Original Field Survery:
Northern Engineering
Project No. 1590-001
Date: January 2019
Additional Field Survey:
Northern Engineering
Project No. 1590-001
Date: March 2021
OCTOBER 2021 CONTACT INFORMATION
PROJECT TEAM:
VICINITY MAP
NORTH
PROJECT DATUM: NAVD88
BENCHMARK 1-11 SOUTHEAST CORNER OF MULBERRY ST. AND LOOMIS
AVE., AT THE NORTHEAST CORNER OF A CONCRETE
TRAFFIC SIGNAL BASE.
ELEVATION: 5008.62
BENCHMARK 6-00 ON A CATCH BASIN AT THE NORTHWEST CORNER OF
MULBERRY ST. AND COLLEGE AVE.
ELEVATION: 4993.85
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM
(PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS
REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 -
3.17'.
BASIS OF BEARINGS
EAST LINE OF BLOCK 96, HARRISON'S ADDITION AS BEARING SOUTH 00 DEG 18
MIN 09 SEC WEST (ASSUMED) AND MONUMENTED AS SHOWN ON PLAT
PROJECT BENCHMARKS:
HOWES SIX TWO NINE
PROJECT TEAM:
Kristin Turner
TB Group
444 Mountain Avenue
Berthoud, Colorado 80513
(970) 532-5891
Carlson Land Development
Blake Carlson
14570 Clay St
Broomfield, CO 80023
(303)809-7930
Northern Engineering Services, Inc.
Danny Weber, PE
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
(970) 221-4158
PLANNER/
LANDSCAPE ARCHITECT
OWNER/APPLICANT
SITE ENGINEER
GEOTECHNICAL ENGINEER
Soilogic
Darrel DiCarlo, PE
3522 Draft Horse Ct
Loveland, Colorado 80538
(970)535-6144
SHEET INDEX
THE NORTH HALF OF LOT 2 AND THE SOUTH HALF OF LOT 3, BLOCK 96, HARRISON'S ADDITION,
LOCATED IN THE NORTHEAST QUARTER OF SECTION 14, TOWNSHIP 7 NORTH,
RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
FIELD SURVEY BY:
Northern Engineering Services, Inc.
Bob Tessely, PLS
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
(970) 221-4158
SITE SURVEYOR
UTILITY PLANS FOR
Soilogic
Geotechnical Subsurface Exploration Report
Proposed Townhome Development
Fort Collins, CO
Soilogic Project #19-1182
Date: April 30, 2019
SUBSURFACE EXPLORATION BY:
UTILITY CONTACT LIST: *
UTILITY COMPANY
* This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for
the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for
locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of
Colorado (UNCC) at 811 for additional information.
PHONE NUMBER
GAS-----------------Xcel Energy-----------------------------
ELECTRIC--------City of Fort Collins Light & Power--Austin Kreager (970) 224-6152
CABLE-------------Comcast----------------------------------Don Kapperman (970) 567-0425
TELECOM.--------CenturyLink-------------------------------
WATER------------City of Fort Collins Utilities-----------Matt Simpson (970) 416-2754
WASTEWATER--City of Fort Collins Utilities-----------Matt Simpson (970) 416-2754
STORMWATER-City of Fort Collins Utilities-----------Matt Simpson (970) 416-2754
E N G I N E E R N GI
EHTRON R N
E N G I N E E R N GI
EHTRON R N
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
CS1 COVER SHEET 1
City of Fort Collins, CO
UTILITY PLAN APPROVAL
APPROVED:
CITY ENGINEER,APPROVED SHEETS DATE
APPROVED:
WATER & WASTEWATER UTILITY,APPROVED SHEETS DATE
APPROVED:
STORMWATER UTILITY,APPROVED SHEETS DATE
APPROVED:
PARK PLANNING & DEVELOPMENT,APPROVED SHEETS DATE
APPROVED:
TRAFFIC OPERATIONS,APPROVED SHEETS DATE
APPROVED:
ENVIRONMENTAL PLANNER,APPROVED SHEETS DATE
SheetHOWES SIX TWO NINEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 15
PROJECT
LOCATION
I hereby affirm that these final
construction plans were prepared
under my direct supervision, in
accordance with all applicable City
of Fort Collins and State of
Colorado standards and statutes,
respectively; and that I am fully
responsible for the accuracy of all
design. revisions, and record
conditions that I have noted on
these plans.
These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility
by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness
of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities
required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort
Collins for additional quantities of items shown that may be required during the construction phase.
DISCLAIMER STATEMENT:
CERTIFICATION STATEMENT:
1 CS1 COVER SHEET
2 CS2 GENERAL & CONSTRUCTION NOTES
3 EX1 EXISTING CONDITIONS & DEMOLITION PLAN
4 HC1 HORIZONTAL CONTROL & PAVING PLAN
UTILITY SHEETS
5 OU1 OVERALL UTILITY PLAN
6 ST1 STORM DRAIN LINE 1 AND 1-1 PLAN AND PROFILE
GRADING SHEETS
7 OG1 OVERALL GRADING PLAN
DETAIL SHEETS
8 D1 UTILITY DETAILS
9-10 D2-D3 DRAINAGE DETAILS
11 D4 SITE DETAILS
DRAINAGE SHEETS
12 EC1 EROSION CONTROL PLAN
13 EC2 EROSION CONTROL DETAILS
14 HD1 HISTORIC DRAINAGE EXHIBIT
15 DR1 OVERALL DRAINAGE PLAN
BUILDING ARCHITECT
AU Workshop
405 Linden Street
Fort Collins, Colorado 80524
(970) 430-5220
ST
ST STSTSTG G G G
EE E E E E E ET CS
S
C
CC
CCG
CS
VAULT
ELEC
C.O.
C S
EELEC
BRKR
CS
W
VAULT
ELEC
W
G G
D
D
D
6" SS6" SS6" SS6" SS6" SS6" W6" W6" W6" W6" W4" W4" W4" W4" W4" WSTSTST
STW
SS SS SS
SS
W
W
W
SSV SSV SSV
WSV WSV WSV
F F
EEE
E
E
EE
UD UD UD FDCG
DRAINAGE BASIN 1-1
STA 10+69.08
N: 128022.49
E: 193662.28
CLEANOUT 1-2
STA 10+87.51
N: 128004.06
E: 193662.20
EX-STMH 1
STA 10+00.00
N: 128022.31
E: 193731.36
CLEANOUT 1-3
STA 10+98.33
N: 128002.23
E: 193651.54
69.08 LF
15" PVC
@ 0.50%
6.05 LF 12" HDPE @ 0.50%
18.43 LF 15" HDPE @ 0.50%
10.82 LF
12" HDPE
@ 0.50%
STORM DRAIN LINE 1-1
SEE THIS SHEET- RIGHT
SANITARY SERVICE LINE A
SEE SHEET OU1
AREA INLET 1-4
STA 11+04.37
N: 128005.28
E: 193646.32
PROPOSED TRENCH DRAIN
90.95 LF 4" PERF. PVC @ 0.20%
4990
4995
5000
5005
5010
5015
4990
4995
5000
5005
5010
5015
9+7510+0011+0012+0012+25 5000.625000.405001.015000.005000.005000.0018.43 LF
15" HDPE
@ 0.50%DRAINAGE BASIN 1-1STA 10+69.08RIM 5001.2±INV. IN 4998.10 (S)INV. IN 4997.86 (N)INV. OUT 4997.46 (E)CLEANOUT 1-2STA 10+87.51RIM 5001.0±INV. IN 4998.19 (W)INV. OUT 4998.19 (N)EX-STMH 1STA 10+00.00RIM 5001.7±INV. IN 4997.11 (W)INV. OUT 4995.55 (S)INV. OUT 4995.55 (N)CLEANOUT 1-3STA 10+98.33RIM 5000.8±INV. IN 4998.24 (NW)INV. OUT 4998.24 (E)EXISTING
4" CIP WATER
STA.=10+25.10
TOP=4995.10
EXISTING
6" VCP SANITARY
STA.=10+10.10
INV.=4995.174" PVC SANITARY
STA.=10+77.75
INV.=4996.33
EXISTING
GROUND
15" RISER PIPE +
15" NYLOPLAST
DOME INLET
100-YR.
HGL
18"
18"
10.82 LF 12" HDPE @ 0.50%
6.05 LF 12" HDPE @ 0.50%AREA INLET 1-4STA 11+04.37RIM 5000.8±INV. IN 4998.27 (W)INV. OUT 4998.27 (SE)69.08 LF 15" HP STORM PIPE
@ 0.50%
RIM ELEV 5000.83'
90.95 LF 4" PERF. PVC @ 0.20%
PROPOSED
GROUND
UNDER ROADWAY
FLOW FILL FROM
SPRINGLINE TO
PAVEMENT
4990
4995
5000
5005
5010
5015
4990
4995
5000
5005
5010
5015
9+7510+0011+00 5001.155001.5721.14 LF
8" HDPE
@ 0.40%AREA INLET 1-1.2STA 10+34.40RIM 5001.0±INV. OUT 4998.10 (S)AREA INLET 1-1.1STA 10+21.14RIM 5001.1±INV. IN 4998.05 (N)INV. OUT 4997.95 (S)13.25 LF
8" HDPE
@ 0.40%DRAINAGE BASIN 1-1STA 10+69.08RIM 5001.2±INV. IN 4998.10 (S)INV. IN 4997.86 (N)INV. OUT 4997.46 (E)EXISTING
GROUND
PROPOSED
GROUND
100-YR.
HGL STSTGGGEEEEESCCCCGCCVAULTELECC.O.CSEELECBRKRGGD6" SS6" SS6" SS6" SS6" SS6" SS4" W4" W4" W4" W4" W4" WSTSTWSSSSSSVSSVSSVWSVWSVFFEE EUDUDUDFDCGAREA INLET 1-1.2
STA 10+34.40
N: 128056.89
E: 193662.43
AREA INLET 1-1.1
STA 10+21.14
N: 128043.63
E: 193662.37
21.14 LF 8" HDPE @ 0.40%
13.25 LF 8" HDPE @ 0.40%
DRAINAGE BASIN 1-1
STA 10+69.08
N: 128022.49
E: 193662.28
STORM DRAIN LINE 1
SEE THIS SHEET- LEFT
SANITARY SERVICE LINE A
SEE SHEET OU1
90.95 LF 4" PERF. PVC @ 0.20%
SheetHOWES SIX TWO NINEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 15
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
( IN FEET )
1 inch = ft.
Feet03030
30
60 90
PROFILE SCALE:
STORM DRAIN LINE 1
PROFILE SCALE:
STORM DRAIN LINE 1-1
ST1 PLAN AND PROFILE STORM DRAIN LINE 1 AND 1-1 6
NORTH NORTH
EXISTING WATER MAIN
PROPOSED WATER MAIN
PROPOSED STORM SEWER
LEGEND:
NOTES:
W
EXISTING SANITARY SEWER SS
PROPOSED STORM INLET
PROPOSED CURB & GUTTER
PROPOSED SANITARY SEWER
PROPOSED FIRE HYDRANT
EXISTING FIRE HYDRANT
PROPOSED LOT LINE
PROJECT BOUNDARY
EXISTING RIGHT OF WAY
EXISTING STORM SEWER
EASEMENT LINE
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL
STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES UNLESS
OTHERWISE SPECIFIED.
3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND
STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF
FLARED END SECTIONS.
4.WHERE UNDER ROADWAY, STORM PIPE TRENCH TO BE FLOW-FILLED FROM PIPE
SPRINGLINE TO PAVEMENT DURING BACKFILL/PAVEMENT REPLACEMENT.
PROPOSED RIGHT OF WAY
PROPOSED TRENCH DRAIN
SheetHOWES SIX TWO NINEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 15
100 WATER MAIN TRENCH BEDDING
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
D1 UTILITY DETAILS 8
COMPACTED GRANULAR MATERIAL
CONFORMING TO CDDH #67
LOWER LIMIT OF
TRENCH WALL
SLOPING
INITIAL LIFT *
12 IN. MIN.
PIPE O.D.
4 IN. MIN.
TRENCH WIDTH AS SPECIFIED
IN SECTION 02221
COMPACTED GRANULAR MATERIAL
CONFORMING TO CDDH #67
*
BEDDING REQUIRMENTS
WW-1 FLOWFLOW FLOW
PIPE SPRINGLINE℄ SADDLE℄
S
A
D
D
L
E
PIPE
CROWN
45°45°
℄
STAINLESS STEEL CLAMPS
90° PVC SADDLE
PVC PIPE ADAPTER, USE
'FERNO COUPLING 445-401'
OR APPROVED EQUAL TO SEAL
SADDLE INSTALLATION LIMITS
TAPPING SADDLE
SERVICE INSTALLATION
101 1-1/2" AND 2" WATER METER INTERIOR
102 1-1/2" AND 2" WATER METER EXTERIOR
103 WATER SERVICE INSTALLATION
104 SANITARY SEWER TRENCH BEDDING
105 TAPPING SADDLE DETAIL
106 VALVE BLOCKING