110 0.5%15 1.1 1.7 5.3 Yes 240 11 5.3 B5 B5 0.22 0.85 95 2.5%3.3 50 4.0%20 4.0 0.2 3.5 Yes 145 11 5.0 B6 B6 0.30 0.98 55 3.7%1.0 40 5.2%20 4.6 0.1 1.2 Yes 95 11 5.0 -0.00 -------- C1 C1 0.61 1.00 55 2.5%1.0 380 5.0%20 4.5 1.4 2.4 Yes 435 12 5.0 C2 C2 0.83 0.82 60 2.5%2.9 300 5.0%20 4.5 1.1 4.0 Yes 360 12 5.0 C3 C3 2.73 1.00 180 3.5%1.6 300 2.5%20 3.2 1.6 3.2 Yes 480 13 5.0 C4 C4 0.38 1.00 65 2.0%1.2 75 2.0%20 2.8 0.4 1.6 Yes 140 11 5.0 0.00 D1 D1 0.49 0.90 40 2.0%1.8 210 2.5%20 3.2 1.1 2.9 Yes 250 11 5.0 E1 E1 2.12 0.99 40 2.0%1.0 940 2.5%20 3.2 5.0 6.0 Yes 980 15 6.0 0.00 OS1 OS1 3.70 0.80 65 2.0%3.5 475 2.0%20 2.8 2.8 6.3 Yes 540 13 6.3 OS2 OS2 5.84 0.31 380 10.0%13.0 360 2.0%7 1.0 6.1 19.0 No --19.0 Notes: (1) C=Cx*Cf (2)ti = [0.395(1.1-C5)L1/2]/S1/3, S= slope in %, L=length of overland flow (300' max urban, 500' max rural) (3)V=KS0.5, S=watercourse slope in ft/ft, UDFCD Equation 6-4 (4)tt=L/(V*60 sec/min) (5)tc check (for urban or developed areas only) = total length/180 + 10 (6)min tc = 5 min Existing Basins Travel/Channelized Time of Flow (tt) ti+tt tc Check for Urbanized Basins Final tc (6) Proposed Basins Travel/Channelized Time of Flow (tt) ti+tt tc Check for Urbanized Basins Final tc (6) Date: 10/5/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP RATIONAL METHOD PEAK RUNOFF Nissan Dealership, Fort Collins, CO Basin Design Pt.Area 2-Year 100-Year acre tc tc C2 C100 I2 I100 Q2 Q100 min min in/hr in/hr cfs cfs EX1 EX1 2.12 11.0 9.0 0.70 0.87 2.30 8.03 3.40 14.85 EX2 EX2 1.70 8.0 6.0 0.67 0.84 2.67 9.31 3.05 13.30 EX3 EX3 0.41 6.0 5.0 0.82 1.00 2.85 9.95 0.96 4.12 EX4 EX4 0.38 5.0 5.0 0.89 1.00 2.85 9.95 0.96 3.80 EX5 EX5 7.97 21.0 20.0 0.25 0.31 1.61 5.60 3.21 13.95 EX6 EX6 6.44 14.0 14.0 0.41 0.52 1.92 6.71 5.12 22.35 OS1 OS1 3.70 8.0 6.0 0.64 0.80 2.67 9.31 6.33 27.60 OS2 OS2 5.75 20.0 19.0 0.25 0.31 1.65 5.75 2.37 10.33 Basin Design Pt.Area 2-Year 100-Year acre tc tc C2 C100 I2 I100 Q2 Q100 min min in/hr in/hr cfs cfs A1 A1 0.95 9.0 8.0 0.25 0.31 2.40 8.38 0.57 2.49 A2 A2 0.41 7.0 7.0 0.25 0.31 2.52 8.80 0.26 1.13 A3 A3 0.45 5.0 5.0 0.76 0.95 2.85 9.95 0.98 4.27 A4 A4 0.45 5.0 5.0 0.86 1.00 2.85 9.95 1.10 4.50 A5 A5 0.48 5.0 5.0 0.95 1.00 2.85 9.95 1.30 4.77 A6 A6 0.20 5.0 5.0 0.71 0.88 2.85 9.95 0.41 1.77 A7 A7 0.38 5.0 5.0 0.68 0.85 2.85 9.95 0.74 3.25 A8 A8 0.09 5.0 5.0 0.95 1.00 2.85 9.95 0.26 0.94 A9 A9 0.18 5.0 5.0 0.95 1.00 2.85 9.95 0.48 1.76 A10 A10 0.50 5.0 5.0 0.78 0.97 2.85 9.95 1.11 4.86 A11 A11 0.05 5.0 5.0 0.95 1.00 2.85 9.95 0.13 0.47 A12 A12 0.81 5.0 5.0 0.79 0.99 2.85 9.95 1.83 7.97 A13 A13 0.48 5.0 5.0 0.95 1.00 2.85 9.95 1.31 4.80 A14 A14 0.57 5.0 5.0 0.91 1.00 2.85 9.95 1.46 5.62 A15 A15 0.74 5.0 5.0 0.90 1.00 2.85 9.95 1.90 7.36 A16 A16 0.60 5.0 5.0 0.95 1.00 2.85 9.95 1.63 5.98 B1 B1 0.95 7.0 7.0 0.25 0.31 2.52 8.80 0.60 2.60 B2 B2 0.99 7.0 5.0 0.80 0.99 2.85 9.95 2.25 9.81 B3 B3 0.42 5.0 5.0 0.95 1.00 2.85 9.95 1.13 4.14 B4 B4 0.59 8.0 5.0 0.69 0.86 2.85 9.95 1.16 5.08 B5 B5 0.22 6.0 5.0 0.68 0.85 2.85 9.95 0.43 1.88 B6 B6 0.30 5.0 5.0 0.79 0.98 2.85 9.95 0.68 2.97 C1 C1 0.61 5.0 5.0 0.84 1.00 2.85 9.95 1.46 6.07 C2 C2 0.83 6.0 5.0 0.66 0.82 2.85 9.95 1.56 6.81 C3 C3 2.73 5.0 5.0 0.89 1.00 2.85 9.95 6.94 27.15 C4 C4 0.38 5.0 5.0 0.95 1.00 2.85 9.95 1.04 3.82 D1 D1 0.49 5.0 5.0 0.72 0.90 2.85 9.95 1.00 4.37 E1 E1 2.12 8.0 6.0 0.79 0.99 2.67 9.31 4.47 19.48 OS1 OS1 3.70 8.0 6.0 0.64 0.80 2.67 9.31 6.33 27.60 OS2 OS2 5.84 20.0 19.0 0.25 0.31 1.65 5.75 2.41 10.49 Existing Basins Peak Discharge Proposed Basins Runoff Coefficients Rainfall Intensity Peak Discharge Rainfall IntensityRunoff Coefficients Date: 10/5/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP A PPENDIX B H YDRAULIC C ALCULATIONS LOW IMPACT DEVELOPMENT SUMMARY Nissan Dealership, Fort Collins, CO Basin Proposed Impervious Area LID Treatment Area Treated % of Site Treated (sf)(acres)(sf)(%) A1 830 None 0 0.0% A2 360 Bioretention 360 0.1% A3 14,425 None 0 0.0% A4 17,098 Bioretention 17,098 3.2% A5 20,865 Bioretention 20,865 3.8% A6 5,781 Bioretention 5,781 1.1% A7 10,409 Bioretention 10,409 1.9% A8 4,110 Bioretention 4,110 0.8% A9 7,695 Bioretention 7,695 1.4% A10 11,201 Bioretention 11,201 2.1% A11 2,065 Bioretention 2,065 0.4% A12 27,425 Bioretention 27,425 5.1% A13 18,927 Bioretention 18,927 3.5% A14 23,189 Bioretention 23,189 4.3% A15 30,044 Bioretention 30,044 5.5% A16 23,580 Bioretention 23,580 4.3% B1 825 Wetland Channel 825 0.2% B2 33,856 Wetland Channel 33,856 6.2% B3 18,110 Wetland Channel 18,110 3.3% B4 16,368 Bioretention 16,368 3.0% B5 6,021 Wetland Channel 6,021 1.1% B6 10,186 Wetland Channel 10,186 1.9% C1 22,552 None 0 0.0% C2 21,376 None 0 0.0% C3 109,197 Underground Water Quality 109,197 20.1% C4 15,039 Underground Water Quality 15,039 2.8% D1 6,889 None 0 0.0% E1 53,932 None 0 0.0% OS1 9,795 None 0 0.0% Total New/Modified Site 542,149 412,351 76.1% Low Impact Development (LID) Treated Areas Date: 10/5/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP WATER QUALITY Nissan Dealership, Fort Collins, CO Required Water Quality Capture Volume Basin Area Area Imperviousness Watershed WQCV (sf)(acres)(%)(inches)(cf) A1 41,480 0.952 2%0.01 42 A2 17,975 0.413 2%0.01 18 A3(3)19,800 0.455 73%0.29 571 A4 19,715 0.453 87%0.30 493 A5 20,865 0.479 100%0.40 696 A6 8,745 0.201 66%0.21 151 A7 16,710 0.384 62%0.20 272 A8 4,110 0.094 100%0.40 137 A9 7,695 0.177 100%0.40 257 A10 21,945 0.504 76%0.24 443 A11 2,065 0.047 100%0.40 69 A12 35,285 0.810 78%0.25 740 A13 21,030 0.483 90%0.32 563 A14 24,620 0.565 94%0.35 721 A15 32,215 0.740 93%0.34 925 A16 26,200 0.601 90%0.32 701 B1 41,250 0.947 2%0.01 42 B2 43,197 0.992 78%0.25 917 B3 18,110 0.416 100%0.40 604 B4 25,857 0.594 63%0.20 427 B5 9,748 0.224 62%0.19 157 B6 13,195 0.303 77%0.25 274 ---- C1 26,565 0.610 85%0.36 800 C2 36,362 0.835 59%0.23 703 C3 118,860 2.729 92%0.33 3,311 C4 16,710 0.384 90%0.32 447 D1 21,220 0.487 68%0.21 376 E1 92,490 2.123 77%0.25 1,928 OS1(3)161,165 3.700 56%0.22 2,985 (1)Water quality provided by bioretention and based on 12-hour storage (2)Water quality provided by underground detention and based on 12-hour storage (3)based on 40 hr storage and additional 20% for extended detention (4) Basins C1 & C2 free release from the site (5) Basins D1 & E1 are related to CDOT R.O.W and are not captured with the site improvemens (1) (2) (2) (4) (4) Date: 10/5/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP UNDERGROUND DETENTION & WATER QUALITY Nissan Dealership, Fort Collins, CO Required Underground Detention/WQ Volume Chamber Total Required Detention/ Chamber Chamber Chamber *Installed Min.End Cap *Installed Min.Min. Req'd Design No. of No. of Provided Provided Total ID Detention/WQ WQ Type Unit Unit Chamber Unit No. of Unit End Cap WQ Isolator Row Controli Chambers End Caps Release Isolator Installed Volumea Inflowb Release Volumed Volume inc.Chambersf Volumed Volume inc. Release Volume by Provided Provided Ratej Row System Ratec Aggregatee Aggregatee Rateg FAA Methodh Volumek Volumel (cf)(cfs)(cfs)(cf)(cf)(sf)(cf)(cf)(cfs)(cf)(cfs)(cf)(cf) Pond C1 (LID/WQ)3,758 3.99 MC-4500 0.028 106.50 166.30 22 39.50 118.60 0.62 2,159 WQCV 22 2 0.62 2,343 3,896 Pond C1 (Detention)24,182 30.97 MC-4500 0.028 146.00 284.90 80 39.50 118.60 2.25 0 WQCV 85 12 2.4 N/A 24,217 *Volume assumes minimum aggregate depth below chamber. a. Total required WQCV calculated per 12-hr drain time. b. WQ inflow is approximated as one-half the 2-yr peak runoff rate. c. Release rate per chamber, limited by flow through geotextile with accumulated sediment. d. Volume within chamber only, not accounting for void spaces in surrounding aggregate. The Isolator Row(s) are sized per this unit volume. e. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. The total system WQCV is sized per this unit volume. f. Number of chambers required to provide full WQCV within total installed system, including aggregate. g. Release rate per chamber times number of chambers. This is used at the 'outlet control' for the FAA calculations. h. Minimum 'chamber-only' volume to ensure dirty water is fully contained within Isolator Row. i. Determines whether the design is controlled by the Isolator Row volume or WQCV. j. Release rate per chamber times number of chambers provided. k. Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. l. System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required 12-hr WQCV. Date: 8/20/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP.xlsm DETENTION POND VOLUME (FAA Method) Nissan Dealership, Fort Collins, CO POND ID:Pond A1 100 Year Storm Into Detention Facility Area =440,140 square feet Area =10.10 acres C 2 = 0.70 C 100 = 0.84 Release Rate Out of Pond Q OUT = 3.50 cfs Unit Flow =0.35 cfs/acre Notes: 1. Pond area includes all "A" Basins & Basin OS1. Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T)Intensity (I)Qin= ∑C100*Area*I Vi=(Qin*T*60)Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 9.95 84.1 25,241 1.00 3.50 1,050 24,191 10 7.72 65.3 39,168 1.00 3.50 2,100 37,068 15 6.52 55.1 49,620 1.00 3.50 3,150 46,470 20 5.60 47.4 56,824 1.00 3.50 4,200 52,624 25 4.98 42.1 63,166 1.00 3.50 5,250 57,916 30 4.52 38.2 68,798 1.00 3.50 6,300 62,498 35 4.08 34.5 72,451 1.00 3.50 7,350 65,101 40 3.74 31.6 75,901 1.00 3.50 8,400 67,501 45 3.46 29.3 78,996 1.00 3.50 9,450 69,546 50 3.23 27.3 81,938 1.00 3.50 10,500 71,438 55 3.03 25.6 84,551 1.00 3.50 11,550 73,001 60 2.86 24.2 87,063 1.00 3.50 12,600 74,463 70 2.59 21.9 91,984 1.00 3.50 14,700 77,284 80 2.38 20.1 96,601 1.00 3.50 16,800 79,801 90 2.21 18.7 100,913 1.00 3.50 18,900 82,013 100 2.06 17.4 104,516 1.00 3.50 21,000 83,516 110 1.94 16.4 108,270 1.00 3.50 23,100 85,170 120 1.84 15.6 112,025 1.00 3.50 25,200 86,825 Required Detention Volume V 100 = 86,825 cubic feet V 100 = 1.99 acre-ft Date: 8/20/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP.xlsm DETENTION POND VOLUME (FAA Method) Nissan Dealership, Fort Collins, CO POND ID:Pond B1 100 Year Storm Into Detention Facility Area =151,357 square feet Area =3.47 acres C 2 = 0.64 C 100 = 0.78 Release Rate Out of Pond Q OUT = 2.00 cfs Unit Flow =0.58 cfs/acre Notes: 1. Pond area includes all "B" Basins. Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T)Intensity (I)Qin= ∑C100*Area*I Vi=(Qin*T*60)Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 9.95 26.8 8,046 1.00 2.00 600 7,446 10 7.72 20.8 12,486 1.00 2.00 1,200 11,286 15 6.52 17.6 15,818 1.00 2.00 1,800 14,018 20 5.60 15.1 18,114 1.00 2.00 2,400 15,714 25 4.98 13.4 20,136 1.00 2.00 3,000 17,136 30 4.52 12.2 21,931 1.00 2.00 3,600 18,331 35 4.08 11.0 23,096 1.00 2.00 4,200 18,896 40 3.74 10.1 24,196 1.00 2.00 4,800 19,396 45 3.46 9.3 25,182 1.00 2.00 5,400 19,782 50 3.23 8.7 26,120 1.00 2.00 6,000 20,120 55 3.03 8.2 26,953 1.00 2.00 6,600 20,353 60 2.86 7.7 27,754 1.00 2.00 7,200 20,554 70 2.59 7.0 29,323 1.00 2.00 8,400 20,923 80 2.38 6.4 30,794 1.00 2.00 9,600 21,194 90 2.21 6.0 32,169 1.00 2.00 10,800 21,369 100 2.06 5.6 33,318 1.00 2.00 12,000 21,318 110 1.94 5.2 34,514 1.00 2.00 13,200 21,314 120 1.84 5.0 35,711 1.00 2.00 14,400 21,311 Required Detention Volume V 100 = 21,369 cubic feet V 100 = 0.49 acre-ft Date: 8/20/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP.xlsm DETENTION POND VOLUME (FAA Method) Nissan Dealership, Fort Collins, CO POND ID:Pond C1 - Underground Detention 100 Year Storm Into Detention Facility Area =135,570 square feet Area =3.11 acres C 2 = 0.90 C 100 = 1.00 Release Rate Out of Pond Q OUT = 2.40 cfs Unit Flow =0.77 cfs/acre Notes: 1. Pond area includes Basins C3 & C4. Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T)Intensity (I)Qin= ∑C100*Area*I Vi=(Qin*T*60)Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 9.95 31.0 9,290 1.00 2.40 720 8,570 10 7.72 24.0 14,416 1.00 2.40 1,440 12,976 15 6.52 20.3 18,263 1.00 2.40 2,160 16,103 20 5.60 17.4 20,914 1.00 2.40 2,880 18,034 25 4.98 15.5 23,249 1.00 2.40 3,600 19,649 30 4.52 14.1 25,321 1.00 2.40 4,320 21,001 35 4.08 12.7 26,666 1.00 2.40 5,040 21,626 40 3.74 11.6 27,936 1.00 2.40 5,760 22,176 45 3.46 10.8 29,075 1.00 2.40 6,480 22,595 50 3.23 10.1 30,158 1.00 2.40 7,200 22,958 55 3.03 9.4 31,119 1.00 2.40 7,920 23,199 60 2.86 8.9 32,044 1.00 2.40 8,640 23,404 70 2.59 8.1 33,855 1.00 2.40 10,080 23,775 80 2.38 7.4 35,554 1.00 2.40 11,520 24,034 90 2.21 6.9 37,142 1.00 2.40 12,960 24,182 100 2.06 6.4 38,468 1.00 2.40 14,400 24,068 110 1.94 6.0 39,849 1.00 2.40 15,840 24,009 120 1.84 5.7 41,231 1.00 2.40 17,280 23,951 Required Detention Volume V 100 = 24,182 cubic feet V 100 = 0.56 acre-ft Date: 8/20/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP.xlsm DETENTION POND VOLUME (FAA Method) Nissan Dealership, Fort Collins, CO POND ID:Pond C1 (Underground Water Quality) WQ Basin Characateristics Area =135,570 square feet Area =3.11 acres C 2 = 0.90 C 100 = 1.00 WQ Release Rate Determined from Number of Chambers and Chamber Release Rate Q OUT = 0.62 cfs Unit Flow =0.20 cfs/acre Notes: 1. Release rate out of pond based on number of chambers multiplied by release rate per chamber. 2. Rainfall intensities approximated as one-half the 2-yr peak runoff rate. 3. C2 utilized for water quality event detention calculation. 4. Pond is designed to provide WQ for Basins C3 & C4. Detention Volume Calculations Rainfall Rainfall Inflow Rate Inflow Volume Adjustment Factor Average Outflow Volume Required Duration (T)Intensity (I)Qin= ∑C100*Area*I Vi=(Qin*T*60)Factor Outflow Rate Vo=Qav*T *60 Storage Volume m= 0.5(1 + Tc/T) Qav = m*Qout Vs=Vi-Vo min in/hr cfs ft 3 cfs ft 3 ft 3 5 1.425 4.0 1,196 1.00 0.62 186 1,010 10 1.105 3.1 1,855 1.00 0.62 372 1,483 15 0.935 2.6 2,355 1.00 0.62 558 1,797 20 0.805 2.3 2,703 1.00 0.62 743 1,960 25 0.715 2.0 3,001 1.00 0.62 929 2,072 30 0.650 1.8 3,274 1.00 0.62 1,115 2,159 35 0.585 1.6 3,438 1.00 0.62 1,301 2,137 40 0.535 1.5 3,593 1.00 0.62 1,487 2,106 45 0.495 1.4 3,740 1.00 0.62 1,673 2,067 50 0.460 1.3 3,862 1.00 0.62 1,859 2,003 55 0.435 1.2 4,017 1.00 0.62 2,044 1,972 60 0.410 1.1 4,130 1.00 0.62 2,230 1,900 65 0.385 1.1 4,201 1.00 0.62 2,416 1,785 70 0.365 1.0 4,290 1.00 0.62 2,602 1,688 75 0.345 1.0 4,344 1.00 0.62 2,788 1,556 80 0.330 0.9 4,432 1.00 0.62 2,974 1,459 85 0.315 0.9 4,495 1.00 0.62 3,160 1,336 90 0.305 0.9 4,609 1.00 0.62 3,345 1,263 95 0.290 0.8 4,625 1.00 0.62 3,531 1,094 100 0.280 0.8 4,701 1.00 0.62 3,717 984 105 0.270 0.8 4,760 1.00 0.62 3,903 857 110 0.260 0.7 4,802 1.00 0.62 4,089 713 115 0.255 0.7 4,923 1.00 0.62 4,275 649 120 0.245 0.7 4,936 1.00 0.62 4,460 476 Required Detention Volume V 100 = 2,159 cubic feet V 100 = 0.05 acre-ft Date: 8/20/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP.xlsm DETENTION POND STORAGE AND ORIFICE CALCULATIONS Nissan Dealership, Fort Collins, CO POND ID:Detention Pond A1 Stage Storage Calculations Elevation Area (sf)Depth (ft) Incremental Volume (cf)Volume total (cf) Volume total (ac- ft) 5,002.60 386.39 0.00 0 0 0.00 5,003.00 2,348.39 0.40 492 492 0.01 5,003.40 5,228.93 0.40 1,478 1,969 0.05 5,003.80 7,339.29 0.40 2,502 4,471 0.10 5,004.20 8,104.02 0.40 3,087 7,558 0.17 5,004.60 8,858.92 0.40 3,391 10,950 0.25 5,005.00 9,622.23 0.40 3,695 14,645 0.34 5,005.40 10,397.70 0.40 4,003 18,648 0.43 5,005.80 11,233.24 0.40 4,325 22,973 0.53 5,006.20 12,212.56 0.40 4,688 27,661 0.64 5,006.60 13,269.49 0.40 5,095 32,756 0.75 5,007.00 14,211.28 0.40 5,495 38,251 0.88 5,007.40 15,134.21 0.40 5,868 44,119 1.01 5,007.80 16,052.55 0.40 6,236 50,355 1.16 5,008.20 17,055.77 0.40 6,621 56,976 1.31 5,008.60 18,160.48 0.40 7,042 64,018 1.47 5,009.00 19,264.83 0.40 7,484 71,502 1.64 5,009.40 20,480.73 0.40 7,948 79,450 1.82 5,009.80 21,831.87 0.40 8,461 87,911 2.02 5,010.00 22,543.68 0.20 4,437 92,349 2.12 Detention Pond Storage & Water Quality Detention Volume Required =86,825 ft3 Water Quality Volume Required =3,557 ft3 1.99 ac-ft 0.08 ac-ft Elev81 - Elev80 (VolRequired-Vol80)+Elev80 Elev81 - Elev80 (VolRequired-Vol80)+Elev80 Vol81 - Vo80 Vol81 - Vo80 Required W.S. Elevation = 5009.75 ft Required W.S. Elevation = 5003.68 ft Provided W.S. Elevation = 5010.00 ft Provided W.S. Elevation = 5003.80 ft Detention Volume Provided =92,349 ft3 Water Quality Volume Provided =4,471 ft3 2.12 ac-ft 0.10 ac-ft 100-year Depth D = 7.40 ft Water Quality Depth D = 1.20 ft Top-of-Berm = 5011.00 ft 100-year W.S. Elevation = 5010.00 ft Freeboard = 1.00 ft Freeboard = 6.20 ft Orifice Opening and Water Quality Plate Orifice Flow Rate, Q = CoAo(2gHo)0.5 cfs Area Required per WQ Plate Row 0.56 in2 Area of orifice Ao, ft2 = Q diam of WQ Hole = 0.85 in Co(2gHo)0.5 diam of WQ Hole (fraction) = 7/8 in C o = 0.65 Space Between Rows 4 in Q = Q out of pond = 3.50 cfs Number of Columns 1 gravitational acceleration g = 32.2 ft/sec2 Number of Rows 4 diam = 0.566 ft Effective head on orifice H o = D-1/2diam =7.12 ft Area of orifice A o = 0.25 ft2 Area of orifice A o = 36.22 in2 100-Year Orifice Diameter = 6.79 6 13/16 inches 100-Year Detention Volume and Elevations Water Quality Volume and Elevations W.S. Elevation, ft = W.S. Elevation, ft = 100-Year Orifice Calculation Water Quality Plate Calculation Date: 10/5/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP DETENTION POND STORAGE AND ORIFICE CALCULATIONS Nissan Dealership, Fort Collins, CO POND ID:Detention Pond B1 Stage Storage Calculations Elevation Area (sf)Depth (ft) Incremental Volume (cf)Volume total (cf) Volume total (ac- ft) 5,005.20 101.22 0.00 0 0 0.00 5,005.40 845.29 0.20 83 83 0.00 5,005.60 1,846.91 0.20 263 345 0.01 5,005.80 2,721.64 0.20 454 799 0.02 5,006.00 3,664.58 0.20 636 1,436 0.03 5,006.20 4,762.37 0.20 840 2,276 0.05 5,006.40 6,060.53 0.20 1,080 3,356 0.08 5,006.60 7,766.58 0.20 1,379 4,735 0.11 5,006.80 9,347.25 0.20 1,709 6,444 0.15 5,007.00 10,363.36 0.20 1,970 8,414 0.19 5,007.20 11,322.35 0.20 2,168 10,582 0.24 5,007.40 12,246.48 0.20 2,356 12,938 0.30 5,007.60 13,143.87 0.20 2,539 15,477 0.36 5,007.80 14,022.27 0.20 2,716 18,193 0.42 5,008.00 14,888.24 0.20 2,891 21,083 0.48 5,008.20 15,746.17 0.20 3,063 24,146 0.55 5,008.40 16,600.07 0.20 3,234 27,381 0.63 5,008.60 17,458.93 0.20 3,406 30,786 0.71 5,008.80 18,338.80 0.20 3,579 34,366 0.79 5,009.00 19,235.07 0.20 3,757 38,123 0.88 Detention Pond Storage & Water Quality Detention Volume Required =21,369 ft3 Water Quality Volume Required =1,994 ft3 0.49 ac-ft 0.05 ac-ft Elev81 - Elev80 (VolRequired-Vol80)+Elev80 Elev81 - Elev80 (VolRequired-Vol80)+Elev80 Vol81 - Vo80 Vol81 - Vo80 Required W.S. Elevation = 5008.11 ft Required W.S. Elevation = 5006.13 ft Provided W.S. Elevation = 5009.00 ft Provided W.S. Elevation = 5006.30 ft Detention Volume Provided =38,123 ft3 Water Quality Volume Provided =2,816 ft3 0.88 ac-ft 0.06 ac-ft 100-year Depth D = 3.80 ft Water Quality Depth D = 1.10 ft Top-of-Berm = 5010.00 ft 100-year W.S. Elevation = 5009.00 ft Freeboard = 1.00 ft Freeboard = 2.70 ft Orifice Opening and Water Quality Plate Orifice Flow Rate, Q = CoAo(2gHo)0.5 cfs Area Required per WQ Plate Row 0.41 in2 Area of orifice Ao, ft2 = Q diam of WQ Hole = 0.72 in Co(2gHo)0.5 diam of WQ Hole (fraction) = 3/4 in C o = 0.65 Space Between Rows 4 in Q = Q out of pond = 2.00 cfs Number of Columns 1 gravitational acceleration g = 32.2 ft/sec2 Number of Rows 4 diam = 0.509 ft Effective head on orifice H o = D-1/2diam =3.55 ft Area of orifice A o = 0.20 ft2 Area of orifice A o = 29.32 in2 100-Year Orifice Diameter = 6.11 6 1/8 inches 100-Year Detention Volume and Elevations Water Quality Volume and Elevations W.S. Elevation, ft = W.S. Elevation, ft = 100-Year Orifice Calculation Water Quality Plate Calculation Date: 10/5/2021 C:\United Civil Dropbox\Projects\U21004 - Nissan Dealership\Reports\Drainage\Calculations\U21004-Drain Calcs-PDP COLLEGE AVE (HWY 287)VENUS AVESKYVIEW SUBDIVISIONZONED RLOS13.70EX12.12EX21.70EX30.41EX40.38EX57.97FOSSIL CREEKS COLLEGE AVER.O.W BOUNDARYEXISTING WETLANDSOS25.75EX66.44PATH:0'150'300'SCALE: 1" = 150'75'C:\UNITED CIVIL DROPBOX\PROJECTS\U21004 - NISSAN DEALERSHIP\CADD\ET\EXISTING DRAINAGE MAP.DWG EXISTING DRAINAGE MAPDRAWING NAME:SHEET SIZE: 11 x 17 FORT COLLINS NISSANEXISTING DRAINAGE MAPDATE:October 5, 2021PREPARED FOR:TCC CORPORATIONJOB NUMBER:U21004NOTE:THIS EXHIBIT WAS PREPARED FOR INFORMATION ONLY AND THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR UNAUTHORIZED USE OF THEM.SHEETOF11NORTH19 OLD TOWN SQUARE #238 | FORT COLLINS, CO 80524 | (970) 530-4044 | www.unitedcivil.comUNITED CIVILDesign GroupEXISTING MAJOR CONTOUREXISTING MINOR CONTOURXX.XXBASIN DESIGNATIONEXISTING BASINEXISTING BASIN LINELEGENDBASIN AREA (ACRE)