Loading...
HomeMy WebLinkAboutBLOOM - PHASE 1 - PDP210014 - SUBMITTAL DOCUMENTS - ROUND 3 - VARIANCE REQUEST5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 •GallowayUS.com January 19, 2022 City of Fort Collins Engineering Department 281 North College Avenue Fort Collins, CO 80522 RE: Bloom Filing One – Delozier Road to International Blvd Connection (Centerline) Variance Dear Marc Virata, Galloway, on behalf of Hartford Homes and in support of the Bloom project currently under review, is providing the following written justification for the intersection/connection of the existing Delozier Road and the proposed International Boulevard per the request of the City of Fort Collins. A)Identification of the standard to be waived or varied and why the standard is unfeasible or is not in the public interest. A variance is requested for the connection of Delozier Road and International Blvd. The ultimate condition is to be a tee intersection between Delozier Road and International Blvd. This connection is on property that is not owned by Hartford Homes and cannot be obtained. This creates a long-term dead-end road for both Delozier Road and International Blvd. which provides no benefit to the public to own and maintain. These roads are classified as a collector and an arterial for which the minimum radii are 600’ and 1075’ respectively. B) Proposing Alternate Design. Identification of the proposed alternative design or construction criteria. The variance requested is to create an interim radius connection which is below the collector and arterial minimum standard radii allowing the public to use these roads. C)A thorough description of the variance request including impact on capital and maintenance requirements, costs, and how the new design compares to the standard. With this connection an inside radius of 100’ is provided which relates to a centerline radius of 125 feet. This will allow for the use of the roads while providing the least amount of removal or road, curb, gutter and sidewalk when the ultimate tee intersection is built. D) Justification. The Professional Engineer must determine and state that the variance will not be detrimental to the public health, safety and welfare, will not reduce design life of the improvement nor cause the Local Entity additional maintenance costs. The proposed plan (as varied) must advance the public purpose of the standard sought to be varied equally well or better than would compliance with such standard. The justification for this variance is to provide connectivity during the interim condition for the proposed development in addition to the existing Mosaic development. Residential local street sections are appropriate for ADTS up to 1500. The ADTS for the International Blvd to Delozer Road intersection Hartford Homes Bloom Filing 1 1/19/2022 Galloway & Company, Inc.Page 2 of 2 would be fewer than 1285. This would warrant a residential-to-residential connection in the interim condition for which the LCUASS detail 7-24 could be applied. LCUASS detail 7-24 states a minimum inside radius of 20-36’ is needed. With this connection an inside radius of 100’ is provided. There will be no additional Right of way requirements from these properties at the time of the ultimate International Blvd and Delozier Road construction as the Right of Way is being dedicated for the ultimate condition within the owned properties and the proposed area needed for the radial connection. The variance will not be detrimental to the public health, safety and welfare, will not reduce design life of the improvement nor cause the Local Entity additional maintenance costs. Sincerely, GALLOWAY James Prelog, PE Civil Engineering Project Manager JamesPrelog@GallowayUS.com cc: